The information contained herein and any other advice are given in good faith based on FFR-‐K1’s current knowledge and experience of the products when properly stored, handled and applied under normal conditions in accordance with FFR-‐K1’s recommendations. The information only applies to the application(s) and product(s) expressly referred to herein. In case of changes in the parameters of the application, such as changes in substrates etc., or in case of a different application, consult FFR-‐K1’s Technical Service prior to using FFR-‐K1 products. The information contained herein does not relieve the user of the products from testing them for the intended application and purpose. All orders are subject to our current terms of sale and delivery. Users must always refer to the most recent issue of the local Product Technical Data Sheet for the product concerned, copies of which will be supplied.
FFR-K1 Technical Manual !Final Flat Roof -‐ One Part Kevlar
Revision 1.4 Sept 2014
ABEP Ltd!40 Wheatley Road!Napier!+64 6 843 [email protected]!www.abep.co.nz
Table of Contents! 1. New Zealand Building Code Compliance! 4!
1.1 Clause B2 - Durability! 4! 1.2 Clause E2 - External Moisture! 4! 1.3 Clause F2 - Hazardous Building Materials! 4!
2. System Build Up - Diagrams! 5! 3. Product Description! 6! 4. Product Data and Information! 7! 6. FFR-K1 Reinforcing Scrim Technical Data! 9!
6.1 Mule-Hide Fabric Tape! 9! 7. Substrate Inspection & Testing Procedure! 10! 8. Substrate Cleaning & Preparation! 11!
8.1 General Roof Preparation! 11! 9. Substrate Condition Inspection! 12!
9.1 Wooden Substrates! 12! 9.2 Metal Substrates! 12! 9.3 Cementitious Substrates! 12! 9.4 Hard-finished Concrete! 12! 9.5 Brick, Stone, Slates And Tiles! 13! 9.6 Asphalt Substrates! 13! 9.7 Bituminous Felt Substrates! 13! 9.8 Butyl Rubber, EPDM Rubber / TPO, PVC Membrane Substrates! 13! 9.9 Paints and Existing Coatings! 13! 9.10 Existing FFR-K1 Coatings! 13!
10. Substrate Priming Requirements! 14! 11. Application Preparation! 15!
11.1 Repairs and Preparation! 15! 11.2 System Application! 15!
12. Application Procedure! 16! 12.1 Final Flat Roof (Without FFR-K1 Reinforcing Scrim)! 16! 12.2 Final Flat Roof (With FFR-K1 Reinforcing Scrim)! 16!
13. FFR-K1 System Product Consumption Rates! 17! 14 Application Tools! 17!
14.1 Clean Up Of Product & Tools! 17! 15 System Typical Detail Drawings! 18!
15.1 Change in level! 18! 15.2 Pipe Penetration! 19!
Page � of �2 24Revision 1.4 September 2014!
Table of Contents! 15.3 Rain Water Outlet! 20! 15.4 Repair to Damaged Substrate! 21!
16 System Warranty Information! 22! 17 System Limitations! 22! 18 Safety Information! 23!
18.1 Safety Information - on site safety! 23! 18.2 System Safety Information - Personal Protection! 23! 18.3 Disposal of materials! 24!
19 Technical Manual Information/Disclaimer! 24
Page � of �3 24Revision 1.4 September 2014!
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 1. New Zealand Building Code Compliance!!1.1 Clause B2 - Durability!The FFR-K1 Waterproof Membrane System when installed according to the manufacturer’s instructions, will meet Performance B2.3.1(b) 15 years of the New Zealand Building Code.!!1.2 Clause E2 - External Moisture!The FFR-K1 Waterproof Membrane System complies with clause E2.3.2 of the NZ Building Code, when installed in accordance to the manufacturer’s instructions.!!1.3 Clause F2 - Hazardous Building Materials!The FFR-K1 Waterproof Membrane System complies with clause F2.3.1 of the NZ Building Code, when installed in accordance to the manufacturer’s instructions.!!
Page � of �4 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !2. System Build Up - Diagrams!!
