Name of work C/o Stage I of ‘Phase I Construction of Permanent campus’ for ‘Indian Institute of Management, Tiruchirappalli’ at the site adjacent to Bharathidasan University on Trichy -Pudukottai Road, Trichy .(Packages II and III)
1.1b General description and number of packages contemplated for the entire project
Enclosed as Annexure I
1.1c Administrative approval & expenditure sanction
Rs. 332,72,00,000 Vide letter No: Nil Dated 20.04.2014
1.1d Brief specifications Enclosed as Annexure II
1.1e Name of architectural agency CHANDAVARKAR & THACKER CONSULTNATS PRIVATE LIMITED, Bangalore
1.2a Sub-Division and name of the officer in charge
1) IIM Trichy Project Division-I: Sub division I, II, III Sh. C.S.Abineesh, AEE(C) Sh. C.Sunderam, AE(C) Sh.Sajikumar, AE(C).
2) IIM Trichy Project Division-II: Sub division I, II, III Sh.P R Laxmanan AE(C).
3) IIM Trichy Project Electrical Division: Sub Division I Sh. Siva Kumar Reddy AEE(E) Sh. Muthu Selvan JE(E)
1.2b Division and name of the officer in charge Shri B.Srinivas, Executive Engineer(Civil) IIM Trichy Project Division-I, CPWD,Trichy. Sh. R.D.ShajilKumar, Executive Engineer (Elect.) IIM Trichy Project Electrical Division,CPWD,Trichy.
1.2c Project Circle and name of the officer in charge
Shri. P.Kanaka Raju, Project Manager, IIM Trichy Project Circle, Central PWD, Trichy.
1.2d Zone and name of the officer in charge Shri P.P.Srinivasan, Chief Engineer(SZ)IV, CPWD, Madurai.
2
1.3a Name of the main agency/contractor Shapoorji Pallonji And Company Private Ltd.,
1.3b Registration class Maharastra PWD Class 1-A
1.4a Agreement No. 03/CE/IIMTPD/2014-15.
1.4b Whether minimum Quality Assurance plan forms a part of agreement
As per para 1.45 page no: 13 of 130 of Volume III of VI volumes of agreement
1.5a Stipulated time and date of start 04.01.2015(Date of handing over of site)
1.6a Stipulated time and date of completion 03.01.2017
1.7a Estimated cost put to tender(Rs) Rs.290,19,28,898/-
1.7b Schedule of rates applicable DSR 2013 / LMR
1.8a Accepted tendered cost with overall percentage
Rs.326,40,00,000/-
12.47% above
1.9 Percentage progress at time of inspection vis-à-vis expected as per contract and reasons for delay, if any
10% (Work is progressing as per schedule)
1.9a Physical progress 10%
1.9b Availability of architectural drawings Available
1.9c Availability of structural drawings Structural drawings available except library , sports complex, OHT, Married students hostel and MDPblock. Same also under preparation.
1.9d Civil work status Enclosed as Annexure III
1.9e Electrical works status(Internal elec./Lift/AC/External/Solar)
All items except for high side AC works are included in this agreement. Since the RCC frame work is in progress, only Internal EI is in progress as per civil works
1.9f Status of peripheral services Road and Drain work started. Casting of drain is under progress
1.9g GRIHA compliance Registered for 4 start GRIHA LD. Initial site visit done by GRIHA team and documents being furnished by IIMT and agency
1.10a Name of QA official Dr.N.Ravi
1.11a Officials with designation and representative of agency present
Shri. T. VENKATESWARAN, Project Director
1.12a Date of inspection and its sequential number
Inspection No:2 Inspection date: 25-04-2015
3
2.0a Deployment of quality assurance aids: Drawing register Inspection register Site order book Cement register(Bulk supply/Packaged supply) Hindrance register Road metal account Material at site register
Drawing register, site order book and hindrance register are maintained separately for separate type of buildings. All other register are maintained commonly
2.1a Copy of agreement Yes
2.1b CPWD specifications with( upto date) correction slips
Yes
2.1c List of ISI marked/approved materials to be used
Materials as specified in the Agreement (Annexure IV)
2.1d Guard file containing inspection and quality assurance reports of CTE/QA/AE(QC)/CE/SE etc.
Soft copies are available for reference. Hard copies are under preparation.
2.1e Testing facilities to check confirmations to acceptance criteria
Site testing lab was established by the agency
2.1f QACW circulars on QC/QA Yes
2.1g Deployment of test registers: Concrete Paints and other materials
Yes
2.2a Is field laboratory existing and well equipped
Yes
3.0a Departmental [procedural aspects: As per Specifications and Standard Engineering practices.
3.1a Maintenance of inspection register Yes
3.2a Highlights of inspection by CE/SE and their compliance
Yes
3.3a Are test registers maintained in standard forms?
Yes
3.4a Are test register reviewed by EE/SE with dates
Yes
3.5a Is cement store checked by AE/EE periodically as stipulated?
Yes
3.5b Comment on cement stock with reference to cement register
Cement register is being updated regularly.
4
3.6a Is site order book properly maintained? Yes
3.6b Is site order book reviewed by EE/SE?(mention details)
For Each individual block one site order book has been issued and being maintained
3.6c Have timely notices been issued to the agency with schedule of defects/damages and date of compliance? In case of failure to rectify defects/damages whether action under clause 14/17 initiated?
Yes, any shortcomings observed are brought to notice of agency through letters/mails from PMC and the same are being rectified/attended immediately.
4.0a Process control aspects:
4.1a Is soil investigation done? Give details. Soil investigation has been done. Report is available. ( Annexure V )
4.2a Suitability of water for construction: Source
Supply from bore wells.
4.2b Has water been tested and approved by engineer in charge before construction?
Yes, Copy of water test result is attached as Annexure VI
4.2c Has water been tested subsequently (i.e. after every 3 months) and found fit for use in works?
Yes
4.3a Are 10%(25% for concrete) of all samples for testing taken in presence of EE as per DG(W)’s O.M. No.28/7/86-Wi(DG),Circular No.9/87 dt. 1.9.1987/6.10.1987?
Yes
4.4a Are all mandatory tests carried out at stipulated frequency?
Yes
4.5a Are materials approved by engineer-in-charge? If so, are samples available at site?
Yes
4.6a Are sample units/items completed and approved by engineer-in-charge before commencement of mass finishing works?
Yes, mock up unit will be done for approval
4.7a Specific control on RCC work like centering/shuttering and schedule of making them available with work requirement, proportioning with boxes, mixing by full bag capacity hopper fed mixer, control of slump, placing/compaction with vibrator
Yes, Same mix is used for all structural elements of the various buildings
4.8a Any other particular comment on adequacy of process control
Adequate process control exist
5
5.0a Site inspection for observation and comments on quality control system in place
Adequate control systems are in place
5.0b Deployment of safety measures All necessary safety measures are being deployed. 1) Entry inside the site is allowed with safety
shoes, helmet, safety glasses, etc. 2) Barricading 3) Safety induction given to labour
(periodically), visitors etc. 4) Proper staging and safety belt for working in
heights, 5) Assembly point has been earmarked near all
buildings in case of emergency evacuation. The same will be used for giving safety training for labours
5.1a General ---
5.1b Comments on compliance of Quality Assurance plan for the work by SE/CE for works more than Rs.10 crores
Being reviewed periodically be SE/CE. CE’s inspection Note Dt.12.02.2015 is perused.
5.2a Observation on floors slopes (especially in bath, WC kitchen, terrace, Balcony etc.)
Presently only Concrete work is going and being laid with necessary slopes and levels being ensured before concreting.
5.3a Observation of QC for dampness/leakages prevention. If dampness/leakages noticed, then state locations and probable reasons
Not applicable at this stage. Will be taken up at appropriate stages
5.4a Samples collected by QC core/cell As and when required by PMC.
6.0a Observations on site material QC aspects. (Keeping in view the requirement of contract specification; BIS marked/CPWD approved products etc.)(Attach additional sheet if required)
All materials used in the work are as per IS and CPWD specifications. However the approved material list enclosed as Annexure IV
7.0a Observations on workmanship QC aspects.(Attach separate sheet if required)
Full fledged QC team is working on the QC aspects from agency side and PMC is ensuring QC aspects. Apart from this, both engineer of IIMT and AED consultant’s engineers are ensuring QC aspects.Over and above, TPQA being done by undersigned
8.0a Bill details: Test audit of RA bill (Indicate RA bill No., gross amount, Vr. No. and date)
1.Mobilization advance of Rs.5,00,00,000/- Vr.No. 75 Dated 31.12.2014. 2. R.A. Bills 1 Rs.3,80,71,660/- Vr.No.41 Dated 19.03.2015 3. R.A.Bill 2 (Advance payment) Rs. 4,29,67,948/- Vr.
No.61 Dated 31.03.2015
6
8.0b Whether all test registers MAS register, Hindrance register submitted with the bill?
