8/9/2019 Final Bill (Submitted)
1/16
CONSTRUCTION OF MCB HASSANABDAL BRANCH
FINAL BILL
Client: MCB Bank Limited
Design Consultants: The Consultants A!hite!tue
Total Cost o" Summa#
S$No Des!i%tion Amount
1 Brick Masonry Work 104,916
2 Plaster Works 169,816
3 Concrete work 383,273
4 Flooring 1,090,63
Finis!es 147,699
6 False Ceiling 29,29
7 Woo" works 449,127
8 #l$%in$% Works 626,679
9 P$&lic 'ealt! Works 18,263
10 Miscellaneo$s Works 146,020
Total Cost o" Ci&il 'oks ()*+,)+-*
1 Wiring 27,00
2 (ig!t Fi)t$res 10,00
3 *ele+!one an" co%+$ter 121,300
4 Ca&le an" Con"$its 141,20
Fire #lar% yste% 119,00
6 -istri&$ation Boar" 8,000
7 .art!ing 80,000
8 CC*/ yste% Miscellaneo$s 47,000
Total Cost o" .le!ti!al 'oks /)0/+)100
Total Cost o" Ai!onditioning 'ok -,)000
2)1+1)*-*TOTAL COST OF CI3IL 4 .L.CTRICAL 4
AIRCONDITIONIN5 'OR6S
8/9/2019 Final Bill (Submitted)
2/16
#-- .*# *.M 77,90
'OR6 DON. U7TO FINAL BILL 2)1,0)8((
(ess Work -one $+to 2n" Bill 4,399,395
N.T 7A9ABL. 8,0)1+2
8/9/2019 Final Bill (Submitted)
3/16
CONSTRUCTION OF MCB HASSANABDAL BRANCH
Client: MCB Bank Limited
Design Consultants: The Consultants A!hite!tue
FINAL BILL
S$Des!i%tion Unit Rate Amount
CI3IL 'OR6S
/ MASONR9 'OR6S
Bi!k Mason# in
2:1 $+er tr$ct$re ;sing 1t 240 1,66
Total Cost o" Mason# 'oks /02)+/1
2
2:1nternal +laster work walls5 ,116 ,061:67 91:88 ,13: >t 30 14,606
2:2.)ternal +laster walls5 40 07:00 07:00 >t 30 1,210
Total Cost o" 7laste ;oks /1+),/1
( CONCR.T. 'OR6
3:1
297: 191:26 191:26 C>t 33 64,072
3:2
88 70:90 28:94 99:84 C>t 100 9,984
3:3
600 933:84 933:84 C>t 22 210,114
3:4
0 48:16 48:16 >t 60 2,890
3:
(intel Concrete < CC 1t 10 9,000
Total Cost o" Con!ete 'oks (,()8-(
2 FLOORIN5 'OR6
4:1
1 040 749 00 749 00 >t 190 142 310
BOinis!e" s%oot! wit! steel >loat:
Pro@i"ing, %i)ing, +lacing, co%+acting, @i&rating c$ring o>%i) not leaner t!an 1 rein>orce%ent, co%+lete in all res+ect
Brick &allast P( 2= PCC 1or%e" &ars gra"e 40 ic c$tting,&en"ing, &in"ing an" +lacing rein>orce%ent in +osition
Constr$ction o> 40= ) 100= ra%+ at entrance wit! laying o>PCC 1 Cera%ic local Master5 tiles in &at! ?itc!en >loor walls $+to 70= ie 12=)18=5 P20108 P202M
8/9/2019 Final Bill (Submitted)
4/16
Client: MCB Bank Limited
Design Consultants: The Consultants A!hite!tue
FINAL BILL
S$Des!i%tion Unit Rate Amount
BOt 2,000 74,000
4:7 1 7:00 7:00 >t 1,000 7,000
Total Cost o" Flooing /)0+0)1*(
* FINISH.S
:110,041 ,907:96 ,907:96 >t 2 147,699
Cost o" Finishes /2-)1++
1 FALS. C.ILIN5
6:1
3,384 2,829:84 2,829:84 >t 90 24,686
6:2
82 91:19 4:68 14:87 >t 280 40,844
Total Cost o" False Ceiling 8+*)*8+
- 'OOD 'OR6S
7:1
17 189:00 12:2 201:2 >t 800 161,000
7:2
88 89:31 89:31 >t 280 2,007
7:3
7o!elain Tile Skiting: P( o> Master +orcelain tile 4=skirting o> "esie" color s!a"e as s+eci>ie" &y t!eCons$ltant: 16=)4=)38= Co"e PDM1135
7o!elain Tile : P( Porcelain tile Master tri+ o> color tiles
on >loors5anite$ P( o> 34= t!ick #W silk Eranite at stair ste+s wit!&$ll nose e"gin at one si"e an" +lis!e" starig!t e"ge onot!ers:
