Project Documentation Document TN-0102
Revision E
Instrument Control System Design
John Hubbard Software
March 2017
Instrument Control System Reference Design
TN-0102, Rev E Page ii
REVISION SUMMARY:
1. Date: January 28, 2010 - July 18, 2011
Revision: Drafts 1-12
Changes: Created. Added ICS sequence diagrams, instrument adapter thoughts and general
thoughts on various sections. Multiple design updates. Fixed page printing problem, organized
document according to interface layer and SIF. Added deployment diagrams and mock-up ICS
GUI. Removed references to Synchrobus. Updated so there are 4 modulator parameters.
Corrected data type of modT0. Updated categories of instrument parameters. Updated TRADS,
modulator attribute names, headers and VC meta-data. Removed sections on SIF and Database
Services.
2. Date: August 2, 2011
Revision: A
Changes: Minor updates regarding modulator attributes, headers and TCS attributes. Final
updates prior to release for review.
3. Date: September 1, 2011
Revision: B
Changes: Fixed mistake in compliance matrix, minor update to 3.1.7 (Synchronization) and
addition of 3.1.8 (Coordination) based on David’s comments.
4. Date: May 2012
Revision: Draft C1
Changes: Updated design to reflect new version of SPEC 23.
5. Date: February 2014
Revision: Draft C2
Changes: Incorporated Science Feedback
6. Date: July 2014
Revision: C
Changes: Updated after the creation of the ICS DRD. Released for HLS FDR.
7. Date: October/November 2016
Revision: D
Changes: Input from Science and additional updates to reflect ICS zsh-release as-built.
8. Date: March 2017
Revision: E
Changes: Changed tense to reflect as-built; updated UI section.
Instrument Control System Reference Design
TN-0102, Rev E Page iii
Table of Contents
1. OVERVIEW ........................................................................................................... 1
1.1 REFERENCES.......................................................................................................... 1 1.2 ABBREVIATIONS ...................................................................................................... 1 2. BASIC OPERATION.............................................................................................. 2 2.1 ICS CONTEXT ......................................................................................................... 3 3. DESIGN OVERVIEW ............................................................................................ 4
3.1 OBSERVATION MANAGEMENT SYSTEM ...................................................................... 4 3.2 INSTRUMENT ADAPTER ............................................................................................ 4 3.3 RENDEZVOUS ......................................................................................................... 5 3.4 TIME REFERENCE DISTRIBUTION SYSTEM ................................................................. 5 3.5 THE ICS USER INTERFACE (GUI) ............................................................................. 5
3.6 HARDWARE REQUIREMENTS .................................................................................... 5 3.6.1 ICS Deployment ............................................................................................................. 6 3.6.2 ICS Early Performance Numbers .................................................................................... 6 4. OMS DETAILED DESIGN ..................................................................................... 8 4.1 OMS INTERFACES .................................................................................................. 8 4.1.1 OMS to OCS Interface .................................................................................................... 8 4.2 OMS IMPLEMENTATION ......................................................................................... 13
5. IA DETAILED DESIGN ........................................................................................ 15 5.1 INSTRUMENT ADAPTER INTERFACES ....................................................................... 15 5.1.1 OMS to Instrument Adapter Interface ............................................................................15 5.2 IA IMPLEMENTATION .............................................................................................. 15
6. RENDEZVOUS DETAILED DESIGN .................................................................. 17 6.1 RENDEZVOUS SERVICE INTERFACES ....................................................................... 18 6.1.1 Rendezvous Helper API ................................................................................................18 6.1.2 Helper to Rendezvous Component Interface .................................................................18 6.2 RENDEZVOUS SERVICE IMPLEMENTATION ............................................................... 19 6.2.1 Rendezvous Component Implementation ......................................................................19 6.2.2 Rendezvous Callback Implementation ...........................................................................19 6.2.3 Rendezvous Access Helper Implementation .................................................................19 6.2.4 Rendezvous Adapter Implementation ............................................................................20 6.2.5 Rendezvous Events .......................................................................................................20 7. UI DETAILED DESIGN ........................................................................................ 21 8. TESTING ............................................................................................................. 22 9. UML DIAGRAMS ................................................................................................. 24
Instrument Control System Reference Design
TN-0102, Rev E Page 1 of 24
1. OVERVIEW
This document describes the design of the Instrument Control System. It is written for two different
audiences: reviewers and implementers/maintainers. Both groups of readers should have a grasp for the
overall design of the DKIST High Level Software (HLS). This includes knowing of the four principal
system are (OCS, ICS, TCS and DHS), understanding the frameworks on which the principal systems
have been implemented (CSF and Base) and a basic understanding of how Experiments and Observations
will be carried out at the DKIST. If you are not familiar with the above, you are urged to read the
referenced documents before beginning to read this document.
The DKIST Instrument Control System (ICS) is the principal system responsible for the operation of the
DKIST facility instruments. It is a layer of software between the Observatory Control System (OCS) and
the instruments that implements a simple control interface for the instruments and relieves the OCS of the
burden of managing the instruments themselves. The ICS responds to OCS commands and events,
coordinating and distributing them to the various instruments. The ICS presents a single narrow interface
to the OCS, while synchronizing and coordinating the actions of the instrument controllers underneath it.
1.1 REFERENCES
The following documents are used or referenced in this document:
1. SPEC-0013, Software Concepts Definition.
2. SPEC-0022, Common Services Framework Software Design.
3. SPEC-0023, Instrument Control System Specification.
4. SPEC-0036, Operational Concepts Definition.
5. SPEC-0063, Interconnect and Services Specification Document.
6. SPEC-0113, Facility Instrument Interface Specification.
7. SPEC-0122, DKIST Data Model.
8. TN-0064, Observatory Control System Reference Design Study and Analysis
9. TN-0088, Base Software for Control Systems.
10. TN-0152, The Standard Instrument Framework.
11. ICD 3.1.4-4.2 ICS to OCS
1.2 ABBREVIATIONS
The following abbreviations are used within this document:
1. ATST- Advanced Technology Solar Telescope
2. BDT- Bulk Data Transport
3. CSF- Common Services Framework
4. DHS- Data Handling System
5. DKIST – Daniel K. Inouye Solar Telescope
6. IA- Instrument Adapter
7. ICS- Instrument Control System
8. OCS- Observatory Control System
9. TCS- Telescope Control System
Instrument Control System Reference Design
TN-0102, Rev E Page 2 of 24
2. BASIC OPERATION
The interface between the OCS and ICS1 is configuration-based and essentially stateless. Commands
from the OCS, ICS engineering GUI (or any outside actor) are submitted to the ICS top-level controller
(atst.ics), using DKIST CSF Configuration objects. Configurations are used to send the appropriate
observing parameters to the instruments. These configurations contain information about the Experiment
and Observing Program IDs, Observing Task, list of instruments participating in the experiment (the
active instrument list), a list of those instruments who control the pacing of the observation, parameters
for each of the instruments, and information about the state of the telescope. These configurations and the
Actions that they cause are referred to as Task Groups (see OCS/ICS ICD for more details). The ICS
passes the relevant portion of the Task Group to each instrument2. The interface to the instrument is also
an essentially stateless configuration-based interface. After the ICS has submitted the configuration to the
instruments it awaits their completion. As the instruments complete the ICS compares the completed
instruments against the pacing instruments. When all pacing instruments have finished the ICS cancels
the rest. When all instruments have reported completion, the ICS notifies the OCS. While the above is a
good summary of the behavior, the actual logic associated with canceling non-pacing instruments is
somewhat more complicated. It is formally defined in the SPEC-0163 the ICS Design Requirements
Document; specifically requirements 20070, 20080 and 20090.