Yes
8.0c Whether checking of all registers as stated above done by AE(P) and their receipt acknowledged by AO in Division office
Yes, being checked by bill passing division. However,it is awaited the posting of regular AO for acknowledgement of receipt of registers,while paying the RA bill.
8.1a Deviation in quantities (modified vide OM DG/MAN/290 dt.01.10.2013): Whether deviation in quantities noticed?
Nil
8.1b If so, the reason thereof and whether prior approval of competent authority has been obtained before allowing deviations?
N.A. in view of above
8.1c Whether revised T/S is required due to these deviations? If yes, action taken
NA
8.2a Items not conforming to specification: Whether notice was issued as specified in contact?
NA
8.2b Whether approval in principle was obtained from competent authority before acceptance of substandard work?
NA
8.3a Extra/Substituted items(Modified vide OM DG/MAN/290 dt. 1.10.2013) Are justifications of items in remark column of EI/SI proper?
Since the work is in initial stages, no EI/SI has cropped up.
8.3b Whether prior approval of competent authority for EI/SI has been obtained before execution?
NA
8.3c Whether sanction of competent authority issued?
NA
8.4a Part Rates-whether rates held back are adequate?
NA
8.5a Comments on secured advance paid with reference to materials lying at site.
S.A. is paid for the materials received at site and as per Agreement conditions only.
8.6a Test check by AE/EE: Critical items:
RA bill No.1 bills are paid after completing mandatory requirements
8.6b Hidden items: RA bill No.1 bills are paid after completing mandatory requirements
8.6c Extent(whether satisfactory) Proper
8.7a Any other observation[The observation made about quality of material and workmanship relate to only what could be seen randomly at locations specified .The
Inspection notes attached as per Annexure VII
7
executive engineer and supervisory staff shall thoroughly inspect the entire Work for such defects as observed as well as for other defects and take suitable remedial measures properly. The executive engineer shall be responsible for accepting any defective work that went unnoticed but pointed out during such inspection.)
8.8a Progress of work and programme chart (Modified vide OM DG/MAN/290 dt.01.10.2013) Whether progress of work is as per stipulated milestone/approved revised mile stone? If no, action taken by EE
Yes
8.8b Whether contractor has submitted the programme to complete the various activities of work within the stipulated date of completion as per contract condition duly accepted by EE?
Yes
8.8c Whether the monthly progress report submitted by contractor as per programme submitted has been certified by JE/AE and reviewed by EE/SE?
Yes
8.8d Deployment of equipment/machinery with time schedule
Deployed in line with work program
8.8e Any notice under clause 3(a), (b) or (c) for inordinate delays has been issued or not. If yes, the action taken by EE.
NA
8.8f Review of hindrances and action taken by officers concerned to overcome them
Every week, work progress review meeting is being conducted to discuss about the progress and hindrances if any. Necessary steps being taken to remove those hindrances, apart from day-to-day review for minor issues are sorted out by raising RFIs
8.8g Availability of sanitation facility to workmen and submission of labour reports
Sanitation facilities are provided. Labour reports are complied as per agreement conditions.
8.8h Labour welfare measures Canteen established for labour.
8.8i Insurance policy to cover construction policy
Car Policy is taken by agencies
8.9 Initiative on use of innovative technology 1) GRIHA rating is being adopted 2) Rain water harvesting being effectively
proposed without letting of water drainage outside the site ( two ponds of area 17,000 and 6000 sqm are being created)
8
3) Recycled water is proposed to use for horticulture, chiller plant and flushing. (No waste water is running out of campus)
4) Solar panels to harness the solar energy for efficient use of energy.
5) Cup lock system and table form shuttering (aluminium doca system) has been used to enhance the speed of work to match with the schedule.
6) Since the building designs are unique, formwork and shuttering design had been asked from the contractor and the same has been checked before execution.
7) LEC roofing system is proposed to reduce electricity loads.
8) Water saver fixtures are proposed for effective utilization of water and to avoid wastage.
9) Glazing system is designed extensively for effective utilization of day light.
10) Under Green initiative,800 saplings have been planted at various location inside the campus to make it environment friendly. Further it is planned to plant more saplings along the boundary of the public nalla as well as in OSR areas.
11) Safety measures are witnessed at site
Scope of work
The Phase I construction of IIMT permanent campus is mandated to be ‘GRIHA COMPLIANT’ with 4 star rating. Accordingly, all the buildings are proposed to be provided with green building concepts like usage of green building materials in the construction, usage of water saver fittings for water supply and energy efficient electrical fittings and fixtures. CIVIL WORKS: The following provisions are made in this estimate for civil works of stage I of phase I construction.
(i) INSTITUTIONAL AREA OF CAMPUS: a. Administrative Building: The Building will be 3 storied RCC framed construction with 4
wings in each floor with a connecting bridge at each floor level. One wing(Wing ‘B’) in 2nd floor is proposed to be completed with hall type construction and flooring laid, so as to give an aesthetic and completed look for usage of such space in future and also to avoid any disturbance due to future construction activity to the administrative functions of the institute. Further a board room is proposed on the 3rd floor over the connecting bridge portion alone.
b. Academic Block: The class rooms portion will be of 2 storied RCC framed construction
(except for 1 No. of 250 seater class rooms and 2 Nos. of 120 seater class room, which will be of only single storied construction) with, 4 Nos. of 80 seater class rooms, 4 Nos. of 50 seater class rooms, 4 Nos. of 25 seater class rooms, 6 Nos. of multipurpose rooms and one finance lab.
The portion of faculty rooms along the campus arcade will be of 2 storied RCC framed construction with 64 Nos. of faculty/ Visiting faculty rooms and 12 Nos. of Secretarial Assistant’s rooms/ Teaching Assistant rooms apart from faculty lounges. An amphitheatre is proposed between class room portion and faculty room portion.
c. MDP Block: This block consists of both Residential and Academic areas.
The Academic portion will be 2 storied RCC framed construction with 1 No. 80 seater class room, 2 Nos. of 60 seater class rooms, 2 Nos. of 40 seater class rooms, one computer room, 2 Nos. of studio rooms with necessary kitchen and dining areas.
The Residential portion will be 4 storied RCC framed construction with 49 Nos. of residential rooms and 6 Nos. of suite rooms, one common rooms, and one electrical rooms
d. Library: The Library will be 5 storied RCC framed construction with ‘basement plus 4
upper floor’. Server room for data centre and network operations and IT meeting room are provided in basement, Computer class room in first floor, digital library and digital library store in third floor
e. Sports Complex: This building will be of single storied RCC framed construction with
provision for carrom/chess, Billiards, Meditation/Yoga room, Gymnasium, Table Tennis, Squash court, Short course, Swimming pool, Sauna etc. and 2 badminton courts with
Galvalume sheet roofing. One amphitheatre is also proposed on the rear side of the building.
f. PG Students Hostel Block: Students hostel will be 4 storied RCC framed construction with 70 Nos. of single occupancy rooms (2 for persons with physical disabilities(PwD)) in each block with common toilets and it is proposed to construct 7 such blocks in phase I construction, housing a total of 490 Nos. of students. The middle cut out portions are proposed to be covered with MS truss frame work and sheeting and planned to be housing sun photo voltaic cells.
g. Students Mess Block: Mess Block will be single storied RCC framed construction with 2 Nos. of 150 seating capacity dining areas each, with necessary kitchen, bain maries, electrical and AHU rooms and toilets.
h. Miscellaneous service blocks: Blocks such as Day care centre, Dispensary, Canteen, Faculty
club, Laundry block and Estate office (for immediate project site office purpose) are proposed to be single storied RCC framed construction. The Security block will be of 2 storied RCC framed construction.
i. Married Students hostel: This block will be 5 storied RCC framed construction with stilt
floor for parking and upper floors with 30 units of 2 bed room housing in each block. One such blocks is proposed to be constructed with a total of 30 residential married students hostel units under stage I of phase I construction.
(II). RESIDENTIAL AREA OF CAMPUS:
a. Staff Housing: It is proposed to construct one block of Type A housing with 3 bed rooms, for each unit, with 22 such quarters in a block. The block will be of 4 storied RCC framed construction(stilt for parking and 3 upper floors for residences)
Similarly one block for Type ‘B’(with 2 bed rooms) housing is proposed with 22 units for each block. These blocks also will be of 4 storied RCC framed construction (stilt for parking and 3 upper floor for residences).
b. Faculty Residences: These will be individual duplex type bungalows with 3 bed rooms of
RCC framed construction for housing the faculty members. A total of 40 such units (out of total 40 units, 2 units are proposed for barrier free utility for persons with physical disabilities) are proposed under stage I of phase I construction. Each unit is provided with garage for parking.
c. Director’s Residence: This unit will be of duplex type RCC framed construction with one office room.