S$S$ Railing: PF tainless steel railing wit! 38= t!ick 3 Doso> 34= "ia tainless steel +i+e !oriontly an" 1 Do 2= "iastainless steel +i+e on to+, @ertical &l$ster 212= "ia at 3 ccic t!e cost o> Polis!ing:
3anit# Ma=le: PF o> 34= t!ick /anity *o+ Eranite o>a++ro@e" s!a"e an" color s+eci>ie" &y t!e Cons$ltant
7e%aation o" Su"a!e "o 7ainting: *!e s$r>ace to &e
+ainte", s!all &e >ille" wit! +$tty an" san" +ra+ere" to o&taina s%oot! an" e@en s$r>ace: *!e s$r>ace t!$s +re+are" s!all&e co@ere" wit! a coat o> Pri%er o> C. B.E. %ake:*wo coats o> reco%%en" +aint s!all &e a++lie" to t!e+re+are" s$r>ace:
7lasti! .mulsion: #++lie" to interior s$r>ace wit! rollerceiling as well
False Ceiling: PF o> 2)2 Ey+s$% False ceiling, o> a++ro@e"G$ality ic E %etal s$s+ension syste%, +ro@i"ing o> lig!t>i)t$re arrange%ents, +ro@ision o> !an"ing #C- "i>>$sersco%+lete in all res+ect e)cl$"ing t!e area o> 2)2 lig!t as +ers+eci>ication o> #rc!itect:
Bulk Head a=o&e !ash Counte: PF o> 12= t!ick (asaniWoo" &$lk !ea" wit! Beac!#? cla""ing a&o@e cas!co$nter wit! +artal woo" >ra%ing ic t!e +aint+olis! co%+letein all res+ect as +er "rawing an" "irections o> t!e #rc!itect:?Onl# =ase@=ottom and sides ae taken in measument
'ooden Flush Doos:PF woo"en >l$s! "oors, consisting o>"oor >ra%e in 2=)4= &eac! woo" section, sec$re" in +ositionwit! 9= long M !ol" >asts: -oor lea@es consisting o> 112=t!ick soli" core >l$s! "oor, %ac!anically +resse" wit! 4%%t!ick &eac! woo" +ly, on &ot! si"es o> &eac! woo" 3=)1
12=5 s!$tter >ra%e, 112=)112= &eac! woo" &racing 2=)1=&eac! woo" lock rail, &eac! woo" li+ing, arc!itra@e, a++ro@e"local &est !arwares, i%+orte" lock ?u%to Rs$ 100@> an"laG$or +olis!: Co%+lete as +er "esign:
Lasani 'ood 7atitions: $++ly >i) lasani woo" +artitionwalls +artal woo" inner >ra%e 2=)112= &ars +lace" 2 a+artin &ot! "irections to walls ceiling co@ere" wit! 34= t!icklasani woo" on &ot! si"es
6it!hen Ca=inets Mounted on Floo:Pro@i"ing, %aking an">i)ing >loor %o$nte" kitc!en ca&inets consisting o> 212=)114= sie "eo"ar woo" >ace >ra%e wit! woo" stain lacG$er+olis! !a@ing 17%% t!ick i%+orte" lasani &oar" &ot! si"e>or%ica cal""ing skeletion >or @ertical an" !oriontal s!al@eswit! "eo"ar woo" "rawers an" 114= t!ick o+ena&le s!$tter
!a@ing 38= t!ick "eo"ar +ly +anel wit! woo" stain lacG$er+olis! as s!own on "rawings ic cost o> 112= t!ick CC1
8/9/2019 Final Bill (Submitted)
5/16
Client: MCB Bank Limited
Design Consultants: The Consultants A!hite!tue
FINAL BILL
S$Des!i%tion Unit Rate Amount
BO !oo"
Cash @ Telle$ PF Cas! *ellers, Co$nter, !a@ing >ront wall in&rick %asonry to+ s!el@e in CC 1i) glass "oors ingle s!$tter wit!#l$%in$% to+ &otto% al$%in$% rails in 2%% t!ick sec:Pak Ca&le %ake5, ano"ie" in "esire" color, >itting wit!12%% t!ick clear glass, co%+lete wit! +i@otal !inges lockingarrange%ents t$rning %ec!anis% wit! new star %otor as+er "esign:
