Government of Nepal

Ministry of Energy, Water Resources and IrrigationDepartment of Electricity Development

Budhi Ganga Hydropower Project

Sano Gaucharan , Kathmandu

Expression of Interest (EoI)

for

Procurement of Consulting Services

for

Detailed Engineering Design and IEE Studyof

Jugada Budhi Ganga Hydropower Project (20.16 MW),Bajura District

Project Name: Jugada Budhi Ganga Hydropower Project, Bajura DistrictEOI : BHP-JBHP-EOI-01-75/76Office Name: Budhi Ganga Hydropower ProjectOffice Address : Sano Gaucharan, KathmanduFunding Agency :Government of NepalIssued on : 6 th November, 2018

Page 2: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

Abbreviations

CV - Curriculum Vitae

DO - Development Partner

EA - Executive Agency

EOI - Expression of Interest

GON - Government of Nepal

PAN - Permanent Account Number

PPA - Public Procurement Act

PPR - Public Procurement Regulation

TOR - Terms of Reference

VAT - Value Added Tax

Page 3: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

3

Contents

A.Request for Expression of Interest ........................................................................4B. Instructions for submission of Expression of Interest ............................................5C.Brief TOR ............................................................................................................6D.Evaluation of Consultant’s EOI Application .............................................................. 18

E. EOI Forms & Formats.................................................................................................. 24

1. Letter of Application ........................................................................................................ 252. Applicant’s Information Form ........................................................................................ 273. Experience........................................................................................................................ 284. Capacity....................................................................................................................................... 315. Key Experts (Include details of Key Experts only) ............................................................... 33

Page 4: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

4

A. Request for Expression of Interest

Government of NepalMinistry of Energy, Water Resources and Irrigation

Department of Electricity DevelopmentBudhi Ganga Hydropower Project

Sano Gaucharan, Kathmandu

Name : Detailed Engineering Design and IEE Study of Jugada Budhi GangaHydropower Project (20.16 MW), Bajura District

(Date of First Publication: 6th November, 2018)

1. Government of Nepal (GoN) has allocated fund for Detailed Engineering Design andIEE Study of Jugada Budhi Ganga Hydropower Project (20.16 MW), Bajura Districtand intends to apply a portion of this fund to eligible payments under the Contract forwhich this Expression of Interest is invited for National Consulting Service.

2. The Budhi Ganga Hydropower Project now invites Expression of Interest (EOI) fromeligible consulting firms (“consultant”) to provide the following consulting services:Detailed Engineering Design and IEE Study of Jugada Budhi Ganga HydropowerProject (20.16 MW), Bajura District

3. Interested eligible consultants may obtain further information and EOI document free ofcost at the address Budhi Ganga Hydropower Project, Sano Gaucharan, Kathmandu duringoffice hours on or before 25th November, 2018 or visit e-GP systemwww.bolpatra.gov.np/egp or visit the client’s website www.bhp.gov.np

4. Consultants may joint venture with other Consultants to enhance their qualifications. Thenumber of consulting firms in a JV should not exceed three including the lead firm. Inaddition, same consulting firm is not allowed to enter into more than one JV for the sameJob.

5. Expressions of interest shall be delivered online only through e-GP systemwww.bolpatra.gov.np/egp or before 26th November, 2018 at 12 pm.

6. In case the last date of obtaining and submission of the EOI documents happens to be aholiday, the next working day will be deemed as the due date but the time will be the sameas stipulated.

7. EOI will be assessed based on Qualification 40%, Experience 50%,and Capacity10%of consulting firm and key personnel. Based on evaluation of EOI, only shortlistedfirms will be invited to submit technical and financial proposal through a request forproposal.

8. Minimum score to pass the EOI is 60%

Page 5: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

5

B. Instructions for submission of Expression of Interest

1. Expression of Interest may be submitted by a sole firm or a joint venture of consultingfirms.

2. Interested consultants must provide information indicating that they are qualified toperform the Detailed Engineering Design and IEE Study of Jugada Budhi GangaHydropower Project (20.16 MW), Bajura District (descriptions, organization andemployee and of the firm or company, description of assignments of similar naturecompleted in the last 7 years and their location, experience in similar conditions, generalqualifications and the key personnel to be involved in the proposed assignment).

3. This expression of interest is open to all eligible consulting firms.

4. In case, the applicant is individual consultant, details of similar assignment experience,their location in the previous 4 years and audited balance sheet and bio data shall beconsidered for evaluation.

5. The assignment has been scheduled for a period of 30 Months. Expected date ofcommencement of the assignment is April,2019.

6. A Consultant will be selected in accordance with the Quality and Cost Based Selection(QCBS) method.

7. Expression of Interest should contain following information:

(i) A covering letter addressed to the representative of the client on the official letter headof company duly signed by authorized signatory.