Page � of �5 24Rev 1.4 September 2014
Not to Scale
Not to Scale
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!3. Product Description!!FFR-‐K1 is a single pot, highly Klexible, multi-‐purpose Kevlar reinforced Thermo-‐Set Liquid Applied Membrane. It is designed for the seamless water-‐prooKing and long term protection of rooKing system surfaces from harsh environments. !3.1 FFR-‐K1 Uses The use and application of FFR-‐K1 Liquid Membrane is reserved for FFR-‐K1 Accredited & Fully Trained Applicators only. !
Designed to protect a variety of rooKing system surfaces including: Asphalt, Concrete and Cementitious materials , Foam, Wood , Metal, PVC, TPO & EPDM Rubber. (Substrate suitability must meet all requirements under section 7 of this Technical Manual). !
Highly Suitable for water-‐prooKing solutions in both new construction and refurbishment projects. !
Excellent for applications over Single or Multi-‐layer sheet membranes. !Ideal for complex rooKing details with limited accessibility. !FFR-‐K1 is especially suited to applications where surface movement may defeat protection of a rigid, non-‐reinforced coating. !
3.2 FFR-‐K1 Advantages and Characteristics !Instantly waterproof from initial application. !High reKlectivity and thermal insulation abilities. !Permanently withstands ponded water !Moisture & UV cured single component aliphatic low VOC coating. !Does not yellow when exposed to the atmosphere. !The Klexibility retained by FFR-‐K1 allows for surface movement caused by the thermal shock sustained by most structures. !
FFR-‐K1 is a self-‐terminating material, therefore reducing the requirement for Klashing details in many areas. !!
Page � of �6 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!4. Product Data and Information!!!Manufacture Details !
FFR-‐K1 is Exclusively Produced and Supplied by Fielco Adhesives 1957 Pioneer Road, Huntingdon Valley, PA 19006 (800)825-‐7156 • (215)674-‐8700 • Fax: (215)674-‐1712 [email protected] www.Kielco.com !
Packaging !Supplied in 5 US Gallon/18.9 Litre Units (30Kg Approx.) !Smaller unit sizes are available on request !
Appearance !Low Gloss/Satin White – Viscous Liquid !
Odour !Mainly Sweet Ethereal Distinct !
Mixing !No mixing is required (Stir thoroughly before initial usage) !
Storage & Shelf Life !When stored at temperatures between 2°C & 27°C (35°F & 80°F) FFR-‐K1 is Kit for use for up to 12 months from the date of manufacture when stored in the original unopened & undamaged packaging. Higher storage temperatures may reduce the shelf life of FFR-‐K1. Opened units may begin to solidify within a few days. !
Curing Times – (Approximate when exposed to UV or Moisture) !Pot Life – 5 hours @ 27°C (80°F) !Set to touch time – 3 hours @ 27°C (80°F) !Tack Free – 5 hours @ 27°C (80°F) !Open To Light TrafKic – 16 hours @ 27°C (80°F) !Complete System Cure – Between 7 to 30 Days @ 27°C (80°F) !
Density !1.32 Kg/Litre !
Solids Content !95% Solids !
SpeciOic Gravity !1.30 – 1.50
Page � of �7 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!Viscosity !Thixotropic -‐ 75,000 cps !
Shore Hardness (ASTM D2240) !Circa 70A !
Water Vapour Transmission (ASTM E-‐96) !Permeance 19.7 MNs/g !
Salt-‐Fog Testing (ASTM B-‐117) !500 hrs – Pass !
VOC -‐ Title 24 Low VOC (ASTM E1826-‐11) !< 0.4 pounds per gallon !< 50 g/litre (VOC exempt list) !
Chemical Resistance !FFR-‐K1 is highly resistant to many chemicals. Please contact FFR-‐K1 Technical Services for speciKic information. !
Kevlar Resin Tensile Strength (ASTM D638-‐10) !525,000 psi !
Kevlar Breaking Tenacity (ASTM D3217-‐07) !424,000 psi !
Kevlar Thermal Conductivity (ASTM E1530) !0.03 (BTU x in./(h x ft x °F) Shows no embrittlement or degradation at temperatures as low at -‐195°C (-‐320°F ) !
Mould/Fungal Resistance (ASTM D3273/D3274) !Highly resistant !
