Environmental impacts Noise Vibration Air Quality Ecology Archaeology Architecture Waste Water/material use Energy
Environmental impacts Noise Vibration Air Quality Ecology Archaeology Architecture Waste Water/material use Energy
Local environment Noise Vibration Air Quality Ecology Archaeology Architecture Waste Water/material use Energy
Pollution
Pollution control
Pollution control
Pollution control
Pollution control
Pollution control
Pollution control
Local community
Local environment
Local community
Environmental impacts Noise Vibration Air Quality Ecology
Ecology
Ecology
Ecology
Ecology
Environmental impacts Noise Vibration Air Quality Ecology Archaeology
Archaeology
Archaeology
Archaeology
Environmental impacts Noise Vibration Air Quality Ecology Archaeology Architecture
Architecture
Crown House
Global environment Waste Water/material use Energy
Waste
Waste98%
Waste
Environment
Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry
Waste
Environment
Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry
Waste
Environment
Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry
Waste
Waste
Environment
Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry
Waste
Environment
Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry
Waste
Environment
Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry
Waste
Environment
Waste materialQuantity %MethodologyApproved supplierHardcore4600 tonnes87.4Crushed on-siteBricks97000 (262 tonnes)4.98Salvaged/cleanedCleanawayFerrous metals54.5 tonnes1.03RecycleEMRNon Ferrous metals15 tonnes0.28RecycleEMRPlasterboard9.5 tonnes0.18RecyclePBRGlass20 tonnes0.38RecycleBerrymanTimber24 tonnes0.46Recycle/re-useGBNWaste Overall (rubbish ) 20m3 (240 tonnes)4.56Sort at transfer station, Dispose non recyclable at LandfillVeoliaAsbestos39.9 tonnes0.76LandfillPinden Quarry
Waste
Waste
Global environment Waste Water/material use
Materials
Materials
Global environment Waste Water/material use Energy
Energy
Energy
Energy
Energy14kg/tonne
Reporting
ReportingWe were very impressed with the documentationthat has supported the sustainability and environmental initiatives which are being implemented in this project. We received a letter confirming this from the British Standards Institute, who recently carried out an audit for ISO 14001. They were similarly impressed with the environmental feedback and reporting we receive from our supply chain.
Terry Gallagher, London Borough of Camden
The empirical data contained in the Clifford Devlins close-out report for this project not only allowed us to demonstrate compliance with Site Waste Management Plan Regulations and BREAM but the photographic evidence of the various stages of the demolition provide an essential body of reference material that we can forward to developers and local authorities and apply to future projects.
Matt Heshmati, Project Manager, Wates Construction