(ii) Applicants shall provide the following information in the respective formats given inthe EOI document:

EOI Form: Letter of Application (Form 1)

EOI Form: Applicant’s Information (Form 2)

EOI Form: Work Experience Details (Form 3(A), 3(B) & 3(C))

EOI Form: Capacity Details (Form 4)

EOI Form: Key Experts List (Form 5).

8. Applicants may submit additional information with their application but shortlisting willbe based on the evaluation of information requested and included in the formatsprovided in the EOI document.

9. The applicants can submit their EOI application through e-GP system by using the formsand instructions provided by the system.

10. The completed EOI document must be submitted on or before the date and address

Page 6: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

6

mentioned in the “Request for Expression of Interest (EOI)”. In case the submission fallson public holiday the submission can be made on the next working day. Any EOIDocument received after the closing time for submission of proposals shall not beconsidered for evaluation.

C. Brief TOR1 Background

Water resources are the major natural resources of Nepal. It has more than 6000 rivers andrivulets belonging to three main drainage basins: Koshi, Gandaki and Karnali. Most of therivers are perennial as they are originated in high Himalayas and are nourished by snow andglaciers. Water resources of Nepal have been regarded as nature's bountiful gift to the country.Hydropower is one of the major potential water resources which can boost economy of thecountry. The main reason for hydropower projects being the most attractive is due toenvironment friendly, reliable, safe and cheap source of energy. It has 83,000 MW theoreticalpotential among which42,000 MW is economically viable potential. At present, only about2%of the techno-economically viable potential has been harnessed.

It has been realized that hydropower can play vital role in Nepalese economy, both byproviding cost efficient &environment friendly power supply to improve energy services andalso by contributing to GDP growth by exporting power. In addition, the harnessing of un-tapped water resources on large scale could provide significant contribution to the povertyreduction and employment generation. It could be considered as the major economicbackbones of the country.

The government of Nepal intends to develop these hydropower potential in economical,efficient and sustainable manner to meet the growing power demand in the country as well asto export. In line with the Hydropower Development Policy, 2001 and Water ResourcesStrategy, 2002, the government of Nepal has emphasized to increase the private sectorinvolvement in the hydropower development for large, medium and small hydropowerprojects. Government of Nepal has provided various incentives to private sector fordevelopment of hydropower sector. In order to promote private sector, Nepal ElectricityAuthority (NEA) has fixed the energy rates for small hydropower projects upto 25 MWcapacity initiated by Independent Power Producers (IPPs). Similarly, domestic commercialbanks are also interested to invest in hydropower projects as priority sector investment.

Despite of various efforts of government to promote private sector, the private sector is notable to flourish as envisaged. Potential mega-projects have failed to take shape in Nepalprimarily due to the lack of adequate funds and the basic infra-structural facilities; in view ofwhich, the development of medium scale and small hydropower projects are given highpriority. Larger projects require huge amount of investment and time. The significantadvantages of the small to medium hydropower plants are lower capital investment andproximity to the regional load centres, as well as use of local technology and shorterconstruction period. Hence, at present the GON has initiated its plan to make the bankablehydropower projects of small and medium size for its development in future using various

Page 7: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

7

modalities of the development.

In this context Budhi Ganga Hydropower Project(BGHP),Department of ElectricityDevelopment (DoED) intends to conduct Detailed Engineering Design and EnvironmentalStudy of small and medium hydropower projects using government fund. In this regard, TheBudhi Ganga Hydropower intends to procure services of domestic consulting firm to conductdetailed engineering design and IEE study of Jugada Budhi Ganga Hydropower Project alongwith the feasibility study for regional balance of country based on hydropower development.

2 Objective of the complete study

The main objective of the consulting service is to conduct feasibility study, detailedengineering design & Initial Environmental Examination (IEE) study of the proposedhydropower project and prepare study report covering technical, financial, socio-economic,institutional, environmental and any other relevant aspects of project development includingexamine technical, financial, economic and environmental viability of the project. In order tomeet targeted objective, the consultant shall carryout necessary field survey and investigationexpect drilling works along with technical via financial viability for different projectalternatives at feasibility level. After that, the Client will provide the consultant an approval togo forward with the best project option among the project alternatives obtained fromfeasibility level for detailed engineering design that will include project optimization designof project & its components, prepare drawing and cost estimate, conduct IEE and preparereport accordingly. The IEE study should constitute an integral part of the Detailed DesignStudy in conformity with the environmental legislation of Nepal.

Hence this study is divided in to two components which are:(i) Feasibility Study(ii) Detailed Engineering Design(iii)Initial Environmental Examination (IEE)

For any other matters not covered in the TOR, the consultant should refer the Guidelines forStudy of Hydropower Projects (2018), various manuals prepared by DoED and internationallyaccepted standard and guidelines. The IEE study shall be carried out in accordance with therequirements of the Environmental Protection Act, 1997 and Environmental Protection Rule1997 and its amendments. The IEE study shall be carried out by the environmental study teamin conjunction with the team of experts of detailed engineering design.

