Figure 1: Schematic Process Flow Sheet for Nine Mile Processing plant
Version: 1, Version Date: 16/07/2021Document Set ID: 310872
Figure 2: Schematic plant site layout with stockpiles, roading, drainage and settling ponds.
Version: 1, Version Date: 16/07/2021Document Set ID: 310872
Figure 3: General Arrangement – Feed Hopper (left) & Conveyer to screen (right)
Figure 4: Trommel Screening Area - General Arrangement (Top) and Elevations (Bottom)
Version: 1, Version Date: 16/07/2021Document Set ID: 310872
Figure 5: Spiral Unit General Arrangement (Top) and Elevations (Bottom)
Version: 1, Version Date: 16/07/2021Document Set ID: 310872
Figure 6: HMC Upgrade Unit General arrangement (Top) and Elevation (Bottom)
Version: 1, Version Date: 16/07/2021Document Set ID: 310872
Figure 7: Water Reticulation – Settling cones
Figure 8: Control Room and MCC General Arrangement
Version: 1, Version Date: 16/07/2021Document Set ID: 310872
Figure 9: Site Office General Arrangement (Top) and Elevation (Bottom)
Version: 1, Version Date: 16/07/2021Document Set ID: 310872
Top Related