The broad specifications for civil works of various buildings are enclosed vide Annexure B. CIVIL BULK SERVICES AND OTHER ALLIED WORKS: The provision is also made in this estimate for civil bulk services and other allied works like:
a. Development of campus site with internal roads for main Academic and Residential spine roads,
storm water drains and sewer lines. The entire road network shall be of bituminous road.
b. Pre-construction anti termite treatment of the campus buildings. c. Over head tank for gravity flow of water for faculty residences (with single pumping for the
present and pumping twice daily in the future). For other buildings, sumps of suitable capacity are being proposed with direct pressure pumping to terrace water tanks of respective buildings.
d. Water treatment plant of 225 KLD (with necessary R.O system for drinking water requirements alone).
e. Sewage treatment plants with MBBR technology of total of 165 KLD capacities with 2 STPs (100 KLD and 65 KLD), one each for institutional area (with necessary pumping arrangements) and one for residential area as per the standard design requirement.
f. Tertiary treatment for STP treated water of 100KLD for HVAC chiller requirement. g. Utility crossing pipes across the roads of the entire campus. h. Provision for Architectural features of glass reinforced concrete Jali with MS frame work for all
the buildings is added. i. Creation water bodies with EPDM lining. j. Utility buildings like pump room, DG set rooms, etc.
. ELECTRICAL WORKS: - The following provisions are made in this estimate for Electrical and Mechanical services of stage I of phase I construction..
1) 11 KV / 433 V substations 2) Power distribution system 3) Internal electrification works 4) Low side HVAC works 5) HT DG sets 6) UPS 7) Lifts 8) Fire fighting system 9) Fire alarm system 10) Public Address System 11) Street lighting limited to main roads and built up areas 12) Automatic power transfer switches with dual metering for all residences with necessary
power cabling Electrical substations: One receiving station to receive 11 KV HT supply with 7 sub stations at different locations with compact / dry type/ ONAN type transformers of required capacity is proposed. All Substation equipments comprising of HT panels, Transformers, LT panels, Bus trunking from Transformers to LT Panels, APFC panels and other allied items are included in Sub stations. HT looped ring main cable is proposed through the outer ring road of the campus with VCB & RMGs. Internal electrification works: Internal electrical works proposed are of wiring with Fire Retardant PVC insulated copper conductor cable in surface / recessed PVC conduit with modular type switches, accessories and energy efficient fittings. Power wiring, telephone and LAN wiring with socket outlets. Lighting controls and sensors as per requirement is also proposed. HVAC system: All the main buildings viz., Academic, Admin, Library, MDP, PGP Hostels and Married Student’s Hostels are proposed to be air conditioned with chilled water plants. PGP Hostels and Married
Annexure ‘C’ Student’s Hostels are proposed to be air conditioning during off period of other major loads (i.e. during night times only).Low side HVAC works like fan coil units, chilled water piping arrangement inside the
buildings are included in the above said buildings. Air conditioning with VRF System of 70 HP capacity is proposed for Sports Complex, faculty club, Day Care Centre etc. HT DG sets: HT DG sets of 1010 KVA each with synchronizing and AMF panels are proposed at the main receiving station. UG fuel tank for HT DG sets is also proposed.One trolley mounted LT DG set of 500 KVA is proposed as standby. UPS: UPS of capacity 50 KVA for Admin block and 40 KVA for Academic block is proposed. 150 KVA for Library Block (including Server Rooms),40 KVA for MDP Academic block and 7 KVA for ancillary buildings like security cabin and dispensary is also proposed. All the UPS are proposed with 30 minutes battery backup. The UPS for the main institute server is not included in the scope as it is proposed to utilize the existing UPS of institute. Lifts: Total 21 numbers lifts (19 Nos. 13 passenger and 2 Nos. 8 passenger) are proposed as per individual building requirements. Fire fighting and alarm system: Fire fighting installations with Wet risers / Down comers and allied items are proposed for individual buildings as per NBC requirement. Automatic sprinkler system is also proposed in the Library. . Similarly Fire alarms with manual and or automatic detection system are proposed in individual buildings as per requirement. Solar PV system: Roof top solar PV panel of total 105 KW (15 KW capacity in each PGP hostel block) is proposed. Street Lighting: Street lighting with LED fittings and automatic control is proposed for Main roads.
IIM - TRICHY - MATERIAL & SPECIFICATION LIST
SPACES FLOORING FINISH RAILING FALSE CELINGINTERNAL EXTERNAL
ENTRANCE FOYER
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint+ Plastic
Emulsion paint
Metal false
ceiling
LIVING ROOM/FAMILY ROOM
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint+ Plastic
Emulsion paintCOURT YARD Cobble stone
OFFICE SPACE
Engineered Wooden
floor
Texture paint+ Plastic
Emulsion paint
STAIRCASEKota flooring with Kota Skirting
Texture paint+ Plastic Emulsion paint
Teak wood handrail with MS Railing
DINING ROOMKota flooring + Jaisalmer border with Kota Skirting
Texture paint+ Plastic Emulsion paint
BED ROOM 01Vitrified Tiles with VT skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
BED ROOM 02Vitrified Tiles with VT skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
KITCHEN Antiskid Vitrified Tiles
Cement tile Dado+Plastic Emulsion paint
SERVICE BAY/UTILITY Antiskid Vitrified Tiles
Cement tile
Dado+Plastic Emulsion paint
PORCH Cobble stones
STAIRCASEKota flooring with Kota Skirting
Texture paint+ Plastic Emulsion paint
Teak wood handrail with MS Railing
CONNECTION - FIRST
FLOOR Kota flooring + Jaisalmer border with Kota Skirting
Texture paint+ Plastic Emulsion paint
BED ROOM 03 (Master bed)Vitrified Tiles with VT skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Cement tile Dado+Plastic Emulsion paint
BALCONY Antiskid Vitrified Tiles MS Railing
BED ROOM 04
Vitrified Tiles with VT
skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Cement tile Dado+Plastic Emulsion paint
BALCONY Antiskid Vitrified Tiles MS Railing
ATT. TOILET Antiskid Vitrified Tiles
Cement tile Dado+Plastic Emulsion paint
TERRACESIntegrated water proofing + APP membrane MS Railing
ROOFIntegrated water proofing + APP membrane MS Railing
ROOF
Granite Wet cladding/Textur
e paint/
Structural Glazing/ GRC
Jalli/ Grit Plaster
Texture paint/ GRC Jalli/ Grit Plaster
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
DIRECTORS HOUSE
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
ENTRANCE FOYER
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
Metal false
ceiling
LIVING ROOM
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
COURT YARD Cobble stone
CONNECTION - L/D
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
STAIRCASE
Kota flooring with Kota
Skirting
Texture paint +
Plastic Emulsion paint
Teak wood
handrail with
MS Railing
DINING ROOM
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
DINING DECK
Kota flooring + Jaisalmer
border with Kota Skirting
BED ROOM 01
Vitrified Tiles with VT
skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
KITCHEN Antiskid Vitrified Tiles
Ceramic tile
Dado+Plastic
Emulsion paint
SERVICE BAY/UTILITY Antiskid Vitrified Tiles
Ceramic tile
Dado+Plastic
Emulsion paint
SERVICE STAIRCASE MS Staircase Paint Finish MS Railing
PORCH Cobble stone
STAIRCASE
Kota flooring with Kota
Skirting
Texture paint +
Plastic Emulsion paint MS Railing
CONNECTION - FIRST
FLOOR
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
BED ROOM 02 (Master bed)
Vitrified Tiles with VT
skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
BALCONY Antiskid Vitrified Tiles MS Railing
BED ROOM 03
Vitrified Tiles with VT
skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
BALCONY Antiskid Vitrified Tiles MS Railing
SERVANTS ROOM
Vitrified Tiles with
skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
ROOF
s
Texture paint/
GRC Jalli/ Grit
plaster
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
FACULTY HOUSE
GROUND FLOOR
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
ENTRANCE FOYER
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
LIVING ROOM
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
CORRIDOR
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
BED ROOM 01
Vitrified Tiles with VT
skirting Plastic Emulsion paint
DINING ROOM
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion paint
BED ROOM 02
Vitrified Tiles with VT
skirting Plastic Emulsion paint
BED ROOM 03
Vitrified Tiles with VT
skirting Plastic Emulsion paint
TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
KITCHEN Antiskid Vitrified Tiles
Ceramic tile
Dado+Plastic
Emulsion paint
SERVICE BAY/UTILITY Antiskid Vitrified Tiles
Ceramic tile
Dado+Plastic
Emulsion paint
SERVICE STAIRCASE MS Staircase Paint Finish MS Railing
SERVANTS ROOM
Vitrified Tiles with
skirting Plastic Emulsion paint