In the backdrop mentioned above, BGHP is desirous to procure the services of domesticreputed engineering consulting firms ("Consultant") having competent team of specialists toperform relevant field survey & investigations at feasibility level with different projectoptions, detailed engineering design, IEE study and prepare project report. This scope of workmentioned here under outlines the services of the consultant which has to be performed duringstudy period. However, the list of tasks and activities provided therein may not be a completeand comprehensive description of the consultant's duties. It is expected that the consultant

Page 8: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

8

shall critically assess the scope of services indicated herein and may suggest and adoptamendments wherever it deems necessary as per their own professional judgment inconsultation with BGHP and may accordingly propose to achieve the objectives of the study.

3 Application and use of manuals, guidelines and standards

The DoED has published various guidelines, manuals and standards listed below. The selectedconsultant has to use guidelines, manuals and standards as far as possible in addition tointernationally accepted standards, guidelines and manuals. The consultant has to provide listof such guidelines, manuals and standards used during the study phase in every reportsubmitted to DoED. Some of the guidelines are mentioned here under.

Design Guidelines for Headworks of Hydropower Project. 2006 Design Guidelines for Water Conveyance System of Hydropower Project, 2006 Power House Design Guidelines ,2018 Guidelines for Study of Hydropower Projects, 2018 Manual for Preparing Scoping Document for Environment Impact Assessment

(EIA) of Hydropower Projects Manual for Preparing Terms of Reference (ToR) for Environmental Impact

Assessment of Hydropower Projects, with Notes on EIA Report Preparation. Manual for Preparing Environment Management Plan (EMP) for Hydropower

Projects Manual for Public Involvement in the Environmental Impact Assessment (EIA)

Process of Hydropower Projects Manual for Developing and Reviewing Water Quality Monitoring Plans and Results

for Hydropower Projects Manual for Conducting Public Hearings in the Environmental Impact Assessment

Process for Hydropower Projects

4 Scopes of WorkThe study is divided in to two components which are:

(i) Feasibility Study(ii) Detailed Engineering Design(iii) IEE Study

(A) Scope of Work for Feasibility Study

The scope of consulting services for the Feasibility Study shall include but notnecessarily limited to the followings:

a) Collect and review of previous study reports, manuals, standards, guidelines,legislations, policies & plans, maps, drawing etc.

b) Conduct desk study and field reconnaissance survey, analyse the available data andidentify data gap of previous study & recommend the further additional study neededwith justification

Page 9: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

9

c) Prepare preliminary project layout and configuration based examine alternativesconfiguration of project component in inception survey for further field survey andinvestigation

d) Conduct engineering survey and field investigation for

Topographical surveys including L-section & X-section survey,

Hydrological studies, sediment studies and hydro-metrological surveys

Geological survey, engineering geological mapping, geophysicalinvestigations including seismicity/seismic study,

Construction materials survey and testing

Communication surveys for transportation of equipment

Alignment survey of transmission line surveys

Alignment survey of access road and bridge

e) Compile, analyze outcome of field survey & investigation tests

f) Carry out optimum project scheme selection and alternative configuration.

g) Prepare conceptual/preliminary layout & design considering alternative configurationof project component and conduct optimization of the components & associatedstructures of hydropower project

h) Conduct economic and financial analysis including sensitivity and risk analysis

i) Prepare a complete, feasibility study report covering the above mentioned scopes ofthe hydropower project including different project alternatives.

j) Recommend the best feasible alternative for detailed engineering design.

(B) Scope of Work for Detailed Engineering Design

The scope of consulting services for the DED for selected option shall include but notnecessarily limited to the followings:

a) Conduct complete detail field investigation for hydrological and sediment studies,geotechnical investigations including core drilling and test adits, GLOF study,construction materials survey and testing, communication surveys, muck disposalsurvey, construction power survey, power evacuation survey, transmission linesurveys, access road and cross drainage structure surveys for selected options as perrequirement of the study for detailed engineering design and scope of work detailed insubsequent heading.

b) Compile, analyse outcome of field survey and investigation, prepare required specificmaps and reports as per requirement of scope of work detailed in subsequent headingand use these maps, data & parameters for detail design

c) Prepare and establish design module and design memorandum for the detailed designof all major project components and associated structures as per recognized bestpractices and applicable standards.

