Our commercial building is based on sports center called CF Sports, named after two clients, Chau Xet Nee, and me. A 5 storey building including 1 floor of basement parking. Our sport center is a one stop place for people that are into sports and fitness. Where people can work out, relax and even spend time with their family in one of our main attraction drop off pool. They can also find all types of sports accessories, from diving accessories to football, just about anything. We offer different types of fitness class including yoga, zumba and aerobic. What is best about our sport center is, it opens 24hours per day!
We chose this site because of its accessability. The site is centred by housing, commercial, religious and tourism area where people always go.
3BENEFITS
Easy accessibility to the site location.
2 minutes away from the town by car.
Nearby housing area, people from this area
can easily go to the location at anytime they
want.
I was told that no traffic jam is ever
happened in this location, therefore people
will not get worried of the traffic to go here.
Only 5 minutes away from religious areas
such as Mosque, Chinese temple and Church
by road transport.
24 hours open; sometimes people would just
feel like having their workout in a quiet
condition or while not everyone is around.
4
Lack of parking area; only consist of 1 floor
basement parking and no extra space around
that area as it was fully covered by forest. If
there were too many customers, they would
be having trouble on the parking.
The road to access the location was not well
maintained.
5
IMPACTS
3rd FLOOR
Consist of; Swimming pools (Kids, Adults & Jacuzzi ) Small stall by the pool Toilets / Changing Rooms (Male & Female) Sauna Outside Shower Counter (for towels rent) Barbeque Area with tables, chairs and huts Stairs Elevator
6
DETAILS
The Drop off Swimming PoolOne of the main attractions of the building, known as “The Drop Off” because of the visual effect of water extending to the horizon, vanishing, or extending to "infinity." It is use to describe perimeter overflow pools. This only applies in adult’s swimming pool with a height of 2 to 4.5 meters high. This is why it is strictly for adults only.
The JacuzziWith a height of 1 meter and warm or sometimes hot water with massage of a Jacuzzi help people to relax and have a spa with an outdoor view.The kid’s swimming pool
7
With only a height of 0.5 to 0.8 meters high even babies are allowed to swim in (but of course with guards or safety).
illustration
Stall by thev poolToo tired spending hours swimming? Have a rest at the infinity pool. They offers fresh juices, salads and all kinds of healthy foods (since it’s a fitness center, why need to serve fats?)
The Sauna
8
Besides, Jacuzzi, they’ll somehow need sauna! With a relaxation piano rhymes music played when in used.
9
Barbecue & Sitting AreaWe provide a place to chill in confortable and natural concept.
2ND FLOOR
Consist of;
Dance Room
Rock Climbing
First Aid Room
Workout Area
Toilets (Male & Female)
12
Materials Used
WALL
One brick thick of wall
FINISHES
FLOORING
Non-Slippery tiles, mainly for 3rd floor (Swimming Pool Area)
14
ROOF
Flat roof with skyline view
Rubber Gym Floor Tiles, mainly for workout area.
For other small rooms such as Dance Room and First Aid.
WINDOWS
Double layered thick glass
15
Smooth wooden flooring
DOORS
Sliding doors
DETAILED COST
PLAN
16
Elements COST B$
1 PRELIMINARIESA Site Preparation 4,782.30B Setting Out 140.00
I Total for Preliminaries 4,922.302 SUBSTRUCTUREA Piling 13,650.00B Substructure 28,197.00
IITotal for Substructure (2A - 2B)
41,847.00
3 SUPERSTRUCTUREA Frame 16,575.00B Upper Floors 10,140.00
CRoof Structure & Finish
46,800.00
D Staircase 12,168.00E Walls 9,750.00F Windows 13,338.00G Doors 11,076.00
III Total for Superstructure (3A - 3G) 119,847.00
4FINISHES (External & Internal)
A Wall FinishesPlastering and Painting
23,049.00
Glazed Wall Tile 7,293.00
B Floor FinishesHomogeneous Tile 14,469.00Laminate Flooring 12,519.00
C Ceiling FinishesGypsum 15,054.00Timber T&G Ceiling 5,226.00
IVTotal for Finishes (4A - 4C)
77,610.00
5 FURNISHING, FITTINGS AND FIXTURES
AFittings and Furnishings
11,622.00
VTotal for Furnishing, Fittings and Fixtures (5A)
11,622.00
6 SERVICESA Sanitary Appliances 4,485.00B Plumbing Installations 8,385.00
VITotal for Services (6A - 6B)
12,870.00
TOTAL COST FOR BUILDING (1A - 6B) $268,718.30
7 MECHANICAL & ELECTRICAL WORKS
VII Total for M&E 78,195.008 EXTERNAL WORKS & SERVICESA Earthworks 0.00B Fencing 11,934.00D Roads & Carparks 9,594.00E Stormwater Drains 4,719.00F Foul Drainage 9,867.00G External Water Supply 7,020.00
VIII Total for External Works & Services (8A - 8G) 43,134.00
TOTAL COST FOR BUILDING AND EXTERNAL WORKS (1A - 7G)
$390,047.30
17
Doing this project is a lot tougher than I thought. I had never experience on doing a proposal but this can help to improve better and also helps me to understand more on how proposal report should include.