The ICS (with help from the Instruments) supports a two-pass approach for carrying out Instrument
Programs. The first pass is intended for setup. The instrument is given an IP along with a flag indicating
that the TCS is not configured. In the first pass the instrument is expected to fetch its script and prepare
for the upcoming observation and return. The assumption is that the instrument will be re-issued the
same IP a second time, but with a flag indicating that the TCS is configured. At this point the instrument
picks up where it left off and begins the data collection phase of the observation. Most of this capability
is provided within Instrument Controller, but the ICS does need to be aware that the pacing instrument list
only applies when the TCS is configured and the instruments are collecting data.
It should be pointed out that while the assumption is that the OCS sends two copies of each Task Group
to the ICS, the first Configuration tcsConfigured is false and the second it is true, there is no
requirement that the OCS send Task Groups in this manner. Because the entire contents of the Task
Group are always sent down, the ICS is always capable of ‘doing what its told’ and will never end up in a
broken state. This means that if the OCS were to only send a Task Group with tcsConfigured=true
the ICS would accept such a configuration and pass it along to the instruments for immediate execution.
Conversely if the ICS receives a Configuration with tcsConfigured=false followed by another
Configuration with tcsConfigured=false and a set of different parameters (e.g. different Instrument
Programs) the ICS would queue the IPs from the new TG. After the instruments return from setting up
for the now defunct IPs the ICS will pass IPs from the new Task Group to the instruments. The
instruments are responsible for 'discarding' the pre-configure state from the first Task Group's IP when the
new Task Group's IP arrives.
1 See ICD 3.1.4-4.2 ICS to OCS for the formal definition of this interface. 2 See SPEC-0113 Facility Instrument Interface Specification for the formal definition of this interface.
Instrument Control System Reference Design
TN-0102, Rev E Page 3 of 24
2.1 ICS CONTEXT
OCS
OMS
VBI BLUE
IA
VBI RED
IA
VISP
IA
DL NIRSP
IA
CR NIRSP
IA
VTF
IA
ASI
IA
VIS INST
IA
VBI BLUE IC VBI RED IC VISP IC DL NIRSP IC CR NIRSP IC VTF IC ASI IC VIS INST IC
Engineering GUIICD 3.1.4/4.2
Summit Database
ServicesTRADS
ICS Interface Layer
SPEC-0113 Facility Instrument Interface Specification
Summit Database
Services
Rendezvous
Controller
Figure 1: A block diagram of the Instrument Control System, illustrating the main components, the Observation
Management System (OMS), the Instrument Adapters (IAs) and the Rendezvous Controller. The diagram also shows the
Instrument Controllers (ICs), the Time Reference and Distribution System (TRADS), and the Database Services. The
database services are provided by the OCS for all high-level software entities at the summit. The Instrument Controllers
are provided by the respective instruments. Also shown in blue is the ICS-provided ICS Engineering Graphical User
Interface.
Instrument Control System Reference Design
TN-0102, Rev E Page 4 of 24
3. DESIGN OVERVIEW
The DKIST Instrument Control System (ICS) is the principal system responsible for the coordination of
instruments within the DKIST Facility. It is a layer of software between the OCS and the instruments. It
implements a simple control interface for the instruments and relieves the OCS of the burden of managing
them. The ICS responds to OCS commands, coordinating and distributing them to the various
instruments as required. The ICS presents a single narrow interface to the OCS, while synchronizing and
coordinating the actions of the instrument controllers underneath it. The ICS comprises the software and
hardware required to implement these control systems.
The ICS requires no specific knowledge about the instruments to be controlled. All information about the
instruments used in an experiment and their parameter settings is passed by the OCS through the ICS,
which uses the instrument list to extract and forward the parameters to the appropriate instrument
controllers (ICs). All ICs, which do have detailed knowledge about their underlying instruments, use the
same standard narrow interface. This allows new instruments to be added without having to modify the
interface or any existing ICs. If an instrument implements the Facility Instrument Interface it can be
controlled by the ICS. This is true for both facility instruments as well as visitor instruments.
The ICS consists of two main components: the Observation Management System (OMS), which provides
the interface to the OCS, and a set of Instrument Adapters (IAs), which provide a standardized interface
between the OMS and their respective Instrument Controllers. A context diagram illustrating the
structure of the ICS is shown above in Figure 1.
The ICS is constructed using the DKIST Common Software Framework without the need for any
additional third party libraries. This means that the ICS makes use of CSF’s event and connection
services for communications and CSF’s log service to log pertinent state changes, errors and information
necessary for the reconstruction of instrument operations. Because the ICS is built on top of the CSF and
relies on the command action response model the ICS provides a non-blocking interface for command
submission. The ICS makes use of CSF’s Property and Application Databases for application
persistence. As per the CSF standards the ICS uses Ethernet control over the LAN. By using CSF and
following the best practices for Configuration construction the ICS automatically gains configuration
traceability. The ICS relies on its host OS to provide it with time. Because the ICS runs on the standard
CSF Linux distribution this will be UTC. It is constructed following typical Best Software Practices,
including not requiring the system to reboot/restart. The ICS application is able to start in under a minute
as is typical with other CSF applications.
3.1 OBSERVATION MANAGEMENT SYSTEM
The Observation Management System (OMS) manages instruments as part of an ongoing experiment. It
is the role of the OMS to provide an interface between the OCS and the instruments involved in an
experiment. The OMS is a control layer between the experiment management of the OCS and the
individual instrument control systems and the operation of the instrument mechanisms. The OMS is
responsible for organizing the instruments required by an OCS Observing Program, sending instrument
parameters to them, and collecting and returning their completion states. The OMS is also responsible for
canceling some instruments (non-pacing instruments) when others (pacing instruments) have completed
their observations. The OMS also provides a location for canceling/aborting the ICS’s portion of an
Observing Program. See Section 4: OMS Detailed Design, for details about the OMS.
3.2 INSTRUMENT ADAPTER
As shown in Figure 1, there is a Controller called an Instrument Adapter (IA) between the OMS and each
Instrument Controller (IC). Instrument Adapters are responsible for queuing Instrument Programs for
their associated Instrument Controller. The primary reason for IAs being standalone controllers is the
Instrument Control System Reference Design
TN-0102, Rev E Page 5 of 24
modularity that it provides. Breaking the IA functionality into a separate Controller/Class allows the
OMS to focus on the logic behind completion and canceling non-pacing instruments, while the IA
handles all of the queuing of IPs. The Instrument Adapters also make canceling/aborting an instrument’s
entire IP queue simpler. Finally the Standard Instrument Adapter could be replaced with a custom
adapter to support visitor instruments. The Standard Instrument Adapter is capable of interfacing to any
instrument implementing the Facility Instrument API. This means that for all first light instruments the
same Controller class is used.
See Section 5: IA Detailed Design, for details about the Instrument Adapters.