Page 10: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

10

d) Conduct detail engineering design of civil structures, hydro-mechanical equipment,electro-mechanical equipment of hydropower and associated structures of optimizedoptions.

e) Conduct detail design of the access road, project road and cross drainage structures.

f) Conduct detail design of switchyard, transmission line and associated substation.

g) Conduct planning &design of office complex, camp site and their required facilitiessuch as water supply system, power supply etc.

h) Conduct IEE study as per standard guidelines (EPR/EPA).

i) Conduct project optimization study considering present load demand scenario.

j) Prepare detail drawings and tender drawings.

k) Conduct rate analysis, prepare quantity estimate & cost estimate.

l) Prepare construction plan/schedule and project implementation plan.

m) Conduct economic and financial analysis including sensitivity and risk analysis.

n) Analyze and propose appropriate contract/implementation module and institutionalarrangement for project implementation.

o) Prepare tender documents for civil structures, hydro-mechanical equipments, electro-mechanical equipments of hydropower and associated structures.

p) Prepare tender document for preparatory works (camp site, project & access road,water supply, power supply & other facilities) and transmission line and associatedsubstation.

q) Prepare a complete, bankable and implementable detail design report of thehydropower project including associated structure considering the report ready forimplementation

r) Conduct the capacity building training for project team.

s) The detail scope of work to be covered under each specific heading of the study isprovided in respective heading.

(C) Scope of Work of IEE Study

The scope of consulting services for the Initial Environmental Examination Study shallinclude but not necessarily limited to the followings:

a) Collect and review of previous study reports, manuals, standards, guidelines,legislations, policies & plans, maps, drawing etc.

b) Conduct desk study and preliminary reconnaissance survey, analyse the available data.c) Delineate the project areas to be covered in the IEE studyd) Collect baseline environment condition (physical, biological, socio-economic and

cultural) of the project areae) Identify, examine and assess project implementation activities of hydropower project,

transmission line and substation, access and project road, camp site & office complex,quarry site etc.

Page 11: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

11

f) Evaluate and analyse environmental and related legislation, environmental standards,policies, plans and international conventions for the IEE study.

g) Identify the concerned authorities, interested organizations, affected communities andstakeholders to be consulted during the study.

h) Identify and predict key physical, biological, socio-economic and cultural positive andnegative impacts & issues associated with project implementation

i) Access, examine and analysis consequence of the impact and issues on existingenvironment

j) Analyse the significance of environmental impacts in terms of magnitude, extent andduration.

k) Identify and analyse the various alternatives in planning and design of the projectsfrom environmental considerations.

l) Enable the authorities, stakeholders, local people, and affected communities toadequately participate in discussions/ hearings that dwell on the acceptability of theproject, availability of alternatives, potential impacts and possible mitigationmeasures.

m) Assess and estimate the number of families to be affected and displaced, and studytheir socio-economic conditions as well as ways for the betterment of their livingstatus.

n) Identify the potential areas for resettlement of the displaced families.o) Propose pragmatic, specific and cost-effective mitigation measures to avoid or

minimize potential adverse environmental impacts and suggest enhancement measuresto enhance the beneficial impacts.

p) Prepare an environmental management plan to implement the proposed mitigationmeasures.

q) Prepare environmental monitoring plans.r) Involve the local public people and Monitor water quality, air quality, and noise levels

for establishment of baseline monitoring data.s) Organize public consultation program as per requirement of EPA, 1997 and EPR,

1998t) Inform and aware decision makers and interested parties about the environmental

implication of the proposed project together with conclusion and recommendationu) Prepare and submit, ToR and IEE Reports as per the requirements set forth in the

environmental legislation.v) Present ToR and IEE Reports to Environment Report Review Committees.w) Incorporate the comments provided by the client and agencies in authority.x) Meet the reporting requirement as specified in this ToR and environmental legislation.

The consultant has to cover all the scope of work for field survey and investigation andpreparation of reports.

5 Duration of Services

The estimated time for completion of the complete assignment is Thirty (30) months.

Page 12: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

12

6 Deliverables

The Consultant shall discuss all the findings at review meetings to be held with the ProjectManagement on regular basis. The Consultant shall prepare and provide the following finaldeliverables.

Detailed Engineering Design

Report Time Duration(months)

Draft Copy Approved Copy

Inception 2 3 2

First Field 8 2 2

Feasibility Study 12 3 2

Second Field 16 2 2

Interim 20 3 2

Draft 24 3 2

Draft Final 27 5 2

Consolidated(DetailedEngineering Design& Approved IEE)

30 5

IEE Study

Report Time Duration(Months)

Draft Copy Approved Copy

Draft TOR 12 10

Final TOR 15 5

Draft IEE 20 10

Final IEE 24 5

The following are the number of copies of each additional report to be submitted by the

Consultant to the Project in total:

Topographical Survey Report : 2 Copies

Geological Mapping Report : 2 Copies

Geophysical (2D ERT) Report : 2 Copies

Geotechnical Study Report : 2 Copies

Hydrology Report : 2 Copies

Design Criteria Report : 2 Copies

Monthly Progress Report : 2 Copies (each month)

Page 13: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

13

Data, Local Services, Personnel and Facilities to be provided by the Project OfficeThe following reports and data will be made available to the Consultants:

Pre-Feasibility Study Report (2017) of Jugada Budhi Ganga Hydropower Projectalong with annexes.