ATT. TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
PORCH Cobble stone
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
HANDICAPPED FACULTY HOUSE
GROUND FLOOR
ROOF
Texture paint/
Grit plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
ENTRANCE
Vitrified Tiles with VT
skirting
Texture paint +
Plastic Emulsion
paint
LIVING ROOM/DINING ROOM
Kota flooring with Kota
Skirting
Texture paint +
Plastic Emulsion
paint
BALCONY Antiskid Vitrified Tiles
BED ROOM 01 (Master)
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
ATT. TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
BED ROOM 02
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
BED ROOM 03
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
BATH Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
KITCHEN Antiskid Vitrified Tiles
Ceramic tile
Dado+Plastic
Emulsion paint
UTILITY/SERVICE BAY Antiskid Vitrified Tiles
Ceramic tile
Dado/Plastic
Emulsion paint
STAIRCASE
Kota flooring with Kota
Skirting
Texture paint +
Plastic Emulsion
paint
Teak wood
hand rail with
MS railing
LIFT LOBBIES
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint +
Plastic Emulsion
paint
Teak wood
hand rail with
MS railing
LIFTS
Kota flooring + Jaisalmer
border with Kota Skirting
SS Cladding/As
specified by Lift
Vendors
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
STILT PARKING Cement concrete flooring
Apex paint/Column
guards
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
ROOF
Texture paint/
Grit Plaster
Texture paint/
Grit Plaster
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
STAFF HOUSE TYPE A/B
Units
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
RECEPTION
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint As per interiors
LOBBY/CORRIDOR
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint As per interiors
AV/THEATER ROOM
Engineered Wooden
floor
Plastic Emulsion
paint/As per interior
scheme/AV
ConsultantsBADMINTON/CENTRAL
COURT Synthetic flooring
GAMES ROOM
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint As per interior
scheme
GYMNASIUM Linonium
Plastic Emulsion
paint As per interior
scheme
ACTIVITY/CLASS ROOM
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint As per interior
scheme
DECK
Antiskid Vitrified
Tiles+flamed granite
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
FACULTY CLUB
GROUND FLOOR
ROOF
Texture paint/
Grit Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
ROOM
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
BALCONY Antiskid Vitrified Tiles
CORRIDOR
Kota flooring + Jaisalmer
border with Kota Skirting
M.S Railing
with Parapet
wall
GROUD FLOOR COMMON
AREA
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
TOILET LOBBIES
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
LIFTS Kota flooring
SS Cladding/As
specified by Lift
Vendors
STAIRCASE Kota flooring
Plastic Emulsion
paint M.S Railing
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
ACTIVITY BRIDGES
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint M.S Railing
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
PGP HOSTEL
Units
Common area
ROOF
Texture paint/
Grit Plaster
Texture paint/
Grit Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
DINING AREA Vitrified Tiles
Plastic Emulsion
paint
BAIN MARIE/SERVING AREA
Kota flooring + Jaisalmer
border with Kota Skirting
Cement tile
Dado+Plastic
Emulsion paint
CORRIDOR
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
HAND WASH Antiskid Vitrified Tiles
Cement tile
Dado+Plastic
Emulsion paint
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
KITCHEN
Kota flooring + Jaisalmer
border with Kota Skirting
Cement tile
Dado+Plastic
Emulsion paint
DISHWASH/GARBAGE
ROOM
Kota flooring + Jaisalmer
border with Kota Skirting
Cement tile
Dado+Plastic
Emulsion paint
LOADING/UNLOADING AREA
Kota flooring + Jaisalmer
border with Kota Skirting
Cement tile
Dado+Plastic
Emulsion paint
GAS BANK Cement floor MS Mesh
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
PGP MESS
GROUND FLOOR
ROOF
Texture paint/
Grit Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
ENTRANCE
Kota flooring + Jaisalmer
border with Kota Skirting
Texture paint+Plastic
Emulsion paint
LIVING ROOM/DINING ROOM
Vitrified Tiles with VT
skirting
Texture paint+Plastic
Emulsion paint
BED ROOM 01 (Master)
Vitrified Tiles with VT
skirting
Plastic Emulsion
paintBED ROOM 02/STUDY
ROOM
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
BATH Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
TOILET Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
KITCHEN Antiskid Vitrified Tiles
Cement tile
Dado+Plastic
Emulsion paint
UTILITY/SERVICE BAY Antiskid Vitrified Tiles
Cement tile
Dado/Plastic
Emulsion paint
STAIRCASE
Kota flooring with Kota
Skirting
Plastic Emulsion
paint
Teak wood
hand railing
with M.S
Railing
LIFT LOBBIES
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
Teak wood
hand railing
with M.S
Railing
LIFTS Kota flooring
SS Cladding/As
specified by Lift
Vendors
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
STILT PARKING Cement concrete flooring
Apex paint/Column
guards
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
ROOF
Texture paint/
Grit plaster
Texture paint/
Grit plaster
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
MARRIED STUDENT HOSTEL
Units
Common area
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
OFFICE CUBICALS
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
DIRECTOR/CHAIRMAN's
OFFICE
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
CONFERENCE ROOM
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
BOARD ROOM
Engineer Wooden
flooring
Plastic Emulsion
paint/As per interior
scheme
MEETING ROOM
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
OPEN OFFICE AREA
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
RECEPTION
Polished Finish Granite
with Granite skirting
Plastic Emulsion
paint/As per interior
scheme
LOBBY/
CORRIDOR/PASSAGES
Polished Finish Granite
with Granite skirting
Plastic Emulsion
paint/As per interior
scheme
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint/As per interior
scheme
LIFTS
Polished Finish Granite
with Granite skirting
SS Cladding/As
specified by Lift
Vendors
STAIRCASE
Polished Finish Granite /
Kota with Granite skirting
Plastic Emulsion
paint
S.S Railing
with SS
verticals
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
AHU
IPS flooring + antistatic
mat
Plastic Emulsion
paint
STAFF CAFETERIA Vitrified Tiles
Plastic Emulsion
paint/As per interior
scheme
PANTRY Kota flooring & skirting
Vitrified tile
Dado+Plastic
Emulsion paint
TERRACES
Roof Insulation with
water proofing
Parapet
wall/Planter
ROOF
Roof Insulation with
water proofing Parapet wall
ROOF
Granite Dry
cladding/Texture
paint/ Structural
Glazing/ Grit
plaster
Granite Dry
cladding/Texture
paint/ Structural
Glazing/ Grit
plaster
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
ADMINISTRATION
Units
Common area
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
OFFICE CUBICALS
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
OPEN OFFICE AREA
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
CLASS ROOMS
Carpet + Engineer
wooden flooring
Plastic Emulsion
paint/As per interior
scheme
COMPUTER ROOM
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
RESTAURANT/FOOD COURT
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint/As per interior
scheme
RESTAURANT/FOOD COURT-
EXTERIOR SPILL OUT Flamed granite
Plastic Emulsion
paint/As per interior
scheme
RESIDENTIAL SINGLE
ROOM
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
ATT. TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
RESIDENTIAL SUITE ROOM Antiskid Vitrified Tiles
Plastic Emulsion
paint/As per interior
scheme
ATT. TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
RECEPTION
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint/As per interior
scheme
LOBBY
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint/As per interior
scheme
CORRIDOR/PASSAGES
Kota flooring with Kota
Skirting
Plastic Emulsion
paint/As per interior
scheme
Teak wood
handrail and
S.S Railing
with Parapet
wall
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint/As per interior
scheme
LIFTS
Kota flooring with Kota
Skirting
SS Cladding/As
specified by Lift
Vendors
STAIRCASE
Kota flooring with Kota
Skirting
Plastic Emulsion
paint
Teak wood
handrail and
S.S Railing
with Parapet
wall
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
AHU
IPS flooring + antistatic
mat
Plastic Emulsion
paint
KITCHEN Antiskid Vitrified Tiles
Cement tile
Dado+Plastic
Emulsion paint
PANTRY Antiskid Vitrified Tiles
Cement tile
Dado+Plastic
Emulsion paint
TERRACES
Roof Insulation with
water proofing
Parapet
wall/Planter
ROOF
Roof Insulation with
water proofing Parapet wall
Common area
ROOF
Granite Dry
cladding/Texture
paint/ Grit plaster
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
MDP
Units
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
RECEPTION
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
LOBBY
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
STACK AREA
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
READING AREA
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
ACTIVITY AREA/CLASS
ROOMS/CAFETERIA
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