5lass 7atitions: Pro@i"e an" >i) glass +artitions in 2%%!ig! strengt! #l$%in$% alloy section Pak Ca&le %ake5,ano"ie" in "esire" color, >itting wit! 12%% t!ick clear glass,co%+lete in all res+ect ;ith &in#l 5askets etc as +er "esign:
5lass 'indo;s: Pro@i"e an" >i) Elass win"ows 2%% t!ick!ig! strengt! al$%in$% alloy section Pak ca&le %ake5,ano"ie" in "esire" color, >itting wit! 12%% t!ick i%+orte"clear glass, co%+lete wit! @inyl gaskets etc as +er "esign one)terior s$r>aces an" on t!e si"es o> %ain an" #*M -oor:
Aluminium Com%osite 7anel Cladding: PF o> #l$%ini$%co%+osite +anels on e)terior >$r>ace wit! #l$%ini$%C!annels as +er !eig!t s!own in t!e "rawing ic all wastagean" c$tting co%+lete in all res+ect an" as "irecte" &y t!e
#rc!itect:
Fosting Ta%e: Pro@i"e an" >i) o> >rosting ta+e on glass asreG$ire" !eig!t o> &est G$ality:
$++ly an" >i) e)+ort G$ality .$ro+ean Elae" .art!enwareWC Porta Ma"e5 in reco%%en"e" color an" s!a+e co$+le"wit! 13 litter eart!en >l$s!ing, cistern, ic CP Brass *:sto+cock, connecting +i+e, ger%ina +lastice seat li", co%+letewit! >i)ing in +osition as +er "esign sec+>iciations
$++ly an" >i) rrisa Elae" +attern .art!enware WC CF wit! 3 gallon low le@el >l$s!ing tank cistern, ic CP Brass*:sto+ cock, connecting +i+e, ger%ina +lastice seat li",co%+lete wit! >i)ing in +osition as +er "esign sec+>iciations
$++ly >i) .art!en Elae" Was! !an" &asin o> Porta%a"e5 o> a++ro@e" color o> e)+ort G$ality, ic CP &rass %i)er
>or !ot an" col" water, "esire color wit! co%+leteaccessories:
8/9/2019 Final Bill (Submitted)
6/16
Client: MCB Bank Limited
Design Consultants: The Consultants A!hite!tue
FINAL BILL
S$Des!i%tion Unit Rate Amount
BOt 200
9:16
a5 3= "ia 70 8:00 8:00 >t 200 17,000
&5 4= "ia 42 90:00 90:00 >t 20 22,00
c5 6= "ia 40 >t 400
9:17 1 1:00 1:00 Dos 18,000 18,000
9:18
1 2:00 2:00 Ho& ,000 10,00
9:19 1 1:00 1:00 Ho& 20,000 20,00
9 20
6it!hen Sinks: $++ly >i) tainless teel ?itc!en #isa or#tlas %ake5 in "esire" s!a+e wit! 32%% "ia &rass waste,stainless steel &ottle tra+, &rackets, CP &rass !ot an" col"%i)er Faisal or Master %ake5, co%+lete wit! >i)ing in +osition
as +er s+eci>ications:
Floo ta%s: PF cast iron sel> cleaning 10)7%%5 >loortra+s
5ull# ta%s: F 10)0%%5 g$lly tra+s, #l+ine teel orCM. %ake wit! 100%% o$tlet necessary %asonry work:
5as Co!ks: F$ll way &rone Bo"y
5ate 3al&es: F$ll way &rone Bo"y
1mm th!k Mio as %e Da;ing Belgi$% or Ha+an %ake,%o$nte" on rea"y %a"e >ra%e wit! s!el>
To;el Rail:C:P Brass
Toilet 7a%e Holde :C:P Brass
Muslim Sho;e:C:P Brass 12= "ia
77R 7i%e: PF PP Pi+e >or Col" 'ot water wit! all >ittings*ee, .l&ow, $nion socket etc >itting testing wit! +ress$reconceale" in walls >loor ic !ocks etc co%+lete %an$>act$re&y Ms -#-., Ms F.*'.M, M .**
U73C 7i%e: PF $+@c oil, waste an" @ent +i+es con>ir%ingto t!e
>ollowing "ia%eter, ic r$&&er ringsol@en ce%ent >ittingAointing, c$tting, an" &reaking concrete etc testing an"co%%issioning co%+lete in all res+ect Ms M#(.I or Ms-#-.
