Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
Pre – Feasibility Report
1.0 Executive Summary
Divi's Laboratories Limited is proposing to establish Unit-III as a commercial facility for manufacturing of APIs &
Intermediates products with a firm commitment to Environmental care. DIVI’S has intended to develop and
manufacture intermediates for many MNC customers by undertaking contract research work for them. This
manufacturing facility as Unit-3 is going to be located at Kongavanipalem (V), Bhogapuram (M), Vijayanagaram
District of Andhra Pradesh. This manufacturing facility is proposed to be developed in an area of 60.7 Ha (150 acre)
with multipurpose production blocks operating under full cGMP.
Features of the Site
Name of the Project M/s Divi’s Laboratories Unit III
Land Area 150 acres, 60.7 Ha
Survey Numbers 111,124,125,125/14,126,127,128,129,131,132,133,134,135,136,137,138,148,150,
151,152,153,154,157,59,62,65
Land Coordinates Latitude Longitude
17 59 46.47 83 32 32.19
17 59 18.22 83 32 32.68
17 59 11.69 83 32 57.49
17 59 22.40 83 32 59.97
Nearest village Komadhi (V)
Nearest Railway Station Vijayanagaram
Nearest City in Km Visakhapatnam
Nearest Airport Visakhapatnam
Nearest Highway NH-5
Nearest Water Bodies Champavathi River
Water Supply Bore wells, pipe lines from the streams
Estimated Cost of the Project Rs. 300 Crores
2.0 Introduction of the project / Background information
Identification of the project and project proponent
The proposal of establishment of Divi's Laboratories Limited as a commercial facility is to manufacture only
Intermediate products with a firm commitment to Environmental care. DIVI’S has intended to develop and
manufacture intermediates for many MNC customers by undertaking contract research work for them. This
manufacturing facility as Unit-3 is going to be located at Kongavanipalem (V), Bhogapuram (M), Vijayanagaram
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
2 / 13
District of Andhra Pradesh. The site is located at about 50 Kms far of vishakapatnam city and on National High way
No.5.
The company after establishment is enthusiastic to obtain certificate of ISO-9001:2000, for its Quality Management
System (QMS), ISO 14001:2004 for it Environment Management System (EMS) and OHSAS 18001 for its
Occupational Health & Safety Management System (OHSMS).
The company has a view of developing technologies for the products with least emissions and effluents there by
reducing the environmental burden and minimizing adverse Environmental Impacts.
Brief description of nature of project
The role of the Divis Laboratories for the proposed Plant Unit 3 will consists of developing Common
Infrastructural Facilities - roads, water, power, drainage, street lightening green belt, CETP, TSDF, and
STP etc. Social Infrastructure - Banks, Post Office, canteens, primary health centre, etc. The Proposed
Industry will also have an Industrial Area Local Authority for maintenance of the facility, approval of
building plans etc. The Industry will be developed based on the Sustainable Industrial Development,
reasonable and planned use of the finite resources of land according to their natural environmental
properties. To cater this need, the preparation of Zoning Plan for siting of industries, based on
environmental considerations has been conceived. The environmental parameters and conditions are
evaluated and quantified and the suitability of sites is determined based on their sensitivity to air, water and
land pollution. Economic development and industrialization have become synonymous and are integral part
of regional planning of a country. There is a need that apart from preventive measures, proper siting of
industries / industrial estates should be done. The environmental planning is a proven tool for achieving
sustainable development. Proper siting of newly planned industries & industrial estates is a strong pollution
preventive instrument that ensures environmental soundness of the industrial development. Site selection
based on environmental criteria with the objective of minimizing adverse environmental impacts is,
therefore, a vital prerequisite.
DIVI’S scale of production facilities include: Multi-purpose production blocks, Special reaction blocks, warehousing
and all service facilities. DIVI’S to take outmost care of the safety of the employees, contract workmen and
surrounding public by maintaining safe and congenial Environment.