Boiling Point !Range-‐ starts at 91°C !
Vapour Pressure !N/A !
Sol. In Water !Slight (108-‐65-‐6) !!
Page � of �8 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!6. FFR-K1 Reinforcing Scrim Technical Data!!FFR-‐K1 Reinforcing Scrim is a 5x5 strands-‐per-‐inch polyester scrim with a thin layer of spun bonded polyester bonded to the top side. The woven strands of the scrim give very high tensile strength to the fabric. This is the only speciKied fabric for the FFR-‐K1 system. ! !Technical Features: High tensile and tear strength Wets out well with full product embedment Moisture, rot and mildew resistant !
!!6.1 Mule-Hide Fabric Tape!!Description : A grey synthetic and resin roofing tape with a white woven cloth face.
Mule-Hide Fabric tape is a non-butyl synthetic rubber and resin adhesive tape which remains flexible even in cold temperatures. The fabric facer is designed to be coated to match the surrounding roofing surface. It can be used on most external substrates to strip in side laps, end laps, bridge transitions and penetrations prior to the application of a FFR-K1 coating.NOTE : Fabric Tape must be coated in all circumstances. !
Reinforcing Scrim Physical PropertiesStrip Tensile Strength
Machine Direction 45 (PSI)
Cross Machine Direction 40 (PSI)
Strip Elongation at break (%)Machine Direction 53
Cross Machine Direction 53
Trapezoid Tear Strength* (lbs) (Median load)Machine Direction 12 (lbs) (Median load)
Cross Machine Direction 11 (lbs) (Median load)
*ASTM D1117
Page � of �9 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !It will adhere to wood, glass, plastics, concrete and metals. This product may be used to repair gutters, chimney flashings, metal roofs on mobile homes and transport vehicles. Mule-Hide Fabric Tape makes a permanent watertight seal, but must be applied to a clean, sound and dry substrate.
!7. Substrate Inspection & Testing Procedure!!Whenever FFR-‐K1 is to be applied over an old or exiting substrate, it is essential to carry out a survey that includes an inspection and testing procedure. !The inspection needs to include all substrates intended to be coated. The inspection will uncover the need for: a) repair work b) cleaning and preparation work as described in following section (Section 8). All instances of repair work needs to be recorded and photographed so that they can be used in developing a scope of work. If during the inspection of the substrates it is noted that there are potential or existing structural deKiciencies, such as weak timber framing under the substrate, a record with photographs should be taken, so that all relevant information may be passed on to a consultant engineer for an opinion of the area of concern. This may require the consultant engineer to carry out their own site inspection to verify the condition of the structure under the substrate. !Included in the survey, is the need to verify the condition of the uppermost substrate, over which the FFR-‐K1 is to be applied. This will require the testing of: Existing substrate adhesion The presence of residual moisture contained within, or below the sub-‐substrates. Substrate
moisture values are to be compared to the, (where possible), original manufacturers material speciKications for applicable moisture content.
For this reason, it is recommended that a qualiKied trade professional is utilised to carry out the required inspection prior to any major scope of work being created. !For further information and recommendations of testing procedures, please contact FFR-‐K1 Technical Services. !!
Page � of �10 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!8. Substrate Cleaning & Preparation!!For all existing rooKing substrates the following cleaning process steps must be followed to ensure that a high quality application is obtained: !!
8.1 General Roof Preparation! !Step 1 Inspect the rooKing system to determine condition of rooKing materials and roof sub-‐structure.
SpeciKically note the following: !1. Roof deck structural integrity and viability. Any structural areas to be repaired. !2. Type and condition of rooKing substrates and materials. Identify original rooKing materials manufacturer if possible. !
3. Areas affected by foreign materials. !4. Areas to be removed, repaired, or capped prior to applying FFR-‐K1 coating. !5. Items to be removed. !6. Cleaning to be carried out. !
