LAT ISOC ISOC Review, 15 February 2006
1
GLAST Large Area TelescopeGLAST Large Area TelescopeInstrument Science Operations Center Instrument Science Operations Center
Commanding, Health and Safety
Rob CameronStanford Linear Accelerator CenterISOC Manager
Gamma-ray Large Area Gamma-ray Large Area Space TelescopeSpace Telescope
LAT ISOC ISOC Review, 15 February 2006
2
OutlineOutline
Overview of CHS GLAST ground system test support Development activities CHS software releases Operating Procedure Development Operations Networks and Security CHS resource requirements
– Staffing– Operations Facility– M&S
LAT ISOC ISOC Review, 15 February 2006
3
Commanding, Health and SafetyCommanding, Health and Safety
The Commanding, Health and Safety (CHS) team is responsible for:– LAT mission planning support– generation and validation of LAT commands– passing LAT commands to the GSSC – verifying commands were correctly executed – receiving Level 0 data from the MOC– logging and archiving of all commands and Level 0 data– monitoring the health and safety of the instrument– continuous knowledge of the configuration of the LAT
LAT ISOC ISOC Review, 15 February 2006
4
CHS Activities - BreakdownCHS Activities - Breakdown
LAT ISOC ISOC Review, 15 February 2006
5
GLAST Ground System Test SupportGLAST Ground System Test Support
Participation in 5 Ground Readiness Tests– Test of Individual interfaces and products between GS
elements– June 2005 – Dec 2006– 2 GRTs successfully completed to date
Participation in 6 End-to-End Tests– Complete GS system exercises with GLAST Observatory– Dec 2006 – Aug 2007
Mission Simulations– Team training using Observatory+Instrument simulators– Start in Sept 2006
LAT ISOC ISOC Review, 15 February 2006
6
Simulation and Mission Test ScheduleSimulation and Mission Test Schedule
2/1/2006 3/1/2006 4/1/2006 5/1/2006 6/1/2006 7/1/2006 8/1/2006 9/1/2006 10/1/2006 11/1/2006 12/1/2006
1/1/2006 12/28/2006
2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007 9/1/2007 10/1/2007 11/1/2007 12/1/2007
1/1/2007 12/28/2007
9/7/2007Launch
1/15 - 2/28Sim Plan Development
4/1 - 6/1Sim Plan Update
6/15/2007Fllight Operations Review
1/14 - 1/21DITL #1
4/25 - 5/4DITL #2
7/30Launch sitesim dry run
8/29Launch sitesimulation
9/1LEO #1
10/1Commish #1Observatory
11/6Commish #2
LAT instrument
2/11LEO #2
3/11Cont #1
4/7Commish #3Observatory
3/14/2006Mission Operations Review
9/1Launch Site
Dress Rehearsal
9/1LEO #3
5/15Commish #4
GBMInstrument
6/1Re-entry #1
8/14Cont #2
7/16Reentry #2
RF Compat Test #2 11/29-12/4
ETE Test #2 3/6-7
ETE Test #5 7/1-2
ETE Test #4 6/8-11
ETE Test #3 5/9-11
ETE Test #6 8/11-12
ETE Test #1 12/4-5/06
RF Compat Test #1 9/20-28
LAT ISOC ISOC Review, 15 February 2006
7
CHS Development ActivitiesCHS Development Activities CHS Software development tied to GS testing schedule
– Software release schedule driven by GRT and ETE schedule ISOC Operations Data Products tested/debugged during GRTs LAT Operating Procedures
– NASA requires Narrative Procedures in prescribed format– 66 NPs identified to date– ISOC/CHS is working with NASA Instrument Operations Engineer to develop and test
STOL PROCs from Narrative Procedures CHS Participation in LAT I&T at SLAC
– ISOC/CHS provides transport and archiving of data from SLAC cleanroom• FASTcopy-based transport• Provides experience with LAT data formats• Exercises ISOC Level0 data handling • Offloads effort from I&T
CHS Participation in LAT I&T at NRL– Data transport and archiving, similar to SLAC
Observatory I&T at GD/Spectrum Astro Space Systems– ISOC provided EGSE h/w and s/w– Performs telemetry data filtering and format conversion to support ITAR restrictions
Pre-launch activity at Titusville/KSC– TBD, probably similar to ISOC-provided EGSE support at GD/SASS
LAT ISOC ISOC Review, 15 February 2006
8
CHS Software Releases Driven by GS TestsCHS Software Releases Driven by GS Tests
LAT ISOC ISOC Review, 15 February 2006
9
ISOC Operations Data ProductsISOC Operations Data Products From MOC (GLAST-GS-ICD-0002)
Level 0 (science, HK, diagnostic & alerts) Real-time data Integrated Observatory Timeline – As-Flown Timeline TDRSS Ephemerides GLAST Ephemerides Requested TDRSS Contact Schedule– TDRSS Forecast Schedule LAT South Atlantic Anomaly Report Eclipse Entry and Exit Report Project Database– ToO Notification MOC Command Log– MOC File Transfer Log– Anomaly Report– MOC Status Report– Trending Tool Access– Remote Real-Time Telemetry Monitoring File Retransmission Request
From GSSC (GLAST-GS-ICD-0002) Preliminary Science Timeline File Retransmission Request
From LISOC (GLAST-GS-ICD-0002) LAT Science Timeline Instrument Flight Software Load PROC Request– South Atlantic Anomaly Definition