OFFICES/CUBCALS
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paintNoC/COMPUTER
CENTER/DATA CENTER Raise/Deck Flooring
Plastic Emulsion
paint
STORES IPS flooring
Plastic Emulsion
paint
LIFTS Kota with Kota skirting
SS Cladding/As
specified by Lift
Vendors
STAIRCASE/RAMPS Kota with Kota skirting
Plastic Emulsion
paint
Teak wood
handrail and
S.S finish
Railing with
SS verticals
CORRIDOR/PASSAGES
Kota flooring + Jaisalmer
border with Kota Skirting
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal false
ceiling
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
AHU
IPS flooring + antistatic
mat
Plastic Emulsion
paint
TERRACES
Roof insulation with
water proofing MS Mesh
Parapet
wall/Planter
ROOF
Roof insulation with
water proofing Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
LIBRARY
Bisazza
tiles/Texture
paint/ Grit Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
FACULTY OFFICE
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
SECRETARY
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
TEACHING ASSISTANTS
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint/As per interior
scheme
CLASS ROOMS
Carpet + Engineer
wooden flooring
Plastic Emulsion
paint/As per interior
scheme/As per AV
Consultants
SEMINAR ROOM
Carpet + Engineer
wooden flooring
Plastic Emulsion
paint/As per interior
scheme/As per AV
Consultants
MULTIPURPOSE CLASS
ROOM
Engineer wooden
flooring
Plastic Emulsion
paint/As per interior
scheme/As per AV
Consultants
COMPUTER ROOM Kota with Kota skirting
Plastic Emulsion
paint/As per interior
scheme
MEETING/DISCUSION ROOM Kota with Kota skirting
Plastic Emulsion
paint/As per interior
scheme
GUEST/VISITOR LOUNGE Kota with Kota skirting
Plastic Emulsion
paint/As per interior
scheme
CAMPUS ARCADE Kota with Kota skirting
CORRIDOR/PASSAGES Kota with Kota skirting
Teakwood
hand rail and
S.S Railing
with Parapet
wall
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
Metal False
ceiling
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint/As per interior
scheme
LIFTS Kota with Kota skirting
SS Cladding/As
specified by Lift
Vendors
STAIRCASE Kota with Kota skirting
Plastic Emulsion
paint
Teakwood
hand rail and
S.S Railing
with Parapet
wall
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
AHU
IPS flooring + antistatic
mat
Plastic Emulsion
paint
PANTRY Antiskid Vitrified Tiles
Cement tile
Dado+Plastic
Emulsion paint
AMPHITHEATER Flamed Granite Tile
TERRACES
Roof insulation with
water proofing
Parapet
wall/Planter
ROOF
Roof insulation with
water proofing Parapet wall
ROOF
Granite Dry
cladding/Texture
paint/ Grit plaster
Granite Dry
cladding/Texture
paint/ Structural
Glazing/ GRC
Jalli/ Apex paint
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
ACADEMIC
Units
Common area
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
SHOPS
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
FOOD COURT
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
KITCHEN/SERVING
COUNTERS
Kota flooring + Jaisalmer
border with Kota Skirting
Cement tile
Dado+Plastic
Emulsion paint
HAND WASH Antiskid Vitrified Tiles
Cement tile
Dado+Plastic
Emulsion paint
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
DISHWASH/GARBAGE
ROOM
Kota flooring + Jaisalmer
border with Kota Skirting
Cement tile
Dado+Plastic
Emulsion paint
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
CANTEEN
GROUND FLOOR
ROOF
Texture paint/
Grit Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
CONSULTATION ROOMS
Vitrified Tiles with
skirting
Plastic Emulsion
paint
TREATMENT ROOMS
Vitrified Tiles with
skirting
Cement tile
Dado+Plastic
Emulsion paint
EMERGENCY ROOM
Vitrified Tiles with
skirting
Cement tile
Dado+Plastic
Emulsion paint
WARDS/NURSE STATION
Vitrified Tiles with
skirting
Cement tile
Dado+Plastic
Emulsion paint
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
PHARMACY
Vitrified Tiles with
skirting
Plastic Emulsion
paint
RECEPTION/LOBBY/CORRID
ORS
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
DISPENSARY
GROUND FLOOR
ROOF
Texture paint Grit
Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
RECEPTION/LOBBY/CORRID
ORS
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
PRE-SCHOOL PLAY ROOM
Vitrified Tiles with
skirting
Cement tile
Dado+Plastic
Emulsion paint
PANTRY
Vitrified Tiles with
skirting
Cement tile
Dado+Plastic
Emulsion paint
BABY'S PLAY ROOM
Vitrified Tiles with
skirting
Cement tile
Dado+Plastic
Emulsion paint
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
TODDLER PLAY ROOM
Vitrified Tiles with
skirting
Cement tile
Dado+Plastic
Emulsion paint
LACTATION ROOM Vitrified Tiles with
skirting
Cement tile
Dado+Plastic
Emulsion paint
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
DAY CARE
GROUND FLOOR
ROOF
Texture paint/
Grit Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
ENTRANCE AREA
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
LAUNDRY AREA
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
LAUNDRY
GROUND FLOOR
ROOF
Texture paint/
Grit Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
RECEPTION
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
LOBBY
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
YOGA ROOM
Engineered Wooden
Flooring
Plastic Emulsion
paint/As per interior
scheme/AV
Consultants
BADMINTON/SQUASH
COURT Synthetic Flooring
Plastic Emulsion
paint
GAMES ROOM -
TT/CARROM/CHESS/BILLIAR
DS
Vitrified Tiles with VT
skirting
Plastic Emulsion
paint
GYMNASIUM Linonium
Plastic Emulsion
paint/As per interior
scheme
POOL/POOL DECK
ceramic tiles/Antiskid
Vitrified Tiles+flamed
Finished Granite Glazed Tiles
CORRIDOR/PASSAGES
Kota flooring + Jaisalmer
border with Kota Skirting
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint
ELECTRICAL ROOM
IPS flooring + antistatic
mat
Plastic Emulsion
paint
TERRACES
Integrated water proofing
+ APP membrane MS Mesh
Parapet
wall/Planter
ROOF PUF panel roofing Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
SPORTS COMPLEX
GROUND FLOOR
ROOF
Texture paint/
Grit Plaster
SPACES FLOORING FINISH RAILING FALSE CELING
INTERNAL EXTERNAL
WAITING / RECEPTION
Kota flooring + Jaisalmer
border with Kota Skirting
Plastic Emulsion
paint
MALE + FEMALE
DORMITORY Vitrified Tiles
Plastic Emulsion
paint
TOILETS Antiskid Vitrified Tiles
Ceramic tile
Dado+Distemper
TOILET LOBBIES Vitrified Tiles
Plastic Emulsion
paint
SECURITY POST + CHIEF
SECUIRTY OFFICER'S
ROOM Vitrified Tiles
Plastic Emulsion
paint
TERRACES
Integrated water proofing
+ APP membrane
Parapet
wall/Planter
DINING + PANTRY Vitrified Tiles
Plastic Emulsion
paint
ROOF
Integrated water proofing
+ APP membrane Parapet wall
IIM - TRICHY - MATERIAL & SPECIFICATION LISTWALL FINISH
SECURITY GATE
GROUND FLOOR
FIRST FLOOR
Texture paint/
Grit Plaster
Annexure III
35
PROGRESS REPORT AS ON 25.04.2015
1.Admin Block : The Building is of 3 (G+2) storied RCC framed construction with 4 wings (North,
South, East, West) in each floor with a connecting bridge at each floor level. Further a board
room is proposed on the 3rd floor over the connecting bridge portion alone.
west wing: Casting of First floor slab completed and Centering and shuttering for second floor slab is
under progress.
North wing: Casting of the First floor slab completed and Centering and shuttering for second floor slab
is under progress.
South wing: Casting of the first floor slab is under progress.
East wing: Casting of the external grade/plinth beams completed.
2. Academic Block: The class rooms portion will be of partly 2 (G+1) storied and partly single
storied RCC framed construction. The portion of faculty rooms will be of 2 (G+1)storied RCC
framed construction.
Casting of the footings over for entire block and casting of the plinth/grade beam of
length 2500 meters out of 6800 running meters length is completed. Presently
centering shuttering for first floor slab in faculty rooms area (left side) and casting of
the remaining plinth/grade beam is under progress.
3.Canteen: The building is of Single ( G )storied RCC framed construction.
Casting of the Roof slab is completed. Presently AAC block masonry work is under
progress.
4.PGP Hostel Blocks: Students hostel will be 4 (G+3) storied RCC framed construction with 70 Nos. of single occupancy rooms in each block with common toilets and it is proposed to construct 7 such blocks.
Casting of the footings for 5 blocks completed and 10 footings are pending in each of the 2 remaining blocks. Presently in block 1, centering and shuttering for First floor slab is under progress and casting of the plinth/grade beam in Block No.2 and 3 are under progress.
5. Students Mess Block: Mess Block will be of partly 2 (G+1) storied RCC framed construction with 2 Nos. of 150 seating capacity dining areas each, with necessary kitchen, bain maries, electrical and AHU rooms and toilets in ground floor and mess workers area in first floor.
Casting of all the footings are completed. Presently casting of the Plinth/grade beam is
under progress.
Annexure III
36
6.Faculty Residences: These will be individual duplex type bungalows with 3 bed rooms of RCC framed construction for housing the faculty members. A total of 40 such units (out of total 40 units, 2 units are proposed for barrier free utility for persons with physical disabilities).
