Monthly Safety Meeting for February 2012
Habshan 5 IGD Project, Abu Dhabi JGC-Tecnimont Joint Venture
Presentation Agenda Project Lost Time Injury Frequency Rate & Recordable Frequency Rate;
Days and Man-hours without LTI and Days and Man-hours without RI;
JV Monthly Medical Consultation for February 2012;
Cumulative Up to February 2012;
FAC Body Part for the Month of February 2012;
Recordable Incidents for the Month of February 2012;
Noncompliance with safe work Issues for the Month of February 2012;
Poor Housekeeping Issues for the Month of February 2012;
Equipment & Tool Issues for the Month of February 2012;
PPE Issues for the Month of February 2012;
JV Risk Assessment Graph, High Medium & Low Risk Analysis;
NM, UC & UA Observation Report and Trend Analysis for JV;
Area Violation, Incident Violation for the Month of February 2012;
Safety Moment, Toolbox Meeting, and Safety Alert;
Manpower & Observation Up to February 2012;
Training Man-Hours Up to February 2012;
Action Tracking Register Up to February 2012;
Environmental Initiatives for February 2012;
Traffic Management for February 2012;
Monthly KPI and Target 2010 – 2012;
IIF Culture;
HSE Objectives & Campaign March 2012;
0.00
0.01
0.02
20102011 2012 PTD
0.003 0.003 0.003
LOST TIME INJURY
FREQUENCY RATE - PROJECT
YEARLY STATISTICS
0.00
0.05
0.10
0.15
0.20
2010 2011 2012 PTD
0.13 0.10 0.09 0.09
TOTAL RECORDABLE INJURY RATE
- PROJECT YEARLY STATISTICS
0
10
20 16
11 10 8
FIRST AID CASE
COMPARISON TABLE
Lost Time Injury Frequency Rate
Construction Period To Date
Man-Hours 4,866,179 68,360,371
LTI 0 1
LTIR 0.00 0.003 0.01
Days w/o LTI 220 Up to 24/02/2012
Date of Last LTI Case 19-Jul-11
Man-Hours Worked Since Last LTI 33,379,710
Total Recordable Injury Rate
Construction Period To Date
Man-Hours 4,866,179 68,360,371
Recorable Case 0 30
TRIR 0.00 0.09 0.44
Days w/o Rec.
Case 38
Up to
24/02/2012
Date of Last Rec. Case 17-Jan-12
Man-Hours Worked Since Last RI 6,668,115
0.003
0.01
0
0.02
0.04
LTIR
MONTH
Lost Time Injury Frequency Rate Target LTIR = 0.02
0.09
0.44
0.00
0.20
0.40
0.60
0.80
1.00
1.20
LTIR
MONTH
Total Recordable Injury Rate Target TRIR = 0.20
RIR, LTI x 1,000,000/man-hours - Company
RIR, LTI x 200,000/man-hours - JV
0
0
10,000,000
20,000,000
30,000,000
40,000,000
JV Days & Man-Hours without LTI
Up to February 2012
January 7, 2010
Starting Project
up to
Feb. 24, 2012
33,379,710
Date of Last LTI Case : 19th July 2011
0
0
2,000,000
4,000,000
6,000,000
8,000,000
JV Days & Man-Hours without Recordable
Up to February 2012
January 7, 2010
Starting Project
up to
Feb. 24,
2012
6,668,115
Date of Last RI Case : 17th Jan. 2012
JV Monthly Medical Consultation
For the Month of February 2012
1,322
105
445
16
477
266
3
0
0
1,182
514
32
226
36
168
216
5
0
0
913
0 200 400 600 800 1000 1200 1400
Respiratory Problem (Cold,Cough etc.)
Urinary Tract Infection
Gastro-Intestinal Disorder (Diarrhea Abdominal Pain)
Etc.
Systemic Problem Hypertension Etc.
EENT (Eyes, Ear, Nose and Throat)
Skin Infection / Allergy
First Aid Minor Scratches, Bruises, Laceration,
Abrassions, Insect Bites, Etc.
Major Accident/Injury
Heat Stress
Others, Backache, Muscular Pain, Toothache, Etc.
