FUI Stakeholder Group4th July 2008, Sellindge
IFA Overview,Performance Report 2007-8& Valve Replacement Project
Simon McVeighIFA Manager
• IFA Overview
• Performance Report 2007-8
• Valve Replacement Project
Interconnexion France-Angleterre
National Grid & Interconnectors
• 1500km (cabled under the St.Lawrence River) Sandy Pond HVDC transmission link connecting New England, USA and Quebec, Canada;
• 370km link (290km submarine) across the Bass strait between Tasmania and Victoria, Australia;
• 43km submarine cable system, to enhance electricity delivery to the island of Nantucket, off the Massachusetts coast;
• National Grid is assessing the feasibility with Elia of a submarine link between GB and Belgium.
Basslink – at the time the world’s longest subsea cable coming ashore in Tasmania
National Grid has a strong track record in developing and operating interconnector projects
Background
Original link• First steps to assess feasibility in 1948• Government approval 1957• 160MW link commissioned in 1961• Prone to damage from marine activity and withdrawn from service in 1982• Benefits of a link already established
Cross-Channel Link (later termed IFA)• Investigation into a suitable route• Development of new machines to
bury cables in the sea bed• Project cost £700m at 1981 prices• Half the cost of a 2GW power station
Scotland
Commissioned in 1986, the link is 70km in length, (45km sub-sea), consisting of 2 converter stations, 8 land cables and 4 submarine cable routes
England & Wales
France
2000MW High Voltage Direct Current (HVDC) link connecting the GB and French transmission systems
IFA Asset Overview
•Both converter stations can ‘rectify’ (AC→DC) or ‘invert’ (DC→AC) to allow import or export of power•Discrete asset ownership but jointly operated by National Grid and Réseau de Transport d'Electricité•Compatible but not identical equipment•No asset (capacity) redundancy
Converter Stations
Les MandarinsLes Mandarins
•High Voltage Direct Current (HVDC); ‘current source’ technology; low loss•Allows precise control of the magnitude and direction of the Direct Current flow between two very large synchronous Alternating Current power systems (GB, UCTE)•AC System frequencies are nominally the same (50Hz) but AC link not possible between 400kV systems for technical reasons
Submarine Operations
Contracts• Maritime Operations: LD Travocean• Submarine Cable Repair: Nexans
Standby• Equipment & spares at Dunkirk• Submersible co-owned, maintained by contractor• Fault estimation & ‘hold’ for survey• Fault location & ‘hold’ for vessel hire & mobilisation• Desktop review
• IFA Overview
• Performance Report 2007-8
• Valve Replacement Project
Interconnexion France-Angleterre
ETSO NACM Task Force
• Sub-group to Task Force led by E.On
• Several interconnections studied– IFA, IFB, IFD, P-Cz, D-P, D-DW, B-NI, D-NI, D-CH
• Analyse curtailments for 2006 CY data– Classified as caused by:
• Internal AC Network• Interconnector assets
Firmness Study on Interconnectors Draft Curtailment Data 2006
0
5
10
15
20
25
30
B-NL D-DW D-NL D-CH D-F P-Cz P-SL P-VE SL-P IFA
Interconnector Network
Annual Outages
Short-Notice Planned Outages
Unplanned Trips/Reductions
IFA Curtailment Commentary*
* Discrete curtailment events shown (not duration) Switching transitions 500MW / 1000MW not listed individually
AC Borders
Asset related maintenance/faults have not curtailed cross-border capacity because of
Security Standards (UCTE Handbook) therefore redundancy in interconnection capacity
IFA Performance Report 2007-8
• Mid-point in asset life after nearly 25 years operation
IFA Annual Availability (%)
94.6
93.0
93.9
90
91
92
93
94
95
96
97
98
99
100
2005-06 2006-07 2007-08
IFA Monthly Unavailability (%)Split RTE / NGIL
0
2
4
6
8
10
12
14
APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
NGIL RTE
IFA Planned Outages 2007-8Split RTE / NGIL
0
1
2
3
4
5
Ou
tag
es >
(D-2
) no
tice
Joint RTE NGIL
IFA Unplanned Outages 2007-8Split RTE / NGIL
0
1
2
3
4
5
6
7
8
9
10
Ou
tag
es
< (
D-2
) n
oti
ce
RTE NGIL
Valve/Control System Related OutagesSplit RTE / NGIL
0
2
4
6
8
10
12
14
Pla
nn
ed
& U
np
lan
ne
d O
uta
ge
s
RTE Valves/Controls NGIL Valves/Controls Other Assets
• IFA Overview
• Performance Report 2007-8
• Valve Replacement Project
Interconnexion France-Angleterre
Joint feasibility study commenced 2005 to replace thyristor valves and controls with common designJoint contract for €70m (£56m) awarded to Areva 16th May 2008
Valve Replacement
Mid-life refurbishment: 25 yearsIdentical equipment will yield additional benefits in maintenance and supportDynamic frequency responseNesting of other mid-life work being assessed