7 Payment Schedule

The payment schedule for the study shall be as follows:

S. N. Submission of Reports % of Payment1 Inception Report 15%2 First Field 10%3 Feasibility Report 15%4 Second Field 10 %5 Interim Report 15 %7 Draft Final Detail Design Report 15 %8 Consolidated (Detailed Engineering

Design & Approved IEE)20%

Page 14: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

14

PROJECT DESCRIPTION1. PROJECT LOCATION

1.1 Project location and Access

Jugada Budgi Ganga Hydropower (JBHP) is located in far western development region,Bajura District of the Province No-7and it is situated at the upstream of the Budhi GangaKhola Small Hydropower Project which is under study by Department of ElectricityDevelopment. The proposed Jugada Budi Ganga Hydropower Project is a run-of-the-river(RoR) project. The project area of the JBHP ranges from latitudes 29 24' 00" N to 29 28' 30"N and the longitudes 81 23' 45"E to 81 28' 27"E.

Salient Features from Pre-feasibility Level1.0 General

Source River : Budhi Ganga

VDC : Jugaada, Atichaur and Budhi Ganga

District : Bajura

Zone : Seti

Development Region : Far Western

Type of Scheme : Run-of-river

Gross Head : 238.27m

Net Head : 225.68

Design Discharge (Q45%) : 10.17 m3/sec

Installed Capacity : 20.16 MW

Net Annual Marketable Energy : 127.51GWh

2.0 Hydrology

Catchment Area at Intake : 335.9 km2

Design 100-yrs Flood at Intake : 710 m3/s

3.0 Diversion Weir & Intake

Diversion Weir - Type : Free overflow

- Length : 45.00 m

- Crest Level : 1363 m

Intake - Type : Side intake with free-fall weir

- Length : 3.0 m x 2 Nos.

Undersluice- Width : 4.00 m

- No. of Bays : 1 Nos.

Gravel Trap

Page 15: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

15

-Size (L x W x H ): 17.00 m x 5.00 m x 2.5 m

-Particle Size to be desilted : 5 mm

Connecting Canal-Size (W x H) : 3.0 m x 2.3 m

Desilting Basin-Type : Dufour (Double-chamber)

-Size (L x W x H) : 75.00 m x 9.0 m x 4.5 m

-Particle Size to be desilted : 0.2 mm

4.0 Water Conveyance

Headrace Canal : Cut and Cover Canal (Rectangular shape)

Size (WxH) : 3m x 2.5m

Length : 1050m

Headrace Tunnel Type : D-shaped

Size (Diameter) : 3.0m

Diameter : 2.0 m

Length (m) : 5300 m

5.0 Surge Tank

Diameter of Surge Tank : 6.0m

Height of Surge Tank : 25.0m

6.0 Powerhouse

Type : Surface

Clear Size : 30.0 m x 12.0 m x 8.1 m (L x B x H)

Number of Units : 2 Nos.

Type of Turbine : Pelton, Horizontal Shaft

Rated Capacity : 10800kW x 2 Nos.

7.0 Tailrace Canal

Type : RCC Box Culvert

Size : 3.00m x 2.40 m (B x D)

8.0 Transmission Line & Grid Connection

Specification : 33 kV single-circuit, 3 Phase, 50 Hz

Length : 8000 m (Powerhouse to Budhi GangaKhola Small Hydropower HEP)

9.0 Transformer

Page 16: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

16

Step-up Transformer

Rating : 24,200 kVA, 6.6/33 kV, 50 Hz

Specific.n : 3 Phase

10.0 Generator

Generator - Type : Brushless synchronous, 3 Phase

- Specific : 12,100kVA, 0.4 kV, 50 Hz, 600 rpm x 2 Nos.

11.0 Approach Road

Kathmandu to Attariya : 646 km

Attariya to Budar : 65 km

Buder to Syaule : 52 km

Syaule to Sanfebagar : 135 km

Sanfebagar to Martadi : 55 km

Martadi to Powerhouse : 7 km

Powerhouse to Headworks : 3.5 km

12.0 Total Cost of the Project : NRs. 3702.41 million (without IDC)

13.0 Internal Rate of Return (IRR) : 19% (FIRR)

14.0 Benefit Cost Ratio (B/C Ratio) : 1.54

Page 17: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

17

2928'30"N

812

8'27

"E

2924'00"N"

8123'45"E

Page 18: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

18

D. Evaluation of Consultant’s EOI Application

Consultant’s EOI application which meets the eligibility criteria will be ranked on the basis ofthe Ranking Criteria..