3.3 RENDEZVOUS
The ICS provides a loose synchronization service for instruments. The Rendezvous Services provides an
API for entities to call to request a ‘common’ time. The entities wishing to rendezvous tell the service
which other entities they want to rendezvous with and then await notification from the service that all
other entities are ready. Supporting this service is a CSF Component (managed by the OMS) that listens
for rendezvous events and provides a rendezvous time when all entities are ready. The Rendezvous
Service is only a service. Instrument Scripts must be developed to use the service in order to actually
achieve loose synchronization.
3.4 TIME REFERENCE DISTRIBUTION SYSTEM
The Time Reference Distribution System is responsible for distributing the common time to all interested
entities within the DKIST telescope. It consists of a Grand Master Clock, which receives a GPS time
reference, and then distributes the time reference throughout the observatory via IEEE-1588 Precision
Time Protocol (PTP), and as an NTP Stratum 1 Server.
3.5 THE ICS USER INTERFACE (GUI)
The ICS Engineering UI consists of two parts. The first part is a standalone GUI through which Task
Groups may be constructed, and submitted to the ICS. It is meant for engineering use only, primarily to
test the ICS in the absence of the OCS and for debug purposes. The second part is a status monitoring
‘panel’ that can be embedded within other GUIs (e.g. the OCS). This panel allows for monitoring of
ongoing observations, and the ability to cancel/abort elements of those observations. The panel is
embedded within the OCS GUI and appears in the ICS standalone GUI. Both elements are implemented
using Java Engineering Screens (JES).
3.6 HARDWARE REQUIREMENTS
The ICS proper consists of a single host located in a rack in the Computer Room (located adjacent to the
Control Room). The host may be either a physical machine, or a virtualized environment. The ICS host
consists of at least 4 GB of RAM, and at least 16 apparent x86_64 COTS processing cores running
CentOS Linux 7 or newer (e.g a 1U ASLab Lancelot 1890 with one Xeon E5-v3 2630 CPU & 4x8GB
RAM.) A development machine with a similar configuration has no problems booting in under 4
minutes. Changes to this specification are likely as processor technology and CSF evolve. The
development machine has shown itself to be powerful enough that it never rises above 50% CPU or disk
utilization. The systems are interconnected to the DKIST control network as described in SPEC-0063,
Interconnects and Services Specification Document. Power, cooling, and inter-host communications are
provided by DKIST.
The ICS GUI runs on a single host located in the DKIST Control Room. The host is a physical machine,
consisting of at least 16GB of RAM, and at least 16 apparent x86_64 processing cores running CentOS
Linux 7 with the Gnome Desktop Manager. (e.g. an ASLab Marquis C531 with a Core i7-5960X).
Changes to this specification are likely as processor technology and CSF evolve. The systems are
Instrument Control System Reference Design
TN-0102, Rev E Page 6 of 24
interconnected to the DKIST control network as described in SPEC-0063, Interconnects and Services
Specification Document. Power, cooling, and inter-processor communications are provided by DKIST.
3.6.1 ICS Deployment
A deployment diagram for the ICS is shown in Figure 2. The OCS and the Instrument Hosts are shown
for context. All communications between nodes in the diagram use either the CSF connection service
(point-to-point) or the CSF event service (publish-subscribe) over Ethernet (TCP/IP). The OCS and ICS
are shown deployed in separate nodes, but it may be possible to deploy them in the same node. This will
be determined during construction. The OCS and ICS node(s) will be located in the DKIST computer
room. The Instrument Hosts and their Instrument Controllers are shown as separate nodes. It is assumed
that each instrument will have its own host, installed under the Coudé Lab floor but (by virtue of CSF) the
ICS is agnostic to instrument deployment.
OCS Server
OCS
CSF Services
DB
Event
Connection
GUI Station
ICS GUI
Inst Host
instIC
Inst Host
instIC
ICS Server
OMS
vbiRedIA
vbiBlueIA vispIA
vtfIAdlNirspIA
cryoNirspIA
Rendezvous
Figure 2: A deployment diagram of the ICS interface showing the OMS and Instrument Adapters and the some of the
other systems of interest.
3.6.2 ICS Early Performance Numbers
Early prototyping of the ICS has allowed for the gathering of some performance numbers. These include
things like how long the ICS takes to start up, how quickly it can turn accept a Task Group, query the
Instrument Program DB, and pass the IP off to the Instrument. It is important to remember that the test
system does not accurately reflect the final environment that the ICS runs in. Thus even though the
system used for testing was likely slower (slow HDD, slow CPU) there were other advantages (e.g. DBs
likely had less load).
Instrument Control System Reference Design
TN-0102, Rev E Page 7 of 24
ICS Startup: The script used to start the ICS takes about 20 seconds to run. Approximately 5 seconds of
the time is spent starting up the Jython Environment and CSF context that the script runs under. The time
that the startup script actually spends starting the ICS container, and its components, is approximately 15
seconds. This includes deploying and starting the ICS container (starting the JVM process) and
transitioning the ICS proper, 5 instrument adapters, and the Rendezvous component into the running state.
At this point the ICS is ready to begin accepting configurations. Even if the databases were being
particularly hard hit by other systems it seems unlikely that it would impart a 40 second delay into
starting the ICS. Thus the 1 minute startup requirement should be easily met.
ICS TG to IP turnaround time: From a general observational efficiency perspective the most interesting
number is probably the time that it takes the ICS to take a submitted Task Group and perform the
Instrument Program DB lookup, place the IP into a configuration and submit it to the Instrument. Early
testing shows that given a Task Group with three instruments, two IPs per instrument the time between
the submit of the TG and the receipt of the IP at the last instrument was 61 milliseconds. The IPs used for
testing were trivial, and while a larger IP would take longer to transfer from the DB it should not have a
significant impact on the overall time.
ICS completion detection time: After the time it takes to start the IPs associated with a TG the next most
interesting number is probably how long it takes the ICS to realize that an instrument is done and respond
accordingly. There are three cases here 1) the time it takes the ICS to detect an IP is complete and submit
the next IP in an IP Sequence to the instrument, 2) the time it takes the ICS to realize that all pacing
instruments are done, and issues cancel commands to the remaining instruments, 3) the time it takes the
ICS to realize that all instruments are done with all IPs and report out its public interface that it is done.
Using the same TG configuration described above (with a single pacing instrument) it took the ICS 27
milliseconds to detect the completion of an IP and feed the next IP in the sequence to the instrument. It
took the ICS 14 milliseconds to detect that the pacing instrument was complete and issue cancels to the
non-pacing instruments. Finally, it took the ICS 17 milliseconds to detect the completion (canceled) of
the last instrument and report its completion. Note that these tests were carried out using test instruments
and do not take into account any instrument overhead. If an instrument were to take a second to detect its
own completion than the ICS’s completion detection would be actually come 1 + 0.017 =1.017 seconds
after the IP was truly done.
Instrument Control System Reference Design
TN-0102, Rev E Page 8 of 24
4. OMS DETAILED DESIGN
This section describes the design of the Observation Management System in more detail, with an
emphasis on the CSF constructs used. The OMS is the interface between the OCS and the Instrument
Adapters, which provide a standard interface to the instruments.
4.1 OMS INTERFACES
The OMS has two major interfaces: the main command interface to the OCS and an interface to each of
the Instrument Adapters. The OMS-OCS interface is discussed in detail in ICD 3.1.4/4.2 Instrument
Control System to Observatory Control System; it should be used as the primary reference for the
interface. The details of the OMS IA interface as discussed in the MAN-0006 Instrument Control System
Manual appendix. Only a brief overview of the interface is described here.
