Electronic Fihng - Received, Clerk’s Office : 09/02/20W
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
NOTICE OF FILING
PLEASE TAKE NOTICE that today I have filed with the Office of the Clerk of thePollution Control Board the Joint Motion to Terminate Variance. Copies of these documents arehereby served upon you, via electronic filing or service.
To: John Therriault, Assistant ClerkIllinois Pollution Control BoardJames R. Thompson Center100 West Randolph, Suite 11-500Chicago, Illinois 60601
Carol Webb, Hearing OfficerIllinois Pollution Control Board1021 North Grand Avenue EastP.O. Box 19274Springfield, Illinois 62794-9274Carol.webbc~illinois.gov
Gina RoccaforteIllinois Enviromnental Protection Agency1021 North Grand Avenue EastP.O. Box 19276Springfield, Illinois 62794
Andrew ArmstrongFaith BugclEnvironmental Law and Policy Center35 B. Wacker DriveSuite 1600Chicago, Illinois 60601
Dated: September 2, 2016Respectfully Submifted,
IPH, LLC
By: /s/Claire A. ManningOne of Its Attorneys
ILLINOIS POWER HOLDINGS, LLC andAMERENENERGY MEDINA VALLEYCOGEN, LLC;
Petitioners,
AMEREN ENERGYRESOURCES, LLC,
Co-Petitioner,
v.
ILLINOIS ENVIRONMENTALPROTECTION AGENCY,
Respondent.
)))))))))))))))))
PCB 14-10(Variance — Air)
Electronic Filing - Received, [lerk’s Office : 09/02/2016
BROWN, HAY & STEPHENS, LLPClaire A. ManningWilliam D. Ingersoll205 S. Fifth Street, Suite 700P.O. Box 2459Springfield, IL 62705-2459cmanning~bhslaw.comwingersollcWbhslaw.com
Electronic Filing - Received, [lerk’s Uffice : 09/U2/2016
BEFORE TIlE ILLINOIS POLLUTION CONTROL BOARD
LLINOIS POWER HOLDINGS, LLC and )AMERENENERGY MEDINA VALLEY )COGEN,LLC; )
)Petitioners, )
)AMEREN ENERGY )RESOURCES, LLC, )
)Co-Petitioner, )
) PCB 14-10v. ) (Variance — Air)
)ILLINOIS ENVIRONMENTAL )PROTECTION AGENCY, )
)Respondent. )
JOINT MOTION TO TERMINATE VARIANCE
NOW COMES IPH, LLC (formerly known as ILLINOIS POWER HOLDINGS, LLC),1
a Delaware limited liability company (‘IPH”) by and through its attorneys, Brown, Hay &
Stephens, LLP, and AMERENENERGY MEDINA VALLEY COGEN, LLC, an Illinois limited.
liability company (“Medina Valley”), by and through its aftorneys, Schiff Hardin, LLP, and
pursuant to 35 Ill. Adm. Code 101.500, hereby submit this Joint Motion to Terminate Variance
(“Motion”) and state as follows:
1. IPH, Medina Valley and AMEREN ENERGY RESOURCES, LLC (“AER”) filed
their Petition for Variance (“Petition”) with the Illinois Pollution Control Board (“Board”) on July
22, 2013 seeking dual variances from the sulfur dioxide (“SO2”) annual emission rate limits
provided in 35 Ill. Adrn. Code 225.233(e)(3)(C)(iii) and (iv) of the Illinois Multi-Pollutant
Standard (“MPS”) as applicable to the group of seven coal-fired electrical generating stations that
Illinois PowerHoldings, LLC was renamed “IPH, LLC” on April 30, 2015. See Exhibit!, Affidavit of Shannon L.Brown at ¶ 3 (“Brown Aff.”).
1
Electronic Filing - Received, Clerk’s Office : OR/02/2016
are together subject to those emission limits (“MPS Group”). The timing of the Petition was
necessary in order to allow a seamless regulatory transition in concert with a planned change in
ownership of the MPS Group from the then owner, AER,2 to the current owners, IPH and Medina
Valley.3
2. In the Board’s November 21, 2013 Order (“Order”), the Board granted the Petition
and allowed the combined dual variances for the electrical generating units in the MPS Group from
the applicable requirements of 35 Ill. Adm. Code 225.233(e)(3)(C)(iii) for a period beginning
January 1, 2015 through December 31, 2019 and 35 Ill. Adm. Code 225.233(e)(3)(C)(iv) for a
period beginning January 1, 2017 through December 31, 2019, subject to the conditions outlined
therein (the “Variance”).
3. IPH and Medina Valley have complied with all conditions of the Variance since
acquiring the electrical generating units in the MPS Group. Brown Aft at ¶9~ 4-5; Birk Aft at ¶ 5.
PH has submitted annual reports to the illinois Environmental Protection Agency (the “Agency”)
demonstrating the combined tons ofmass 502 emissions and the overall SO2 annual emission rate
from the five operating power stations in the MPS Group: Coffeen, Duck Creek, ED. Edwards,
Joppa, and Newton. Those reports, which have also been included in IPH’s Annual Emissions
Reports, show the mass SO2 emissions for each time period (October 1,2013 through December
31, 2013, and each calendar year thereafler), along with a running total of the remaining emissions
available under the system-wide mass SO2 emissions limit provided in the Variance. Moreover,
IPH permanently retired Edwards Unit 1 on January 1, 2016, as soon as was allowed by the
2 AER ceased to exist as an ongoing corporate entity as a consequence of corporate reorganizations related to the
December 2013 consummation of the transaction involving the change in ownership of the MPS Group. See Exhibit2.
IPH, through its subsidiaries, owns the five operating electrical generating stations (Coffeea, Duck Creek, E.D.Edwards, Joppa and Newton) in the MPS Group. Medina Valley owns the Hutsonville and Meredosia stations, eachof winch remains shutdown. See Board’s November 21, 2013 Opinion and Order (“Opinion”) at 7, 9-10. See alsoExhibit 3, Affidavit of Mark C. Birk at ¶ ¶ 4-5 (“Birk Aff’).
2
Electronic Filing - Received, [lerkTs Office : 08/02/2016
Midcontinent Independent System Operator, Inc. (“MISO”), the applicable regional transmission
organization; Duck Creek and Coffeen have operated their flue gas desulifirization (“FGD”)
systems to achieve a combined SO2 removal rate of at least 98 percent on a calendar year basis;
and Edwards, Joppa and Newton have burned low sulfi~r coal and have not exceeded 0.55 lb
SO2/nlmBtu combined on an calendar year annual average basis. Brown Aff. at ¶ 4.
4. Condition 9 of the Variance calls for defined activities regarding the Flue Gas
Desulfhrization project at the Newton Energy Center (LD. No. 079808AAA) (“Newton FGD
project”) to occur in accordance with the schedule established therein. All milestones to date set
forth in Condition 9 have been complied with through the date of this Motion. Id. at ¶ 5. Annual
progress reports on the status of Newton FGD project construction activities, including itemizing
activities completed during the year, have been submitted to the Agency. Id.
5. The Petition for the Variance was partially based on the need for electricity market
conditions to improve prior to completing the Newton FGD project, which would enable the MPS
Group to comply with the SO2 emission limits in 35 Ill. Adm. Code 225.233(e)(3)(C)(iii) and (iv).
See Petition, at 22. However, market conditions have not improved as expected. Since August
2013, energy prices at the Newton Energy Center have dropped approximately 20 percent. In
addition, the capacity market in the MISO has not improved and the Newton Energy Center failed
to clear any volume in the most recent MISO capacity auction. Thus, the Newton Energy Center
has failed to recover its basic operating costs, even before considering its ability to cover needed
capital expenditures that include the cost of completing the Newton FGD project. Gradual
recovery ofpower prices was an important considerationjustifying the delayed construction of the
Newton FGD project. The power price and capacity market recovery was central for IPH to
continue to Rind capital investments, including the Newton FGD project. Brown Aff. at ¶ 6.
3
Electronic Filing - Received, Clerk’s Office : OB/02/2016
6. Due to continued depressed energy pricing and the failure of the Newton Energy
Center to recover its basic operating costs, TPH has decided to permanently retire Newton Unit 2
effective September 15, 2016. Brown Aff. at ¶ 7. The MISO has approved the retirement of
Newton Unit 2. Id. With the permanent retirement of Newton Unit 2 the MPS Group can comply
with the SO2 emission limit in 35 Iii. Adm. Code 225.233(e)(3)(C)(iii) for the current calendar
year, 2016, without the Variance. Brown Aff. at ¶ 8. Moreover, in lieu of completing the Newton
FGD project identified in Condition 9, with the retirement of Newton Unit 2, the MPS Group can
comply with the 502 emission limit in 35 Iii. Adm. Code 225.233(e)(3)(C)(iv) without the
Variance in calendar year 2017 and each calendar year thereafter. Id.
7. A “variance is a temporary exemption from any specified rule, regulation,
requirement or order of the Board.” 35 111. Adm. Code l04.200(a)(1). Pursuant to Title TX of the
Environmental Protection Act (“Act”), 415 TLCS 5/35-38, the Board is responsible for granting
variances when a petitioner demonstrates that immediate compliance with a Board regulation
would impose an “arbitrary or unreasonable hardship” on the petitioner. 415 JLCS 5/35(a).
8. When conditions that were anticipated upon the filing of a petition for variance are
not realized and a petitioner can no longer justify the need for a variance, termination of the
variance is “the appropriate action”. Wallace Pharmaceuticals (n/ic/a Medpointe Pharmaceuticals
v. IEPA, Ill. Pollution Control Bd. Supp. op. 02-207 (April 7, 2005), p. 3. Tn Wallace
Pharmaceuticals, the petitioner sought a variance from the volatile organic material emission
control requirements of 35 Ill. Adm. Code 215.482(a) basedpartially on an anticipated increase in
emissions from three new products. Id. at 1. The variance sought was granted with conditions
imposed by the Board that required various research, testing, and evaluation for control technology
be accomplished by various times certain, and that regular progress reports be filed. Id. However,
4
Electronic Filing - Received, [lerk’s Office OR/02/2016
the production of those products ceased instead of increasing as anticipated. Id. at 3. The lack of
production resulted in compliance with the subject emissions standards, and there was rio longer
any need for the variance or compliance with the variance conditions. Id. As such, the Board
summarily terminated the variance, pursuant to the petitioner’s request. Id. at 3.