Update– Anomaly Report– Instrument Procedures Project Database Update– Status Report– Data Retransmission Request File Retransmission Request
LAT ISOC ISOC Review, 15 February 2006
10
Operating Procedure DevelopmentOperating Procedure Development
Procedures Need Date
Conduct physics observations ETE1
Dwell telemetry, configure task messaging, configure command confirmation ETE1
File upload and file management ETE2
Calibration data collection run ETE2
SIU and EPU memory dump/write ETE2
ToO observation ETE3
LAT turn on/off ETE3
Set bias voltages ETE4
Configure LHK, mode control settings ETE4
Enable and disable science counters ETE4
Thermal Control commanding ETE4
Contingency file upload ETE5
CPU reboot ETE5
Miscellaneous contingency operations ETE5
LAT ISOC ISOC Review, 15 February 2006
11
Document StatusDocument StatusDocument Title LATDocs # Last Update Comment
LAT Performance Specification – Level II(B) LAT-SS-00010 12/10/01
LAT IOC Performance Specification – Level II(B) LAT-SS-00015 9/15/04
LAT ISOC Operations Plan LAT-SS-01378 7/14/04 Update in work
LAT ISOC Management Plan LAT-MD-04443 7/8/04
LAT ISOC Verification and Validation Plan LAT-SS-02513 Draft
ISOC Configuration Management Plan LAT-MD-04835 Draft
LAT Science Verification and Calibration Plan LAT-MD-00446 8/20/04
LAT SAS Level III Requirements LAT-SS-00020 1/7/02
LAT ISOC Level III Requirements LAT-SS-00021 8/3/04 Update in work
LAT Instrument Operations Handbook LAT-TD-07944 Draft
ISOC Test Plan LAT-MD-05150 Draft
Flight Software User Guide LAT-TD-07665 1/5/06
FSW-ISOC ICD LAT-SS-05141 10/31/05 Update in work
ISOC Software Architecture LAT-TD-04778 Draft
LAT ISOC ISOC Review, 15 February 2006
12
LAT Operations Facility at SLAC LAT Operations Facility at SLAC
LAT ISOC ISOC Review, 15 February 2006
13
ISOC Operations Network at SLACISOC Operations Network at SLAC
LAT ISOC ISOC Review, 15 February 2006
14
Operations SecurityOperations Security
Implementing subnet for ISOC operations facility Locked door physical security for operations facility ISOC FASTcopy on secure servers in SCCS ISOC at GD/SASS
– ISOC will support filtering of GLAST test data on – Only pass LAT data off GD/SASS I&T LAN
ISOC at NASA/GSFC MOC– Access to ITOS computers on open IONET– LAT-provided computers on CNE network
ITAR considerations– LAT is in public domain– Spacecraft information is ITAR-restricted– Only LAT-related data comes to SLAC– GLAST GS elements use ITOS (ITAR-restricted) operations platform– Controlled access to ITAR-restricted items
LAT ISOC ISOC Review, 15 February 2006
15
ISOC Workstations at GD/SASS ISOC Workstations at GD/SASS
Spacecraft
LAT
SLACWorkstations
SLACMCR
VSC
CENIC
SASSWorkstations
I&TLAN
SLACLAN
SASS Net
EGSE
LA
B
Hot Bench PTPWindows XP(2 NIC Cards)
HIG
H B
AY
E3634A E3631A
AE-322549S/N xxxxx
SEPERATION SWITCHESSEP2ASEP1A
CMD GPS 1PPSSEPSEP
INHB EN
SCIT Rack PTP(2 NIC Cards)
SLACFirewall
MOCWorkstation(s
(Linux))
MOCWorkstation
(Linux)
IONetRack
T-1 (GSFC)
GFEPRack
(Linux)
Hot Bench PC(s)Windows 2000(2 NIC Cards)
BP DMZ
GBMWorkstation(s)
(3 Linux)
GBMLAN
MOCLAN
SASSFirewall
SASSFirewall
Internet
LAT ITARWorkstation
(VC 0,1,10,11)
GBMFirewall
SASSFirewall
GBM AstroRTWorkstation(Windows)
LAT ITARWorkstation
(VC 2,3,8)
TCWorkstation
Data Server
GBM AstroRTWorkstation(Windows)
HBLANDedicated
SLACT3
SASSPrinter
LAT ISOC ISOC Review, 15 February 2006
16
CHS Resource Requirements SummaryCHS Resource Requirements Summary Current Staffing
– 5 FTEs: 3 SLAC term staff + 2 contractors• 1 Operations Engineer• 1 Test lead + 0.5 test support• 2.5 Software developers
Future steady-state staffing plan (post-launch)– 5 FTEs: SLAC staff with NASA/space experience
• Operations Lead/Engineer• Operations support scientist (alternate lead)• Software developer• 2 Operators (can multi-task, for s/w support or sysadmin)• 0.5 network support / sysadmin
– Objective is to have 2 people capable of supporting any operations task Interim Computer room
– 1 office for placement of ITOS workstations (ITAR restricted s/w), until Ops facility available Computer hardware, software
– Operations control-room buildout scheduled for 2006• 7 workstations + local sub-network support• Other control room hardware: printers, copier, fax, UPS, A/V, etc.• Furniture provided in SLAC Infrastructure project• COTS software: SatTrack for mission planning support
– 2 workstations for GD/SASS I&T– Laptops/desktops for L&EO, placed MOC on NASA CNE network
Telecom: cellphone/PDAs for essential ops staff Travel
– 2006: I&T support at NRL– 2006: ITOS workstation setup and support at GD/SASS– 2006/2007: Mission Simulations support at NASA/GSFC– 2006/2007: Face-to-face operations TIMs