i) Eligibility & Completeness Test Compliance

Copy of Registration of the company/firm

Tax Clearance/Tax Return Submission/Letter of Time Extension for Tax Return

Submission for Fiscal year2074/75]. In case of submission of Tax Return

Submission/Letter of Time Extension for Tax Return Submission for Fiscal

year 2074/75, the Consultant must submit Tax Clearance for 2073/74

VAT/PAN Registration

Power Of Attorney

Self Declaration

Joint Venture Agreement

EOI Form 1: Letter of Application

EOI Form 2: Applicant’s Information Form

EOI Form 3: Experience (3(A) and 3(B))

EOI Form 4: Capacity

EOI Form 5: Qualification of Key Experts

ii) EOI Evaluation Criteria

SN Description Weightage Marks

1 Proposed Key Professionals for the Study(Qualification &Experience)

40

I Qualification of the Key Personnel in relevant Discipline:Marks will be equally distributed among the list of key Personnel/Professionals

10

A Masters/ Ph. D. or Higher Qualification 100 %

B Bachelor’s Degree 90 %

Page 19: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

19

In case the min. qualification is Master’s degree, Professionalswith Bachelor’s degree will not be awarded the mark under thiscriterion.

II Experience of the Key Professionals: 30

A Team Leader

Should have min. 15 years of experience after graduation.

Should have min. qualification of Master degree in relevantEngineering subject.

1X5.5 =5.5

B Key Professionals

1. Hydropower Engineer

2. Engineering Geologist

3. Geotechnical Engineer

4. Hydrologist

5. Hydraulic Engineer

6. EnvironmentalEngineer/Environmentalist

7. Civil Engineer/AutocadEngineer

7X3.5 =

24.5

Should have min.10 years of experience after graduation.

Should have min. qualification of Master Degree in relevantsubject

C Remaining other professionals

1. Structural Engineer

2. Electrical Engineer

3. Mechanical Engineer

4. Economist/Financial Analyst

5. Sociologist/Anthropologist

6. Zoologist/Aquatic Life Expert

7. Botanist/Ecologist/Forest Expert

8. Contract/Procurement Specialist

9. Highway/Road Engineer

10. Senior Surveyor

11. Cost/Quantity Estimator

Should have min. 10 years of experience after graduation

Should have min. qualification of Bachelor’s Degree inrelevant subject

2 Work Experience of the Firm (Only study completed projectswill be considered for evaluation)

50

2a General Work Experience of the firm in various EngineeringProjects having consulting fee more than NRs. 5 million

5

A 10 or more than 10 projects 100%

Page 20: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

20

B 7 orless than 10 projects 90%

C 3 orless than 7 projects 80%

D Less than 3 projects 0%

2b Specific Experience of the firm in last 7 years

I Work experience of the firm in Feasibility Study or DetailedEngineering Design (studies)/Detail Project Report (DPR) ofHydropower Projects based on numbers of projects.

Only the projects having capacity more than 10MW will beconsidered for evaluation.

15

A more than 3 projects 100 %

B 3 projects 90 %

C 2 projects 80 %

D Less than 2 projects 0 %

Ii Work experience of the firm in Feasibility Study or DetailedEngineering Design (studies)/Detail Project Report (DPR) ofHydropower Projects based on capacity of project.Only the projects having capacity more than 10 MW will beconsidered for evaluation.

15

A Cumulative capacity of more than 60 MW 100%

B Cumulative capacity of more than 45 MW to 60 MW 90%

C Cumulative capacity of more than 10 MW to 45 MW 80%

D Cumulative capacity less than or equal to 10 MW 0%

III Work experience of the firm in EIA/ IEE Study ofhydropower projects based on number of project. Only theprojects having capacity more than 10MW will be consideredfor evaluation.

15

A 3 or more than 3 projects 100 %

B 2 Projects 90 %

C 1 Project 80 %

D 0 project 0 %

3 Financial Capacity of the Firm in NRs (Average AnnualTurnover (AAT) in million NRs in last five consecutive fiscalyears)

10

More than 60 100 %

Page 21: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

21

More than 45 to 60 90 %

More than 30 to 45 80 %

Less than 30 0%

TOTAL MARKS 100

Note:

a. The information furnished by the Firm(s) in the EOI document should be realistic. If any

faulty information is found, legal action may be taken as per prevailing rules and

regulations.

b. The Consultant must put the signature of authorized representative with indelible blue ink

and stamp of company on each and every page of the EOI. In absence of signature of

authorized representative with indelible blue ink and stamp of company, the particular

page will not be considered for evaluation.

c. The relevant figures/numbers of each members of joint venture shall be added together to

calculate cumulative figures/numbers of the joint ventures for the purpose of evaluation of

experience and turnover of the firm(s).

