Top Related
J.P.Delahaye CLIC @ ACE 16-01-08 1 CLIC A dvisory C ommitte E (ACE) Introduction to the CLIC Advisory Committee meeting (16-18/01/08) CLIC status, developments.
The CLIC alignment studies 1 CLIC workshop 16-18 October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
WG4 Detector Mechanics · 9/25/2018 · FUTURE DETECTOR MECHANICS NEEDS hh collisions e+e-collisions CLIC, FCCee, ILC, CEPC,… • Large dimensions (50m) • High radiation Level
CLIC power consumption B. Jeanneret CLIC Project meeting, Oct 2011 Clic Power, BJ, proj meet oct 20111.
A Demonstration of High- Gradient Acceleration W. Wuensch, C. Achard… · 2003. 5. 5. · A Demonstration of High- Gradient Acceleration W. Wuensch, C. Achard, S. Döbert*, H. H.
Introduction to CLIC and breakdown in rf structures W. Wuensch Breakdown physics workshop 6-5-2010.
Walter Wuensch, CERN CLIC Project meeting, 29 September 2015 X-Band: test stand and structure program.
CLIC Staged Design October 2012 D. Schulte for the CLIC collaboration.