Client
Project
Key Plan
Rev.
Project No. Date
Number
1858
Title
Reason ForIssueDate
Apple Campus 2
www.arup.comTel (415)957 9445 Fax (415)957 9096San Francisco,CA 94105 USA560 Mission Street,Suite 700
Arup North America Ltd.
00 08/09/11 Planned DevelopmentPermit
Apple Inc.
6DQWD &ODUD &DOLIRUQLD6FRWW%RXOHYDUG %XLOG
.,(5 :5,*+73KRQHZZZ NLHUZULJKW FRP
) D[.L
02/29/2012
N
01 11/04/11 Planning Revision
P1.22
Existing and PropoLandscape
Proposed Absorbent Landscape02 NTS
East Homestead Road
N o r
t h W o l
f e R o a
d
I n t e r s t a t e 2 8 0
N o r
t h T a n t a u
A v e n u e
Impermeable Area: 59.0 acres
Permeable Area: 114.0 acres
N o r
t h T a n t a u
A v e n u e
02 01/17/12 Planning Revision
03 02/29/12 Planning Revision
04 05/25/12 Planning Revision
7/31/2019 Intro Submittal 4
11/15
Client
Project
Key Plan
Rev.
Project No. Date
Number
1858
Title
Reason ForIssueDate
Apple Campus 2
www.arup.comTel (415)957 9445 Fax (415)957 9096San Francisco,CA 94105 USA560 Mission Street,Suite 700
Arup North America Ltd.
00 08/09/11 Planned DevelopmentPermit
Apple Inc.
6DQWD &ODUD &DOLIRUQLD6FRWW%RXOHYDUG %XLOG
.,(5 :5,*+73KRQHZZZ NLHUZULJKW FRP
) D[.L
02/29/2012
N
01 11/04/11 Planning Revision
P1.23
Existing and PropoTrees
Proposed Trees02 NTS
Proposed Trees: 6146Standard Trees to Remain: 850Specimen Trees to Remain: 04
Total Trees: 7000See P7.02 and P7.03
*Note: Tree #1034 Memorial English Oak will be transplanted. If it does not survive it will be replaced by another specimen oak.*Note: 108 new specimen trees will replace the 54 specimen trees to be removed at a rate of 2 trees for every 1 removed.
East Homestead Road
N o r
t h W o l
f e R o a
d
I n t e r s t a t e 2 8 0
N o r
t h T a n t a u
A v e n u e
N o r
t h T a n t a u
A v e n u e
02 01/17/12 Planning Revision
03 02/29/12 Planning Revision
04 05/25/12 Planning Revision