d. The projects listed in Form -3 (Experience) for work experience of the firm will be

considered for evaluation. The experience of the projects not listed in Form -3 will not be

considered for evaluation.

e. In case of the firm’s experience, if the completion certificate is issued by a private Client,

the firm should mention the name of the public entity where the study reports were

submitted; otherwise the experience will not be accounted for evaluation

f. The experience of the firm shall be supported with notarized copies of

experience/completion certificates in the form of experience/ completion certificates

showing the name & type of consulting service, project size and date of completion of the

assignment as given in Form -3. The experience of the firm without evidence/proof or

experience certificate will not be considered for evaluation. The data/figure such as name

& type of consulting service, project size and date of completion of the assignment

mentioned in experience/ completion certificates will only be considered as authentic and

will only be considered for evaluation purpose. If these required data/figures are not

mentioned in experience/ completion certificates, these data will not be considered from

elsewhere such as data sheet. If copy of experience/ completion certificate is not notarized,

the particular non-notarized copy document will not be considered for evaluation.

Page 22: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

22

g. For experience of the firms in EIA/IEE study projects, the EIA/IEE study of projects

which were approved as per the prevailing Environmental Protection Act, 1997 and the

Environmental Protection Rule 1997 will only be considered for evaluation. For the

evidence of EIA/IEE approval, firms should submit EIA/IEE approval letter issued by

public entity. Otherwise such experience will not be accounted in evaluation.

h. Only study completed project will be considered for evaluation. The ongoing study or

partially study completed project will not be considered for evaluation.

i. Marks will be given only to the key professionals to be deployed for the as listed in list of

key professional. If Consultant propose alternate professional in designated post,

minimum marks obtained of professional will be considered for evaluation.

j. Public/Semi-public entities’ employees need to submit official no objection letter to

provide consultancy services. In absence of official no objection letter, such professional

will not be evaluated.

k. Pass year and month of educational degree of the key professional shall also be mentioned

in Form -5. If the month of degree is not mentioned, the month of December of mentioned

year will be considered for evaluation. If pass year of education is not mentioned, the

education degree will not be considered for evaluation.

l. Firm shall not propose the same key professional for more than one designation for the

same job. If so proposed, the respective person will not be accounted in the evaluation for

any designation.

m. The average annual turnover of the Firm/Company shall be calculated in Net Present

Value using inflation index of Nepal Rastra Bank. Exchange rate shall be considered the

rate as on the last date of submission of EOI.

n. If the Client finds the proposed key professional doubtful regarding education, experience

or any issues then such professional may be asked to appear in Bughi Ganga Hydropower

Project Office for verification. Failing to appear in such verification may cause

disqualification of that key professional.

o. In case of a joint venture, the Consultant must submit the joint venture

agreement duly signed by authorized signatories & stamped with company seal of each

member of joint venture in every page of JV agreement & clearly mentioning name of the

lead firm, name of JV partners, role and responsibility of each member, name of the

authorized signatories. In case of failure to submit joint venture agreement between each

JV partner, the EOI will be considered as non-responsive and will not be considered for

evaluation. Similarly, the JV agreement should be signed by authorized representative

having power of attorney to sign the JV agreement with indelible blue ink. The signature

Page 23: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

23

of authorized representatives & stamp of companies should be in each page of JV

agreement. If JV agreement is not signed with by authorized representative having power

of attorney and with indelible blue ink, the EOI will be considered as non-responsive and

will not be considered for evaluation.

p. The Consultant must submit power of attorney of authorized signatories to sign JV

agreement and submit the EOI from their respective firm with signature & stamp of each

member of JV. Such Power of attorney of authorized signatories of JV shall have been

issued by executive head of organization such as Board, Managing Director, CEO or

Chairperson, etc. If otherwise, the EOI will be considered as non-responsive and will not

be considered for evaluation.

Page 24: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

24

E. EOI Forms & Formats

Form 1. Letter of Application

Form 2. Applicant’s information

Form 3.Experience (General, Specific and Geographical)

Form 4. Capacity

Form 5. Qualification of Key Experts

Page 25: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

25

1. Letter of Application

(Letterhead paper of the Applicant or partner responsible for a joint venture, including fullpostal address, telephone no., fax and email address)

Date: ............................

To,

Full Name of Client: __________________________

Full Address of Client: ________________________

Telephone No.: ______________________________

Fax No.: ____________________________________

Email Address: _______________________________

Sir/Madam,

1. Being duly authorized to represent and act on behalf of (hereinafter "the Applicant"), andhaving reviewed and fully understood all the short-listing information provided, theundersigned hereby apply to be short-listed by Budhi Ganga Hydopower Project asConsultant for Detailed Engineering Design and IEE Study of Jugada Budhi GangaHydropower Project (20.16 MW), Bajura District

2. Attached to this letter are photocopies of original documents defining:

a) the Applicant's legal status;

b) the principal place of business;

3. Budhi Ganga Hydopower Project and its authorized representatives are hereby authorized toverify the statements, documents, and information submitted in connection with thisapplication. This Letter of Application will also serve as authorization to anyindividual or authorized representative of any institution referred to in the supportinginformation, to provide such information deemed necessary and requested byyourselves to verify statements and information provided in this application, or withregard to the resources, experience, and competence of the Applicant.