The dedicated teams with dynamic, experienced and well capable persons will be selected and assigned
responsibilities for implementation of EHS at all levels. The team includes various sub teams like OHSAS, EMS,
SAFETY & HEALTH COMMITTEE, OSET (On Site Emergency Team) which include Fire fighting team, Leak control
team, Evacuation team, Communication team (Internal & External) and First aides.
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
3 / 13
Feasibility of the Project
Detailed feasibility study was carried for the proposed Industry. The results of the study are very encouraging and
instilled confidence in would be project proponents. The infrastructure requirement for the Industry can be broadly
classified into the following four heads:
• Basic Infrastructure
• Environmental Infrastructure
• Other Infrastructure – Industry Specific and social facilities
The basic infrastructure covers the main requirements like
• Water - Water Treatment Facility
• Power
• Roads
• Street lights
The Environment Infrastructure Covers:
• Green Belt
• Storm Water drain
• Wastewater treatment facilities
• Solid waste collection and disposal facilities
Other Infrastructure – Industry Specific
• Firefighting facilities
• Security etc.
• First aid facilities
• Canteen
2.3 Needs for the project and its importance.
Viziyanagaram city is the district head quarter of the Viziyanagaram District, main occupation of people of
Viziyanagaram is agriculture and agriculture labour. The proposed projet shall employ the local skilled and
unskilled human resources from the district. The proposed project directly support economically support to
the local area.
3.0 Project Description
Type of the project:
Divi's Laboratories Limited is proposing to establish Unit-III as a commercial facility for and manufacturing of APIs &
Intermediates products with a firm commitment to Environmental care. This manufacturing facility is proposed to
be developed in an area of 60.7 Ha (150 acre) with multipurpose production blocks operating under full cGMP to be
Location of the project
The project is located at Kongavanipalem (V), Bhogapuram (M), Vijayanagaram District of Andhra Pradesh, in survey
nos. 111, 124, 125, 125/14, 126, 127, 128, 129, 131, 132, 133, 134, 135, 136, 137, 138, 148, 150, 151, 152, 153, 154,
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
4 / 13
157, 59, 62, 65, which is 20 km away form Vijanagarm Town and 50 Km distance from Visakhapatnam city and co-
ordinates of the project boundaries as below.
Latitude Longitude
17 59 46.47 83 32 32.19
17 59 18.22 83 32 32.68
17 59 11.69 83 32 57.49
17 59 22.40 83 32 59.97
Location Map
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
5 / 13
Project Layout
List of manufacturing products
The following API & intermediates products have been proposed to be manufactured depending upon the national
and international market demand and availability of raw materials
S.No Product Code Qty.
(MTA)
1 (+) N-Formyl Octa Base Sigma-I 450
2 Octamandalate Base OM & Praarec 780
3 PMPA ISA 780
4 CHEA(100%) ISB 540
5 Atipadichloride BASF 1210
6 2-(S) - Acetoxy propionylchloride Nobel 135
7 4-CPCCA Key 50
8 3-HAP Kyto 330
9 Benzyladrinone HCl BAH 560
10 2-Acetyl-6-methoxy naphthalene Fluka 5000
11 2-(n-Butyl)-4-Chloro-5-formyl imidazole Bergen 250
12 Beta-Ionylidine ethyl triphenyl phosphene bromide Excelon 400
13 C10-dialdehyde Dial 150
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
6 / 13
S.No Product Code Qty.
