Information Dominance Anytime, Anywhere…
PEOC4I.NAVY.MIL
Program Executive OfficeCommand, Control, Communications, Computers and Intelligence (PEO C4I)
Deployable Joint Command & Control (DJC2)
Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to PEO C4I or the SPAWAR Office of Congressional and Public Affairs (SPAWAR 00P).
2 May 2013Kevin Washburn
PEO C4!, PMW 790DJC2 APM
Why DJC2?
2
Need for JTFs was increasing …
Need for DJC2 capability still valid …“The QDR vision is for the joint force of the future to have more robust and coherent joint command and control capabilities. Rapidly deployable, joint task force headquarters will be available to the combatant
commanders in greater numbers to meet the range of potential contingencies.”
-- QDR 2005, Joint Command & Control Capability Area Execution Roadmap
Need for DJC2 capability still valid …“The QDR vision is for the joint force of the future to have more robust and coherent joint command and control capabilities. Rapidly deployable, joint task force headquarters will be available to the combatant
commanders in greater numbers to meet the range of potential contingencies.”
-- QDR 2005, Joint Command & Control Capability Area Execution Roadmap
No standardized, deployable Joint C2 capability existed …Ad hoc, piece-mealed capabilities cobbled together at the last minute during a crisis not a good solution
Standing up a JTF took too long …
EX ORD EXECUTE BACKFILLALERT ORDWARN ORD
Legacy JTF Performance
Desired JTF Performance
• Just Cause• Provide Comfort• Somalia• Haiti• Kosovo••• JTF 160/170• JTF GTMO• JTF 180/OEF• JTF Horn of Africa
9/11
Nominal JTF Capability
EX ORD EXECUTE BACKFILLALERT ORDWARN ORD
Legacy JTF Performance
Desired JTF Performance
• Just Cause• Provide Comfort• Somalia• Haiti• Kosovo••• JTF 160/170• JTF GTMO•• JTF Horn of Africa
9/11
• Just Cause• Provide Comfort• Somalia• Haiti• Kosovo
•• JTF 160/170• JTF GTMO•• JTF Horn of Africa
9/11
TimeTime
PPeerrffoorrmmaannccee
JTF 7/OIFJTF 510/SOCPAC
EX ORD EXECUTE BACKFILLALERT ORDWARN ORD
Legacy JTF Performance
Desired JTF Performance
• Just Cause• Provide Comfort• Somalia• Haiti• Kosovo••• JTF 160/170• JTF GTMO• JTF 180/OEF• JTF Horn of Africa
9/11
Nominal JTF Capability
EX ORD EXECUTE BACKFILLALERT ORDWARN ORD
Legacy JTF Performance
Desired JTF Performance
• Just Cause• Provide Comfort• Somalia• Haiti• Kosovo••• JTF 160/170• JTF GTMO•• JTF Horn of Africa
9/11
• Just Cause• Provide Comfort• Somalia• Haiti• Kosovo
•• JTF 160/170• JTF GTMO•• JTF Horn of Africa
9/11
TimeTime
PPeerrffoorrmmaannccee
JTF 7/OIFJTF 510/SOCPAC
HISTORICAL JTF STANDUPS
EARLY ENTRY (EE) and CORE20 / 40 operators (EE), setup / operational < 6 hr 60 operators (Core), setup / operational < 24 hr
EN ROUTE (ER)6 / 12 operators on pallet
Provides C2 while airborne
• 5 networks, 130 clients
• Secure Wireless Networking with extension of services
• IP Convergence Suite (EoIP)
• C-JWICS / DODIIS
• GCCS-J
• Robust 8 Mb comms (GBS, TACSAT)
• Defense Connect Online (DCO) / VTC / Collaboration Tools
• Onsite support manning
• 24/7 Help Desk, Support Portal, training, tech manuals, spares
• 5 networks, 130 clients
• Secure Wireless Networking with extension of services
• IP Convergence Suite (EoIP)
• C-JWICS / DODIIS
• GCCS-J
• Robust 8 Mb comms (GBS, TACSAT)
• Defense Connect Online (DCO) / VTC / Collaboration Tools
• Onsite support manning
• 24/7 Help Desk, Support Portal, training, tech manuals, spares
What is DJC2?Integrated C4I system which enables Joint Task Force Ops for HA/DR, Drug Interdiction,
Homeland Security Defense, and Overseas Contingency Ops
3
RAPID RESPONSE KIT (RRK)2 / 15 operators (reachback)Carry-on/Checked baggage
DJC2 MissionField an integrated C2 HQ system to enable a commander to set up a self-contained, self-powered,
network-enabled JTF HQ anywhere in the world within 6 - 24 hours of arrival
Design is fully self-supporting, with its own power, environmental control, and SATCOM — augmented with autonomous rapid response