9. The Order does not address a scenario where one of the Newton electrical
generating units is permanently retired. However, with the retirement ofNewton Unit 2, it will no
longer be necessary to complete construction of the Newton FGD project (i.e., perform Conditions
9(c) - 9(g)) for the MPS Group to meet the MPS rule’s applicable SO2 emission rate limit as the
MPS Group will comply with the MPS limit beginning with 2016 (35 Ill. Adm. Code
225.233(e)(3)(C)(iii)) and continuing each year thereafter (35 Ill. Adm. Code
225.233(e)(3)(C)(iv)).
10. In these circumstances, termination by the Board of the granted Variance is
appropriate as IPH now is, and will continue to be, compliant with the underlying relevant
regulation, the MPS.
WHEREFORE, IPH, LLC, and AMERENENERGY MEDINA VALLEY COGEN, LLC,
request that the Board terminate the Variance, effective immediately upon Order of the Board.
5
Electronic Filing - Received, Clerk’s Office 09/l12!2EIIB
Respectihuly submitted,
IPH, LLC AMERENENERGY MEDINA VALLEYCOGEN, LLC
By(4tat~ -~Thy:~4 fl~One of Its Attorneys “ One of Its A$orneys
BROWN, HAY & STEPHENScL1~ SCHIFF HARDIN, LLP
Claire A. Manning Renee CiprianoWilliam D. Ingersoll Amy Antoniolli205 S. Fifth Street, Suite 700 233 South Wacker Drive, Suite 6600P.O. Box 2459 Chicago, Illinois 60606Springfield, IL 62705-2459 (312) 258-5550(217) 544-8491 Fax: 312-258-5600Fax: (217)241-3111 rcipriaflo@schifThardin [email protected] [email protected]~bhslaw.com
6
Eleotrunic Filing - Received, Clerk’s Uffice : Ufl/U2/2016
Exhibit 1
Affidavit of Shannon L. Brown
Electrnnic Filing - REcHived, ~Ierk’s UffiGs : U9/U2/2U18
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
ILLINOIS POWER I IOLDINGS. tiC andAMERENENERGY MEDINAVAIJTYCOGEN, LILC:
Petitioners,
AMEREN ENERGYRIiSOLRCES, [LU.
Co-Penfloner,i PUB 14—luI (Variance A
ILLINOIS ENVIRONMENTALPRO lEd ION AGENCY.
Respondent
AFFIDAVIT OF SHANNON I,. BROWN
My ozone is Shannon L Brown. I am Vice President. Asset Management - MISC).
br IPH. [LU C’IPI-I”k an indirect, wholl o\uwd subsidiar of D>negy Inc. rDynepy’i My
husmess address is 001 Travis Street, SalLe 1400. llouston, Fex’as, 77002, 1 make this affidavit
based on persona] knowledee or on knowledge I have obtained through inquiry of individuals
employed by Dyncgv or its subsidiaries and affiliates.
2. I ha~ e been employed with Dvnegv in various -asset management positions since
2001 and have been a Vice President of asset mammement since 2013, As Vice President, Assct
Management — MISC), I am responsible idr. among other things. managin~ the commercial
operation of IPH’s electric generating fleer located in l]linois JPH’s generaling fleet sells
capacity and energ~ into the Midcontinein Independent System Operator. Inc. rMiSOTh and
RIM markeis My responsibilities include manacing and directing a staff of 27 responsible Ow
financial reporting. bidding. scheduling and trading wholesale energy and capacity transactions
Electronic Filing - Received, Clerk’s Uffice : IIH/U2/2016
in the MISO and PJM mathets I base extensive experience originating and managing energy
and capacity in wholesale markets, These responsibilities include the five operating power
stations in the multi-pollutant standard rMPS”~ Group ~ Cofièen, Duck Creek. Eli
Edwards, Joppa. and Ne”tont that are the subject of the Variance granted by the Illinois
Pollution Control Board rBoard”) in PC[3 14-lb.
3, At the time the Board granted the Variance in I’CB 14—10, 1PM was named Illinois
Ptn%cr Iloldmgs, LEG. On April 30, 2015. illinois Power Holdings. EEC amended its
Ceniflcation of Fomialion to change its company name to “IPM. LLC and filed a Certificate Of
Amendment with the Secretary of State of the State of Delaware, the jurisdiction in which
Illinois Power Holdings. NC “as Ibrined. On May 1. 2015, the Delaware Secretary of State
certitied the name change to fF11. LEG. On May 1. 2015. the illinois Office of the Secretary uf
State accepted Illinois Power Holdings, LEG’s Amended Application for Admission changing
the name olthe compatn to [PH. TAX’.
4. 1PM has complied with all conditions of the Variance since acquiring the fi~e
operating electric generating stations in the MPS Group. As required by Condition 8 of [lie
FIoard”s November 21, 201$ Order in PCB 14-10. [PIt has submitted annual reports to the
Illinois Environmental Protection Agency (“IEPA”) dcmonstratinu the combined tons of mass
sulfur dioxide (“SO’Th em~ssions and the overall SO~ annual emission rate from the five
operating Stations in the NIPS Group. See :\ttachments A. B and C. [hose reports, which have
been included in I PH’s Annual Emissions Reports. show the mass SO2 emissions 6w each time
period (October 1. 201.3 through December 3 1, 21) l 3, and each calendar year therealier). along
sOth a running total of the remaining emissions available under the system-wide mass Sfl~
emissions limit provided in the Variance, As required by Condition 6 of the Board’s Order. IFS
Electronic Filing - Received, [lark’s Elffice : fl9/02/2016
permanentlr retired Edssards Unit I on Januar I. 21)16. as soon as was allowed by the MISO.
As required by Condition 5 of the Board’s. Order, Duck Creek and Coffeat have operated their
flue uas desultiarization rFGD”j s\stems to achie3e a combined SO2 removal rate of at least 92
percent on a calendar year hasts And, as required by Condition 4 of the Board’s Order,
hd~sards, Joppa and Newton ha~c burned low sulfur coal and hate nor exceeded 0.55 lb
SO~ mmBtu combined on a calendar year annual average basis
5. 11Th has to date complied with all milestones coneernina activities regarding the
lCD proiect at the Newton [Energy Center (ID. No. 079$0SAAA~ (“Newton HID r~iecCl as
set knOt in Condition 9 of the Order. In doing so. as reqwred by Condition 9g. 1PM has
submitted annual progress reports to the 1EPA on the status of Newton [GD project consimetion
acttvies, incindinu itemizanon of activities completed during the sear, See Attachments U. F
and F, Since acquiring the operating stations in the NIPS Group in December 2013. 1PM has
spent approximareLs 54 miLlion on continuing construction of the Newton RID prcdecr The
current estimated cost to complete the Newton [GD prolect is approximatels S’201 million.
6. Since tiling of the Petition Ow Variance in August 2013. electricit market
conditions have not impros ed as expected Energy pnces at Newton have dropped
approximately 20 percent since August 2013. the capacity market in the MISO also has not
improved In the MISO’s most recent capacity auertun 0 e , [hr planning year 20162017: MISc)
released the results of that auction in April 2016). Ne~aton failed to clear any volume, As a
result. Newton has failed to recoxer its basic operating costs, even hcthre considering the
additional ahtiiry needed to cover required capital expenditures including the cost of ccnnpleting
the Newton Ff1) project, [Energy price and capacity market recm err was central (hr WI! to
continue to fund capital investments, including the Newton [GD project, and the gradual
Electronic Filing - Received. Clerk’s flifice: DA/02/201B
recovezy of elecwicity markets was a key consideration justifying the delayed construction of the
Neaton P01) project.
7. Due to continued depressed electricity markets and the failure of Newton to
recover even its basic opQraling costs. IPI! has decided to retire Ne~ston Unit 2 permanently
effective September IS. 2016. The MISO has approved the permanent retirement of Newton
Unit 2 effective on that date. See Attachment (3.
S. With the retirement of Newion Unit 2 and by effectively managing utilization of
the remaining operating electrical generating units in the NIPS Group. IPH can and will comply
with the MI’S rul&s SO1 emission limit for the MPS Group in current calendar year 2016 (It.,
0.25 lb/mm9m; 35 111 Mm. Code 225.233(e)(3XCX1iI)) without the Variance. Furthermore, in
lieu of completing the Newton POD project identified in Condition 0 of the Otder. with the
retirement of Newton Unit 2 and ef&ctive utilization management of the NIPS Group. IPH can
and win comply with the MPS ruWs S0, emission limit ibr ‘N MPS Group in calendar year
20!? and each calendar year thereafter (It.. 0,23 lb?minBttt 35 lii Mm. Code
225.233(e)(3XCXIV)). In shon, IPH is now able to and i~ilt meet the MPS rule’s SO~ emission
limits beginning with current calendar year 2016.
10, IPH believes that compliance with the Variance to date has resulted in an
environmental benefit compared to ithat the MPS Ciroup’s compliance with ike MI’S rule SO2
limits would have achieved without the Variance over the same period. See Attachment H.
IT. I have reviewed the Petitioners’ Joint Motion to tenninate Variance and the mets
stated therein are, to the best of my knowledge and belief, true and correct.
4
Electronic Filing Received, Clerk’s Office UH/U2/2016
FLUUFIEI{.AflianLsayethno~.
Cl J ‘~ .~j /DA~FD L/~4~ L.