4.1.1 OMS to OCS Interface
The OMS/OCS interface is formally described in ICD 3.1.4/4.2, Instrument Control System to
Observatory Control System. Only a brief summary of the key concepts of the interface is provided here.
The OMS is the top-level interface of the ICS and is registered in the DKIST connection service under the
name atst.ics. Instrument Controllers under the OMS are given similar hierarchical names, such as
atst.ics.vbiBlue for the Visible Broadband Imager Blue instrument controller.
The OMS is the top-level master controller for the ICS, responsible for coordinating and synchronizing
the actions of the instrument controllers below it. Each instrument in the system is given a name in the
hierarchy of the ICS; for example:
atst.ics # Top-level ICS controller (the OMS)
atst.ics.visp # Visible Spectropolarimeter (ViSP) Instrument Controller (IC)
atst.ics.vbiRed # Visible Broadband Imager Red (VBI red) IC
atst.ics.vbiBlue # Visible Broadband Imager Blue (VBI blue) IC
atst.ics.vtf # Visible Tunable Filter (VTF) IC
atst.ics.dlNirsp # Diffraction-limited Near-IR Spectropolarimeter (DL-NIRSP) IC
atst.ics.cn # Cryogenic Near-IR Spectropolarimeter (Cryo-NIRSP) IC
atst.ics.asi # A Simple Instrument (ASI) IC
The OMS is implemented as a subclass of the DKIST CSF ManagementController, implementing the
full set of technical lifecycle commands and the functional Command-Action-Response model for
commands, as described in SPEC-0022-1, Common Services Framework User’s Manual. This will be
discussed in more detail in the sections that follow.
All communication of commands from the OCS to the OMS is via CSF configurations. The OMS parses
and interprets the configurations, extracting the appropriate portions and sending them to the
corresponding Instrument Controllers, via the Instrument Adapter. The OMS then monitors the
instrument controllers for completion and sends status information back to the OCS.
4.1.1.1 Task Groups
The fundamental unit of work that the OCS sends to the ICS is the Task Group. It consists of a list of
instruments, parameters for those instruments, the telescope status, and some observation metadata. From
the ICS perspective there are two different kinds of Task Groups: Configure, and Execute. Both Task
Groups contain all of the same information, but in a TG-Configure the tcsConfigured flag is false.
This indicates that the telescope has not yet achieved its target state. In a TG-Execute the
Instrument Control System Reference Design
TN-0102, Rev E Page 9 of 24
tcsConfigured flag is true, indicating that the TCS has achieved its target state, and the observation
may commence.
The general sequence of commands is expected to be similar to the following:
The OCS sends all parameters for a Task Group in one CSF configuration. The OMS extracts the
parameters relevant for each instrument and then sends the parameters (as Configurations) to the
appropriate instruments via the Instrument Adapters. This activity is assumed to begin while the
TCS is still moving into position (i.e. the initial Task Group is a TG-Configure). The OMS
monitors the progress of the Instrument-Program Configurations being executed by the various
Instruments and reports the status, including final completion, to the OCS using the standard CSF
Action/Response callback mechanism.
When the TCS has reached its target state, the OCS sends the corresponding TG-Execute. The
OMS forwards the relevant Task Group information to all active instruments. The instruments
begin their observations as soon as they have individually finished their setups. The OMS
monitors the completion progress of the configurations and reports back the status, including final
completion to the OCS.
After the TG-Execute has been sent, the OCS may send the next TG-Configure to the OMS. The
parameters in these configurations are sent to the appropriate instruments as soon as possible,
allowing the instruments to setup for the next observation as soon as they have completed the
current observation. Having the next TG-Configure waiting in the queue is referred to as pre-
configuration.
The OMS monitors the completion status of the observation actions started with TG-Execute.
When all of the instruments that are required to complete their observations for this Task Group
(the pacingInsts set) have completed their observing actions, the OMS terminates the
observing activities of the remaining instruments participating in the observation and sends the
final completion callback to the OCS. See the discussion in Section 4.4 of the ICS/OCS ICD
regarding the activeInsts and pacingInsts sets for further details.
Additional observations are executed by repeating the pattern described above. This process
repeats until all the observations for an experiment are completed or the experiment is cancelled
or aborted by the operator.
4.1.1.2 OCS/TCS/ICS Interactions:
In general, the OCS sends configurations to both the OMS and the TCS when setting up for a new
Experiment or Observing Program. The OMS immediately begins configuring all the participating
instruments while the TCS is processing its configuration. After the TCS is configured (in position), the
OCS sends a TG-Execute configuration to the OMS. The OMS forwards relevant parts of the Task
Group to the participating instruments to indicate that they may start their observing activities.
There are two variations to this process depending on whether pre-configuration is requested or not. The
remainder of this section discusses these variations in more detail and presents sequence diagrams and
descriptions for each.
The first example shows a sequence of two Observations without pre-configuration. The sequence
diagram is shown below in Figure 3.
1. At the start, Configurations are sent to both the OMS (cfg1a) and the TCS (cfg1b) (shown in red
lines). The TCS is receiving its demand state. The OMS is receiving a TG-Configure.
2. The OMS assigns the command to one of its action threads (OMS T1 in this case). The action
thread parses the configuration and sends the appropriate portions to the Instrument Adapters of
Instrument Control System Reference Design
TN-0102, Rev E Page 10 of 24
the participating instruments (the ViSP and VBI in this example). The TCS begins processing its
configuration as well, setting up for this observation.
3. The Instrument Adapters forward the configurations on to their instruments, which begin their,
configure actions. When the configure actions are complete, the instruments respond to their IA’s
with a done. The IA’s then respond to the OMS with done.
4. Both the TCS and OMS respond with done callbacks to the OCS when their actions are complete,
done cfg1a for the OMS and done cfg1b for the TCS. In this particular case, the OMS completes
before the TCS.
5. When the TCS action completes, the OCS sends a TG-Execute Configuration to the OMS (cfg1x,
shown with blue lines). The OMS assigns this command to the next available action thread
(OMS T1 in this case). The action thread passes the command on to the Instrument Adapters,
which are idle3, and begin processing it immediately.
6. Each instrument starts its observing actions as soon as it receives its part of the TG-Execute.
Upon completion, it responds with a done callback to the IA, which in turn responds to the OMS
with done.4
7. When all instruments have finished their actions (successfully, canceled, or with errors), the OMS
reports the completion status to the OCS (done cfg1x).
8. Once the Observing Task is complete, the OCS sends configurations for the next Task Group to
both the OMS (cfg2a) and the TCS (cfg2b), and the entire process begins again. In this case, the
TCS action is shorter than before and the VBI is still busy processing the setup configuration
when the TCS issues the tcsConfigured command (cfg2x). As a result, the command is
queued at the Instrument Adapter until the VBI completes its setup and is ready to begin
observing. The dashed yellow line in the VBI IA thread indicates the queuing. Note that the
ViSP has completed its setup actions by the time the tcsConfigured command arrived, and is
able to start its observing actions immediately.
9. The OCS sends the tcsConfigured command as soon as possible, regardless of whether the
instruments have completed their setup actions. This allows instruments to begin their observing
actions as soon as they are ready, not having to wait for any other instruments to complete their
setups before proceeding and helps to maximize efficiency.