5as 5e#ses:$++ly >i) gas geysers o> 20 Eallon ca+acityas s+eci>ie"
.tenal 7lum=ing ;oks: Masonry work o> %an!ole +ro@i"e a new 2:)2:)3 wit! co@er, w!ere necessary:Co%+lete sewerage lines to conecting wit! %ain line,co%+lete as +er inst$rction o> t!e Cons$ltant
O&e Head 'ate Tank: Water *ank M#*. -o$&le Ply00 Eallons
'ate 7um%: F one 'orse Power water +$%+ ic a$ot
8/9/2019 Final Bill (Submitted)
7/16
8/9/2019 Final Bill (Submitted)
8/16
8/9/2019 Final Bill (Submitted)
9/16
Client: MCB Bank Limited
Design Consultants: The Consultants A!hite!tue
FINAL BILL
S$Des!i%tion Unit Rate Amount
BO2 /2/)8*0
S.CTION>* FIR. ALARM S9ST.M
1
22 19:00 19:00 .ac! 1,00 28,00
1a5
2 2:00 2:00 .ac! 1,00 3,000
2
a5Fire #lar% Control Panel 2Kone 1 1:00 1:00 .ac! 2,000 2,000
&5
19 19:00 19:00 .ac! 2,00 47,00
c5
1 1:00 1:00 .ac! 2,00 2,00
"5
2 2:00 2:00 .ac! 2,000 4,000
e5
Fire #lar% &ell 6= "ia Eong 2 2:00 2:00 .ac! 2,000 4,000
3
*esting Co%%issioning 1 1:00 1:00 Ho& ,000 ,000
Total Se!tion>* //+)*0
S.CTION>1 DISTRIBUTION BOARD
1 MAIN D$B LI5HT) 7O'.R 4 A@C 5ROUND
1 1:00 1:00 .ac! 0,000 0,000
2 D$B U7S
1 1:00 1:00 .ac! 3,000 3,000
Total Se!tion>1 ,*)000
S.CTION>- CCT3 S9ST.M 4 MISC.LLAN.OUS
2 2:00 2:00 .ac! 40,000 80,000
Total Se!tion>- ,0)000
S.CTION>, CCT3 S9ST.M 4 MISC.LLAN.OUS
1
400 400:00 400:00 >t 0 20,000
2
Pro@i"ing wiring >or s%oke, !eat "etectors or %an$al call+oints wit! 2)1:%% sG P/C ca&le in an" ic P/C +i+erecess in wall or on s$r>ace in "$ra "$ct as +er site con"itionsor a++ro@e" &y t!e .ngineer co%+lete in all res+ect
Pro@i"ing wiring >or Fire alar% &ellso$n"er +oints wit!22:%%sG P/C ca&le in an" incl$"ing P/C +i+e ecess inwall or on s$r>ace in "$ra "$ct as +er site con"itions or asa++ro@e" &y t!e .ngineer co%+lete in all res+ects
$++ly, installation, te)ting co%%issioning o> >ollowingeG$i+%ent o> Fire #lar% yste%
%oke -etector oniation ty+e 'oney well or as a++ro@e"eG@ilt5
'eat -etector oniation ty+e 'oney well or as a++ro@e"eG@ilt5
Man$al Call station Break glass ty+e5 'oney well or asa++ro@e" eG@lt:
Pro@i"ing, >i)ing, testing an" co%%issiong o> -istri&$ation&oar"s as +er "etails gi@en in "rawing: Co%+lete in allres+ect
Pro@i"ing, >i)ing, testing an" co%%issiong o> -istri&$ation&oar"s as +er "etails gi@en in "rawing: Co%+lete in allres+ect