Shannon T~. Brown
Subscribed and sworn to he6,re methis i~ day of Sepiembcr, 2016
c
Electronic Filing - Received, Clerk’s Office : 09/02/2016
ATTACHMFt4T A
Electronic Filing - Received, [lerk’s Office OH/02/2016
.~ Sr
504 P~e~oe SNO
r 622fl~Thon~ ~15206.5S0O
It’
DYNEGYlubruan 24 2014
Illinois Environmental Protection \genevAnn: Ray Pilapil, Manager1021 N. Grand Avenue EastSpringfiekl, IL fi2794J~7fi
Re: PCB 2014 010 Annual Variance Report lbr Condition Number 4. 5, 7, and SReporting Period: October 1, 2013 December $ 1, 2013Report for 35 fAQ 225233(efl4)
Dear Mr Pilaptl;
This report is submitted ~jr the Miowing Illinois Power Holdine, 1,, LC iheilities:
Facihty____ ~ —_______
134SO3AAA~.~uck Creek ~1) I 05780’IAAA _____________
LE D Edwarcis Jifli,____ 143805MA6
Newton (1,2) O79BOBMA _____________
Attached is the report for the combined tons of mass 502 emissions and the evernU 502 annualemission raw from the five operating power stations in the MPS Group as listed in the tableabove, This includes the total tons ofsoa emissions, average 502 rate, and the running total ofremaining S02 emissions from the initial limit of 327,096 tons as specified in condition seven,In accordance with condition four, the combined annual averaue stack 502 emissions of thethree stations, ED. Edwards, Joppa, and Newton Energ~ Centers, is reported to showcompliance with the calendar year annual average limit of 055 lb mm[3tu In accordance withcondition five, the combined 502 removal rate of’ Duck Creek and Coffeen Energy Centers isalso reported to show compliance with the 98 percent hunt,
The data showing compliance with the ft it lhinmf3tu NOv rate in 35 IAC 225 Subpart 13Section 225.233(eR4) is also attached to this letter.
If you have any questtons regarding this submittal, please contact Wendell Watson in6i&206.5927 or via email at wendeIlwarson~dvnegy,coni,
Electronic Filing - Received, Clerk’s Office ElR/02/2016
In acctirdance x~ith ~5 I AC 225 200( dM3). -, certi under penn/ft of tuw That Thi~ document and otiattachments were prepared under my direst/on or supervision in accordance with a system designed to:~s&ire bat quahhea pn, .o,:tnpl properly gather anti evaO,ate •the rnñrnia won ~ubmrtted. Based on mynq ry 0 II a ~ierwn Cr perror c r nO S ii f@ 0~,u (1 ,n~fn, ‘t on ‘hr infrr n I ‘Psuomitted is. to the test of my knowledge anct behe! true, acct,rate and comnietc I am aware that thereare sign/i/cant penn/twos for submitting false Thldrmnhon, including the possibility of fine anti impnscnmenlfor knowing vtotations’
Sincerely.Illinois Power Holdings I. LC
~zf~;;K~ NDaine!,-PliØrnpsonVice lkrc≤idenr
Enclosure
EIRctrunic Filing - Received, Clerk’s Uffice UH/U2/2016
PCB 2014 -010 MPS Variance
Hhino~s Power Holdings, LLC~orCondition2
MPScLqung2flm[t=O45fl~/
Period: October 1, 2013 - December 31, 2013
~SO2 AverageHeat Input Rate
Energy Center 502 tons (mmett4 (Ib/mmBtu)
Coffeen 17 12,628489 0.003Duck Creek 75 5,926,214 0.025ED. Edwards 2,193 10,394,510 0.422Joppa 3,762 1 17,435,087 0.432Newton 4,323 f 18,995,946 0455
)PH Total 10,371 1 65,380,446 0.317
Report for Condition 4Variance Umit~ 0.55 lbfmmfltu
PeHod: January 1, 2013 - December 31, 2013
~AverageHeat Input Rate
Energy Center 502 tons (mmBtu) (lb/mmBtu)
ED Edwards 2 193 10,394510 0422Joppa 3,762 17,435,087 0.432Newton 4,323 18,995.946 0~455
IPII Total J 10,278 46,825,543 L 0 439
Electronic Filing - Received, Clerk’s Office O9!02/201B
35 IAC 225.233(efl4)ANnals Power HoId~ngs, LLC
Annua~ NOx Rate~
Period: January 1,2013 December 31, 2013
NOx AverageHeat Input Rate
EnergyCenter NOxTons (mmatu) (Ib/mmBtu)Coffer, 1,886 ~9,2S8,6i0 0_oilDuck Creek 1,263 23,561,779 0.108ED. Edwards 2,947 44,718,318 0i32Joppa 4,039 72,832,234 0_illNewton 3,384 68,589,929 0,099
IPH Total 13,523 f 252,960,870 0.104
Electronic Filing - Received, Clerk’s Office : 09/02/2016
Illinois Power Holdings, LICPCB 2014-010 Report for Condition S
Reporting Period: October 1, 2013 December 31, 2013MPS System 502 Tens Remainimi (Running Total)
~Gual502 I —
Year ~!~L!~ar End2013 327,996 10,371 317,5252014 317,5257Qj:~5
20162017201820192020
2012 represents the period at October 1, 2013 - December 31,2013
~orCondltion5R’eporfing Period: January 1,2013 - December 31. 2013
Scrubber 502 Removal Efficiency Average
Measured ‘ AverageEfficiency of Heat Input Removal
Energy Center 502 removal (mmBtu) Efficiencycorfeeni 992 18453,1011Caffeen 2 — 99~0 30,805,509Duck Creek 9881 23 361,779
.. =Average 502 Removal Efficiency 99~1
Electronic Filing - Received, Clerk’s Office : OB/U2/2016
ATTACHMENT B
Electronic Filing - Received, [lerk’s Uffice U9/E12/2llIH
iiLfltt~ Pc,we~ ~ir~a,t1500 EasIpofi Plan Drive
O’Faiioa, IL. 62234
DYNEGYFebruary 9,2015
Mr. Eric JonesCompliance Section Manager ~40Bureau of Airlilnois Environmental Protection Agency1021 North Grand Avenue EastSpringfield, llhnois 62?94~9276
Re: PCB 2014— 010 Annuar Variance Report for Cortdftion Number 4, 5. 7. and 8Reporting Pcrod Janury 1 20 4 — December 3 2014Report for 35 lAG 225 233(e)(4)
Dear Mr. Jones
This report is submitted for the foWowing minors Power Homing. LLC lacdlties:
LE~sili!z___.,,,J1fl,_,,_ Facility LD,~,Coffe~n Ene~terJDuckCree~fl2__ 057801W
t E. 0. Edwards (1,2,3) 143805AAG~Joppa J~3~4~5M) 127855AACFi4~llt2L_~ OT9BOBMA
Attached is the report for the combined tons of mass 502 emissions and the overall S02 annualemisson rate from the five operating power stations in the MRS Group as Isted in the table above. Theincludes the total tons of 802 emissions, average 502 rate, and the running totat of remaining 502emissions from the rnitial limit of 327,996 tons as specified in condition seven. In accordance with000chuorl ~oJr the cenibined annual average stacy 802 e vussions of II e three stations E 0 Ed yardsJoppa. and Newton Energy Centers, is reported to show comphance with the catendar year annualaverage limit o~ 0~55 lbimmBtu. In accordance wth condition five, the combned 802 removal rate ofDuck Creek and Coffeen Energy Centers is aiso reported to show compliance with the 98 percent limit.
The data snowing compliance with the Dli lbdn,mBhj NOx rate in 35 lAG 225 Subpart B Section225.233(e)i4) is also attached to thrs letter.
If you have any questions regarding this submittal, please contact Wendell Watson at 618343J837 cc viaemail at [email protected].
Electronic Filing - Received, Clerk’s Office : 09/02/2016
in accordance wiTh 35 lAG 22529O(d)(3~, ‘7 candy under penalty of law that this document and auaqachmer~s were prepared unchir my U’ CrC on a” r~ perwson in accordatre wuh a sys’em designed Coassure that qualified personnel properly gather and evaiuale the information submitted, Based on myenquiry of the carson o~ persons chiccity responsthte mar gathering The en’ormation The infom’uhonsubrrdied is to the best ofmy knowledge and belief true accurate and co-np’ete I am aware that bareare significant penalties for submitting false information, including the possibility of flne and imprisonmentfor knowing V0iathns*~
S~ncerely.llhnois Power Ho’dings. LLC
Enclosure
Electronic Filing - Received, Clerk’s Office : Dfl/U2/2016
PCB 2014 ~010 MPS VarianceIllinois Power Holdings, tiC
Report for Condition 2MPS Group 502 limit: tt35 lb/nimstu
Period: January 1, 2014 - December 31~ 2014
502 AverageHeat Input Rate
€nergy Center 502 Tons (mmBtu) (Tb/mmBtu)
Coffeen 32j 56,129,001 C.001Duck Creek 240 22 385 699 0 021ED. Edwards 8,278 39,374,994 0~420Joppa F 18,281 75,404,993 0.425Newton [ 16,416 65,754,871 0,499
..