(MTA)
14 1,2,3-Tri-O-Acetyl-5-deoxy-n-ribofuranose Kawasaki 50
15 Acetonide Fusion 132
16 1-Pentynol Apachi 84
17 Lycopene Pulsar 25
18 Beta-Carotene BT 150
19 Cathaxanthin Zeta 5
20 Apocarotenal Aviator 25
21 Lutein Figo 50
22 Asthaxanthin IT 60
23 ZL-Valine Sanver 150
24 DL-2,2-Dimethyl cyclopropane-1-carboxylic acid ISAU 30
25 Dimethylacetylene di carboxylate Dunai 60
26 N-Hydroxy succinamide Fruit
27 2,4-Thiazole methyl amine Salora 50
28 5-[4-Methylbiphenyl-2yl]-2-trityl-2Htetrazole IRV-II 500
29 L-Valine methyl ester HCl Shine 382
30 4-Bromomethylbiphenyl-2-Carbonitrile Bexley 630
31 Iohexol Avlon 360
32 NOG Newyork 400
33 2,4,5-Trifluorophenylacetic acid Tokala 350
34 Triazole HCl Tobago 350
35 Ethyl -2-Isocyanato Acetate ROCKY 10
36 1-Methyl-1h-Pyrazole-5-Boronic Acid DASHER 10
37 5-Amino-2-Methyl Benzene Sulfonamide MIATA 10
38 O-benzyl hydroxylamine hydrochloride ILUX 10
39 [(+/-)-trans -1,2-bis(methanesulfonyloxymethyl)cyclohexane ILUDA 5
40 4-(1,2-benzisothiazole-3-yl)-piperazine ILUDB 2
41 DL-Nicotine ROBO 10
42 P-Methyl-Ѡ- Pyrrolidino Propiophenone Hcl Konica-I 10
43 2-Amino-6-Bromo Pyridine IJP B-II 10
44 6-Chloro Uracil Scala-IIF 10
45 3-Phthalimido piperidine Scala-VIIc 10
46 Boc azido piperidine IMAZ 10
47 Chloroquinozoline IAMZA 10
48 8-Bromo-7-(but-2-ynyl)-3-methyl-1H Purine-2,6(3H,7H) dione IAMZB 10
49 3,5-Di-O-benzoyl-2-deoxy-2-fluoro-2-C-methyl-D-robono-y-
Lactone
Pandora 25
50 6-®-2,2,6-Trimethyl-1,4-cyclo hexadione Rhino 15
51 Aminobutanol Terrano 20
52 Difluorobenzyl amine Dinajpur 20
53 5-Amino-1-isopropyl-3-methyl pyrazole -NA- 5
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
7 / 13
S.No Product Code Qty.
(MTA)
54 2,5-dichloro-4-ido pyridine -NA- 5
55 Ranolazine Scott 5
56 (2'R)-N-Benzoyl-2'-deoxy-2'-fluoro-2'-methylcytidine 3',5'-
dibenzoate
Corvette 25
57 2'-deoxy-2'-fluoro-2'-C-methyluridine Avatar 25
58 Butorphenol tartrate BPT 20
59 4-Chloro-2-butanone Corinto 5
60 Boc-L-3-fluorophenyl alanone Boris 0.5
61 2-Carbethoxy-3-cyano-5-methyl hexanoic acid ethyl ester ILVA 2
62 GSK 2357577A Chandlier 0.5
63 5-(2-Phenyl ethyl)-2-(Propan-2-Yl)Benzene-1,3-diol Midas 0.5
Availability of water and energy requirement.
Water requirement will be fullfilled by bore wells and champavathi river and streams and power requirement will
be substituted by APtransco substations.
Resource Optimization/ Recycle and Reuse
The new & creative approach to enable less waste intensive production is based on different techniques will be
adopted by regular up gradation of process technology. These techniques are as hereunder.
Source Reduction
Under this category there are 5 techniques of Cleaner Production – Energy Efficient (CP-EE) are briefly discussed
below:
a) Good Housekeeping: Systems to prevent leakages & spillages through preventive maintenance schedules
and routine equipment inspections. Proper working instructions, supervision and regular training of
workforce would facilitate proper housekeeping.
b) Input Material change – Substitution of input materials by eco-friendly (non-toxic or less toxic than existing
and renewable) material preferably having longer service time.
Better Process Control Modifications of the working procedures, machine-operating instructions and
process record-keeping in order to run the processes at higher efficiency and with lower waste generation
and emissions.
c) Equipment Modification – Modification of existing producing equipment and utilities, addition of
measuring and controlling devices, in order to run the processes at higher efficiency and lower waste and
emission generation rates.