Step 2 Perform initial roof cleaning and prepare the surface appropriately for coating. Preparation may require sweeping, power broom, scraping, vacuuming, etc. !All surfaces should be pressure washed or steam cleaned where possible to remove any barrier Kilms. A pressure of approximately 2000psi is required to ensure a consistent surface is prepared and all loose/friable materials are removed. !Bitumen or a Butyl rubber substrates must be cleaned to the point where any black coloured residue no longer leeches from the surface as this residue can mix with the FFR-‐K1 and could interfere with its UV performance. !If leeching cannot be eliminated then the FFR-‐K1 20 year application must be used. That is a single coat of FFR-‐K1 with re-‐enforcing scrim embedded, allowed to dry and then a second and Kinal FFR-‐K1 top coat . !The use of a biodegradable cleaner/wash solution may be used to enhance the quality of the cleaning process on rooKing systems that are heavily soiled, but this must be thoroughly rinsed off prior to the application process to avoid potential adhesion issues. (Contact FFR-‐K1 Technical Services for further information). !Surface preparation shall always be in accordance with the highest standards of good trade practices. !!!
Page � of �11 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!9. Substrate Condition Inspection!!Where any inspection raises concern regarding the structural soundness of a particular rooKing system or substrate, an opinion from a qualiKied engineer should be sought prior to further works being carried out. !
9.1 Wooden Substrates!!All wooden based panel roof decks are to be in structurally sound condition. Plywood and all panel/sheeted wooden materials must be Kirmly adhered or mechanically Kixed as per the relevant building code and best trade practice, prior to application. !The New Zealand Building Code (NZBC) E2/AS1 requires a minimum slope for a completed Klat roof of 1.5° (1:40). ABEP recommends a minimum slope of 3° to ensure efKicient water drainage from the roof. !
Note. FFR-K1 is not permeable so roof vents are required .!!!9.2 Metal Substrates!!Metals must be free of mill-‐scale, oils, surface impurities and any loose/friable materials. All joints and over laps must be re-‐enforced with Mule-‐Hide fabric tape, applied with an overlap to a clean and sound substrate of at least 25mm from the joint or over lap. A coat of FFR-‐K1 is then applied over the tape before a full application of the system. !!
9.3 Cementitious Substrates!!!New concrete requires a minimum of 28 days curing time before the application of a FFR-‐K1 membrane. Any visible cracks must Kirst be Killed as described in section 15.4 !All concrete (new or old), including up-‐stands, should be inspected & tested for suitability by either hammer testing or pull of adhesion testing. !Concrete must be suitably Kinished by means of wood Kloat or steel pan. The surface Kinish must be uniform and free from defects such as latence, voids or honeycombing. Any defects should be repaired using acceptable materials and trade practices. !NOTE : Protect the slab before the membrane is applied to prevent it being contaminated by dirt, rust stains, oils and so on. This surface contamination can adversely affect the bond of the FFR-‐K1 membrane. !!
9.4 Hard-finished Concrete!!This should be etched to provide proKile or “tooth” for optimal adhesion. !
Page � of �12 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !9.5 Brick, Stone, Slates And Tiles!Mortar joints must be sound and preferably Klush pointed. Ensure all slates/tiles are sound and securely fastened, with any broken or missing items being replaced prior to application of the FFR-‐K1 system. Use the FFR-‐K1 20 year system only on this type of substrate. !!
9.6 Asphalt Substrates!
Asphalt should be carefully assessed for moisture and/or air entrapment, grade, and surface Kinish prior to any application being carried out. Use the FFR-‐K1 20 year system only on this type of substrate. Glue any loose asphalt substrate back down using FFR-‐K1 prior to full application !!
9.7 Bituminous Felt Substrates!!Ensure that Bituminous felt is Kirmly adhered or mechanically Kixed to the substrate. Areas of Bituminous felt that are badly worn should be repaired prior to any applications of FFR-‐K1. Use twenty year system only on this type of substrate. !!
9.8 Butyl Rubber, EPDM Rubber / TPO, PVC Membrane Substrates!
All materials must be fully inspected for any de-‐lamination from the parent substrate. Seams, laps and material joints need to be inspected to ensure no separation of the material has occurred along the length of the existing system. Areas found to be lacking in adhesion and/or cohesive bond are to be repaired by means of mechanical Kixing or re-‐adhesion prior to FFR-‐K1 application. !Mule-Hide Fabric tape should be used to strip in side laps, end laps, bridge transitions and penetrations prior to the application of an FFR-K1 coating. The substrate must first be cleaned with Isopropyl Alcohol (IPA) before the Mule-Hide tape is applied.