IF’S Total ( 43,247 259,049,558 0.334
pflj~,gandition 4Variance Limit=QSsjbmmptu
Period; January 1, 2014- December 31, 2014
502 AverageHeat Input Rate
Energy Center 502 Tons (mmBtu) (Ib/mmstujED. Edwards 8,278 39,374,994 0420Joppa 12,281 75,404,993 DABSNewton 16,416 65,754,871 0,499
IF’S Total 42,975 180,534,858 0 476
EleGtronic Filing - Received, [lark’s Office : E1R/02/2EIIB
35 ~AC 225.233(e)(4)Illinois Power Holdings, LIC
Ann ua~ N Ox Rate Uniit~Q41lbmmBtu
Period: January 1,2014 December 31, 2014
NOx AverageHeat hput Rate
Energy Center NOx Tons {rnmBtu) (Ib/mm8tu)Coffeen 1,879 55429,001 0.067Duck Creek 1,065 22385k699 0.095ED. Edwards 2,432 39,374,994 0.124Joppa 4,024 75,404,993 0.107Newton 2,898 65,754,871 0.088
1PM Total 12,298 J 2S~,049,5S8 j 0.095
Etectrunic Filing - Received, [lerk’s Office Ofl/02/2UI6
Winois Power Hofdin~s, LLC
~porting Period: October 1, 2013-_December 31, 2014MPS System 502 Tons Remaining (Running Totafl
Actuat 502Year Year Beginning Tons Emitted Vear End
2013k 327,995 10,371 317,5252014 317 625 43 2~7 274 37820152016~017201820192020
2013 represents the period of October 1,2013 - December 31, 2013
Rep~jg~ondition5~~pprting Period: January 1, 2014 - ~ç~~er 312014
Scrubber 502 Removal Efficiency Average
MeasuredEfficiency of Heat Input
EnergyCenter Sozremoval (mmBtu)CoIfeen 1 99.4 20,571,871Cotfeen 2 99.8 35,557,130Duck Creek 98.9 22.385,599
Average S02Remov& Efficiency 99.4
Electronic Filing - Received, [lerk’s Uffice : U9/U2/2016
ATTACHM E.NT C
Electrnnic Filing - Received, Clerk’s Office : O9!E12/2U16
wn, tic~5oo Eastport nina DrivecoWnsville, ft 62234Phone 61L3q3~7837
February 22, aoa6
Mr Eric Jones, Unit Managerillinois Environmental Protection AgencyBureau of Air, Compliance Section #40
ion North Grand Avenue EastSpringfield, Illinois 627g4~ga76
Re: PG 2014—010 Annual Variance Report for Condition Number 4~ ~,7, and SReporting Period: January a, 2015— December 31. 2015
Report for 35 IAC 225.233(eX4)
Dear Mr. Jones
This report is submitted for the following IPH, LLC facilities:
f~iL~Coffeen Energy Center (1,2) 134BO3AAADuck Creek (a) ct57$OIAAA
~~i~i!i~I___~___
Newton (a, a) O79B0SAAA
Attached is the reportfor the combined tons of mass 502 emiss~ens and the overall SOa annualemission rate from the five operating power stations n the MPS Group as hsted in the table above. Thisincludes the total tons of SOa emissions, average SOa rate, and the cunning total of remaining 502emissions from the initial limit of 327,996 tons asspecified incondition seven. in accordance withcondition four, the combined annual average stack 502 emissions of the threestations, ED~ Edwards?Joppa, and Newton Energy Centers, is reported to show comphance with the calendar year annualaverage hrflit of o~ lb/rnrnBtu. In accordance with condition five, the combined SOz removal rate ofDuck Creek and Coffeen Eriergycenters is also reported to show compliance with the gS percent limit,
The data showing compliance with the o~n lb!mrnBtu NOx rate in 3~ IAC aa~ Subpart B Section2as~a33(e)(4) is also attached to this letter.
Electronic Filing - Received, [lerk’s Office : U9/02/2018
IPH, LLC1500 E~stprnt Pbza Drive(dllins~dle, 1L 6fl3qPhone 618.543.7837 a
if you have any questions regarding this submat&, ptease contact Wend&i Watson at 618.343.)837 Or
via email at wendelLwatson®dynegycorn.
in accordance with ~ IAC n~, zgo(d~(3), n~ certify under penalty of law that this document and allattachments were prepared under my direction or supendsion in accordance with a system designed toassure that qualified personnel property gather and evaluate the infcrmotion submitted, Based on myinquiry of the person or persons directly responsibieforgarhering the information, the informationsubmitted as, to the best ofmy knowledge and belief true, accurote~ and complete. I am aware that thereare sign~flcant penaltiesfor submittingfalse information, including the possibility offine and imprisonmentfor knowing vialations~
Sincerely,
James KippVice PresidentPH, LLC
Enclosure
Electronic Filing - Received, Clerk’s Elffice : U9/02/2UIB
PCB 2014 -010 MPS Variancefunds Power Holdings, tiC
Report for Condition 2MPS Group 502 limit = 0.35 lb/mmBtu
Period January 1, 2015 - December 31, 2015
502 AverageHeat hiput Rate
Energy center soz Tons (mm8tu) (ib/mm8tu)Coffeen 37 49,522,657 0.001Duck Creek 78 22 722,935 0 007E~0. Edwards 6,435 29,090,389 0442Joppa 13,230 53,765,015 1 0492Newton 12,805 50,394,880 0308
IPH Total [ 32,SSS ( 205,495,876 J 0.317
Report for condition 4Variance Limit = 0,55 ibfmmStu
Period~ January 1, 2015 - December 31, 2015
502 AverageHeat input Rate
Energy Center 502 Tons (mmBtu) (Ib/mmstu)F 0 Edwards 6,435 29 090 3139 0 442Joppa 13,230 53,765,013 0.492Newton 12,805 50,394,830 0.508
1FF! Total 32,470 133,250,284 0.487
Electronic Filing - Received, clerk’s Office : OB/U2/201H
Illinois Power Holdings, LLCPCB 2014 010 Report for condition 8
fccippsilpt?srloth October 1, 2013 December 31,~~jSMPS System 502 Tons Rcmainhw fRunnin~ Total)
Actual 502Year Year Beginnthg tons Eniftted Year End
2013 — 327,996 10,371 317,6252014 317,625 43,247 274,3782015 274,378 32,585 241,79320162017201820192020
* 2013 represents the pedod of October 1, 2013 December 31, 2013
Report for Condition SReporting Period: January 1,2015 - December 31, 2015
Sç~y~~r 502 Removal Efficient A~era e
MeasuredEfficiency of Heat Input
Energy Center 502 removal (mmBtu)Coffeen 1 99S 15,993,139Coffeen 2 99S 33,529,518Duck Creek 983 22,722,935
Average 502Removal Ernclency~ 99,3
Electronic Filing - Received, Clerk’s Uffice : U9/U2/2UIB
35 IAC 22S.233(e)(4)Illinois Power Holdings, ILC
Annual NOx Rate limit = au lb/mmstu
Period~ January 1, 2015- December 31, 2015
fOx AverageHeat Input Rate
Energy Center NOx Tons {mmatu) (Ib/mmBtu)Coffeen 1,614 49,522,657 0065Duck Creek 1,012 22,722,935 0,089E 0 Edwards 2,141 29 090,389 0 141icppa 2,966 53,765,015 0.110Newton 2,195 50,394 880 0 087
)PH Total 9,929 [ 205,495,876 j 0+097
Electronic Filing - Received, Clerk’s Office El~/U2/2Ol6
ATTACHMENT 9
December 20, 2013
Electronic Filing - Received, [lark’s Uffice : U9/U2/2U16
Illinois Environmental Protection AgencyAttw Ray Pdapil. ManagerBureau of Air -~ Compliance Section1021 N. Grand Avenue EastSpringfi&d, II 52794
RE: Illinois Multi-Pollutant Standard Variance Annual Newton Progress Report for 2013
Dear Mr Pilapil:
In accordance with Condition 9.g of the Illinois Pollution Control Board Order PCB 14-10 datedNovember 21, 2013, Illinois Power Holdings, LLC hereby submits the attached Annual Progress Reportfor 2013 for the Newton Rue Gas Desu[furLzation project, This report encompasses the followinginformation n accordance with the Order: an itemization of activities completed during the year. anitemization of activities planned to be completed in the forthcoming year, progress of the Newton EGOproject to comply with the timelines specified in the variance, and the estimated in se~ice date;
Please contact Rick Diericx at (618) 206-5912 ii you have any questions concerning this subrn~ttal or ifadditional information is required.
certify under penalty of law that this document and all attachments were prepared under my directionor supervision in accordance with a system designed to assure that qualified personnel properly gatherand evaluate the information submitted; Based on my inquiry of the person or persons directlyresponsible for gathering the inlorn,ation. the information submitted is, to the best of my knowledgeand belief, true, accurate, and complete. am aware that there are significant penalties for submittingfalse information, including the possibility of fine and imprisonment for knowing violations.
Cc: Illinois Environmental Protection AgencyAttn: Ms. Gina Roccaforte, Assistant CounselDivision of Legal Counsel - Air Regulatory Unit1021 N. Grand Avenue EastSpringfield, IL 62794
IllinoIs Power Hoidin.cs. LLC604 Pierce: 8oi~ardUFaion. 62269
I LIDYNEGY
Sincerely,
Vice Pm’
Attachment
Electrunic Filing - Received, Clerk’s Office : OR/02/201B
Newton FGB Annual Progress ReportDecember 2013
Fstitnawd In—Service Dates Sprinu/Fall 2019.
Pro~cct ictmties (ornpleted I fit ou~h 2013 E lgmeutng prtIcun~mun and tonstrutnonactivities with respect to the Newton FGD has-c progressed and the overall project is estimated to be63% complete.
itucineeriqg. Cit it engineerine and architectural design Is subsiantults complete exceot fr~r Sue Finishingceope Methanical ard Flettneal cneirwrinp is ‘uh’tintralh compleit e~cpt br a tisilts acsostiakd nibfuture procurements. The piping and instrument diagrams and pining isometric drawings are complete. Themuting ole)etincal ctrcwts is complete escept for scope associated with haute procurentenic. There are atotal of seventy-two equipment and construclion s eci&ations associated with the Newton RiD, Seventy arecomplete ineludinta ossswr’s review and apprtnaF
Procuremergs/Co~s~yue~~og Status,
CkLsrnta Complete.-a Limestone~ Complete.~Cs’rnlete
‘0- 4bsnrbcrF~’scefr Complete.Pjq~nthttztnis L’omp]eteLi~~’pinrtons All faundalions ra ten plere essc.pt r tar tot erpenc> dii en p. aerator I ~ittdat inand several minor mistellarreoas ibundaricins,~e n~!~ ‘L’!hL≥!ILc IOn ‘rh I h. lolloisint. e~1uipna.ni ard tetpi rent.have been procured and delivered to the see- Agitators; Disconnect Switches: Duet~orkExpansion Joints; Gypsum Conveyor; Gypsum Sluny Pemps. Absorber Bleed Pumps; SlurrySpray Nozzles; Non-Slurry Nozzles; Jet Air Snargers; rv!akeup ‘Voter Venical Pumps; PneumaticBlowers; Shop Fabricated Piping tMemlhct: Shop fabricated Piping (ERPI; Expansion Joints(I’iptnT,I Bndgm. trane \‘ nbc [It kin Re’otins. and Siding niatunals aid \b,orber 13.,tldtrHVAC equipment. Installation of such materials remains to be peribnncd.Sb-ne-snail Stee/ Approsimatels 98% of the structural steel has been deliveted to the site.Erection of Unit I and 2 Absorber Budding, Lunestone l’ipe Rack, and Gs~sttiu Cotweeursupport steel isemnplete. Erection of Unit I and Unit 2 ductwork support sled is ongoingErection of rooting and siding fUr the Absorber Building is in proeress, -
L≥t≤ctisork. All of the ductwork has been delivered to the site Assembly and inoallarionactivities are ongoing. Approximatels- 35% of the duetuork has been erected.Own U wit Cc nplie tte pi t~r opplir ‘hop of ut5 resin Ii tint. ..oat k
o ~bsos’berinrenna/ — Beams plJIo~. Complet&I rc non n inn pitse tttepL tot itt lani nation n ila [RI’ [kId it” 0’
a ShnnRenrkPJp~n- All piping, has been rough set Lamination of ihe PEP field joints is inprogressthis Fhnrnurot ( otprilr te tnt wdmrn, the mi i ella inner ti rsh l’tpinsdb’,o,bu Ret-u it Pump Material deli~ evd I he pump~ are ri u5h se en ‘bent peikst ii’ andthe naotnrs.and gear box-es- are stored onsite.LQfqa~ Delivered, The static parts fUr both units ore rough assembled. along nub the motorsReinai-ningeompone-nts- are store.d on site.Pt ii ,tr hg ~ggsr in All tc’n,nnneqts art or’itc St ut Lq0tpnwnt ito di so ii Pd
o ~Fa1criçgu~gl7Pnks The emergency quench tanks are delivered and installed.° vnsfonrscn All three ICt) tonslirniers hate been dobisered. cit tilled ,and testeda f4L≤:igsscn,eWC7Cs. Delivered and installed.