1. Technology Change – Replacement of the technology, processing sequence and / or synthesis pathway in
order to minimize waste and emission generation during production.
d) Recycling
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
8 / 13
� On-site Recovery and Reuse – Reuse of waste materials in the same process or for another useful
application within the industry.
� Production of useful By-Product – Modification of the waste generation process in order to transform
the waste material into a material that can be reused or recycled for another application within or
outside the company.
e) Product Modification- Characteristics of the product can be modified to minimize the environmental
impacts of its production or those of the product itself during or after its use (disposal).
Quantity of Solid Waste and Recycling facility
Solid Waste Management involves activities associated with generation, storage, collection, transport, processing
and disposal of waste. Information on nature of waste, its composition, and the quantities generated are essential
for effective waste management. The Solid waste generated would be send to nearest secure land fill fesility.
Schematic Representation of the Feasibility Drawing for EIA Purpose
For development proposed Divis laboratories Unit III, site screening, pre-feasibility report, environmental impact
assessment (EIA) and environmental management plan (EMP) studies, etc for obtaining environmental clearance
and consent for establishment from statutory authorities.
Stage 1
� Zoning Plan indicating type of industries which can be established considering the site location and market
potential
Stage 2
� Submission of Form-1, Prefeasibility report, draft TOR for appraisal to concerned authority (MOEF)
Stage 3
� Submission of EIA report as per approved TOR by concerned authority (MOEF)
Stage 4
� Submission of CFE application to APPCB Andhra Pradesh Pollution Control Board
4.0 Site Analysis
Conectivity
Site is located for easy conectivity to NH 5(Chennai to Kolkata) and NH 43(Natavalasa in AP to Raipur in
Chhattisgarh) for transportation.
Land Form, land Use and Land Ownership
The total land area (150 acres) is belonging to M/s Divis laboratories limited.
Existing Infrastructure/ land pattern
There is no vegitaion and buildings in existing land.
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
9 / 13
Soil clasification
Soil classifications as derived as below
Red sandy loams
Red sandy clay loams
Red loamy sandy soils
Clay loam
Sandy soil
Clay
Climate
The climate of Vizianagaram district is characterized by high humidity nearly all-round the year with oppressive
summer and good seasonal rainfall. The summer season from March to May is followed by South West monsoon
season, which continues up to September. October and November constitute the retreating monsoon season. The
climate of the hilly regions of the district receives heavier rainfall and cooler than the plains. The maximum
temperature recorded during 2004 is 39.6O C during May and the minimum temperature is 17.1O C during
December.
The normal rainfall of the district for the year is 1,131.0 MM as against the actual rainfall of 740.6 MM received
during 2002-03. The district gets the benefit of both the South West and North- East monsoon.
The average maximum and minimum temperatures and average rainfall recorded in 2004 at Agricultural Research
Station, Vizianagaram are given below:
Climate data for Vizianagaram
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year
Average
high °C
38.7
31.3 36.2
37.2
37.0
35.1
32.9
32.8
33.3 31.9
30.2
29.8
33.87
Average low
°C
17.2
19.1
23.2
26.1 27.0
26.8
25.7
26.3
25.7
22.8 19.5
17.1 23.04
Precipitation
mm (inches)
13.5
1.2
14.0
27.1 54.8
183.2
256.1
105.2
92.5
141.8
30.2
0.0 919.6
Social Infrastructure Available
All infrastructure facilities such as education, health facilities and other social facilities are adequate at district
headquarter
Topography
Viziyanagarm district is about 25 meters of above mean sea level and partly elivated with hills. The topographical
map of the proposed project area 10 KM radius is given below.