Earth work excavation and casting of the footings for 17 blocks completed. Casting of the first floor slab for 2 blocks completed.
7. Dispensary Block : Single ( G ) storied RCC framed structure. Casting of all footing completed and columns raised upto Plinth/grade level. Presently
back filling of foundation trenches are under progress. 8. Laundry Block: Single ( G ) storied RCC framed structure.
Casting of all footing completed and columns raised upto Plinth/grade level. Presently back filling of foundation trenches are under progress.
9. Staff Housing A: The block will be of 4 (Stilt +3)storied RCC framed construction (stilt for parking and 3 upper floors for residences. Each unit in Type A housing with 3 bed rooms, with 22 such units (quarters) in a block.
Earth work excavation in foundation started.
LIST OF APPROVED MAKE OF MATERIALS (FOR CIVIL WORKS)
SI.NO. MATERIALS VENDORS ADDITIONAL VENDORS LIST APPROVED.
1 Earth work
1.1 Chlorpyriphios (Pre-construction treatment)
DE-NOCIL , Bayer
1.2 Damp proof material Impermo, Duraseal, ACCO-proof Pidilite, Sika
2 Concerte works
2.1 Cement
(OPC)
ACC, Ultratech, Coromandel,
RAMCO, Chettinad Dalmia , Zuari
2.2 White cement ACC, Birla , J.K white
2.3 Chemical Admixtures
MC Bauchemie, Pidilite , Sunanda
chemicals, Sika , FOSROC,
ChokseyChemicals
BASF
2.4 Expansion joint board Supreme Industries, SIL FILL or equivalent
3 RCC Works
3.1 Reinforcement steel SAIL , TATA(TISCO) , RINL
4 Steel work
4.1 Structural Steel SAIL , TATA(TISCO), RINL, Jindal
4.2 M.S. Pipe, Tubes, Bar, Flats, Angle, Tee Sections
SAIL, TATA (TISCO) JINDAL
5 Brick works
5.1 AAC blocks Xtralite from Ultratech, Aerocon
from HIL, Siporex India limited,
KAMCRETE, CELL O CON
5.2 Concrete blocks
6 Wod & PVC Work
6.1 Wooden Flush Doors Kutty, Green ply, Century, Kit ply, Ravella door, Kailash, Shakthi
6.2 Water proof Ply Green Ply, Garnet, Century, Kit Ply, Anchor
6.3 Commercial Ply. Archidply, Century, Donear, Green Ply,Kitply, Anchor
6.4 Laminate Greenlam Century, Merino, Royal Touch, Kitply, Formica, Decolam
6.5 Pre-laminated particle board-Exterior
grade
Novopan/Merino/Green Lam/ Kitlam, Ecoboard Associated / Arclid ply/Century
6.6 Gypsum board Saint Gobain, Lafarge, Boral Board, Armstrong
6.7 Melamine Polish
Asian paints, melamine Gold wood fin of Pidilite Industries, Timbertone of ICI
6.8. Door Hardware Dorma, Kich , Classic, Haffle, Ozone, Geze.
Dorset
6.9. Hydraulic door closers / Floor springs
Godrej, Hardwyn, Dorma, Everite. Dorset, OZONE, GEZE.
6.10. Locks / Latches Dorset, Godrej, Harrison, plaza, yale
Dorma, OZONE, GEZE.
6.11. Metalic Steel Fire Door Shakti Met Door, Promat, Godrej Navair
6.12. Fire smoke Seal Hilti, Raven
6.13. Fire Rated Hardware Dorma, Ingersolrand, Geze
6.14. Non Metalic Fire Door Shakti Met Door, Naviar / Promat, Godrej
Navair
6.15. Stainless steel screws for fabrication and fixing of windows.
Kundan/puja/Atul Dorset, OZONE
6.16. Butt Hinges openable Window shutters
Haffle , Alu Alpha Dorma. Dorset
6.17. Mild Steel Butt Hinges/ Piano Hinges
Jolly, Garg, AMIT,Jyoti Crown, Shalimar
6.18. Nuts Bolts/ Screws Kundan, Puja, Atul Shalimar, Dorset, Ozone
6.19. Concealed Tower Bolt Dorma, Ingersolrand, Alu Alpha
Dorset, Ozone, Geze
6.20. Acoustic Insulation U.P. Twiga Ltd, Lloyd Insulation, Saint Gobain,
Anutone, Armstrong
6.21. Glass/ reflective Glass Saint Gobain, Asahi, Pilkington, Glaverbel
6.22. Clear Float Glass Saint Gobain, Asahi, Pilkinton
6.23. Source for tempering Refl.Glass / Clear
FUSO, SaintGobain, Gurind,
Impact Safety
6.24. Fire rated Glass Pyoswiss of Saint Gobain, pyran of schott, pilkington
7 Flooring
7.1 Vitrified Tiles As;ian, NITCO, RAK, Restile, Kajaria,Somany
7.2 Glazed Ceramic Tiles NITCO, RAK, Kajaria, Somany, Asian
7.3 Synthetic sports flooring Armstrong, LG, Wonder floor Gerflor
7.4 Linoleum sports flooring Armstrong, Forgo, Gerilo
7.5. False Floor Hewetson, Unifloor, Unitile, kebao, Pinnacle
7.6 Engineered wood flooring Armstrong, wernel, Pergo Gerflor
7.7 Floor Springs(for Non-DSR items)
Dorma , Ingersoland , GEZE Dorset, Ozone
7.8 Cement Concrete Parking tiles NITCO, Poddar, Eurocon, Dazzle ultra.
7.9 Interlocking Concrete Blocks Ultra, Shree, Hindustan Tiles,
Vyara Tiles Pvt., Ltd. Nitco
7.10. High Density fibre (HDF) Pre-Laminated board
Pergo, Armstrong
7.10. Synthetic Carpet Tiles TOLI, Hollitex, Standard Carpets
8 Finishing
8.1 Paint/primer/oil bound distemper Acrylic paint
Asian Paints, ICI Dulux, Nerolac, Berger, Jotun
AkzoNobel
8.2 Water proof cement paint Snowcem India Ltd, Asian Paints,Berger,
8.3 Synthetic enamel paint Berger, Nerolac, Asian, ICI
8.4 Cement based wall putty JK wall putty, Birla wall case, Asian Paints, Altek.
8.5 Acrylic textured plaster Asian Paints, Spectrum paints, Heritage.
8.6. Ready mix Cement plaster Wall plast, Ultretech, Madras cement Ltd.
8.7. Melamine polish Asian paints, wodfin Timberstone, Polycure
2 1 7
8.8 Fire Retardant paint Jotun, Hilti, Akzonobel
8.9 Mirror Glass Modi Guard, Saint Gobain, Asahi, Atul
8.10 Anti Corrosive Bitumastic Paint Asian / Berger / Shalimar
8.11. Epoxy Paint Asian /Berger /Shalimar
8.12. Epoxy Coating BASF , Forsoc , Laticrete
8.13. Silicon coating Dowcorning, BASF, GE, Wecker
9 Aluminium Work
9.1 Aluminium Systems / Anodized
aluminum fittings for doors /
windows /windows
Schueco, Bhoruka, Kawneer,
Hardima,
Everite, Sigma
9.2 Aluminium Fittings Classic, crown, Jyoti
9.3 Aluminium Sections Hindalco / Jindal / Bhoruka / Indal
9.4 Friction stay hinges Earl-Bihari Ebco, Dorset, Dorma
9.5 E.P.D.M. Gaskets Anand / Roop / Bohra / Hanu / Amee
Rubber
9.6 Silicon Gaskets Sree Gaurav, Roop
10 Water Proofing
10.1 Water proofing compound Fosroc, BASF, Sika, Pidilite, CICO, Impermo, Acco proof
10.2 Membrane Waterproofing system
BASF, STP limited, Texsa, WR Grace, Pidilite, Hydro tech ltd.
Fosroc
10.3 Chemical Waterproofing system BASF, MC-Bauchemie, Sika,
Sunanda Specialty Coatings,
Perma Construction Aid Pvt. Ltd.
