Company history & major events
■A
ibel history and experience dates back more than 100 years with companies such as Elektrisk Bureau (EB)
and Haugesund Mekaniske Verksted (HMV).
■A
ibel AS is owned by a Norwegian investor group led by Ferd and Herkules Capital (since June 2007), well-
known investors with significant investments in both private and public equity
■A
ibel AS is owned by Ratos (SWE) from December 2012 and Ferd (50/50)
Elektrisk Bureau (EB) is established
Aibel is acquired by Ferd and Herkules
Haugesund Mekaniske Verksted (HMV) is established
UMOEacquires HMV
1900 1990
2000
ABB Offshore Systems acquires UMOE Oil & Gas
1882 1993
ABB Offshore Technology (later named ABB Offshore Systems) is established
2007
ABB Offshore Systems is acquired by an international investor group. Vetco International is established with subsidiaries Vetco Gray and Vetco Aibel
2004
Business units
MMO Modification Field development Wind
■Long term onshore and offshore MMO contracts
■Modifications to existing offshore installations and onshore plants
■New offshore installations and onshore plants
■International FPSO market
■New offshore facilities, AC/DC platforms
■Maintenance and facility services
Source: Company data
Current footprint – Norway
Njord A/B
Oslo
StavangerHaugesund
Bergen
Kollsnes
Sture
Mongstad
Troll A
Statford A/B/C
HuldraVeslefrikk
OsebergF/C/ø/SGudrun
Sleipner
Draupner
Ula
Ekofisk
Eldfisk
Kristin
Norne
Snorre A/B
Kårstø
Kristiansund
Harstad
Snøhvit
B11
Hammerfest
Stjørdal
Office Locations
MMO Frame Agreements
Current New-build and Modification Projects
DraugenNjord A/B
Oslo
StavangerHaugesund
Bergen
Kollsnes
Sture
Mongstad
Troll A
Statford A/B/C
HuldraVeslefrikk
OsebergF/C/ø/SGudrun
Sleipner
Draupner
Ula
Ekofisk
Eldfisk
Kristin
Norne
Snorre A/B
Kårstø
Kristiansund
Harstad
Snøhvit
B11
Hammerfest
Stjørdal
Office Locations
MMO Frame Agreements
Current New-build and Modification Projects
Office Locations
MMO Frame Agreements
Current New-build and Modification Projects
Draugen
Draugen EPCMClient A/S Norske Shell
Contract period March 2012 – March 2018
Options for two plus two years extension
Value 6 BNOK
Scope of work Portfolio management, FEED/FEED verification, Project management, Administration, Engineering, Procurement, Construction management, Fabrication, Installation and Commissioning assistance on all major projects and minor modifications on the Draugen asset
Portfolio Procurement Management
Staff Function / Stabsfunksjon
Business Unit / Forretningsenhet Resource Unit / Ressursenhet
Process Owner / Prosessansvarlig
Aib
el A
S –
Level 5
Notes:Personnel located in Stavanger except;1) located in Aibel offices in Oslo2) located in Aibel offices in Kristiansund3) located in Aibel offices in Harstad
Portfolio Procurement Manager
Morten von der Lippe
SQS Lead
Terje Flister
Subcontract
Helge BoyeProcurement Logistic Responsible
Elin Kim Ottersen
Infill Drilling – Oslo
Procurement Manager
Thor-Christen Lomsdal 1)
Topside Campaigne / Other Major Projects – Stavanger
Procurement Manager
Egil Johannessen
Minor Modifications – Kristiansund
Procurement Manager
Gunnar Settemsdal 2)
Supplier pre-qualification
Jon Corneliussen
Gustav Jensen
Odd Dysvik
Sustainable Development /
Local Content
Kåre Kvanli
Upgrade Project – Harstad
Procurement Manager
Kåre Kvanli 3)
© 2
010
7
Locations / Execution
Minor modificationsOperational support
Warehouse activititesFabrication
Upgrade Project (future centre of gravity) and discrete elements of other/future projects
Infill DrillingUpgrade Project (start-up)
Portfolio management
Topsides Campaign (management and seleected building blocks)
Portfolio managementDesign Integrity
Construction Management
FabricationConstruction resources
Draugen
Installation and completion
Topsides Campaign (seleected building
blocks)
Minor mods, Hva skjer i Kristiansund ?
Aibels kontor i Kristiansund sysselsetter i dag ca 200 personer
Vi har to kontrakter :
Statoil V&M, installasjonene Njord A og B. Siden 1998
Industriveien (leid lokale, tidl. Statoil)
Shell EPCM, Draugen Minor Modifications
Melkvikan
Aibel Kristiansund works with design and project management on the Statoil operated Njord field.
Aibel Kristiansund has performed studies, maintenance and modification at the field since 1997.
The Kristiansund office is now working with Aibel Stjørdal on a new and exciting field that is to be connected to Njord. The field is called Nordvestflanken and Aibel Kristiansund is responsible for modification and adjustment of the Njord platform.
Aibel Kristiansund's 42 000 square metre facility is located five kilometres from the centre of Kristiansund. The facility is centrally located between the airport and the city. It is also closely tied to the Vestbase supply base.
