MONTHLY SAFETY MEETING
for October 2012
Habshan 5 IGD Project, Abu Dhabi, UAE
JGC-Tecnimont Joint Venture
Monthly Meeting October 2012 PRESENTATION AGENDA
Project Lost Time Injury Frequency Rate & Recordable Frequency Rate;
Days and Man-hours without LTI and Days and Man-hours without RI;
JV Monthly Medical Consultation for October 2012;
Cumulative Up to September 2012, FAC Body Part for October 2012;
Noncompliance with safe work Issues for October 2012;
Poor Housekeeping Issues for October 2012;
Equipment & Tool Issues for October 2012;
PPE Issues for October 2012;
JV Risk Assessment Graph, High Medium & Low Risk Analysis;
NM, UC & UA Observation Report and Trend Analysis for JV;
Area Violation, Incident Violation for the Month of for October 2012;
Safety Moment, Toolbox Meeting, and Safety Alert;
Manpower & Observation Up to October 2012;
Training Man-Hours Up to October 2012;
Monthly KPI and Target 2010 – 2012;
Safety Achievement for October 2012;
Safety Campaign for November 2012.
0.00
0.10
0.20
20102011 2012 PTD
0.13 0.10
0.06 0.06
TOTAL RECORDABLE INJURY RATE
- PROJECT YEARLY STATISTICS
0
5
10
15
7
11
7
3
FIRST AID CASE
COMPARISON TABLE
Total Recordable Injury Rate
Construction Period To Date
Man-Hours 5,361,848 110,046,094
Recorable Case 0 32
TRIR 0.00 0.00 0.06 0.31
Days w/o Rec.
Case 199
Up to
02/11/2012
Date of Last Rec. Case 19-Apr-12
Man-Hours Worked Since Last RI 31,883,118
0.06
0.29
0.00
0.20
0.40
0.60
0.80
1.00
1.20
TR
IR
MONTH
Total Recordable Injury Rate Target TRIR = 0.20
-0.01
0.00
0.01
0.02
20102011 2012 PTD
0.003 0.002 0.002
LOST TIME INJURY
FREQUENCY RATE - PROJECT
YEARLY STATISTICS
RIR, LTI x 1,000,000/man-hours - Company
RIR, LTI x 200,000/man-hours - JV
0.002
0.01
0
0.02
0.04
LTIR
MONTH
Lost Time Injury Frequency Rate Target LTIR = 0.02 Lost Time Injury Frequency Rate
Construction Period To Date
Man-Hours 5,361,848 110,046,094
LTI 0 1
LTIR 0.00 0.002 0.01
Days w/o LTI 472 Up to 02/11/2012
Date of Last LTI Case 19-Jul-11
Man-Hours Worked Since Last LTI 75,426,033
Monthly Meeting October 2012
0
0
20,000,000
40,000,000
60,000,000
80,000,000
January 7, 2010
Starting Project
up to
Nov. 2, 2012
75,426,033
Date of Last LTI Case : 19th July 2011
JV DAYS & Man-hours Without LTI
Up to October 2012
Monthly Meeting October 2012
0
0
10,000,000
20,000,000
30,000,000
40,000,000
January 7, 2010
Starting Project
up to
Nov. 2, 2012
31,883,118
Date of Last RI Case : 19th April 2012
JV DAYS & Man-hours Without
Recordable Up to October 2012
Monthly Meeting October 2012
937
220
442
39
406
503
3
0
0
1,665
378
22
169
46
244
233
0
0
0
839
0 500 1000 1500 2000
Respiratory Problem (Cold,Cough etc.)
Genito-Urinary Diseases
Gastro-Intestinal Disorder (Diarrhea Abdominal Pain)
Etc.
Systemic Problem Hypertension Etc.
EENT (Eyes, Ear, Nose and Throat)
Skin Infection / Allergy
First Aid Minor Scratches, Bruises, Laceration,
Abrassions, Insect Bites, Etc.
Major Accident/Injury
Heat Stress
Others, Backache, Muscular Pain, Toothache, Etc.