Forsoloc, Pidilite
CICO
10.4 Water stops Hydrotite, BASF, Hydroswell
11.1 PVC Perforated Pipes Rex Polyextrusion Ltd, Akash Enterprises, Zenplas Pipes Pvt. Ltd
11.2 Play equipments Koochie Play, Playworld Systems
12 Miscellaneous
12.1 Structural Sealant Dow Corning, Wacker, GE, Fowroc,
BASF
12.2 Polysulphide sealant Pidilite, Chemetall-Raj, Fosroc, choksey chemicals, Tuff seal
12.3 Bitumen Impregnated Board Shalitex or equivalent
12.4 Polyethylene backer rod Supreme Ind. Ltd. Or equivalent
12.5 Epoxy Fosroc / STP / CICO / Ardex SIKA / BASF/ Pidilite
12.6 False Ceiling Members(Perimeter, ceiling section, intermediates, angles
Armstrong, Gyp. Steel of India
Gypsum
Ltd (Saint Gobain)
12.7 Welding rod ADVANI, Esab
12.8 Metal Deck sheet TATA, SAIL JSW
12.9 Shear Stud / Connector KOCO or equvalent
12.10. Clamp. Rebar, Chemical fastener
Hilti, Fischer, Wurth
12.11. Anchor Fasteners / bolts Hilti, Fischer, Halfen
12.12. Masking Tapes 3M, Sun Control, Wonder Polymer
12.13. Dash Fasteners Hilti, Fischer, Anchor, Kundan.
12.14. Stainless Steel bolts, Washer
and nuts Kundan / Puja / Atul , Hilti
12.15. Stainless Steel Pressure Plate Screws
Kundan / Puja / Atul
12.16. Stainless Steel Friction Stay hinges
Hetich , Haffle , Securistyle , Earl Bihari,
ROTO
12.17 Weather Silicon make and grade
Dow Corning / Momentive (GE)
12.18 Structural Silicon Dow Corning / Momentive (GE)
12.19. GRC Jali Terrafirma , Ecovision & Mahesh GRC
12.20. Stainless Steel Salem , Jindal , SAIL
12.21. Polycarbonate Sheet
Danpalon , Alcox , Polygal , V.A.
Corporation , Joy Fab, Yadav
Engineering
12.22. Post tensioning system CRUX , VSL , Utracon , BBR
12.23 PT Strands DP Wires , Tata , Usha Martin
12.24 Adhesive Dunlop, Vamorganic, Sika, Forsoloc
12.25 Grouts Balendura, Lativete, Kerakoll, Weber
12.26. Solar studs / Median markers 3M, Avery Dennision, Nikkalite
12.27. Polycarbonate Convex Mirrors,
Rubberised road hump Unique safety solutions
12.28. Air transfer grills Cool grills Pune, Systemair India
13 Public Health Engg.
13.1 Vitreous Commodes / wash basin
Hindware, Roca, Parryware, Kohler
13.2 Water supply and sanitary
fixtures / fittings like bib cocks, shower panels
Jaguar, Parryware, Kohler
13.3 GI Pipes TATA, Zenith, Jindal.
13.4 GI pipe fittings Zoloto, Unik, HB, ICS
13.5 RCC Pipes Indian Hume Pipe, Al-Hume pipe ,
Madurai spun pipes, Jain & Co.,
13.6 Ductile Iron covers & gratings Neco or approved equivalent
13.7 Ductile Iron pipes Lanco, Jindal, Kesoram, Electrosteel,
13.8 DI fittings Electrosteel, Kartar
13.9 SCI pipes Neco Kesoram, electrosteel SKF, RIF
13.10. SWR PVC pipes and fittings Supreme, Astral , Finolex, Prince. Ashirvad
13.11 CPVC pipe and fittings Supreme, Astral , Ashirvad, Finolex, Prince.
13.12 UPVC pipes and fittings Supreme, prince, Finolex Ashirvad
13.13 Water supply valves Zoloto, RB Leader , ARCO
13.14 Kitchen sinks Nirali or Hindware , Johnson , Franki Diamond
13.15 CI Manhole cover Neco , BIC
13.16. SFRC Cover and grating Kutty , KK , Advent , Newtech
13.17. Air release valves Kirloskar, RBM, Kartar
13.18 CI double flange sluice valve Kirloskar , RBM , Kartar
13.19. Plastic Encapsulated Foot Rest KK India , KGM , Accurate Buildcon
13.20. Gun Metal valves Zolto , leader , sant , Andco India
13.21. CI Double flanged sluice valves Kirloskar , IVS , BURN , Zoloto , Leader
13.22. CI Double flanged Non-return valves
Kirloskar
13.23. Spray applied PUF thermal insulation for roof treatment
Pidilite, Lloyd Insulations(India) Pvt. Ltd., BASF
13.24 Glass mosaic tiles Italia, Palladio, Bisazza
13.25 Sandwich PUF paneled roofing sheets
Lloyd Insulation (India) Pvt. Ltd.,
Zindal Mectec Pvt Ltd.
13.26 HDPE Pipes Supreme, Jain, Prince
13.27 Pressure Reducing Valve Hawk, Zoloto
13.28 Gypsum Board False Ceilings Armstrong, Anutone, SaintGobian, USG BORAL
13.29 Metallic false ceilings Armstrong, Saint Gobian, Harsons, Hunter Douglas
13.30 Mineral fibre board false ceiling tiles
Armstrong, Saint Gobian, Anutone, Daiken
LIST OF APPROVED MAKE OF MATERIALS (FOR ELECTRICAL & MECHANICAL SERVICES)
Sl.No. Materials Vendors Additional Vendors
Proposed
ELECTRICAL
1 PVC conduit pipe & accessories
Avon Plast / AKG/ Modi / Precision (ISI Marked)
2 PVC insulated copper wire Finolex/ Havells/ L&T/ Lapp Kabel ( FRLS Type with ISI mark )
3
Modular Switches & Sockets, Fan Regulator, RJ-45(cat-6)/ including modular boxes & plates
Legrand-Myrius/ Crabtree-Platinum/ MK-Wraparound Plus / Schneider Zencello
4
MCBs / /MCCBs/MCB DBs/V.TPN DB, Industrial Sockets, cable end box and accessories.
Siemens/ ABB / Legrand/ L&T/GE/Schneider
Hager
5 Cable management systems & accessories
Legrand/ MK.
6 LT XLPE armoured Aluminum/copper XLPE Cable
Havells/ Universal/ Finolex/ Torrent /CCI
7 250 mm, 1400 RPM heavy duty (Metallic) Exhaust fans
Havells-Ventil Air DX-FG/Crompton- trans air /Bajaj- DXG02 / Orient
8 Energy Efficient (5 star) rated ceiling fans-1200mm
Orient -Energy Star/ Crompton-HS- plus/ Havells-ES 505
9 LMS Philips dynalite / Lutron / Crestron
10 Compact Rising Mains Schneider/C&S
11 Solar Photovoltaic Module TATA BP SOLAR, BOSCH, MOSER BEAR
12 ATS Panel ASCO/RUSS Electric
13 Diesel engine
Cummins/ Caterpillar/ MITSUBISHI /MTU Emission standards shall be in compliance with Environment (protection) (third Amendment) Rules 2014
14 Passenger Lifts OTIS/Schindler/ Mitsubishi Johnson / Kone
15 UPS Schneider / Numeric /Siemens Emerson /GE
16 Batteries Exide / AMCO / Panasonic
HVAC
1 PROPELLER FANS GREENHECK/KRUGER/NICOTRA
2 INLINE FANS REENHECK / KRUGER / SYSTEMAIR
3 Aluminium grilles/diffusers AIRMASTER/RUSKINTITUS/SYSTEMAIR
Caryaire / Dynacraft
4 smoke & Fire Dampers AIRMASTER/RUSKINTITUS/SYSTEMAIR/CONAIRE
Carryaire
5 CHILLED WATER HIGH WALL UNITS
EUROCLIMA / YORK Media
6 HDPE drain Pipe FINOLEX/HASTI/ORIPLAST Supreme
7 CAHU FLAKTWOODS / EDGETECH / SYSTEMAIR
8 DUCTING CAMDUCT/ROLASTAR/ZECO
9 Fresh/Exhaust air louver AIRMASTER/RUSKINTITUS/SYSTEMAIR
Caryaire
10 PVC flexible duct AEROFLEX/SUPERLON ATCO /AIRMASTER
11 Supply air plenums EDGETECH/FLAKT WOODS/SYSTEMAIR
Zeco
12 Aluminium flexible duct AEROFLEX/SUPERLON ATCO
13 VARIABLE AIR VOLUME (VAV) BOXES
ACUTHERM/JC/TROX/CONAIRE
Honeywell
14 MS PIPE JINDAL / TATA SAIL
15 Butterfly valve ADVANCE / SEVCON / VALTREE
Intervalve
16 Y type strainers EMERALD / SANT / VALTREE
17 Pressure independent balancing valves(PIBC)
DANFOSS / FLOWCON / TOUR & ANDERSON
18 DX SPLIT SYSTEM BLUESTAR / DAIKIN / PANASONIC / OGENERAL / CARRIER
19 VRF System DAIKIN/PANASONIC/THOSIBA/OGENERAL/ITACHI
ADDRESSABLE FIRE ALARM SYSTEM
1 Fire Alarm Control Panel Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
2 Repeater Panel Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
3 Addressable Smoke Detector Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
4 Short Circuit Isolator Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
5 Addressable Control Module Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
6 Addressable Input Module Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
7 Addressable Manual Call Point
Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
8 Sounder with Relay Module Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
9 Strobes Edwards / Apollo / Agni/ System Sensor/ Honeywell / Notifier Siemens
PA System
1 PA Speakers Bosch / Bose/JBL/QSC
Fire Fighting System
1 Sprinklers HD/ Tyco/VIKING
2 Installation Control Valve HD/ Tyco
3 Fire Extinguishers Safex/cease fire NOTE: Equivalent material and finishes of any other specialized make may be used , in case it is established that the brands specified above are not available in the market but only after approval of the alternate brand by the Engineer-in-charge.