Electronic Filing - Received1 [Ierk’s Office : U9/02/2016
~ Factory •\cccpianee and Site \ eprartee lest a complete The equIPmenthat been dclI\ ered and stored .11 the vlsnt~ Ne~ rot Unit arid 2 LKS pUnt upsrade~ arecomplete.I ≥7~s ‘~‘II1” tt’Buit’th J~~u~[y4 Ii t tl~.4ItI , Li C pitt..
t~s~~i St ~II ~ ( ~rij’~1 ft Litti I t.. Let 11 ‘lIlt. itt Os
P Ji i4Jrzr~L “ n \ppm~ini ~k ~ o’ he tile! ~i k amW titer Ii n. n~. en c or ~iki ilLcet Ii / C lOt S this I i..htrt a hat bet n inc ilL ii 4. ~bso~ncr 11mM4 table trus lit’
been installed in the Electrical. Ahs~trber and Des tonar’ Ituildinso’ feinnectina cablebetween Swnchoear and MCCa haa been completed in the Elecincal i3utidmnL~ehrsru, /I: 0tu, Dust htnk UI tflti ‘IL ~~apleL Ir ~n ttetsfl p~piti sci ‘pDie makeup water piping t~ ~Ci to he completedHil)inLif~t:LIlstf~ 1) ii it L \t ~ the documen an, a pa Wed Its \mcrctl Iithe rnitial submittal to the TONE.
Project Activities Planned in 2014,
Engineerinrr Limited engineering In suppoil construction.
l’roctirenierfllConslrucflon Status,
~sAh.carbcp 8n~ldin~ Complete rustaibtu’n of the Unti I and 2 Absorber Bwldtng roofing an.dsidimi.
O Piric~~g~ni. Pretense and deliver the balance of plant FRP piping, valves, hangers, insiminents.and switeltyard nnJeLures.
—‘ Pm ci’ Stan 7ns, hat ~n ul ER~ hioni, ‘tin nil prpm (~ aIIm e lannn ‘fls I ic.,\c Ic pipin,.and sinus Itcadet ileldjoims.
nS,ig0ht’~5~,f Liner switebsard structures and overhead conductors.o Dueninrk. Continue to assemble ductwork sections and support tied4, !)ttttIiThit lnw/,,n,.q,. La}ltsnc’,nsL4la1p~n
ProlLress to Comply with the tnwhin~ Specified in the Variance,
“Onor before july I.. 2015, IPil cl)bnots Power~
l,SiQ Pjcct l3s if e nct I 2r11 3 s spe ci Fnctnetnn,. s he tppmstI ,‘stt U Ottt compicre Ew,pnecnt~~ tshe substantially complete by July 1.2015.
“On or before Dc’ctnnberll. 211j7 1111 must ethiarna new or estcridedconsirucnonpemsanin!eded, fdr theInstalLileon of’ the FGl) rqLpjm ni Ut he%ewtnnPoscerSflpirn P net s vs no, nttcrpate that amodification or extension of the construetton penmt will he tiCeessarS,
Urn,’ before Deesnl tr a’ ‘us T.?H it ust~ nip etc ar,vnrt or ci°Jie ibse Ni mnldngi rth~ \v s-mnPOD erotect.” IPH has identified no project related issues that would preclude compliance with corisinicitonrequ~remenIs associated with the absorber vest-el and iehsted .struetures and building
“Onor before July 1. 2019, 1PH must comalete steel_fahncattonofductworjs arid msu!atwn actwiues on theNsti~iLl (ill I’LL cut IN-i ha. tdt untied no proje t rehatcd t,u,,s thai is aId p ceLtic soinp’t tiree ‘t oh !Jt3’~reqwrerneni ( mr current schedule calls for the flue I hut to he in ‘en ice in the sprint uf2{) JO, The secondUnrt will hem service in the fall of 2019.
‘ “Onnpheforeiuh 3, 1,ill2Ji’JL.m ntpkJi!biininaisjcciucal sysrenicandpiprpgoittheNcwr,rn
FGDprrjeci IPH hat 4’ ‘tidied no prn~ t eflicti rout’ it ‘1 it ‘uhi risc mdc compltino— is on ilti’requirement. Our current schedule calls for the tint Von to b-c ut aces ice in the spring of 2019. ‘the secondUnit will be in sets ice to the fall of 2019
Electronic Filing - ReceivEd, [lerk’s Office 08/02/2016
~ ~ ~~~pIc ~l~c~_ Lt!.~~JI9 ~nt~st ~~i~4fdflts i he Ntf~Ion I (4j~r!c~C h~s i n$~ed . [$ieecl. idated ~c~sth$l ~euW. pft dude eLnndiiL ~h lt~Oer eerrem seI~edtde ealk k~r the iks iThh he ~n sun ~ce ihe ~prmg ~fJ~° [he ceciwd Unu ~ he m~eV% LCC m the ihil e(
Electronic filing - Received, Clerk’s Elffice EIB/02/21116
ATTACHMENT ~
Electronic Filing - Received, Clerk’s Office : U9/02/201BIllinois Power Generating CompanyISVO 5-asipon Piaza noveColtinsvile, H. t2234
DYNEGYDecember16, 2014
Mr. Eric JonesCompliance Section Manager #40Bureau of Airlihnois Environmental Protection Agency1021 Norm Grand Avenue East5pringfield, lihnois 62794~9276
Re: illinois Muitt~Pollutant Stardard VarianceAnnual Newton Progress Report for 2014
Dear Mr. Jones:
In accordance with Condibon 0 g of the Illinois Pollution Control Board Order PCB i4~10 dated November21. 2013, Illinois Power Generating Company hereby submits the attached Annual Progress Report for2014 for the Newton Flue Gas Desulfurization project. This report encompasses the following Intormationin accordance with the Order: an itemization of actrvities completed during the year, an itemization ofactivities planned to be completed in the forthcoming year, progress of the Newton FOb project to complywith the timelines specified in the variance, and the estimated inieMce date.
Please contact Rick Diericx at (610) 3434761 ii you have any questions concerning this submittal or ifadditional information is required.
I certify under penalty of law that this document and all attachments were prepared under my direct~on orsupervision in accordance with a system designed to assure that quahfied personnel properly gather andevaluate the informalion sutmitted Based on my inquiry of the person or persons directly responsible forgathering the information he nformation subnhiteo is to .he best of nig knowledge and bet~ef trueaccurate, and complete. I am aware that there are s~gnificant penalties for submitting false information.including the possibility of fine and imprisonment for knowing wolations
Sincerely,
~l~hpoonExecu~veVip~ President
Attachment
cc. Illinois Environmental Protection AgencyAttn: Ms. Gina Roccaforte, Assistant CounselDivision of Legal Counsel Air Regulatory Unit1021 N Grand Avenue EastSpringfield, IL 62794
Electronic Filing - Received, Clerk’s Elffice 09/02/2016
Newton FGD Annu~1 Progress ReportDecember 2013
Estimated In—Service Dates. Spriug~FaH ~O1 0.
Prujal Attn thcs Completed 1 hi ough 2014 L ngn cLI og ~‘WcUlcflkal aDd unstauLPonuctntties with respect to the Nc;~~on [01) Fun e progressed and the overall project is esluflalled In he65% complete.
k~tgi~t≤≤~hg. k~vi~ eri~meerinu and arc ileaturat desisin is suhst tiaulv complete excer~t Dr the Sitera drassu as Mechanic and P ~lrtnl ci acaril st nstin3nlh con plc~. cx~pt thr i~aisir as
associated sruh the remaining rroeurements, and the makeup wewr sa stem. The piping and instrumentd ~r ~ ~ r q n. isoma tric drm in ii, Ha a ‘mpfrtc I ha ml ~i aL RI a ii a IL a niP ii cuniplata 5.Sc apt orscope associated with remaining procurements, fllere are a total of sesean -one equipment and consiruetionspecilleatious associated wtih the teewlon FOD Seventy ate complete including Droen> 5~ review andapprosal.