JGC TCM
Cumulative
Up to February 2012
MTC,
22
RWC, 7
LTI, 1
Recordable
FAC
403
Reportable
FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case
LTI-Lost Injury Incident
FAC by Body Part
For the Month of February 2012
Head, 1,
12% Thigh, 1,
12%
Fingers, 5,
63%
Forearm,
1, 13%
JV Observation Table
for February 2012
PPE
Equipment & Tool
Poor House Keeping
Noncompliance
with safe work
Noncompliance with safe work (B)
75
170
219
30
151
227
56
7
493
0 200 400 600
Excavation Safety
Lifting and rigging
Work at height
PTW
Fire Prevention
Electrical Safety rule
Traffic rule
No JSA
Others
Confined Space Campaign| Argon Training
Housekeeping | Segregation of Waste
Internal HSE Audit| Audit Commence
February 2012-1,056 January 2012
56
146
316
21
288
172
55
2
658
0 200 400 600 800
Excavation Safety
Lifting and rigging
Work at height
PTW
Fire Prevention
Electrical Safety rule
Traffic rule
No JSA
Others
Noncompliance with safe work (B) – Others
January 2012
51
85 35
18
33
13
9
9 18
46
9
14
29
3
65
2
10
7
31
3
3
0 50 100
Access and egress
Barricade
Cable Management
Confined Space
Environmental
Grating
Health
Hot Work
Hygiene
illumination
No Banksman
No Flagman
Open Hole
Restricted Area
Scaffolding
Security
Signage
Trip/Slip/Fall
Worker Behavior
Falling Object
Positive Observation
81
114 48
17
36
19
17
25 14
22
5
7
37
10
122
1
20
12
44
7
0 50 100 150
Access and egress
Barricade
Cable Management
Confined Space
Environmental
Grating
Health
Hot Work
Hygiene
illumination
No Banksman
No Flagman
Open Hole
Restricted Area
Scaffolding
Security
Signage
Trip/Slip/Fall
Worker Behavior
Falling Object
February 2012-658
Poor House Keeping (D)
January 2012 February 2012-492
219
38
97
126
112
37
28
0 100 200 300
Cleaning of rubbish
on site
Segregation of waste
Material on access
Material arrangement
Waste disposal
Hazardous material
storage
Protruding Nails
174
25
78
96
73
15
31
0 50 100 150 200
Cleaning of rubbish
on site
Segregation of waste
Material on access
Material arrangement
Waste disposal
Hazardous material
storage
Protruding Nails
Equipment & Tool (C)
January 2012 February 2012-362
123
5
57
2
40
52
29
58
0 50 100 150
No/wrong colour code
No Inspection with
tag/sticker
Poor Maintenance
Unauthorized Operation
Incorrect Usage
Wrong equipment/tool
Inappropriate safety
device
Unauthorized
equipment/tool
40
111
54
12
41
58
8
38
0 50 100 150
No/wrong colour code
No Inspection with
tag/sticker
Poor Maintenance
Unauthorized Operation
Incorrect Usage
Wrong equipment/tool
Inappropriate safety
device
Unauthorized
equipment/tool
PPE (A)
January 2012 February 2012-352
37
8
41
69
104
44
16
33
0 50 100 150
No Hard Hat
No Safety Shoes
No Ear Protection
No Hand Protections
No Eyes/Face Protections
No Body
Harness/Lanyard
No Respiratory Protection
Inappropriate Clothes
62
8
57
87
101
92
21
47
0 50 100 150
No Hard Hat
No Safety Shoes
No Ear Protection
No Hand Protections
No Eyes/Face Protections
No Body
Harness/Lanyard
No Respiratory Protection
Inappropriate Clothes
891
1023 1012
687
959
1274
0
200
400
600
800
1000
1200
1400
Low Medium High
January 2012 February 2012
January 2012 – 2,926
February 2012 – 2,920
JV Risk Assessment Graph
Near Miss, Unsafe Act and Unsafe Condition Observation Report
and Trend Analysis for February 2012
972
1,939
1012
10 2 0 0 0 0
950
1,970
1,274
8 0 0 0 0 0 0
500
1000
1500
2000
2500January 2012
February 2012
FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case LWC-Lost Work
Case | FAT – Fatality LTI-Lost Time Injury
Area Violation by Issues
for the Month of February 2012
2*
3
429 Observation Issues
1,048 Observation Issues
49 Observation Issues
1 Near Miss
32
1,386 Observation Issues
3 Near Miss 8 Observation Issues
1 Near Miss
Jan-28-2012
Confined Space
Violation @ IES 505
Jan-29-2012
Falling Object
Violation @ Unit 532
1st
2nd
Feb-07-2012
Work at Height
Violation @ C200
1st
Incident Violation Indicator Area Focus
for the Month of February 2012
2nd
3rd
Feb-14-2012
Confined Space
Violation @ C200
Feb-19-2012
Falling Object
Violation @ C200
Safety Moment for February 2012
Toolbox Meeting for February 2012
21,252
2,920
Manpower Observation
Manpower and Observation
for February 2012
243,116
Total Training Man-Hours 536,389
Up to February 2012
Training Man-hours Completed 243,116
for February 2012
102
30
56
48
PERMIT TO
WORK
LOCKOUT TAG
OUT
Supervisor
Training
TCM JGC
2,278
14
1,906
0
244
1,680
140
18
70
38
2
180
214
462
12
10
162
86
10
0
0
84
Specific Training
JGC TCM
STARRT/TOOLBOX
MEETING/COACHING
Site Training
TCM JGC
73,071
159,577
568
HOUR CRAFT
INDUCTION
Induction
Training
TCM JGC
2,090
Action Tracking Register Up to February 2012
5,252
153 297
66 140 22 35
5,140
115 297
57 133 22 35 112 38 0 9 7 0 0 0
1000
2000
3000
4000
5000
6000
Safety
Walkdown
JV Site Audit GASCO
Observation
JV HSE Meeting JV Food Audit Corporate Audit PHSER CAR
Raised Closed Open
5,965 5,799
166
Total Action Tracking
Register
Housekeeping and Segregation of Waste For February 2012
At around 1445 Hrs, A
THYSSON's (Descon's Painting & Blasting Sub-
Contractor) Coaster No: AD-67487 was
approaching to the Descon Village gate when
the driver of the coaster saw a bus (Global
Security) parked right before the speed breaker.
He also found another bus parked close to the
Global Security bus coming from the opposite
side. Both the bus drivers were talking to each
other in the middle of the road. When the bus
parked on the opposite side passed the Global
Security bus, the driver of the Coaster made his
move to overtake the Global Security bus , it
started to move too. This caused both the
vehicles to collide. As a result the right side
view mirror and a window glass of the Coaster
got broken with slight damage near the right
indicator. No one person has been reported
injured.
Access Road - 3
Ring Road - 3
Village Road -
12
Road Traffic Accident
OBEY TRAFFIC SIGNS
Up to Date
Road JGC Feb-11 Total TCM Feb-11 Total
Access Road 0 0 0 3 0 3
Village Road 7 1 8 4 0 4
Ring Road 2 0 2 0 0 1
Total 7 1 10 7 0 8
Monthly KPI and Target 2010 – 2012 Up to February 2012
0
1
Fatality Rate
Actual Fatality Target Fatality
0
0.01
0.02
0.03
Lost time Injury Frequency Rate
Actual LTIRCompany LTIR
0.000.200.400.600.801.001.20
Total Recordable Injuries Rate
Actual RIR Company RIR Target RIR
0
500
1000
1500
2000
2500
3000
Observation + Near Misses Cases
Actual (Observation + Near Misses)
Target (Observation + Near Misses)
Target 0
Target 0.02
Target 0.20
Target >1000
1
0.003
0.09
2,920
0.02
0.44
Golden Rules | Dismissal Offence
Fighting Alcohol and
prohibited drugs
Theft
Smoking in
Emergency
Evacuation
Falsifying a
Project Permit
Falsifying
a Personal
I.D.
Willful
damage
Modify Safety
Equipment
Unauthorized
Modification
of Scaffolding
Non Permitted
Grating
Removal
HSE Campaign Confined Space
HSE Posters, Banners
SAFETY FOR LIFE