3 If the TCS had finished first, the Instrument Adapters would queue the TG-Execute on a per-IA basis. As soon as
the instrument was available, it would begin carrying out its portion of the Task Group. The assumption is that long
instrument configurations are the exception rather than the rule. 4 If there is a desire to start the instruments at the ‘same’ time there are a few approaches for supporting this but they
rely on behavior outside of the control of the ICS. One option would be for an OP script to wait until the TG-
Configure completes before submitting the TG-Execute; such an OP script should generally result in all IP Scripts
beginning their execute phase to within a few 10s of milliseconds. Another option would be for instruments to
internally rely on the Rendezvous Service to obtain a common reference time; this is dependent on support within
any Instrument Programs, but if present may result in data collection being synchronous to sub millisecond level.
Instrument Control System Reference Design
TN-0102, Rev E Page 11 of 24
Figure 3: A sequence diagram showing the interaction between the OMS, TCS, OMS and instruments for a typical
observing sequence. In this case there is no pre-configuration.
OCS TCS ICS OMS OMS T1 VISP IA VISP T1 VBI IA VBI T1OMS T2cfg1a, cfg1b
done cfg1b
do conf
done
do conf
done
move
move
data
cfg1a
done cfg1adone cfg1a
cfg1a
cfg1x cfg1x cfg1x
data
done vbi
done
done
do exp
done visp
done visp
done cfg1x done cfg1x
done vbi
do exp
cfg2a, cfg2b
done cfg2b
do conf
done
do conf
done
move
cfg2a
done cfg2adone cfg2a
cfg2a
done visp
done vbi
cfg2x cfg2x
done cfg2x
cfg2x
datadone
do exp
data
done
do exp
done cfg2x
done visp
done vbi
move
Instrument Control System Reference Design
TN-0102, Rev E Page 12 of 24
The second example, shown in Figure 4, examines the effect of using pre-configuration, in which the
OCS sends configurations to the OMS as soon as possible. This allows instruments to configure
themselves for the next Observing Task as soon as they have completed their current observing activities,
maximizing the efficiency of the system. The sequence diagram for this scenario is shown above in
Figure 4. This is similar to the first example except that the TG-Setup configuration for the next
observation (cfg2a) is sent immediately after the first TG-Execute configuration (cfg1x). The OMS
immediately sends this configuration to the IAs, where they are queued until the previous configurations
have completed. The VBI begins to act on cfg2a as soon as it completes its first observation (cgf1x),
while the ViSP is still acquiring data. This allows the VBI to begin its configuration activities sooner
than in the previous example, where it had to wait idly for the ViSP to finish its observing activities
before it could act on cfg2a.
Figure 4: A sequence diagram showing the interaction between the OMS, TCS, ICS and instruments using pre-
configuration. Notice the use of the third action thread and the queuing of configurations in the IAs.
No special software is required to implement pre-configuration. It is achieved by the OCS sending
configurations as soon as possible and by using only a single action thread in the IAs so that the incoming
configurations get queued when the IA is busy. Note that even though the IA will queue multiple
configurations, direct access to the instrument is still available through the Instrument Engineering GUI.
The Instrument GUI connects directly to the Instrument Controller, which is below the IA, and is multi-
threaded. The Instrument Controller is not shown in the sequence diagram.
OCS TCS ICS OMS OMS T1 VISP IA VISP T1 VBI IA VBI T1OMS T2cfg1a, cfg1b
done cfg1b
do conf
done
do conf
done
move
move
data
cfg1a
done cfg1adone cfg1a
cfg1a
cfg1x cfg1x cfg1x
data
done vbi
done
done
do exp
done visp
done visp
done cfg1x done cfg1x
done vbi
do exp
cfg2b
done cfg2b
do conf
done
do conf
done
move
cfg2a
done cfg2adone cfg2a
cfg2a
done visp
done vbi
cfg2x cfg2x
done cfg2x
cfg2x
datadone
do exp
data
done
do exp
done cfg2x done visp done vbi
move
cfg2a
Instrument Control System Reference Design
TN-0102, Rev E Page 13 of 24
A minimum of two action threads in the OMS is required to implement the desired behaviors illustrated
above. However, different scenarios may require more action threads: sending multiple setup
configurations or sending a pre-configuration before the current setup configuration is complete. In order
to support these scenarios, the OMS should use a grow-able thread pool for its tasks.
4.2 OMS IMPLEMENTATION
The OMS is implemented in CSF as an extension of the ManagementController class, which is
defined in the Base Software extensions to CSF (TN-0088, Base Software for Control Systems). The
OMS manages just the lifecycle of the Rendezvous Component (as components have no actions to
manage) and both the lifecycle and actions of the Instrument Adapters. It reads its list of Instrument
Adapters from the Property Database during initialization. During operation, it parses incoming
configurations, extracting and forwarding the appropriate portions to each controller in its assigned
controller list. It monitors completion of the subordinate configurations and responds with a completion
callback to the configuration source.
The Management Controller defined in the CSF Base Software is extended to add the following
functionality to implement the OMS:
The OMS keeps a list of all Task Groups that are currently running or queued to it, and what their
statuses are.
The doSubmit() method is overridden to verify that all of the required attributes are present and
the configuration is valid. The doSubmit() method is responsible for rejecting nonsensical
configurations (e.g. has Observing Program ID, but missing experiment ID), and warning about
valid but potentially incorrect configurations (e.g. IP information present for an instrument that is
not in the active instruments list). See the OCS/ICS ICD for details on valid vs. invalid
Configurations. The amount of validity checking here is kept to a minimum to ensure that the
ICS is capable of accepting or rejecting commands submitted on its public interface within 0.1
seconds.
The localDoAction() method is overridden to add the newly started Task Group to the end of
the Task Group List, and to verify that the active instruments are online before starting an
observation.
The makeWorkerConfig() method is overridden to forward all global attributes (experiment
meta-data and Telescope information) and the IP information to all of the instrument adapters. It
additionally forwards all instrument specific attributes to the appropriate Instrument Adapter.
The oneDone() method is updated in order to update the task group’s status (e.g. marking
instruments that have completed as done/aborted) and to determine when to cancel the remaining
active instruments (e.g. all pacing instruments have completed successfully). Instrument failures
will cause the ICS to raise an alarm, and treat the instrument as aborted for the sake of
continuing/canceling other instruments. For details about the ICS’s cancel/abort logic see the ICS
DRD for the detailed requirements.
The handleWorkerReport() method is overridden to update the status of the associated Task
Group.
The OMS Controller makes use of a Posting TAB, to post the event defined in the OCS to ICS
ICD.
o The Status Posting TAB is responsible for posting the regular status event (@ 1Hz)
containing the complete current status of all known, running Task Groups.
Instrument Control System Reference Design
TN-0102, Rev E Page 14 of 24
The OMS Controller makes use of a custom CSF Action objects. It overrides the
getNewAction() and getAction() methods in order to return an OMS Action. The OMS
Action maintains a pointer to the Task Group associated with the action. This allows oneDone()
and handleWorkerReport() to gain a reference to the Task Group associated with the worker-
action without having to walk the entire Task Group list.
The OMS/ICS relies on the standard CSF Controller’s Action Manager to ensure that once a
command has been accepted, it will begin execution within 0.1 seconds.