~o (7titnn~p. Complete.0 ~.L(.SkL~hhS. ConspteLe.o Hjy.,si~ I 1k La! £thf’/,~, ‘ (on pIe e0 aU~attLvcL~aaJ.y C~:mtplcte.o De5~”Fa’mats:w,~ Comp!cte.o j’jundswa \lt rota dana; n an. Cr mph es.~pr ‘ui t~ a a ci0aOL\ diesa~ gcrn.Larot
Ihu.ndatioris, and several mIrtur miccettiner’us tAundalionso IIc,,~a_ I a,qm ul Pa ad flat niUr Sue I in. Iolens m~ equipment end ti nponcnts
have been procured, delivered, and stored at sire: AgiLerei’s, Gypsum Sturiy Pumps. AbsorberBleed Pumps. Jet Air Spareen. Makeup Water Venleal Pumps. Pneumatic Blowers. DucrasorkDampers, Var~abte Freauena-~ Drives, lnstniments, and PPS EquipmencBaueries. lthtaltatioii olsuch materials remains to be pet rormed.
o 5:1 a’ a1 çfr~/ All o~ tIn. ~tru~a rd ted has hpep del sri o we sne Hecucri or Umr I a ‘d 2Absorber Buildine, Limestone Prpe Rack, and Gypsum Uonreyor suppon steel is complete.Laceor; c~t I nit tno Cnn 2 dcatssork sa~ppor steal is oi~o it. Erect n oV ro&ing rid airlineAir the Absorber Building a complete except Air doors./7, at S 511 oflhia r’tiaB’ nih is I ,~ clncrad ,i ii rue 4’s~inh,y ird install nonductwork and expansion jotnts caintirtues, Apprtmimatels 75~ of Ate duensork has b-ecu erected.
o Unfit’! Hno,/t. Complete except mr applrcatiun 01 die resin Imirig coating.° :l/tca~ber’ Jt#r’f’flcJ! Stoma Li/ku. Completeo S/arm’ .5’prer IIeu&’rs. Erection is complete including the spra> nozzles and lamination ot’lhe
FlIP field joiam.o S/im Pmde P ‘ig t-r_tr~on I5 cm iphtc ,n.[uE petit Ia ‘tininon o~ tha [Ri’ hc’d joirta
4” I 70, Hi ,Jj C on iNcn. tin. t~Jm . I ~ in 61 s.’i It itiat is ash pze thc th ;i? esfirurnr Mitcrnl 0C]flc ed I he pum-’s era rot ‘Cr on the r pcdcdalc an~
the motors and sear boses are stored onsite~1) 1 Tha flex’s are S I tn. arIa pan ti’i built nits Ira rune t %s~ tibia I th it~ itS IL [ ‘0101
RemainIng components are stored on sue.~‘ “‘Lartsz ,u~u,y \P to ,sn_ni ~ic a “tic lln. n~ I’ uhan Ii na bean p mdl ii ilL]
o 5:&p Fa~rtcmred TunAs The emergency quench ianlss are delivered and installedo Thsma/drmero Alt three but) zransihrmers hase been deliveatd. oil filled, and testedo Mi ‘—1,1 5ca /rthr’r~’ r,,ifCUs Delivered and installed
Electronic Filing - Received, Clerk’s Uffice Ufl/02/2U16
o LeNS-t1c~ro~. Factory Acceptance and Site Acceptance iestpng is complete. [he equpinenthas been ddhiered and seined at the robsfte, Kenton bitt I and 2 firS plant upgrade~ arecomplete.
ci / rJe L it t , 1Jnn~rth a/i I°~tat1.ron ~onipleo.(a S c n~’ I o9nplett ~ S N tq~ n. ED flint. c(nimgO Dcwnrork lnsu/unoa Approxintakdv 50”~ ofthe ductwork insulation has been completed.
L/s JurJJ < ~‘ fr~ Ut P \ ,,mi au at [1K Eirj nig is I n i ~i al Let r t [it \h’ar bet Bud tieCable tray has been installed in the Electrical, Ahcorher. and Dewareong Bctikiings.intercotmeetme cable between Switchgear and MCC’s his been eornp eted tn the tElectricalBuildine:
o tn~~jj~y IL wuie Duet bans. matullatiol. are. complete I ire pix ettien ppm~ Es comple5eThe makeup water piping ts et to he completed,
C 4/ erffi’Jr~,,,fljUrqujaes Set m pkico ~ Rough set in the Absorber Budding
Iii ID ~/ hint P~ j,,~ A shop d a. ~ I nrnn~ In ml hr aid FRTh ~ \uppors ‘ theeand expansionjosnts have been deliiered to site. Erection of pipina and accessories is inprogress Installation appraxtmalek ~55a~ complete.
o cii DJj~j~j in Li ecton a Lb trin’m,s’ton pole ‘~nc cw itch~ ard Sri’ clvr~s h coimnleteexcept kr the L~nit 2 sniteh’ard structures tar whtch a plain outnee is necessary to complete thework,
o C nIP U ~ corporals ‘xm c flee— delr~eted I b~ cormeic sup~ors are dec~ ha obeen erected
Project Activities Planned in 2015.
bgtaccutlg~ I .ini lied engineering to support procurements and construction. Complete’ the design ofthe makeup wnter system.
Prcurcmnemt/Construetion Statti
0 Pisectiemunn Puicure end deltser the 1 IV Sn ilatd breakers. CLMS eqaipment, AbsorberInternal BatHes, Air Compressors. and Enmergene~ Diesel Generators,
o Pwcag. Continue installation of FRP balance of plant pmnin~. supports, and vali cx.Sit ajrj J C ample K ed on or tI it tie h’ rd ~‘iitti ~ S I ml 2 p1 ii ((it t~t Es 45 111th1
o 4’, Continue to assemble ducuvork sections.ci Litter, pita Fm u/ni a i, Continue nan [at ion.O Marsldcrri C~2n Miter Continue instaflation of plant habtine.
£,r~aress to Corn Iv with the Timelines S~pcified ~n the Y~ri~c~
1 ~i o~J J~ e hjgJ 01 Dj r5j,~ ma~i compleae~en,~ nom noinrt on Ne scion f3t) t’i airsEngineering will be substantialia complete h> ;ult 1.2015.
tt~or ha lore Dc ~mhci 2017 Ihin~e in 01 000mincsm cU S tied ott nuts ‘n~ efl ii 0 neuh I Ithe incaWmon o the POD ~q’gp,m,gp Pour~ratni Dtre,~ di~~ aM ~nticip’tte’hu rmodification or extension of the construcoon permit will he necessary
“On or before 0 the NeistrinU’ftiexx,,,, lAne ha. idvsn]ieJ 110 Pftje,t ftLiled EssLe, LiLt noald rrecle& tonipitanee withS an hue ion equirt 1 itS I (~ci,t. I no’ lIt, ib mu cc ,~ iii ~ d mat I cx id hi tidine, ‘t he hit II at.enclosure is now substantially completed
“On or before Jut’ I 201 a, LAncer tuna corenlere steet [OsrEentlon e~i ductwork and insulation aetmines onthe \catIli Ft tflpn~ t Di c,,i is ident tmLa to ~mn1cc rein ~d trei ti it t ou2i preluJe compliance
Electronic Filing - Received, Clerk’s Office : 09/02/2016
~snh thu requirement. Our currem schedule calls for the uirst Unit tube in service in the spring of 2019. Thesecond UnTI ~ ill he in servtcc to the laN o120l0.
~Onor befOre July l.lOfQ,~RIO tsrojcct Uynecr has ideur~iied no pro~ect related is~acs that unuld preclude compliance with Lhtsreunirement Our current ~chcdule calls fOr the first Unit in he in ~en ice in the sprrntt ul 2019. The secondUnit wtil he in seMce in the fall of 2019,
12ft.w ,bcf ore 5dptcnth~1:L2Q I,9~,I ~‘,gii ,jnim±c≤~nnonenh_iuloJ r?nthe\entcrn PCI)project IXneg~ h~ iden tIled no inqcct rnted c~uv ni~r tsoald rrcclud~ tontphan~, t~ ilk thisrequirement. Our current schedule calls for the first Unit to be in sen ice in the sprtng of 2019. The secondUnit will he in service in Ike ran of 2019
3
Electronic Filing - Received, Clerk’s Office : 09/02/2016
ATTACHMENT F
Electronic Filing - Received, Clerk’s Elifice : 09/02/2016
IPH, LLCISCO Eastport Plaza Driveco~is~aIe, iL 6’i~4ahone 51&343.7837
December 15, 2015
Mr. Eric Jones, Unit ManagerIllinois Env~ronmentai Protection AqencyEureau of An, Compliance 5ection ~4Oion North Grand Avenue EastSpringfield, Illinois 62794-9276
Re: Illinois Multi-Pohutant Standard VarianceAnnual Newton Pmgress Report for 2015
Dear Mr. Jones:
In accordance with Condition 9.g of the Illinois Pollution Control Board Older PCB 24-to dated November 22,
2013, IPH, LLC hereby submits the attached Annual Progress Report for 2015 for the Newton Flue GasDesulfurization pro,ect. This report encompasses the foliowing information in accordance with the Cider, anitemization of activities completed during the year, ar~ emization of activities planned to be completed in theforthcoming year, progress of the Newton PGD project to comply with the timelines specified ni the variance, andthe estimated in service date
Please contact Rick Diericx at (6i8) 343-7761 il you have any questions concerning C’~s submittal or if additronalinformation is required.
I certify under penatty of law that ths document and all attachnmnts were prepared under my direction orsupervision ln accordance with a system designed to assure that qualified personnel properly gather and evaluatethe information submitted. eased on my inquiry of the person or persons directly responsible ~or gathering theinformation, the in1ormat~on submitted is, to the best of mV knowledge and belief, true, accurate, and complete. Iam aware that there are srqnmcant penalties for subrmttinq false information~ including the possibility o~ fine andimprisonment for knowing vioiations
S’ncerely,
PJames KippVice PresidentIPH, LLC
Attachment
cc Illinois Env,ronmentai Protection AgencyAttru Ms. Grna Rocceforte, Assistant CounselDivision of Legal Counsel Air Regulatory Unition N. Grand Avenue EastSpringfield, IL £2794
Electronic filing - Received, [lark’s Office Dfl/F12/2U16
Newton FGD Annual Progress ReportDecember 2015
Estimated In—Service Dates. I he first Unit. to he in sen ice in the spring of 2019; the second Unittsithin 12 months of the firsi
Project Activities Completed Through 2015, Engineering, procurement and constructionactivities will~ respect to the Newton Ff11) htase progressed and the cnerall prqject is estimated to be72% complete.