NOTE : These substrates must continue to be cleaned until there is no black residue leeching from them as contaminates such as this can mix with the FFR-K1 and could interfere with its UV resistance. If leeching cannot be eliminated then the FFR-K1 20 year application must be used. That is a single coat of FFR-K1 with re-enforcing scrim embedded, allowed to dry and then a second and final FFR-K1 top coat .
!!9.9 Paints and Existing Coatings!!Any coatings must be clean and free from loose, degraded materials. Painted surfaces should be inspected for any delaminated materials, ensuring that any loose/chalking materials are removed prior to FFR-‐K1 application. !
9.10 Existing FFR-K1 Coatings!!Check the condition of the system prior to re-‐coating. Ensure the surface to be coated is clean and free from any foreign material. Depending on the time between system applications, closer inspection of the rooKing system may need to be carrying out following the outline in Sections 7 and 8 of this Technical Manual. !
Page � of �13 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!!10. Substrate Priming Requirements!!!
!!
Priming and Cleaning Primer/Cleaner Required Specific NotesMetals :!Stainless steel, Aluminium, Brass, Copper, Ferrous & Non Ferrous, Galvanised & Lad.
Apple Cider VinegarDiluted to 1:3 / 1:5 with clean water. Wiped or washed down and dried prior to application.
Cementitious Substrates :!Concrete, Cement block, Compressed sheet, etc…
Not required Biodegradable wash if heavily degraded or soiled.
Wooden/Timber Substrates :!Plywood, Laminated board, Treated timber etc…
Not required Biodegradable wash if heavily degraded or soiled.
Bricks/Stone/Tiles/Slate Application specific Contact FFR-K1 Technical Services for relative information.
Bituminous Materials/Asphalt Substrates Not required Biodegradable wash if heavily
degraded or soiled.
TPO/PVC Membranes Not required Biodegradable wash if heavily degraded or soiled.
Butyl rubber/EPDM rubber Steam Clean
Substrate must be older than 5 years to be able to apply FFR-K1!Contact FFR-K1 Technical Services for relative information.
Page � of �14 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 11. Application Preparation!!11.1 Repairs and Preparation!!Using the FFR-‐K1 system, repair all cracks and imperfections greater than 3mm wide (1/8-‐inch), including apertures, cracks, voids or stress points. Fill minor imperfections with an appropriate product (Butyl Seam Tape or FFR-‐K1 coating) and make Klush with adjoining surfaces. Applying an FFR-‐K1 coating over the repaired imperfections. !The FFR-‐K1 Repair System must be applied so as to adhere completely to the intended rooKing surface and it must extend a minimum of 300mm (12 inches ) on either side of the imperfection, within reason and where practical. !Tighten all fastening devices (nails, screws, built-‐up material, wieldable seams etc.) to prevent the device from backing out of the substrate. Seal all fastening devices against moisture. Do not rely on the FFR-‐K1 system to secure fastening, sealing, or other such devices in any way . !Apply FFR-‐K1 as a seal coat to all repaired or patched surfaces with a minimum coating thickness of 0.8mm (800 microns) prior to the complete FFR-‐K1 system application. !11.2 System Application! Before the FFR-‐K1 system is applied to the Kield area of the rooKing system, the product should be Kirst applied to all roof protrusions, the entire top and inside of all parapet walls and any other vertical surfaces, details, pipes, up-‐stands, etc. Seal around all protrusions such as air conditioners, pipes, stands, rooKing penetrations etc. with FFR-‐K1 with FFR-‐K1 Scrim where practical, otherwise use 2 – 3 coats of FFR-‐K1 to ensure that a full waterproof encasement of the protrusion is made. !Continue to apply FFR-‐K1 with a full embedment of FFR-‐K1 Scrim to all sheet joins, laps and existing membrane details with a minimum coating thickness of 0.8mm (800 microns). !Once all areas above are completed, the predetermined FFR-‐K1 system can be applied to the Kield area of the rooKing system using the guidelines speciKied below. !!