See Section 9 for a UML class diagram of the OMS.
Instrument Control System Reference Design
TN-0102, Rev E Page 15 of 24
5. IA DETAILED DESIGN
This section discusses the Instrument Adapter (IA) in more detail, with emphasis on implementation in
CSF.
5.1 INSTRUMENT ADAPTER INTERFACES
The IA has two interfaces: the interface to the OMS and an interface to its designated instrument. The
interface to the OMS is described in this section, while the interface to the designated instrument is
discussed in SPEC-0113, Facility Instrument Interface Specification and in TN-0152, The Standard
Instrument Framework.
5.1.1 OMS to Instrument Adapter Interface
Although there are multiple Instrument Adapters in the ICS, the OMS interface to each is the same.
Because this interface is internal to the ICS, no formal ICD is required and the description here shall serve
as the guiding technical documentation for the interface.
5.1.1.1 Interface naming
The OMS is the top-level controller in the ICS and is registered with the DKIST connection service as
atst.ics. The IAs are registered as atst.ics.<inst>_ia, where <inst> is the instrument name as
described earlier in Section 4.1.1. The following instrument adapters are used in conjunction with the
first generation instruments at DKIST:
atst.ics.visp_ia # Visible Spectropolarimeter (ViSP) instrument adapter
atst.ics.vbiRed_ia # Visible Broadband Imager Red (VBI red) instrument adapter
atst.ics.vbiBlue_ia # Visible Broadband Imager Blue (VBI blue) instrument adapter
atst.ics.vtf_ia # Visible Tunable Filter (VTF) instrument adapter
atst.ics.dlNirsp_ia # Diffraction-limited Near-IR Spectropolarimeter (DL-NIRSP) instrument
adapter
atst.ics.cn_ia # Cryogenic Near-IR Spectropolarimeter (Cryo-NIRSP) instrument adapter
atst.ics.asi_ia # A Simple Instrument (ASI) adapter
5.1.1.2 Instrument Programs
The fundamental unit of work for an instrument is the Instrument Program (IP). An IP consists of an
Instrument Script and a collection of Parameters for that script. IPs are passed to the ICS/OMS as part of
a Task Group. The OCS passes IPs to the ICS by reference, not by value. That is the OMS receives an IP
ID that can be used to perform a database lookup and get the contents of the ID. Passing IPs by reference
makes it easy to support multiple IPs to be passed to an instrument within one Task Group. For the same
reasons that passing IPs to the OMS by reference is preferable, passing IPs to the IA by reference is
preferable. Because the interface between the ICS (IA) and Facility Instruments has IPs passed by value,
the IA is responsible for fetching IPs from the database and un-box the IP before sending it to the
instrument. This means that the IA takes the IP identifier that it receives, and extracts that IP from the
database. That object is then deconstructed into a Script reference, and a set of Parameters that are boxed
in a CSF Configuration and submitted to the Instrument Controller.
5.2 IA IMPLEMENTATION
The Instrument Adapters are implemented as extensions of the CSF ManagementController (see TN-
0088, Base Software for Control Systems). Each Instrument Adapter is responsible for controlling only a
single sub-controller: the Instrument Controller for their respective instrument. While the Management
Instrument Control System Reference Design
TN-0102, Rev E Page 16 of 24
Controller is probably overkill in this instance it satisfies all of the needs Instrument Adapters needs and,
by leveraging the existing code, development will be faster, and maintenance will be easier through its
use. Typically Management Controllers are multi-threaded controllers that assume that queuing will be
handled by sub-controllers if they cannot support multiple simultaneous actions. Instrument Controllers
are only capable of supporting on observation at a time, but they do support multiple actions so as to
facilitate engineering intervention in the event of a problem. This results in a need to queue observation
related actions at a level above the IC. By making the Instrument Adapter a single-threaded Controller it
is possible to gain this queuing very easily.
This implementation actually gives IAs two separate levels of queueing. The standard CSF Controller’s
action queue gives IAs their first level. Because Task Groups are Actions and IAs are single threaded,
IAs will queue subsequently submitted TGs until their first has finished. The only limit that is placed on
the size of the queue is JVM/System memory. The second level of queueing happens at the Management
Controller level. Management Controllers support multiple phases of actions. The IA assigns one IP
from a TG to each action phase. This means that the canceling or aborting of an Action at the IA level
will result in the canceling of all IPs associated with that TG but without affecting any other IPs.
The only complexity in the Instrument Adapters is a result of the DKIST/CSF fully qualified attribute
name policy. The IA’s name is not a hierarchical parent of the instrument that it manages. This results in
a little added work in making worker configurations.
The IA Controller overrides the makeWorkerConfiguration() to query the IP database for
the specified IP(s), log that IP Metadata to the appropriate database, and construct a worker
configuration containing the returned the Script ID and Parameters along with the ICS global
parameters.
The IA Controller overrides the hasNextPhase() method to determine if there are multiple IPs
packaged in a single Configuration/Task Group. The method will return true if tcsCfg==true
and there are more IPs to execute. If tcsCfg is false, then the method will return false so that the
Instrument remains properly pre-configured for the first IP.
The IA Controller overrides the oneDone() method to notify the OMS (via action report) when a
controller finishes its IP. In the case of multiple IPs in a single Task Group this is necessary so
that the OMS can properly report the worker’s progress in completing its various IPs.
The handleWorkerReport() method is overridden to receive IP Status updates.
The IA Controller is also responsible for notifying the OMS of the managed Instrument
Controller’s online/offline status. The IA is responsible for subscribing to the IC’s status event.
While the event is being received at regular interval, the IA will propagate the ICs status up to the
OMS. When the IC is not posting a status event (e.g. the IC is not deployed/running) the IA will
assume offline and notify the OMS of the assumed status. This monitoring/notification system
consists of two parts:
o The IA uses an Event Callback to subscribe to the IC’s status event. Every time the event
is received, its value will be stored in the cache. In addition to the IC’s status, the
timestamp of the last-received IC event will be stored.
o Any time there is a change in the status of the Instrument the change will be logged.
o The IA uses a Posting TAB to forward the current IC status to the OMS. Assuming that
the timestamp of the last received event is no older than 1.5 * posting period, the last
received event value will be used. If the timestamp is older than 1.5 * posting period, the
IA assumes that the IC is offline and forward this value to the OMS.
Instrument Control System Reference Design
TN-0102, Rev E Page 17 of 24
6. RENDEZVOUS DETAILED DESIGN
The Rendezvous Services provides a mechanism for loose synchronization between disparate systems.
The basic principal is that the systems wishing to rendezvous notify the service a) that they are ready to
rendezvous, and b) what they wish to rendezvous with. The service is responsible for tracking what is
ready, and when everything is ready, notifying everyone to go forward. The request to rendezvous and
the notification of rendezvous use CSF events as the backing mechanism. In addition to a received event
inherently indicating that everyone is ready, a timestamp included in the event can be used as a common
reference. The Service is composed of two primary parts. The first is a public facing API (Rendezvous
Service Helper) that application developers can call to request rendezvous. The second is a CSF
Component responsible for monitoring rendezvous requests and servicing the requests as they come. The
baseline is for the component to be deployed in the same container as the rest of the ICS components
(OMS and IAs). A NTP backed reference time is expected to be sufficient for the Rendezvous Service.
