NA FIS TD UPDATE 2010 3
Equipment Race Level: NorAm Cup
Sys Timer ASys Timer BStart GateFinish Cell AFinish Cell B
• Brand Name • Model or Type• Serial Number
• Homologation #
NA FIS TD UPDATE 2010 5
Software
Software &ResultsPreparation
BrandVersionDateResults=Tapes
dTrisRev. 1.99-1.448/8/2008yes
NA FIS TD UPDATE 2010 7
Check BEFORE the race(before Arrival at the venue)
Connections
How do we communicate signals/data from Start to Finish?
How is voice communication handled between Start and Finish?
CableRadioSnowmobileSki LiftSkier??
NA FIS TD UPDATE 2010 9
Warm-up and Synchronization
At what time is the run scheduled to start?
--Is there a rule about Synchronization?
--What is the minimum recommended warm up time?
Is there a Maximum?
NA FIS TD UPDATE 2010 12
Synchronization and Synch + 1 Minute
• Are Systems A and B synchronized?
– How close are they?
• What is the maximum difference acceptable?– So what?• What about Hand Times?
– So what?
NA FIS TD UPDATE 2010 22
Start Posts and RampsName the Problems
Wiring should be neat and not easily disturbed
Start should not easily obstruct the athlete and should be closer to the start posts
Start Posts Should be closer to the break over
Some kind of crowd control to separate the start area from the preparation area
Separation between end of wand and start post
NA FIS TD UPDATE 2010 24
What’s the Race Level?Finish Photocells, Posts and Areas
World Cup Regional FIS
NA FIS TD UPDATE 2010 26
Name the ProblemsFinish Photocells, Posts and Areas
Regional FIS
Fiberglass Start Posts(they last a long time, but OUCH)
No Notches
Horizontal Separation
No Finish Line
Metal Spool mounted on metal stake behind finish pad