Ensineerintt. Civil engineena. Architectural dcsigtr Mechamcal and Electrical ensineerina ale all‘,ub~i nn~ taIls nmpl~ it In 2’) 15 tilL routtug o~ ~k~ti it il cln.tlib 54 c~ ‘nplLtL ci intl raccas rs mdcircuit diassnus wart conipicicu Pipma lcnm~.tric dru’uws and Piping and kM mimcnl thoudims ings are complete, Al I seventy-two equipment and construction specifications are completedI he only engi teerirtg actis ittes retnainine are those i’uhtted to ongoing construction sodcommissioning support, writing of plant perfrrmance Test procedures and performance restingsupport ti,llossing commissionimu final site paving after the completion of construction, andupdating of drawings to conform to construe—I ion records (as—bruit dras~ ingsr
Pateurements. Construction~
o Chhnn~v, CompLete~o Limes/one Si/ny Cotupiew.‘~ / At mn~d~al4lJNlorSna~jsnth/un~j l_ QttflilLlt.
O ~Complete.o ~tp Foundations, Complete.
All flttmdations are compicte.o Srnw;um/Sieet All of the structural steel has been rfrhvered to the sUe. Erection of Unit I
and 2 Absorber liuUding, Limestone Pipe Rack. and Gypsum Conscror support steel iscomplete. Erection of Unit I and Unit 2 ductwork support steel is completed to the extentpossible prior to the ounaae tie-ins.
o 1/ic a/km h’m hni/ I at iota; e Lrtctuon or rooting ,utd stdm.z j~r thc ~bstn her IImidmg uccomplete except ibr doors.
o Ducni’rpp’k. All of (he ductwork has been delisered to the she. Assembly and installation ofductwork and expansion joints continues, Approximately 85% of the ductwork has beenerected. Onix the outage tic-in ductwork remains to be erected.
o i2rij2JrkI2onujEn, [‘he ID Ian outlet dampers hate been erected,o Outhit Ifooth, Fabrication and erection complete. [he application oh the resin lining eclating
is complete on Unit 2 and in progress on Unit Io ~4bQt*erl,’PnaIs. The allo:. beams, jet air spargers. and baffles hase been installed.o Slut, t sin as Hc~s~ I ice non i~ complete ~neWilung thc “rra~ notates and I uuniatuc’n ol
the FRP field jointso c/wn &c~ .4 Piping Ertctton is temple e includinufin. I imunjuon ol “ic FRP deld lonu~o :1 1ii, EThnin~nops, Complete tncluding the mist eliminator wash piping.~‘~n’y~s The pumps are rough set on their pedestals and the motors and
sear boxes are stored onsite.ta Mi.seellaneomPun&c. The absorber bleed. gvp~um slurry. and absorber, dew atering~
reclaim, and gypsum sump pttnips have been rough set -
Electronic Filing - Received, Clerk’s Office : 09/02/2016
o lOins, 1 he static pans Jbr both units arc rough assembled, along with the motors.Rema~tung components are stored on site.
n Pt ii rift? W~ I çî sqnu ‘ni All ttifl;poi ~a1 arc asiL I In. In. It filters and ~sso~ int~dequi pmertt have been panhdly installed.
0 Pi~ tills? lOt 1 lUlL C flj I IUQ I ~ hi tfl~ ci id i ssn_ ~tc. d tqu pInent hat c b_cit ~i ut ill’installed,
c Aaifctrorc. [he absorber, gypsum nob, and sump pump agitatorc have been installed.c’ ‘tsr C ‘onwt~’x~1 The air compressors and receiver have been roueh set,o sli q? lobs-u oft d flssth Ilc cmci gtnc~ qus ‘di tank’ a e lelo _i ed and in hi lcdo ,Liamsfortzjers All three POD (Unit 1. Unit 2~ and spare) transformers bate been delis ered,
oil filled, and tested.ci ill c11 Sti n bat as IfCCs \ll itnn~ h0; c be..ri irNtalkdo UPS~Bauenes, [he battery assemblies have been installed.
I IPJL’LjsJ.LSIL_nuJ)s ‘v~ I fr~ \i I lb h n e bee n mstal ledo bLpl2gkLzG: Thcsiil ç;e yasw~c The bUGs have been rough set.o urns! sins I acwtv Ae~eptance and Site ‘\eceptanct. I esting is compIc~e the
equtpment has been delis ered and stored at the jobrdte. Nesvton Unit I and 2 DCS plantupgrades are complete.
o rge~1aflleierBflfles’7tJ’jsIifl Installation complete.0 (s~iwn,i1i qg0 7 oak C inxplctc t nd ml ing dit appl ic.n ion ot he ft in intrig ti at m~o flur!unrk Thsnkst km Approxiniatels 71% of the ductseorb insulation has been completed.o k~~jLkuICumu us. hem Ligutirig h45 been incialled in the Ahsoi bs,r I3uildmg Cable tray
has been installed in the Electrical. Absorber, and l)evv atenng Buildings. Interconnectingcable henveen Sssitchgear and MCC’s has been completed in the Electrical Building.
o tmdergrowsd Lfihtk.c. Duct hank installations are complete. 1 he installation of allunderground piping is cotnplcled.
o ~ (IT it ~ men! 5cr in placeo ~ Rouah vu in the ~bse bier Buildin0 Iiatnc~o~0/us iPi~ flng 0541 Intj Ul5lU1l¼ \ II —hOp hit ns its I j’iptn_ rite! ill. it1d I 1W)
pipe supports, valves, and expansion joints have been delixered to the site. Erection ofpiping. piping accessories. and iiistruinents is nearing completion. Installation isapproximately 05% complete.
o ‘en 1k )i,y as) hesti~m Fi &tion olihe transmission poic~ anti sty itehn.u I ‘tructures is
complete except fir the Unit 2 an iteltvm-d structures for which a plant outage is rlceessan tocomplete the nork. The high voltage breakers have been rtniglt set
o fL !Co~nnuC All components have been delivered. The conve) or ~upports and deckhave been erected. Mechanical cotnponeius are yet to he erected,
s~ ~t rduwnhIl r R~ n S otiS Sn s~,9s 5114 I he hilTon ing tamr mcii!’ has e beendelivered to site but not yet installed: ID Fans. ID Fan inlet dampers. g~psuni conveyerequipment. makeup scater pumps, DC’S equipment. and rentote 10 enclosures,
Project Activities Planned in 2016.
Entrineering. Lngtneertng support oi’eonstruction activities.
Procuremeni/Construdfion..
o ‘ I’s’ocurement No major procurcinents are planned. All major’ procenenKots stiC csiinpleteexcept for the fire protection and slack decommissioning subcomi’acts,
o .Sii’uc’hrcsrd. Complete erection of the swhehvard structures un Unit 2 plant outage isavailable,
o Ductwork, Continue to assemble ductwork sections.2
Electronic Filing - Received, Clerk’s Office 09/02/2016
0 Pj&!njJ&1!m4≤4IOLL (‘orplinuc installation of insulation and [arging on erected:storerjduct~&ork sections
V u. L1 ~ ‘nnusu s on C. ,uit;puis. In inst dl~ ~ idiot car’Iinsz & icunin iniw nid tlc~Lncalequipni cot
£ çss to Corn with the Tirndines S~~eifled in the Variance.
On or huorc Juk 1 2015 IPH must ~onipku cnaincetmtzs~sIPoinhc’~c;sainRd)Prcü~c~Milestone Achieved - Engineering ssas subsutntiaily completed h) July 1,2015.
~Qrw fitre December 31. 2()ILIPII must obtain a new orexler~dedeonsIruehon~gnmt.if needed tor the anstu1lat~on at the HiD eq nkntattheNentm Poer Stanqp_ 1PM doesnot anticipate that a niodificagion or extension of the construction pennht whit be necessar.
• ~‘On or bethre December 3L 2018. IPH must complete construction of the absorber bui Idinu~n d~g Ncu ton Ujj≥~rciject IPI I has ide filled no pto~cct rclatcd oouc.~ that v~ ould pi ccludceomphaiicc with construction requirements associated with rhc absorber vessel and related structutesand building. The bin Idiug enclosure is now substantially completed,
Sn or hetore J ulv I 21)19 1 P11 nEusi compj~~y~cc14jbn~ ~itioa ol dijc tss ork md insulationartinticsnn~ Ifl I ban i&nrpfiod no propect tUned i~sucs tI it ~rou1dpreclude complIance with this requirement. Our current schedule calls for the first Unit to he insen ice in the spring o120 19 with the second Unit to be in service ;s ithin 12 months of the first Unit.
ThLprIqrithJ,~ilj±JPtT~nw~t c~j~p~g~gjpstaflanon of electncJ c~ ~gjnc mdj~j~jn~on the Newton RiD project 1PFI hA~ id~nuliJ nt protect relatcd t~Ues that snoold precludeconiphance with thin requirement. P~ping installation is currently 95% comnlete, Electricalinstallation is the major construction aclivitv planned Oar 2016. Our current schedule calls forthefirst Unit to be in service in the spring of 2019 with the second Unit to be in service uithin 12in oaths of the first Unit
~fl~grbetoieSe’tetnbeiL 2019 IPH must Set n’aior compOnents in o final pusfi’on on theNewton lGflwcU [Pt I h’s idcntidcd o proJect rehued isSlics that ould utedudecompliance with this requirementS Our current schedule calls for the First Unit lobe in service in the~prmg if 2u1 9w ith the ~econd t~ nit to be in ~en ice wi bin 12 months at rhL itt” I
Electronic Filing - Received, Clerk’s Office : 09/02/2016
ATTACHMENT G
Electronic Filing - Received, Clerk’s Office : 08/02/2016
Timothy A~U
S A ~Ufl Director, lieliabdity flan~:,ag~ ~U 317 249 5654~ W ~ tahff~mnoenergy.crg
VIA OVERN1GHT DELIVERY
August 23, 2016
Shannon BrownDynegy, Inc.601 Trav~s St , Suite 1400Houston, Tx 77002
Subject: Approval of Newton Unit 2 Attachment V Request for Expedited RetIrement
Dear Mr Brown:
On August 8,2016 MiSO received a revised Attachment V Notice from Winds Power Marketing Companyfor the retirement of Newton Unit 2 effective September 25, 2016 with an accompanying request forMISO to consider the expechted retirement date. Previously MISO approved an Attachment V Notice ofsuspens~on [or the unit effective September 15, 2016 and a subsequent Attachment V Notice ofetremen rrec~~ve November 29 2016 Af or review of -he power s~~ctem rehabuity impacts, VBSO
determined that the earlier retirement of Newton Unit 2 would not result in violations of applicablereflcbihty criteria. Toerefore. Newton Unit 2 may Retire without the need for the generator to bedesignated as a System Support Resource C”SSR”) unit as defined in the Tariff
This letter acknowledges that MISO has received your amended Attachment V Notice revising theNewton Unit 2 retirement date to September 15, 2015. The decision to Retire is considered final andthe existing interconnection rights for the generators will be terminated as of the retirement datespecified in the revised Attachnient V Notice. Illinois Power Marketing Company may not modify thedecision to Retire Newton Unit 2 unless an Attachment x Request is submitted to enter the generationtnterconnection queue. As there were no reliability criteria violations, MISO will continue to preservethe confidentahtv of this Attachment V Notice. Please submit the necessary Attachment B form to theMiSC) Customer & Asset Registration Department E ~~~ 2nu o.emrzv.cra) to reflect this change ~nasset information.