1
ACADEMIC COMPLEX OF INDIAN INSTITUTE OF MANAGEMENT, TRICHI
Client:
Indian Institute of Management, Trichy
NIT Campus Post, Thanjavore Main Road, Thuvakudi, Tiruchirappalli – 620 015
Report on Assessment of Soil Strata Condition and Recommendations for Foundations
Project Coordinators:
Dr. K. Muthukkumaran Prof. S. R. Gandhi
Geotechnical Engineering Division Prof. R.G. Robinson
Department of Civil Engineering, Geotechnical Engg. Division
NIT Trichy Dept of Civil Engineering,
Tiruchirappalli 620 015 IIT Madras, Chennai-600 036
May, 2014
2
GEOTECHNICAL ENGINEERING DIVISION Department of Civil Engineering
INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI – 600 036
e-mail: [email protected] / [email protected] tel: 22574255 (O) /22576255 (R)
Dr. S.R. Gandhi fax : 044 22570509/22570545 Professor mobile: 98410 27543
FAX COURIER SPEED POST POST E-MAIL HAND DELIVERY
7th May, 2014
Report on Assessment of Soil Strata Conditions and Recommendations for the Foundations of various Academic Block Structures of IIM,
Tiruchirappalli
I. INTRODUCTION
On a request from IIM Trichy, vide letter no. IIMT/Soil Test/2013-14, dated 23rd
September 2013, the undersigned have taken up the necessary Geotechnical Investigation and
recommend the foundations of the buildings. The field work for the testing was entrusted to
M/s Shakthi Developments Co., Chennai. The work was executed as per the specifications
provided by the undersigned and under the supervision of the undersigned. The work of field
testing was completed on 7th February and the laboratory testing of the soil sample was
completed at NIT Trichy.
The site was jointly inspected by the undersigned along with the officials of IIM prior to
the investigation and accordingly the locations for various tests were identified. Detailed
laboratory testing on the selected soil samples were carried out at the Geotechnical
Engineering laboratory at NIT, Trichy. The field test data have been submitted by M/s
Shakthi Developments Co., Chennai and the laboratory test results have been compiled by
NIT Trichy.
This report summarizes the site conditions, Geotechnical data, nature of structures and
recommendations for the foundations.
3
II. INVESTIGATIONS CARRIED OUT
Following field tests were carried out by M/s Shakthi Developments Co., Chennai.
1. Drilling of 150mm diameter borehole with rotary drill at 19 different locations to a
depth of 10m/15m from the existing ground level.
2. Conducting standard penetration test in bore holes at every meter depth interval.
3. Plate load tests, five numbers at depths varying from 1.0 to 1.5m.
4. Electrical resistivity survey at selected locations.
5. Collection of disturbed and undisturbed samples for necessary laboratory tests.
All the above field tests were carried out conforming to the requirements in IS:1892 and other
relevant codes. Selected laboratory tests carried out NIT Trichy are given below:
1. Moisture content
2. Dry unit weight
3. Specific Gravity
4. Sieve analysis
5. Free swell index
6. IS classification based on above tests
7. Shear strength by direct shear
8. Unconfined compression test
9. Optimum moisture content and Proctor density tests
10. California Bearing Ratio Test
11. Point load strength index test
12. Chemical Analysis of soils
4
III. SITE CONDITIONS
The site is fairly dry with little vegetation and having undulation up to 2m which will
require marginal cutting and filling, if uniform level for all the units is desired. The site has
higher elevation near the main entrance on west side and slopping downwards to North-East
side. No water table is noticed in any of the boreholes up to the explored depth of 15m. There
is a natural drain running through the site from South-west corner towards the North-east
leading to a lake about 500m away.
The strata comprises of red soil with fine sand at surface with depth varying from
0.3m to 2.5m followed by a soft disintegrated rock. This strata is competent to support
individual footings for the proposed structures and no pile foundation is envisaged. Also, the
nature of the strata is such that excavation of the foundation pits can be made without any
shoring or dewatering. However, it is advisable to complete the foundation execution before
the monsoon.
IV. DETAILS OF STRUCTURES PROPOSED
The site area is approximately 1sq.km having two entrances, one from the main road and
second entrance from the side road. The site is behind the Bharathidasan University. The
major facilities can be divided into following groups:
1. Shopping complex (B1, B19)
2. Overhead tank (B2)
3. Auditorium (B3)
4. Administration Building (B4, B5, PLT1, PLT2)
5. Academic block (B6, B8, B9)
6. Library (B7, PLT3)
7. Hostels (B10-B14)
8. Quarters (B15-B18)
5
All the structures are RCC frame structures with ground + two floors. The loading
intensity expected is within 200-400 kN/m². The natural ground level has large variations
from 98.5m near the main road and sloping downward towards the north eastern side to an
elevation of 89m. The slope is gently and mostly uniform. In a joint meeting with the
architects, it was decided not to have any uniform site grading over the entire area. Instead
the ground levels may have variations for individual buildings. This will minimize the earth
work required for cutting and filling.
The structures listed above are divided into two categories based on the loading
intensity anticipated as given below:
A. Heavy structures with large column spacing and larger column loads
Following structures are considered in this category:
1. Auditorium
2. Library
3. Administration building
4. Hostels
5. Mess hall
6. Sport campus
7. Non-faculty apartments
8. Food court
Above structures are expected to have ground + three floors with high column loads
depending on the column spacing. It is therefore preferable to support these structures on the
soft disintegrated rock which is available at shallow depth of 2.0 to 2.5 m.
B. Light Structures
Following structures are considered in this category:
1. Academic block
6
2. Faculty quarters
3. Commercial complex
4. School
5. Estate office
Above structures will have only ground + one floor and the column load is expected to be
less compared to the structures in category A above. The loading intensity for these structures
can be within 150kN/m².
V. FOUNDATIONS RECOMMENDATIONS
A. General Recommendations
Following general recommendations shall be exercised during the execution of the
foundation works:
1. To the extent possible, foundation execution shall be avoided during rains.
2. The foundations excavation shall not be exposed for a longer duration. The
construction of foundation shall be taken up immediately after excavation has been
completed.
3. The founding strata shall be verified by a Geotechnical engineer to ensure that the
strata is conforming to the above recommendations.
4. The excavated material shall be stacked away from the excavation face by at least 2
to 3m.
5. The material shall be stacked separately, layer wise so that the same can be reused
appropriately for the construction.
6. The surface clay soil (blackish) is not suitable for back filling of foundations as well
as for plinth filling. Material from this layer shall be used only for leveling the low-
lying area where no structure is coming up.
7
7. The soft disintegrated rock when excavated is suitable for both foundation back
filling as well as for plinth filling.
8. The back filling/plinth filling shall be carried out in layers not exceeding 200mm in
thickness and compacted to 95% Proctor density by suitable compaction technique.
Flooding with water shall not be used for compacting.
9. The CBR test carried out on the soil from the surface layer, which comprise of
clayey sand with silt, indicates very poor values. This layer is therefore not suitable
to support the pavenment. Along the road alignment, the surface layer (clayey sand)
shall be excavated over the width of the road and to a minimum depth of 500mm
below the surface. Depending on the thickness of pavement, the excavation shall be
back filled using the excavated soft disintegrated rock or any other select granular
material.
10. It is noticed that there is a natural drain passing through the site in the North-South
direction. The architects have confirmed that alignment. However, the drain shall be
desilted and made of uniform cross section for smooth flow and to prevent overflow
during monsoon. Brick lining or stone pitching may be adopted so that the
maintenance of the drain is easy.
11. The chemical analysis on selected soil samples show that the value of sulphates and
chlorides are well within the limit. Therefore, OPC or PPC can be used for
foundation concrete. Generally, when sulphates exceed 0.2% in soil, caution is
warranted in the design of concrete. IS 456/BS 8110 provides typical values for
various types of concrete.
B. Foundation Recommendations
1. For the structures under category A mentioned above, the foundation shall be a
minimum depth of 2.5m from the finished ground level and at least 0.3m below the
soft disintegrated rock (SDR). The safe bearing capacity for these foundations shall be
taken as 300kN/m² for maximum size of 4.0m width foundations. In case if SDR is
not meet with, even after 2.5m depth, the foundation shall be excavated further till
SDR is met with and shall be back filled with selected cohesionless soil with top level
2.5m below FGL to continue with foundation construction. The settlement anticipated