However if NTP proves insufficient, the Rendezvous Component will need a more accurate clock. A
Precision Time Protocol (PTP)-aware system or a system with a Spectracom TSync-PCIe timing card5
should be more than sufficient to meet the timing need and will serve as the fallback implementation. In
the event the timing card is required, the Rendezvous Component at a minimum would need to run on a
machine supporting such a card, which may preclude the virtualized environment mentioned in section
3.6 - Hardware Requirements.
The basic sequence of a rendezvous is as follow:
1) Instrument A calls the Rendezvous Service Helper’s rendezvous method indicating its desire to
rendezvous with B, and C. The Service Helper will not return until rendezvous, timeout, or
action abort.
2) The Rendezvous Service Helper posts an event on the rendezvous request event stream, stating
A’s desire to rendezvous with B, and C
3) The ICS Rendezvous Component receives the event, and checks an internal map for a node
corresponding to the {A, B, C} rendezvous.
4) Assuming that the node is not found, the Rendezvous Component creates it.
5) The ICS Rendezvous Component sends an acknowledgement event back to Instrument A, on
Instrument A’s rendezvous event stream.
6) Later Instrument B request rendezvous with A and C.
7) The ICS Rendezvous Component receives the event, and finds a corresponding node in its
internal node map.
8) The ICS Rendezvous Component updates the node to reflect that both A and B are ready.
9) The ICS Rendezvous Component sends an acknowledgement event back to Instrument B, on
Instrument B’s rendezvous event stream.
10) Later Instrument C requests rendezvous with A and B.
11) The ICS Rendezvous Component receives the event, and finds a corresponding node in its
internal node map.
12) The ICS Rendezvous Component updates the node to reflect that A, B and C are ready.
5 The TSync timing card is the standard card used by the DKIST Time Reference and Distribution System. It
receives highly accurate PTP time that can be used to set the host OS time.
Instrument Control System Reference Design
TN-0102, Rev E Page 18 of 24
13) The ICS Rendezvous Component sends an acknowledgement event back to Component C, on
Component C’s rendezvous event stream.
14) Because all components are ready, the Rendezvous Component grabs a timestamp, and posts one
event on each of the three event streams with the acknowledgement of rendezvous.
15) After posting the event, the Rendezvous Component removes the node from the map.
16) When the access helper receives the event, it returns the included timestamp to the calling
Instrument.
In addition to the general sequence that is laid out above, if one or more instruments fail to rendezvous in
a timely manner, the Rendezvous Component can notify others of a timeout. This notification is
dependent on Instruments wishing to rendezvous providing a non-zero value for timeout when making the
initial rendezvous request. Additionally if an Instrument wishing to rendezvous has its CSF-Action
canceled or aborted, the Rendezvous Helper will return immediately.
There are a couple of points to note about the rendezvous service:
While the Rendezvous Service is intended for use by instruments, there is nothing that limits its
use to instruments. Through the above example Instrument could be replaced with Generic
Entity.
The actual call to the Rendezvous service (using the Helper API mentioned below) needs to
happen within an Instrument Program’s Script. Thus it is the responsibility of the Instrument
Developers to make sure that their scripts provide the necessary flags and information to indicate
whether or not rendezvous is required, with whom to rendezvous with, and to make use of the
service if required.
Very complicated rendezvous scenarios are possible but rendezvous is ONLY if the instrument
scripts support them.
6.1 RENDEZVOUS SERVICE INTERFACES
The Rendezvous Service has two interfaces. The first is the API that application developers use to
interact with the service (Rendezvous Helper). The second is the internal interface used between the
Rendezvous Helper, and the Rendezvous Component.
6.1.1 Rendezvous Helper API
IAtstDate rendezvous (IActionStatus action, long timeout, String self,
String... components)
The public API for rendezvous is straightforward. Callers must pass in the CSF Action so that the
Rendezvous Service can properly support cancel and abort. In addition a timeout may be specified in
order to give up after a prescribed amount of time. Finally the caller’s identity must be specified, as well
as what the caller wishes to rendezvous with.
6.1.2 Helper to Rendezvous Component Interface
Internally the Rendezvous Services has an event-based interface that the Service Access Helper uses to
communicate with the Rendezvous Component. The interface relies on a single event that the
Rendezvous Component listens for (atst.ics.rendezvous), and one event per client
(rendezvous.<app>) that the service will post to.
Instrument Control System Reference Design
TN-0102, Rev E Page 19 of 24
6.2 RENDEZVOUS SERVICE IMPLEMENTATION
The rendezvous service is composed of four primary modules all of which are found in the Base
repository. Two, the Rendezvous Component and the Rendezvous Manager, are on the server side. The
other two, Rendezvous Access Helper and Rendezvous Adapter, are on the client side. The following
four sections highlight the key features in each.
6.2.1 Rendezvous Component Implementation
The service backing Rendezvous consists of a single CSF Component responsible for monitoring
rendezvous requests, and creating and updating the ‘nodes’ corresponding to those requests, and
eventually notifying the requestors when all requestors are ready.
It subscribes/unsubscribes the Callback (aka Rendezvous Manager) on Component
startup/shutdown.
It provides an external interface so that debugging can be enabled as needed
Starts and stops the timeout watchdog thread. It is responsible for notifying Instruments that
everyone was not ready to rendezvous in time.
It maintains the internal map used to store the above mentioned nodes.
6.2.2 Rendezvous Callback Implementation
The Rendezvous Callback is a CSF SmartEventCallbackAdapter class. It is constructed with using
the SmatEventCallbackFactory with the Component’s handleEvent method passed in as the event
handler. It is responsible for handing rendezvous requests (propagated as CSF events)
The Callback tracks rendezvous requests using Nodes
o Container class
o Holds complete Instrument list
o Holds ready Instrument list
The callback method is responsible for checking the active rendezvous ‘Nodes’
o Creating a new one if necessary
o Send the requestor an ACK. The ACK is used by the client to ensure that the manager is
actually present and running.
o Update the Node
o Transmit Rendezvous Event (one event per Instrument) if all Instruments are ready
6.2.3 Rendezvous Access Helper Implementation
The Rendezvous Access Helper consists of a single method that takes care of setting up the rendezvous
request, and awaiting the rendezvous. It is responsible for
Subscribing a callback (Rendezvous Adapter) to the ACK/Rendezvous event.
Spawning threads track the Instrument Action’s cancel and abort. The threads are responsible for
interrupting the rendezvous if the action is canceled or aborted.
Transmitting a request to Rendezvous to the Rendezvous Service
Awaiting the Rendezvous ready event or timeout event.
Instrument Control System Reference Design
TN-0102, Rev E Page 20 of 24
6.2.4 Rendezvous Adapter Implementation
The Rendezvous Adapter is an extension of the CSF BaseEventCallbackAdapter class. In addition
to subscribing to the CSF event, it manages the Java Lock/Condition used to signal that the event has
been received.
It is responsible for spawning a thread to ensure that the ACK is received. The thread is
responsible for interrupting the rendezvous if an ACK is not received in a timely manner.
It provides a waitForReady() method that blocks until the rendezvous event has been received,
or the thread is Interrupted (e.g. by the ACK watcher, or an aborted action)
It provides a callback() method that notifies the ACK watcher when the ACK event is
received and signals waitForReady() when the ready event is received.