Pro@i"ing an" installation testing co%%issioning o> 10 >tlong 14L )112= co++er +atti as eart! electro"e 10 >t &elowwater le@el incl$"ing cost o> &oring an" lowering t!e co++erro" 10 >t "own >ro% water le@el, co%+lete wit! cla%+, l$gsan" 2)3 %% G stan"ar" ins$lator co++er con"$ctor >ro%eart! +i+e to eart! connecting +oint in %ain!ole in 2= "ia P/CPi+e wit! watering ca+, 12)12)12L "ee+ ins+ection c!a%&eric connecting t!e eart! lea"s wit! eart! connecting +oint an"%ain +anel or generator &o"y an" ne$tral co%+lete in allres+ect
Pro@i"ing, laying E6 CC*/ Ca&ler >or eac! CC*/ ca%erain an" ic P/C Pi+e a&o@e >alse ceiling $+to CC*/ %onitorco%+lete in all res+ect
Pro@i"ing wiring >or eac! access controll $nit to "ata rack wit!C#*6 Co%+$ter ca&le in +@c +i+e >alse ceiling or as reG$ire"
8/9/2019 Final Bill (Submitted)
10/16
Client: MCB Bank Limited
Design Consultants: The Consultants A!hite!tue
FINAL BILL
S$Des!i%tion Unit Rate Amount
BOt 18 9,990
1:00 1:00 Ho& ,000 ,000
6
:00 :00 Dos 800 4,000
7
1:00 1:00 Ho& 3,800 3,800
8
1:00 1:00 Ho& 10,000 10,000
Total eta 'oks --)*+0
Pro@i"ing wiring >or >oot siren wit! 3)1:%% sG sc ca&le>ro% -B $+s a&o@e >alse ceiling or as reG$ire" co%+lete in allres+ect
Co++er +i+ing >or 1:0, 1: ton 2 ton s+lit #C $nits asreG$ire"
-e%olition o> &rick %asonry wall o> store roo%, Block work
>or &at! @entilators, #*M wall, strong roo% an" locker roo%
"oor o+ening >or steel "oors, >loor cleaning o> concrete,
%ortar an" "e&ries incl$"ing cost o> "is+osal o> "e&ris o$t o>
area as +er "rawing an" "irections o> t!e #rc!itect: etc
co%+lete
Pro@i"ing >i)ing o> oa+ "is! in &at! roo% Ero$n"Floor5 as +er instr$ction o> Branc! Manager:
Pro@i"ing an" %aking o> single si"e" lasani 12= t!ick woo"en
cla""ing on col$%ns: #ll lasani +anels will &e >i)e" wit! gl$e
an" nails on +artal woo" >ra%e 2= ) 2= an" 2 0= cc
str$ct$re incl$"ing cro@e, woo" &ea"ing an" skirting,+olis!ing.na%el +aint >inis!
Pro@i"ing laying o> 34= t!ick *$>> tile on a%+ wit! ce%ent
san" %ortor incl$"ing 1 .)isiting (ocker roo% "oor >ro%e)isting &ranc! wit! co%+lete arrange%ents as +erinstr$ctions o> Branc! Manager
e%o@al o> e)isting &ranc! wall &racket >ans installation o>e)isting >ans in newly constr$cte" &ranc! +re%ises as +erinstr$ctions o> Branc! Manager
e%o@al o> e)isting &ranc! cas! co$nter "oor sec$rity lockan" re>i)ing at newly +re+are" &ranc! cas! co$nter "oor wit!co%+lete arrange%ent an" satis>action o> t!e &ranc!
%anager:
e%o@ing an" re>i)ing o> alrea"y >i)e" Manager ca&in glass+artition, woo"en &ea%, >alse ceiling to resiing o> Branc!