Page � of �15 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 12. Application Procedure!!12.1 Final Flat Roof (Without FFR-K1 Reinforcing Scrim)!!Apply the FFR-‐K1 coating in sections approximately 4.5 to 6 metres long (15 to 20 feet) at the speciKied coverage rate (see consumption rate chart below). Ensure that the product is applied evenly across the surface of the substrate to provide adequate coverage of the Kield area. Apply a sufKicient volume of coating, compensating for absorption and irregularities of the exposed surface. To assure saturation of any surface imperfections and maximum contact with the roof’s waterprooKing element, roll the FFR-‐K1 coating in two directions, 90 degrees to each other. Vigorously roll coating onto the exposed surface integrating any foreign material (dust, small aggregate, etc) into the coating. Continue process until a monolithic coating entirely covers the rooKing system. !12.2 Final Flat Roof (With FFR-K1 Reinforcing Scrim)!!Step 1: Initial Coating Apply the FFR-‐K1 coating in sections approximately 4.5 to 6 metres long (15 to 20 feet) at the speciKied coverage rate (see consumption rate chart below). These sections must be 50mm (2 inches) wider than the FFR-‐K1 Scrim fabric along roof edges, and 100 mm (4 inches) wider than the FFR-‐K1 Scrim. In the middle sections of the roof, allow 50mm (2 inches ) of applied product on each side of the Scrim. Apply a sufKicient volume of coating, compensating for absorption and irregularities of the exposed surface, to cover the surface and to provide a base of full embedment for the FFR-‐K1 Scrim into the coating. Vigorously roll the coating onto the exposed surface integrating any foreign material (dust, small aggregate, etc) into the coating. To assure saturation of any surface imperfections and maximum contact with the roofs waterprooKing element, roll FFR-‐K1 primary coating in two directions, 90 degrees to each other. !Step 2: Embed Scrim fabric Immediately, while the Kirst coat is wet, roll out the FFR-‐K1 Scrim on to the wet coating. Pull the fabric tight and embed the fabric into the wet coating. On the second and ensuing courses, overlap the FFR-‐K1 Scrim at least 75-‐100mm (3-‐4 inches). !Step 3: Apply second FFR-‐K1 Coating Immediately apply a second FFR-‐K1 coat on top of the Scrim at the speciKied coverage rate (see consumption rate chart below). Apply enough coating to saturate the Scrim and make a dried Kilm of at least 1.22mm thick (1220 microns) !Imperative: Vigorously roll FFR-‐K1 coating into fabric with even strokes and remove all wrinkles, bubbles, air pockets, folds and excess coating, and ensure that full fabric penetration and embedment is achieved. Apply strokes with heavy pressure as follows: !Horizontal Planes: Start the strokes in the centre and pull to the edge of the Scrim fabric or seal the lapping edge and then start the strokes about 150 mm (6 inches) from sealed Scrim edge and pull at a 45 degree angle to the Scrim fabric course direction. !Vertical Planes: Apply at a 90 degree angle to the Scrim fabric course direction. Begin strokes within 150 mm (6 inches) of fabric edge or dissimilar plane and pull to the opposing fabric edge. Roll out air pockets, bubbles, folds, wrinkles and excess coating, and assure full fabric penetration. The second coat of FFR-‐K1 should saturate and completely cover the fabric. !Step 4: Finish FFR-‐K1 System Continue the application process until a monolithic coating, embedded with FFR-‐K1 Scrim fabric, entirely covers each vertical and horizontal roof plane and roof protrusion. !!
Page � of �16 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!13. FFR-K1 System Product Consumption Rates!!
!!14 Application Tools!!Drill & Paddle – Upon the Initial opening of the FFR-‐K1 product, inspection of the unit may be required to ensure that separation has not occurred. If it has, stirring of the product may be required. !Medium Pile Roller – Used during the application of FFR-‐K1 to the initial coating and when embedding the FFR-‐K1 Scrim. !Low Pile Roller – Used during the application of FFR-‐K1 as a Kinal coating or to enhance the smoothness of the Kinished surface for a higher ReKlectivity. !Squeegee – Used in the application of FFR-‐K1 to Klat Kield areas. Also useful for removing surface water prior to application. !Universal Spikey Roller – Used to assist with embedment of the FFR-‐K1 Reinforcing Scrim material to wet product on large Klat areas of rooKing. !Paint/Paste Brushes – Used in the application of FFR-‐K1 in detailing and penetrations. !!14.1 Clean Up Of Product & Tools!!Due to the nature of the FFR-‐K1 material, most disposable tools cannot be cleaned or washed after application. However, any tools that need to be cleaned up can be cleaned using either Resene T-‐555 Automotive Thinners, Xylene or MEK. Please follow the appropriate safety guidelines when handling any solvent based materials. !!