Aibel Kristiansund is expanding fast. From the summer of 2010 and to the end of that year, the branch received more than 250 applications from people wanting to work for the company.
Location Manager Eli Lossius Grødal describes the office as a secure and good work place with a good work environment. Aibel Kristiansund gets positive feedback from people wanting to work for us. We are a growing company in a small city.
Contact
Facts
Kristiansund
Aibel ASDalegata 71N-6516 KristiansundNorway
Tel.: 08527Tel. Int'l: (+47) 85 27 00 00Fax: (+47) 71 68 37 01
Location ManagerEli Lossius Grødal
Employees: 200
LocationAibel's facilities arelocated three + fivekilometres from thecentre of Kristiansund
Largest assignmentNjord - IndustriveienDraugen - Dalegata
Topsides Campaign (Living Quarter Extension / Life boat upgrade)
Draugen Upgrade – High Urgency items
Project Item Description Status
Lift Upgrade (K12W01)
The current Alimak lift has a lot of downtime due to reliability issues and unavailability of spare parts due to obsolescence. It will be replaced by a wirelift at the same location, with a bigger lift cart to accomodate scaffolding. The current aim is to install in 2015.
EPC to start in Harstad in June.
Flow Computer Replacement
Obsolescence of flow computers; oil export, gas export, fuelgas, flare gas, etc. O2 analyzer and backup Gas Chromatograph required to honor current agreement with Gassco (not fulfilled today). Stand-alone units will be integrated.
Awaiting FEED
Fire Loop Switchover
LQ fire panel has reached end of design lifetime. The ALQ project will install a new firepanel, while Upgrade will switchover the fire loop in the current LQ to the new fire panel once it´s in operatio.
Awaiting FEED
Drinking Water Upgrade
The drinking water is currently supplied from onshore via supply vessels. Current issue is supply reliability during bad weather, quality of supplied water, storage tank with contamination issues.
Awaiting kick-off Concept study.
HMI Upgrade
Obsolescence of HMI and and screens. New HMI also required to accomodate upcoming projects; Infill, ALQ, Linnorm. This to avoid running 2 separate systems in the control room.
Concept study ongoing.
Dewatering Pump Replacement
Currently using one secondhand pump, original design requires 2 new pumps. Previous secondhand pump broke down earlier this year. If not addressed the outcome would be a high corrosion rate in the GBS. Aim is to install in 2014.
FEED started in May.
Replace CO2 system
Strong recommendation from PSA to replace CO2 firefighting systems with other means (water mist, etc.) A plan for replacement will also be important when it comes to the Lifetime Extension Application to PSA
Technical note has previously been developed by Aker.
Diesel System
Due to forecasted fuel gas deficiency from October 2013, the diesel system will be used at times in continuous operation while it was designed as a back-up solution. Some parts, like the diesel centrifuge must be replaced to ensure sufficient reliability even only as a back-up system
Concept study ongoing. FEED to start Q4 2013.
Crude Oil Level Measurement
There is only 1 transducer left pr. cell that is functioning, these are attached to the cell wall and can only measure 75% of the cell storage. If these should stop functioning the cell will have to be closed and the crude oil capacity at Draugen will be reduced. Aim is to install in 2014 (also dependant on Infill U2H)
Will have a meeting with the original designer of the system to brainstorm around ways of handling the upgrade.
Minor mods, Hva skjer i Kristiansund ?
Ihht kontrakt så skal Monor Mods levere :
“CONTRACTOR shall have an established organisation in Kristiansund with capacity
and competence to deliver all aspects of the Scope of WORK for MINOR
MODIFICATION projects, including the FEED phase.”
Prosjektene i minor mods portefølje varierer fra enkle singeldisipline prosjekt til store
kompliserte prosjekt.
Shells driftsorganisasjon og prosjektledelsen for minor mods sitter i Kristiansund, og
det meste av møtevirksomheten vår foregår derfor lokalt.
Minor mods bruker Project Execution Process “MMO frame agreement” i W3,
på samme måte som Statoil V&M.
Minor modifications, Prosjekter■Shut Down 2013, 10.9. – 18.10.
■ 7 prosjekter er gjennomført; Test- & Prod. Manifold, Turndown, Carcass Bleed, Flare Tip
Grating, Helideck Drain (temp), Condensate Stripper, Knockout Drum
■350331 Helideck Drain, installeres etter at Living Quarter er på plass
■350303 Deluge (brannslukkingssystem)
■ Prosjekt med carry over work fra Aker
■ Noe installasjon høst/vinter 2013, Planlagt installasjon i 2014
■ 15 kabinetter + kabling/piping
■350338 Dry Gas Dewpoint
■ Analysekabinetter, installeres våren 2014
Minor modifications, Prosjekter■350304 Turbine Nodes, Siemens
■ Programmering, noe utstyr?
■350320 New UPS, Feed Study
■ Shell må velge konsept, eksisterende rom, ny modul, endre modul….
■ Bruk av Shell Frame Agreement
■350332 Oil Mist from Turbines
■ Routing avtrekk, vifte, signal – problem mht hydrokarboner
■Ca 10 andre prosjekter, noen med carry-over scope
■ Magnetrol replacer, Grating