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
10 / 13
5.0 Planning Brief
Planning Concept (type of Industries, Facilities and Transportation)
Environment Planning in India
The need for the environmental administration of India to become active in the field of environmental planning is
founded in the Environment (Protection) Act, 1986, which authorizes the Central and State Government " to have
the power to take all such measures as it deems necessary or expedient for the purpose of protecting and
improving the quality of the environment and preventing, controlling and abating environmental pollution. Since,
the carrying capacity of the environment is not unlimited and some areas or ecosystems are more susceptible to
adverse environmental impacts than others, the unplanned and haphazard location of industries might
substantially increase the risk to the environment. Environmental planning is a proven tool for reducing the impacts
from such risks. However, this tool has seldom been used in this country. Proper siting of newly planned industries
and industrial estates is a strong pollution preventive instrument that ensures environmental soundness of the
industrial development.
Emenities/ fecilities
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
11 / 13
Total Quantity of drinking water supplied 16.00 Mld.
Per capita water supply per day 80(LPCD)
No. of House Service Connections 18026
No. of public taps 458
No. of public bore-wells 749
Length of roads (in Kms)
(CC + BT+WBM (Metal)+ Kutcha = Total
330
Length of drains (in Kms.) (Pucca+Kutcha) 243.25
Length of Storm water Drains (in Kms) (Pucca
+Kutcha)
47
No. of street lights (Highmast + Poles + Central
Lighting Poles+ SV Lamps +Tube Lights=Total)
9014
No. of public parks 32
No. of play grounds 02
No. of public markets 06
No. of slaughter houses 01
No. of secondary schools 03
No. of elementary schools 49
No. of maternity and child health center 01
6.0 Proposed infrastructure
GENERAL FACILITY
• Production and Ancillary facilities
• Storage Tanks
• Services
• Boiler
• Effluents Storage Capacity:
• ETP (Effluent Treatment Plant)
Land break up details
Details Area in Acres
Land area (lay out area) 70
Roads 17.19
Green Belt 3.49
Utilities and other buildings 17
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
12 / 13
Full fledged investment envisages for capable of handling additional quantities
Effluent Collection Sumps at individual production blocks
Drainage routes by segregation for:
� Process
� Non-Process
� Stand by / Hazardous
INCINERATOR (Thermal Oxidation System)
Design & select right equipment to maintenance & monitoring such as:
• Scrubbing Systems
• Collection tubs for evaporation
• Condensation systems
• Enclosures
Plant will fully Implement and develop Technologies Like:
Reduction Techniques (Reduce / Recycle / Conserve) WATER……
• Collection of steam condensate and Re-use
• Ejector discharge collection and Re-use to cooling towers
• Treated effluent recycle to cooling towers and gardening
• Reuse of brine cooling at cooling tower make up requirements
• Installation of Drip & Sprinkler system for garden water to minimize water consumption
• Rain water harvesting through tanks, trenches, infiltration pits at places to cooling towers
Installation of latest technology equipments
• WFE
• Hot Oil systems
• Re-Boilers, etc.
• ANF – bag washing
• LF – Filter washing
7.0 Rehabilitation and Resettlement (R & R) Plan
The proposed Industry does not envisage any disturbance to local community or the village since the land is
acquired and fully owned by the Divis laboratories limited. The proposed project will not affect the home oustees,
land oustees and landless laborers. Hence there is no R & R plan required.
8.0 Project Schedule & Cost Estimates
The factors which are responsible for timely implementation of the project are:
• Arrangement of proper finance for the project.
• Finalization of layout of the proposed plant.
• Design of utilities and services.
• Placement of orders for plant and machinery.
• Arrangements for Govt. sanctions and supply of power.
Divi’s Laboratories Unit III, Kongavani palem (V), Bhogapuram (M), Vijayanagaram District, AP
13 / 13
• Recruitment of personnel.
The initial estimate, the cost of the project works out to around Rs. 300 Crores.
9.0 Analysis of Proposal (final Recommendations)
Financial and Social Benefits with emphasis on the benefit to the local people including tribal population if any,
in the area.
The proposed project is expected to bring significant socio-economic and environmental benefits both at local level
as listed below:
Social Infrastructure:
• Social awareness programs will be improved by the local authority such as sanitation and hygiene, HIV
Prevention Program.
• Adult education and female education programme is planned to the illiterate adults and backward females
of the villages in the project surrounding area.