and en route capabilities
EARLY ENTRY (EE) and CORE20 / 40 operators (EE), setup / operational < 6 hr 60 operators (Core), setup / operational < 24 hr
DJC2 ScalabilityDJC2 = Fully scalable Joint C2
4
Commander’s Kit
<4Rapid Response
Kit (RRK)
<15Early Entry (EE)-Lite,*
EE-Lite Plus**
10 Early Entry (EE)
20Core
20/60
# Users
NOTE: Each expansion kit adds 60 seats to Core
Core Expansion
124/244
2 Networks/Rchbko BGAN
2 Networks/Rchbk Client x 5o CCT-120o VoIP/VoSIPo Voice (analog)o VTC
*2 Networks/Rchbk **2 Networks/Local Client x 15o CCT-120o VoIP/VoSIPo Voice (analog)o VTC
• Shelter/HVAC• Power gen & distro• Tables/Chairs
3 Networks/Local Client x 40o AN/USC-60A & -68o GBSo AN/PRC-117F o Iridiumo VoIP/VoSIPo Voice (analog)o DRSNo VTCo FAX
• Shelter/HVAC• Power gen & distro• Tables/Chairs +8 Support
Positions
5 Networks/Local Clients x 130o AN/USC-60A & -68o GBSo AN/PRC-117F o Iridiumo VoIP/VoSIPo Voice (analog)o DRSNo VTCo FAX
• Shelter/HVAC• Power gen & distro• Tables/Chairs +8 Support
Positions
5 Networks/Local
Clients x 250+o AN/USC-60A & -68o GBSo AN/PRC-117F o Iridiumo VoIP/VoSIPo Voice (analog)o DRSNo VTCo FAX
• Shelter/HVAC• Power gen & distro• Tables/Chairs +8 Support Positions
Specialized Configurations: En Route (POR) for C2 aboard C-17 and C-130 Prototype Maritime Variant for temporary C2
HQ install in ISO containers aboard ships of opportunity
Deployable C2 Vehicle for Homeland Defense
Wt : 90 lbCubic ft: 3.59
Wt: 78797 lbCubic ft: 11798.26
Wt: VariableCubic ft: Variable
*Wt: 7652.40*Cubic ft: 926.75
**Wt: 9764.40**Cubic ft: 1014.14
Wt: 44891.0 lbCubic ft: 6288.23
Wt: 465.40 lbCubic ft: 32.47
= No. of networks = No. of clients includedo = Communications• = Infrastructure = No. of support
positionsAll tented configurations can also be set
up in buildings on local power
DJC2 FlexibilityDJC2 = Fully Flexible Joint C2
5
This is DJC2 …
… and so is this
DJC2 in a CONEX box on a ship
DJC2 in a vehicle for Homeland Defense
DJC2 in a building on local powerDJC2 on a pallet in a C-130
DJC2 in a suitcase
6
DJC2 in Real-World OpsMost recent real-world use: Hurricane Sandy relief
JTF KATRINA : New Orleans (2005)
JTF CARING RESPONSE: Myanmar (2008)
Mission:Supported Joint Force Maritime Component Commander (JFMCC) at JRB NAS New OrleansOnly Ashore C2 component
Mission:Provided U.S.-only Command Center for potential real-world operations during CG-08 exercise
Enabled “instant” JTF HQ when Cyclone Nargis hit Myanmar, and then supported move of JTF to Utapao with no gap in C2 for JFC
CJTF HAITI: Port-au-Prince, Haiti (2010)
Mission:Served as command post for CJTF Haiti, providing services to 300 staff, including SIPR/ NIPR/ NGO/ GBS/ JWICS/ VTC/ VOSIP/ VOIP/ PSTN/ DSN
DJC2 Maritime Variant (MV) supported C2F on BATAAN MV on BATAAN
By using EE/Core and RRK, JFC was able to transition JTF HQ from tents to building 200 miles away without losing C2/comms
OPERATION TOMODACHI: Yokota AFB, Japan (2011)
Mission:Deployed by PACOM (supported by JCSE) to provide C2 capabilities in support of operation providing HA/DR support in austere environment where normal infrastructure had been damaged/destroyed by tidal wave
Tech Insertion / Refresh Big Picture
7
DJC2 works closely with Joint Warfighters to identify / provide technologies they need …
Laptop Refresh
(FY2012-2013)
Energy Efficiency(FY2013)
Cloud Computing for Expeditionary
(FY2015)
IT Upgrade(FY2014-2015)
Infrastructure Upgrade(FY2014)
NETC2 Enclaves and Accessories
AN/USQ-200v2C / Rapid Response Kit
Next Generation Rapid Response Kit
(FY2015)
SATCOM Upgrade(FY2012-2013)
Remote Patch Management(FY2014)
TI/TR Overview• IT systems upgraded
every 18 - 24 months• Laptops, servers, etc.
• Funded to enhance systems by inserting high priority, mature new technologies
• Selected from Warfighter inputs, industry best practices
• Fielded in spirals
Top Related