Repairs FFR-K1 - 10 FFR-K1 - 20
Build up FFR-K1 FFR-K1 FFR-K1 Embedded
Total Dry Film Thickness! ~ 0.8 mm (800 microns) 0.8 mm (800 microns) 1.2 mm (1200 microns)
Total Consumption ≥0.86 Litres/m² ≥0.86 Litres/m²
1st coat!≥0.86 Litres/m²
2nd coat!≥0.45 Litres/m²
Page � of �17 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!15 System Typical Detail Drawings!!These detail drawings provide reference information on typical use of this product. This information is generic in nature; it does not contain the full details required for construction, nor does it constitute an express statement as to Kitness for a particular purpose, professional advice is required to take into account all site speciKic inKluences. !Designers and speciKiers will typically provide details speciKic to particular projects: these should always be referred to in preference to the default system drawings !15.1 Change in level!
!!The change in level is carried out in two stages: !1 – A coating of FFR-‐K1 membrane, with Reinforcing Scrim fully embedded, is installed to the change in level extending a minimum of 100mm onto the new Kield area. !2 – The FFR-‐K1 membrane system is then applied over the entire area in accordance with the project speciKication including an additional installation of FFR-‐K1 Reinforcing Scrim. !!
Page � of �18 24Rev 1.4 September 2014
Not to Scale
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!15.2 Pipe Penetration!
!!The Pipe Penetration is carried out in two stages: !1 – A coating of FFR-‐K1 membrane, with Reinforcing Scrim fully embedded, is installed to the base of the pipe penetration and is extended both up the pipe and a minimum of 100mm onto the new Kield area. !2 – The FFR-‐K1 membrane system is then applied over the entire area in accordance with the project speciKication including an additional installation of FFR-‐K1 Reinforcing Scrim. !Note: where a transition to PVC or plastic exists, Mule-Hide Fabric tape may be applied as per section 9.8 prior to the application of FFR- K1 and re-enforcing scrim.
Page � of �19 24Rev 1.4 September 2014
Not to Scale
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!15.3 Rain Water Outlet!
!!The Rain Water Outlet is coated in two stages: !1 – A coating of FFR-‐K1 membrane with Reinforcing Scrim fully embedded is installed into the throat of the outlet and out to a minimum of 100mm onto the Kield area. !2 – The FFR-‐K1 membrane system is then applied in accordance with the project speciKication including an additional installation of FFR-‐K1 Reinforcing Scrim over the entire outlet and again into the throat of the outlet to ensure full embedment into the system. !Note: where a transition to PVC or plastic exists, Mule-‐Hide Fabric tape may be applied as per section 9.8 prior to the application of FFR-‐ K1 and re-‐enforcing scrim,
Page � of �20 24Rev 1.4 September 2014
Not to Scale
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 15.4 Repair to Damaged Substrate!!
!!The Repair To Damaged Substrate is coated in three stages: !1 – An application of FFR-‐K1 Sealant is installed in to the cracked or damaged substrate and tooled off Klush with the adjacent surface area. (Larger areas of damage may require the use of a speciKic repair material. Please contact FFR-‐K1 Technical Services for further assistance) !2 – A coating of FFR-‐K1 membrane, with Reinforcing Scrim fully embedded, is installed over the now Killed damaged are and extended out to a minimum of 100mm onto the Kield area. !3 – The FFR-‐K1 membrane system is then applied in accordance with the project speciKication including an additional installation of FFR-‐K1 Reinforcing Scrim over the entire repair to ensure full embedment into the system. !!