4. Budhi Ganga Hydopower Project and its authorized representatives are authorized tocontact any of the signatories to this letter for any further information.1

5. All further communication concerning this Application should be addressed to the following

1 Applications by joint ventures should provide on a separate sheet, relevant information for each party to theApplication.

Page 26: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

26

person,

[Person]

[Company]

[Address]

[Phone, Fax, Email]

6. We declare that, we have no conflict of interest in the proposed procurement proceedingsand we have not been punished for an offense relating to the concerned profession orbusiness and our Company/firm has not been declared ineligible.

7. We further confirm that, if any of our experts is engaged to prepare the TOR for any ensuingassignment resulting from our work product under this assignment, our firm, JV member orsub-consultant, and the expert(s) will be disqualified from short-listing and participation inthe assignment.

8. The undersigned declares that the statements made and the information provided in the dulycompleted application are complete, true and correct in every detail.

Signed:

Name:

For and on behalf of (name of Applicant or partner of a joint venture):

Page 27: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

27

2. Applicant’s Information Form(In case of joint venture of two or more firms to be filled separately for each constituent member)

1. Name of Firm/Company:

2. Type of Constitution (Partnership/ Pvt. Ltd/Public Ltd/ Public Sector/ NGO)

3. Date of Registration / Commencement of Business (Please specify):

4. Country of Registration:

5. Registered Office/Place of Business:

6. Telephone No; Fax No; E-Mail Address

7. Name of Authorized Contact Person / Designation/ Address/Telephone:

8. Name of Authorized Local Agent /Address/Telephone:

9. Consultant’s Organization:

10. Total number of staff:

11. Number of regular professional staff:

(Provide Company Profile with description of the background and organization of theConsultant and, if applicable, for each joint venture partner for this assignment.)

Page 28: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

28

3. Experience

3(A). General Work Experience

(Details of assignments undertaken. Each consultant or member of a JV must fill in thisform.)

S. N. Name of assignment LocationValue ofContract

YearCompleted Client Description of work carried out

1.

2.

3.

4.

5.

6.

7.

8.

9.

Page 29: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

29

3(B). Specific Experience

Details of similar assignments undertaken in the previous seven years(In case of joint venture of two or more firms to be filled separately for each constituentmember)

Assignment name: Approx. value of the contract (in current NRs; US$or Euro)2:

Country:

Location within country:

Duration of assignment (months):

Name of Client: Total No. of person-months of the assignment:

Address: Approx. value of the services provided by yourfirm under the contract (in current NRs; US$ orEuro):

Start date (month/year):

Completion date (month/year):

No. of professional person-months provided by thejoint venture partners or the Sub-Consultants:

Name of joint venture partner or sub-Consultants, if any:

Narrative description of Project:

Description of actual services provided in the assignment:

Note: Provide highlight on similar services provided by the consultant as required bythe EOI assignment.

Firm’s Name:

2 Consultant should state value in the currency as mentioned in the contract

Page 30: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

30

3(C). Geographic Experience - Not Applicable

Experience of wrking in similar geographic region or country(In case of joint venture of two or more firms to be filled separately for each constituent

member)

No Name of the ProjectLocation(Country/ Region) Execution Year and Duration

1.

2.

3.

4.

5.

6.

7.

Page 31: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

31

4. Capacity4(A). Financial Capacity(In case of joint venture of two or more firms to be filled separately for each constituent member)

Annual Turnover

Year Amount Currency

- Average Annual Turnover

(Note: Supporting documents for Average Turnover should be submitted for the above.)

Page 32: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

32

4(B). Infrastructure/equipment related to the proposed assignment3-Not ApplicableNo Infrastructure/equipment

RequiredRequirements Description

1.

2.

3.

4.

5.

3 Delete this table if infrastructure/equipment for the proposed assignment is not required.

Page 33: Expression of Interest (EoI) for Procurement of Consulting ... · Budhi Ganga Hydropower Project Sano Gaucharan , Kathmandu Expression of Interest (EoI) for Procurement of Consulting

33

5. Key Experts (Include details of Key Experts only)

(In case of joint venture of two or more firms to be filled separately for each constituent

member)

SN Name Position HighestQualification

Work Experience(in year)

Specific WorkExperience (in

year)Nationality

1

2

3

4

5

(Please insert more rows as necessary)