Manager ca&in as +er instr$ctions o> E:M Branc! Manager,MCB 'assana&"al:
8/9/2019 Final Bill (Submitted)
11/16
M C B BAN6 LIMIT.D ?MCB AT
HASANABDAL BRANCH
FINAL BILL
M.ASUR.M.NT SH..TS
Des!i%tion UNIT No L B H Aea
/ MASONR9 'OR6S
/$/ + THIC6 'ALLS
5ROUND FLOOR
1 12:00 0:70 1:0 13:0
C>t **#( /($*0
/$8 2$* THIC6 'ALLS
5ROUND FLOOR
#*M FD* W#(( 1 :7 0:37 11:00 23:72
(. P./; *I 1 4:33 0:37 11:00 17:865
C>t **#( *$,1
8 7LAST.R
8$/ INT.RNAL 5ROUND FLOOR 7LAST.R
FRONT 'INDO'S CILLS ?( NOS 5ROUND 4 /ST FLOOR
-. D*.D#( .*.D#(5 6 0:88 7:0 39:38
6 0:88 10:00 2:0
>t **#( +/$,,
($8 7C$C /:2:, AND STON. BALLAST IN 6ITCH.N AND BATH FLOOR
B#*' F* F( 1 :2 4:00 0:2 :2
1 4:0 4:00 0:2 4:0
B#*' (BI 1 8:2 3:0 0:2 7:22
M#D .D*#DC. 8ND ST.7
*P B**MD*.D#( .*.D#(5
8/9/2019 Final Bill (Submitted)
12/16
M C B BAN6 LIMIT.D ?MCB AT
HASANABDAL BRANCH
FINAL BILL
M.ASUR.M.NT SH..TS
Des!i%tion UNIT No L B H Aea
?*C'.D 1 8:33 :7 0:2 11:97
C>t **#( 8,$+2
2$* 5RANIT. (@2 THIC6
C#' C;D*. -. 1 3:00 4:00 12:00
>t **#( /8$00
*$/ 7LASTIC .MULSION 7AINT
.*.D#( '#-. B**M F:F5 1 29:7 4:00 119:00
W#(( 'B( -. F* F(5 1 30:00 11:00 330:00
>t **#( 22+$00
6:2 BUL6 H.AD OF CASH COUNT.R
FD* B#C? 2 12:17 2:00 48:68
-. 1 3:00 2:00 6:00
>t **#( *2$1,
7:1 'OOD.N FLUSH DOORS
FIRST FLOOR
*. - 2 3:7 7:00 2:0
(. #(.#-I P#- *I 2 3:00 7:00 42:005
?*C'.D - 1 2:7 7:00 19:2
(. #(.#-I P#- *I 1 2:0 7:00 17:05
>t **#( /8$8*
7:4 6ITCH.N MOUNT.D 'ALL CABIN.TS
(DE -. 1 8:2 2:2 18:6
8/9/2019 Final Bill (Submitted)
13/16
M C B BAN6 LIMIT.D ?MCB AT
HASANABDAL BRANCH
FINAL BILL
M.ASUR.M.NT SH..TS
Des!i%tion UNIT No L B H Aea
'* -. 1 4:00 2:2 9:00
(. #(.#-I P#- *I 1 12:2 2:00 24:05
>t **#( ($01
7:7 R.CORD ROOM CABIN.T
C#BD.* 1 10:33 8:17 84:40
(. #(.#-I P#- *I 1 10:00 8:00 80:005
>t **#( 2$20
8:2 5LASS 7ARTITIONS
M#D#E. M 1 0:7 8:00 6:00
#(DE M#D - 1 0:2 8:00 2:00
>t **#( ,$00
8: FROSTIN5 TA7.
M#D#E. C#BD 1 10:2 4:00 41:00
1 9:7 4:00 39:00
Main .ntrance -oor 1 6:2 4:00 2:00
#*M -oor 1 3:00 4:00 12:00
*eller co$nter si"e 1 2:00 4:00 8:00
>t **#( /8*$00
9:11 LOO6IN5 MIRROR
#* (C?. M 1 2:0 3:00 7:0
>t **#( -$*0
10 MISC.LLAN.OUS 'OR6S
8/9/2019 Final Bill (Submitted)
14/16
M C B BAN6 LIMIT.D ?MCB AT
HASANABDAL BRANCH
FINAL BILL
M.ASUR.M.NT SH..TS
Des!i%tion UNIT No L B H Aea
10:2 MS 5RILLS
M#D#E. M WD-W 1 10:00 7:0 7:00
(. #(.#-I P#- *I 1 10:00 7:33 73:305
>t **#( /$-0
10:6 3.RTICAL BLINDS
FD* WD-W M#D#E. M5 1 10:0 8:00 84:00
>t **#( ,2$00
.ETRA 'OR6S
1 RAM7 TIL.S
1 13:0 4:00 4:00
>t **#( *2$00
2 LOC6.R DOOR 1 1:00
Ho& **#( /$00
3 'ALL BRAC6.T FANS
:00
Dos **#( *$00
4 S.CURIT9 LOC6
1 1:00
Ho& **#( /$00
DISMANTLIN5 OF MANA5.R CABIN
1 1:00
Ho& **#( /$00
8/9/2019 Final Bill (Submitted)
15/16
M C B BAN6 LIMIT.D ?MCB AT
HASANABDAL BRANCH
FINAL BILL
M.ASUR.M.NT SH..TS
Des!i%tion UNIT No L B H Aea
8/9/2019 Final Bill (Submitted)
16/16
classic too&a class total too&a total
s%all 0 2,000 0 120000
%e"i$% 100 3,000 0 300000
large 60 42,000 0 220000
0 7270000 1440000
193828
0000
188828