IE 201IE 201IE 201IE 201INTRODUCTION TO INTRODUCTION TO
ENGINEERING DESIGNENGINEERING DESIGN
L-3d Presentation
Team 5Abdullah AbuKhwejahAbdullah SiamiAdam JalalRami AlmataniMohamed AlShayea
Agenda•Context 1 min•The work 1 min
– KTSA 1 min– GANTT CHART 1 min– ARTIFACT SKETCHES 1 min
– Discussion 1 min
• Introduction:
This is the fourth installment of the IE 201 project which is L3-D (implementation). This step comes right after we have selected the artifact which is to obtain, dissect the artifact and prepare for the final step. In this assignment we will apply the KTSA on the artifact and develop a (Gantt chart) that shows when the tasks will be completed. Finally we will sketch our artifact parts after dissection and shall number the parts so that it will be easy for us to put back together.
We first apply the Kepner-Tregoe Situation Analysis KTSA on the artifact that we obtained from the previous assignment which is Bicycle to help us prioritize the tasks and activities that remain to be completed.
The Work:
-The table below shows the KTDA for our implementation problems
SITUATION ANALYSIS
PROBLEMSTIMING
(H,M,L)TREND
(H,M,L)IMPACT
(H,M,L)PROCESS
(PA,DA,PPA)
1. DISSECT BICYCLEHHHDA,PPA
2. SKETCH PARTSMLMPPA
3. REASSEMBLE BICYCLE
HMMDA,PPA
4. TEST PARTSMLMPA
5. ADD DYNAMOMLHPPA
6. ADD LAMPHMMPPA
7. TEST THE COMPONENTS
MMHDA,PPA
Now, after applying the KTDA we need to have a Gantt Chart to show when the tasks will be completed. It lets us know who is working on each task and how long it will take.
- The table below represents a Gantt Chart for our implementation procedure.
SundaySaturday
8p.m.7p.m.6p.m.10p.m.9p.m.8p.m.7p.m.
6p.m.problem
30 min
Memb. 1 and
memb. 4 dissect bicycle
2h 30 minMemb. 5 sketch
bicycle's parts
30min
Memb. 2 and
memb. 4 reassemble bicycle
1h30minMemb. 2
and memb. 3 test the parts
45min
Memb. 1 and
memb. 2 add the dynamo
45min
Memb. 3 and
memb. 4 add the lamp
1h30minMemb. 4 test all
components
SundaySaturday
8p.m.7p.m.6p.m.10p.m.9p.m.8p.m.7p.m.6p.m.
Now, we go for the artifact parts' sketches. After we dissected the Bicycle we made sketches for each part followed by a number and its name to make it easy when we put back together.
• Discussion:
We have come to the end of the assignment L3-D (implementation) which was the fourth assignment for this project. It contained firstly, the KTSA table and results, secondly we used the results and added them to a Gantt chart which helped us figure out who was doing what and how long it would take to achieve. And last but not least we drew some sketches of the parts after dissection to artifact, and we numbered the parts so that it would be easier to put back together. We look forward to the final part of the project L3-E.
THANK YOU