6.2.5 Rendezvous Events
6.2.5.1 Access Helper Rendezvous Initialization Event
The event which the Access Helper posts requesting rendezvous has the following structure:
Name Data type Meaning atst.ics.rendezvous
.origin String The name of the entity attempting to
rendezvous. .cmptList String[] The complete list of entities participating in
this rendezvous. .timeout int The amount of time (in milliseconds) to wait
for other entities to be ready to rendezvous.
6.2.5.2 Rendezvous Service Event
The events which the service-backing component posts have the following structure:
Name Data type Meaning rendezvous.<appName>
.msgType Choice: ACK,
ERROR,
READY
The type of message contained in this event.
This attribute is always present.
.reason String Reason for the error. This attribute is only
present if the msgType is ERROR. .rendezvousTime Date The reference time for the rendezvous. This
attribute is only present if the msgType is
READY.
Instrument Control System Reference Design
TN-0102, Rev E Page 21 of 24
7. UI DETAILED DESIGN
The ICS UI includes two custom parts. The Task Group Builder JES Widget allows Task Groups to be
constructed, viewed and submitted to the ICS. It functions differently depending on whether it is being
used within the ICS Engineering GUI or the OCS Experiment Executor. The Task Group Status Display
JES Widget displays the contents of currently running Task Groups and recently finished Task Groups.
7.1 TASK GROUP BUILDER
The Task Group Builder widget has three modes of operation. The first mode, ICS-EGUI, allows the
complete creation of a task group, including the specification of all associated flags and IDs. The second
mode two OCS-Manual allows for the creation of a task group and allows for the specification of some of
the Task Group flags (e.g. save data) but not others (e.g. manual). Mode three OCS-Auto allows only for
the display of an existing Task Group. When in OCS-Auto mode there is no mechanism to submit the
Task Group (that has already been done by the OCS). The startup mode is encoded into the widget’s
XML representation.
The widget is comprised of a proxy layer, which satisfies the JES interface (TgContentDisplayWidget).
The proxy layer contains a single JPanel (TgContentDisplay) which fills the actual widget’s entire panel.
The TgContentDisplay holds all of the sub-parts, of the display, and implements the ITgMasterDisplay
interface. The TgContentDisplay object (via the Master interface) is passed to all of the sub-screens so
that when they need to kick off an update of the underlying panel they can notify the master of the
change. The Master handles changes by pushing the updated version of the Task Group to all sub-panels.
7.2 TASK GROUP STATUS
The Task Group Status Display JES Widget is responsible for displaying the status of running and
completed Task Groups, as well as supporting cancel and abort behavior as described in the ICS’s DRD
(SPEC-0163). The Status Widget subscribes to the ICS’s cStatus event and parses the list of active, and
historical Task Groups found in that event into a collection of ITaskGroupStatus objects which are then
displayed. Based on the feedback received during the ICS Factory Acceptance Testing this widget is
expected to undergo some changes and is therefore not discussed more thoroughly at this time.
Instrument Control System Reference Design
TN-0102, Rev E Page 22 of 24
8. TESTING
Testing the ICS is carried out by executing python scripts using the scripting facilities available as part of
the CSF. All tests are run using the DKIST end-to-end simulator to provide a fully functional
environment. Where simulators are not yet available for some or all of the instruments the ICS provides
simple interface-compatible simulators. For the non-GUI aspects of the ICS, the testing framework
developed for use with the TCS is adapted for use with the ICS. This discussion draws heavily from the
TCS description of its testing facility.
Using the Quality Assurance System (QAS) testing mechanism allows tests to make full use of the
available services present in the CSF while keeping the testing mechanism detached from the application
and in a scripting format. This makes writing tests and updating tests easy, without the need to recompile
any code. Using the QAS testing framework (also written in jython) ensures all tests are standardized.
The testing framework provides class definitions that the test scripts subclass. The testing classes ensure
test comments are logged into the log database using tags that can easily be retrieved, and also put results
using predefined names that allow specialized JES widgets to pick up and display the results. Coupled
with another JES widget that allows selection and execution of the test scripts results in all testing being
carried out within a standard CSF environment, making use of standard CSF services and recording all
test results to standard CSF logging facilities.
The testing framework script locations are added to the scripting widget (relative to $(ATST) so they are
portable between CSF installations) such that the test scripts themselves can simply import the required
python modules.
If any operator input is required then the test scripts can invoke dialog boxes through jython as no
command line interfaces are available.
The required jython scripts and JES widgets are supplied as part of the ICS deliverables, along with test
python scripts to perform unit and acceptance tests.
The available classes and methods of the testing framework are presented in the table below.
Method Parameters Return Description
TestStep class – subclass and override the Run method. Log message void Logs the message using the CSF log service. Also
posts the message and stores it into the cache for use
(e.g. JES widgets). Fail message void Fail the current test step. The step is logged as
failing with the reason given. The step exits at this
point. Get component,
table
table Call get() on the specified component. The table
is an attribute table filled with the names of
attributes to get. The returned table contains the
filled in values. Set component,
table
void Call set on the specified component. The table is an
attribute table filled with the names and values of
attributes to set. Submit controller,
configuration
int Call submit() on the specified controller. The
configuration is submitted to the controller and the
Instrument Control System Reference Design
TN-0102, Rev E Page 23 of 24
submit return value is returned. This does not block. BlockSubmit controller,
configuration
int Call submit() on the specified controller. The
configuration is submitted to the controller and the
final status of the command is returned. This does
block until the action is
completed/aborted/cancelled. Request message,
table
table Request user input. The names of the values
requested are provided in the table input (attribute
table format) and the return attribute table contains
the names and values that were entered. This
method blocks the test until the user has closed the
popup. Message message void Open a popup to display a message to the user. This
method blocks until the user has closed the popup.
Test class – create, add test steps and then Run the test. Test ID,
description,
requirements,
details
void Constructor for a test object. Create a test object,
add the required steps to it and then run it to perform
the test.
AddStep Step void Add another step to this test. Run table void Execute the test, running through each step in order.
An attribute table is returned that contains the report
for the test, each step is included along with its
pass/fail state and any failure message.
Whenever a test script is executed the testing framework requests a unique ID from the CSF ID service.
This ID is appended to the original test ID (that is defined as part of the test script) and all messages are
logged with this unique ID. The ID is also presented to the operator making the task of retrieving old test
logs in the future much easier (using standard SQL search queries).
For example, if the test is called “TEST.ICS.0001” and the uniquely generated ID is “2272.3” then every
log message for this test starts with
[TEST.ICS.0001.2272.3]
Testing of ICS GUIs is accomplished by providing detailed instructions to the tester on how to perform
the test on the GUI. No attempt is made to automate GUI testing.
Instrument Control System Reference Design
TN-0102, Rev E Page 24 of 24
9. UML DIAGRAMS
UML Diagrams for the key assemblies of the ICS are maintained and kept up to date in the ATST
Software Development Tree. This is done in order to keep them in sync with the software development
effort. They may be found in the directory $ATST/doc/uml. For details on the ICS’s OMS Controller
and associated bits see ics/OMS.png. For details on the ICS’s Instrument Adapter Controller and
associated bits see ics/IA.png. For details on the Rendeavous Service see base/Rendezvous.png. For
details on the ICS GUI’s Task Group Builder see ics/TgBuilder.png and for details on the ICS GUIs Task
Group Status see ics/TG_Status_GUI.png