CONTENTS
CONCEPT INSPIRATION
PAVILION STRUCTURE DESIGN
FLOOR PLAN DESIGN
INTERIOR DESIGN
INTERIOR DESIGN PROCESS
TINELINE
FIXTURE & FITTING
BUDGET
EXHIBITION PROCESS CD
4
6
8
10
12
14
18
20
23
2
Givenchy Perfume Journal - a journey for the senses
4
CONCEPT INSPIRATION
DECONSTRUCTIVIST ARCHITECTURE STYLE
Givenchy Perfume Journal - a journey for the senses
5
CONCEPT INSPIRATION
Harp TURN SMELL INTO SOMETHING VISUAL
Givenchy Perfume Journal - a journey for the senses
10
INTERIOR DESIGN
GIVENCHY PERFUME JOURNAL PAVILION ( front )
GIVENCHY PERFUME JOURNAL PAVILION ( level 2 )
Givenchy Perfume Journal - a journey for the senses
11GIVENCHY PERFUME JOURNAL PAVILION ( level 1 )
GIVENCHY PERFUME JOURNAL PAVILION ( level 1 )
Givenchy Perfume Journal - a journey for the senses
09/2
010-
09/2
012
TIM
ELIN
E
Develop Concept- Themes, Ideas
Sponsor
Risk of the Project
Timeline Budget
Exhibition Date
Perspective Aerial, Perspective Model
i)
-Find Location
-Environment
-Environment Evaluation
-Relief Map
ii)
-Overall Construction Site Plan
-Elevation Planning of the Building
iii)
-Plan of the Land
-Overall Floor Range
-Building Area
-Volume Fraction
-Building Storey
-Floor Height
-(Car Park)
24 Months
22 Months
SEP
DEC 14
TIMELINE
Givenchy Perfume Journal - a journey for the senses
TABLE 1
iv)
-Field Conditions and Characteristics
-Ambience
-General Planning Intention and Characteristics
v)
-Composition of a Plane Picture
-Vertical of a Plane Picture
Includes: Spatial Processing, Elevation of Building Model,
Building of Environment, Analyse of Environment
(Sunlight, Lighting, Ventilation)
vi)
-Function Layout, Various Gateway
(Stair)
vii)
-Indoor Traffic Scheme, Fire Scheme, Safe route
18 Months Building Safety Criteria, Tenure of Use
-Construction Materials of the Main Parts and Special Material
Power distribution System
-Location, Amount
Water Supply and Sewerage Work
Heating and Ventilation
Air Conditioning System
Energy Conserving and Environment Protective
Total HAVC (Hearting Ventilation and Air Controlling)
Cost and Investment Evaluation
Include: Cvil Engineering, Supply and Drain Water System,
HVAC, Air Condition Investm
MAR
15
Givenchy Perfume Journal - a journey for the senses
TABLE 2
16
16 Months
10 Months
Plan (Design Drawing)
-Overall Construction Site Plan
-Location (Floor Plan)
-Location (Area)
-North Arrow, Wind Rose Map, Scale Map
Architecture Plan (Design Drawing)
-Plane Layout, Bay Depth, Dimension, Scale and Dimension
-Define Space
-Structure Force System, Main Wall Layout
-Ground Elevation, Floor Elevation, Roofing Elevation
13 Months
Elevational Drawing
-Main Building Height
6 Months
8 Months Section Plan
Impression Drawing
-Aerial Perspective, Perspective View, Front Perspective
MAY
AUG
NOV
JAN
MAR
Givenchy Perfume Journal - a journey for the senses
TABLE 3
17
3 Days
1 Week
2 Weeks
1 Month &2 Weeks
3 Weeks
Install Pavilion
Interior Arrangement
Promotion and Marketing
-Invitation
-Advertising (Poster, Boucher, Magazine Ad, TV Ad)
-Press Release
-Guess List
Exhibition and Lighting install
Final Rehearsal and Check
Staff, Security and Helper Numbers
Venue Enhancement
Private and Press View
Opening Day
Check Health and Safety
AUG
SEP
Givenchy Perfume Journal - a journey for the senses
TABLE 4
240m Light With 100 Spotlight 100 Ordinary Light Bulbs
FIXTURE & FITTING
18
Givenchy Perfume Journal - a journey for the senses
The size of the pavilion will be 35x28x24m
Alloy Non-Ferrous Metals
Brick Wall
Yellow Travertine
Rubble Surface
Reinforced 9m-80
White Marble 256m2
Black Marble 200m2
Membrane Structure 600m2
Glass Plate, Daixinban,
MDF, Plastic Materials,
Waterproof Coating,
Plaster
19
Givenchy Perfume Journal - a journey for the senses