JGC TCM
JV Monthly Medical Consultation
for the month of October 2012
Monthly Meeting October 2012
MTC,
24
RWC, 7
LTI, 1
Recordable
FAC
475
Reportable
FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case
LTI-Lost Injury Incident
CUMULATIVE
Up to October 2012
Monthly Meeting October 2012
Finger, 1,
34%
Leg, 1,
33%
Shoulder,
1, 33%
FAC by Body Part
For the Month of October 2012
Monthly Meeting October 2012
Equipment & Tool
PPE
Poor House Keeping
Noncompliance with safe work
JV Observation Table
for October 2012
Noncompliance with safe work (A)
2 4 16 13 19 18 7 4
109 106
198
108
212
110 170 152
677
838
0
100
200
300
400
500
600
700
800
900
October 2012-1,353 September 2012-1,410
Monthly Meeting October 2012
Noncompliance with safe work (A)
Others
September 2012 - 677
8
2 17
4
14
13
19
7 10
49
20
33
29
26
27
45
28
63
50
120
93
0 50 100 150
Security
No Banksman
Grating
Falling Object
Restricted Area
STARRT CARD Violation
Signage
Confined Space
Hot Work
Hygiene
Worker Behavior
illumination
Trip/Slip/Fall
No Flagman
Health
Open Hole
Environmental
Cable Management
Access and egress
Barricade
Scaffolding
Monthly Meeting October 2012
9
3 42
18
8
1
32
0 24
26
8
29
46
55
17
58
51
81
64
111
155
0 50 100 150 200
Security
No Banksman
Grating
Falling Object
Restricted Area
STARRT CARD Violation
Signage
Confined Space
Hot Work
Hygiene
Worker Behavior
illumination
Trip/Slip/Fall
No Flagman
Health
Open Hole
Environmental
Cable Management
Access and egress
Barricade
Scaffolding
October 2012 - 838
Poor House Keeping (B)
7 14
30 38
23
82
42
104
67
104
77
53
132 133
0
20
40
60
80
100
120
140
October 2012 - 501 September 2012 - 378
Monthly Meeting October 2012
PPE (D)
6 2
27 28 35
78
29
58
4 16
55
79 86 80
92
136
0
20
40
60
80
100
120
140
160
October 2012 - 477 September 2012 - 334
Monthly Meeting October 2012
Equipment & Tool (C)
0 5
64
160
22 22
135
101
69 78
48
92
55 43
54 44
0
20
40
60
80
100
120
140
160
180
October 2012 - 545 September 2012 - 447
Monthly Meeting October 2012
702
1,118
749 662
1,394
820
0
200
400
600
800
1000
1200
1400
1600
Low Medium High
September 2012 October 2012
September 2012 – 2,569
October 2012 – 2,876
JV Risk Assessment Graph Monthly Meeting October 2012
Near Miss, Unsafe Act and
Unsafe Condition Observation Report
and Trend Analysis for October 2012
776
1,793
749
7 0 0 0 0 0
807
2,069
820
3 0 0 0 0 0 0
500
1000
1500
2000
2500September 2012
October 2012
FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case LWC-Lost Work Case | FAT – Fatality LTI-Lost Time Injury
Monthly Meeting October 2012
Area Violation by Issues for the Month of October 2012
302 Observation Issues
299 Observation Issues
355 Observation Issues
2
1 1,444 Observation Issues
271 Observation Issues
106 Observation Issues
1 Near Miss
2 AD
99 Observation Issues
1 Near Miss
Monthly Meeting October 2012
October-25-2012
Falling Object @ C200
Incident Violation Indicator Area Focus
for the Month of October 2012
October-15-2012
Grating Removal Violation
@ Unit 552
1st
1st
Monthly Meeting October 2012
Safety Moment for October 2012
Monthly Meeting October 2012
Toolbox Meeting
for October 2012
Monthly Meeting October 2012
Safety Alert
for October 2012
Monthly Meeting October 2012
17,226
2,876
Manpower Observation
Manpower and Observation
for October 2012
Monthly Meeting October 2012
164,072
Total Training Man-Hours 2,038,726
Up to October 2012
Monthly Meeting October 2012
Training Man-hours – 164,072
for October 2012
HOUR CRAFT
INDUCTION
Induction
Training
TCM JGC
1,568
984
246
22
PERMIT TO WORK, LOCKOUT TAG OUT
& SUPERVISOR SKILL LEADERSHIP
WORKSHOP
Supervisor Training
TCM JGC
STARRT/TOOLBOX
MEETING/COACHING
Site Training
TCM JGC
56,835
97,921
WORK AT HEIGHT
STARRT & JSA
CONFINED SPACE ENTRY
SAFE DRIVING
FIRE FIGHTING
IIF Orientation
Heat Stress
SAFE USE OF HAND GRINDER
Inert GAS
ELECTRICAL SAFETY
HAZARD IDENTIFICATION…
Specific
Training
TCM JGC
2,280
4,216
Monthly Meeting October 2012 SITE TRAINING SUCCESS
1,200,000
1,250,000
1,300,000
1,350,000
1,400,000
1,450,000
1,500,000
1,550,000
IIF/STARRT/TOOLBOX/COACHING
January - May 2012 June - Oct. 2012
Monthly Meeting October 2012
Monthly KPI and Target 2010 – 2012 Up to September 2012
Target 0
Target 0.02
Target 0.20
Target >1000
1
0.002
0.06
2,876
Monthly Meeting October 2012
STARRT MASTERS Monthly Meeting October 2012
3 GOLDEN RULES Monthly Meeting October 2012
TOTAL IIF PATROL 103
TOTAL IIF PATROL
42 MEMBERS!
Monthly Meeting October 2012
Monthly Meeting October 2012
COMPRESSOR MECHANICAL
RUN-IN TEST
•Proper Barricade for Activity •Good House Keeping and Barricade
•Tool Box Talk before Test •Site Check before Activity
Monthly Meeting October 2012 FFG IGNITION TEST
Monthly Meeting October 2012 COMMISSIONING AREA ACCESS BREAKING NEWS!!!
Monthly Meeting October 2012 CATALYST LOADING
Monthly Meeting October 2012
NO SMOKING IN
CONSTRUCTION AREA
SAFETY FOR LIFE