Page � of �21 24Rev 1.4 September 2014
Not to Scale
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!16 System Warranty Information!!Warranties of up to 20 years on the FFR-‐K1 system may be available, depending on the nature of the project, and strictly by system speciKication only. Typical terms of warranty are provided on request from FFR-‐K1, please contact your FFR-‐K1 representative for details applicable to your project. !!17 System Limitations!!!FFR-‐K1 has relatively few limitations; as are listed below: • Do not apply over oil/grease saturated surfaces or substrates. • Do not apply any coating of FFR-‐K1 at a DFT thicker than 0.8mm (800 microns). • Product will not fully adhere to silicon based products or sealants. Small areas can be bridged with a fully reinforced system of FFR-‐K1 membrane embedded into FF-‐K1 reinforcing scrim. !!
Page � of �22 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !!18 Safety Information!!18.1 Safety Information - on site safety!!For information and advice on the safe handling, storage and disposal of chemical products, users shall refer to the most recent Material Safety Data Sheet containing physical, ecological, toxicological and other safety-‐related data. !The information below is put forward as a minimum requirement and should be followed in conjunction with all national & local body laws regarding safe work practices !18.2 System Safety Information - Personal Protection!!!!!!!!In addition to protective clothing, it is recommended to use a barrier cream on the skin. The use of a barrier cream is more useful and effective than often reputed, they are inexpensive, convenient, and protect well if they are not frequently Klushed with solvents. However, barrier creams are only a supplement to, and not a replacement for, protective gloves, so always wear gloves. Always ensure there is no contamination inside gloves before reusing them. If any FFR-‐K1 products gets on clothing, remove the garment at once. Wash your exposed skin occasionally during the workday and immediately if any Liquid Applied Membrane product gets on it. Avoid using solvents since they can help Liquid Applied Membrane material penetrate in to the skin and the solvents themselves are aggressive and harmful to the skin. If water is not available the or in short supply, clean the contamination with sand instead. Certain hand cleaners also work without harmful effects. Citrus skin cleaners, for example, are effective and mild. Soap and water takes time, but also eventually work for small areas. Avoiding skin contact by keeping tools and equipment clean is one of the best ways to protect oneself. Despite safety precautions, with any instances of skin contact rinse immediately with clean water and use warm water and soap to thoroughly clean the skin. No FFR-‐K1 applications should ever proceed without sufKicient water being adjacent and available for eye washing. If adequate clean water is not provided then the project should not commence, no matter what the urgency. If a professional eyewash kit is not available, then at the very minimum one litre of clean water must be present. The water can be in a pail, plastic jug or via a hosepipe. Safety glasses or other eye protection obviously help those doing the work, but they can also create a false sense of security. Do not take risks with health and safety! !!!!!
Page � of �23 24Rev 1.4 September 2014
! FFR-K1 Technical Manual Rev 1.4 Sept 2014 !In the event of any spillage or contact into the eyes, always seek medical advice immediately after rinsing and cleaning the eyes with the clean water Ensure sufKicient ventilation during application in closed or conKined spaces. Dependent on local regulations, respiratory masks may be required. Please observe all relevant local regulations. 18.3 Disposal of materials!!Where residual material has fully cured the material poses no threat to health, safety or the environment. Therefore, containers coated with fully cured residues do not need special disposal considerations. However, where the tins carry hazard warnings such as transport diamonds or orange squares denoting chemical hazards, these markings should be covered, removed or otherwise obliterated. If these are not removed, there may be difKiculties at the disposal site as the markings indicate that the contents are hazardous. However, where residual material has not cured or a skin has formed on the surface this must be disposed of as hazardous waste, and any markings denoting hazards must remain.
!19 Technical Manual Information/Disclaimer!!The information as set forth in the technical data contained herein has been developed based on test and evaluations made by Final Flat Roof for standard coating applications. We believe this information is the best currently available on the subject. It is offered as a possible helpful suggestion. Any experimentation you may care to undertake along these lines is at your own risk. Application guidelines must be followed to receive warranty.
Page � of �24 24Rev 1.4 September 2014
!ABEP Ltd - Australasian Building Envelope Protection!
‘Supplying Complete Structural Waterproofing Solutions’ !!www.abep.co.nz
Top Related