Please do not hes~tate to contact me if you have any questions on this matter.
Respectfully,
Urn AtiffDirector, Reliability Planning
.i<Xii;.i~.1iririd&c.Ena.~fa
‘c’ )t it r I, I ~
2 — 1~1 ‘4r”~- ‘ “ n’—~~, ~a., 22
Flectrunic Filing - REceived, Clerk’s Office : 09/02/20tH
ATTACHMENT H
Electronic Filing - Received, Clerk’s Offica : 09/02/2U16
iPN~ LLC~SO~) 5ar,t,~ ‘I ~ays~ Driy~Coiiin~v,~, L &2234~6i35
Via E-Mail
September 1,2016
Jim RossManager, Division of Air Pollution ControlIllinois Environmental Protection Agency1021 North Grand Avenue EastSpdngfield, ILlinois 62794
Dear Mr. Ross:
The enclosed spreadsheet demonstrates the environmental benefit that has been achieved to dateunder the Variance in PCR 14~10. The environmental benefit is identified in terms of additional tons of502 reductions achieved under the Variance compared to the 502 tons that would have been allowedunder the MPS Rule. The benefit achieved to date reflects that the Variance imposed more stringent502 emission rates than Ihe MRS Rule uofront in the relevant period (Oct 1 2013— 12/31/2014) andprovides rebel From the MRS Rule SO? emission rates in the back end of the relevant period (1/1/2015-12/31/2019).
The environmental benefit is demonstrated using either the MRS Group’s baseline heat input or, moreconservatively, the MRS Group’s actual heat inpul Specifically:
Using the MRS Group’s baseline heat input:
• During the period October 1,2013-to Aug. 31,2016 (covering both AER and PH ownership ofthe MRS Group), the allowable SO~ emissions under the MRS Rule (without the Variance) wouldhave been 164 984 tons During that same bmeIrame the MRS Groups actual SO emissionswere 100,881 tons. As the MRS would have allowed emissions totaling 164,984 tons of 50r.that represents a reduction (benefit) oF 64103 tons (164,984 100,881).
Using the MPS Group’s actual heat input
• During the period October 1,2013-to Aug. 31,2016 (covering both AER and IPH ownership ofthe MPS Group), the alLowable 502 emIssions under the MRS without the Variance would havebeen 111738 tons. Since the MRS Group’s actualS0,emissionswere 100,881 tans during thatsame tirneframe, a benefit oF 10,857 tons of So~ reductions has occurred to date (111.738 —
100,881).
Alternatively, an environmental benefit is also demonstrated occurring over the period October 12013 to Aug. 31,2016 by comparing actual tons of SO~ emitted by the MRS Group to 502 tons underthe Variance’s allowable SO, emission rare using either the MI’S Group’s baseline heat input or actualheat input. Specifically, actual tons oFSO2 emitted by the MRS Group were less than allowed under theVariance using (I) the MRS Group Baseline heat input (113,478— 100,881 72,59? tons of benefit), or (ii)the MRS Group actual heat input (112,351 - 100,881 = 11 ~*70 tons of benefit; where 112,351 = 035lbs/mmbtu x 642,004,246 mmbtu xl ton/2,000 lbs).
Jim Ross, ~EPAElectronic Filing - Received, Clerk’s Office : 09/02/2016
september i, 2016Page 2 oPZ
1 you have any questions concerning this information, please contact me.
Managing Director, Environmental Compliance Group
Enclosure
Rick Diericx
IPH MPS Group
Cu~0~
CDCD-~
C”]
-n—
Cu
A 13 C 0 E F ci H Jyear MPS ciroup MI’S 802 MI’S Basdilne Vgria~ce $02 Variance $02 Actual 502 Otfference MI’S Actual Heat Input MI’S 502 DIfference
Saseline Heat Rate 502 (tons) Rate Tons Tons Gaseilne $02 (rnmfltu) with Actual MI’S 502 wIthInput (Ib/roraBtu) (th/mmBtu) tans and Actual Heat Inptit Actual Heat
$02 tons (coh 0 (tans) Input (tons) ~- cat, ci) and Actual
502 tons (caL ~)-cotci)
4thQ2013 83443376 05 20861 035 14603 10371 10490 65380445 16345 5974~~öiT 340)Z4&252 043 73196 035 59,578 43 247 29 949 259049558 55 6952015 340 446,252 025 47,556 035 59,573 32 585 9 971 205 495 875 25 687 6 8982016 ian Aug31 226 955 303’ 025 28 371 035 39,719 14 678 13,693 112 078 355 14 010Total 164384 — 173,478 100,881 64,103 642,004,246 111,738
‘MPS Group Baseline Heat input for 2016 ian-Aug 31 66667 ~ annual MI’S Gtnup Baseline Heat mputCD
Cm
Electrnnic Filing - REGRived, ~Ierk’s Uffice : UH/U2/2U16
Exhibit 2
Electronic Filing - Received, Clerk’s Office : 09/02/201B
!Detaware‘The .fTirst State
PAGE 1
I, .JEFFREY W. BULLOCK, SECRETARY OF STATE OF THE STATE OF
DELAWARE, DO HEREBY CERTIFY THE ATTACHED IS A TRUE AND CORRECT
COPY OF THE CERTIFICATE OF CANCELLATION OF “AMEREN ENERGY
RESOURCES COMPANY, LLC”, FILED IN THIS OFFICE ON THE
TWENTY-FOURTH DAY OF DECEMBER, S.D. 2013, AT 3:43 O’CLOCK P.M.
4445570 8100
132474617You may verity this certificate onlineat corp. delaware. gov/authrer~ sh~l
AUTHE)~~W. Bullock Secretary of Statea~~~jTION: 2012963
DATE: 12-26-23
Electronic Filing - Received, Clerk’s Office : 09/02/2016State of Delaware
Secretary of StateDivision CA. Corporations
Delivered 03~49 P24 12/24/2013FILED 03:43 FM 12/24/2013
51W 131474627 - 4445570 FILE
STATE OF DELAWARECERTIFICATE OF CANCELLATION
1. The name of the limited liability company is Arneren Energy ResourcesCompany, LtC
2. The Certificate of Formation of the limited liability company was filed onFebruary ii, 2008
IN WITNESS WHEREOF, the undersigned has executed this Certificate ofCancellation this 24th day of December , A.D.~213
Name:Fr~i9 W.PrintorType
Eleotrunic Filing - Received, Clerk’s Elffice : 09/E12/2U16
Exhibit 3
Affidavit of Mark C. Birk
Electronic Filing - Received, Clerk’s Office : 09/02/2016
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
ILLINOIS POWER HOLDiNGS, LLC and )AMERENENERGY MEDINA VALLEY )COGEN, LLC; )
)Petitioners, )
)AMEREN ENERGY )RESOURCES, LLC, )
)Co-Petitioner, )
) PCB 14-10v. ) (Variance — Air)
)ILLINOIS ENVIRONMENTAL )PROTECTION AGENCY, )
)Respondent. )
AFFIDAVIT OF MARK C BIRK
1. My name is Mark C. Birk. I am employed by Ameren Services Company as a
Senior Vice President of Corporate Planning and Oversight. I am the President of
AmerenEnergy Medina Valley Cogen, LLC. My business address is 1901 Chouteau Avenue,
St. Louis, Missouri, 63103. Both of these entities are subsidiaries of Ameren Corporation
(collectively “Ameren).
2. On behalf of Ameren, I offered affidavit testimony in the Board’s PCB No. 14-10
proceeding, concerning a Petition for Variance filed jointly by Illinois Power Holdings, LLC,
AmerenEnergy Medina Valley Cogen, LLC, and Ameren Energy Resources.
3. Ameren is a public utility holding company whose primary assets are the common
stock of its subsidiaries, one of which is ArnerenEnergy Medina Valley Cogen, LLC (“Medina
Valley”).
Electrunic Filing - Received, Clerk’s Office 08/02/2016
4. One of the conditions in the Board’s Order in PCB 14-10 relates to the assets of
Medina Valley. Condition #3 requires that Medina Valley not operate the electrical generating
units at Meredosia and Hutsonville Power Stations until after December 31, 2010.
5. On behalf of Medina Valley I attest that both the Meredosia and Hutsonville
Power Stations have been permanently retired and all Clean Air Act operating permits previously
applicable to these stations have been surrendered to the Illinois Environmental Protection
Agency.
FURTHER, Affiant sayeth not.
DATED: Us’
Name: Mark C. BirkTitle: PresidentAmerenEnergy Medina Valley Cogen, LLC
Subscribed and swor to before meThis(3iCtdayof &A4tL4t ,2016
00:≤?ITh: 1My Conmilsslon E~lres: Febwaiy 10, 2018
Commission Number: 14579043
Electronic Filing - Received, [lerk’s Uffice : ElR/02/2E116
CERTIFICATE OF SERVICE
I, the undersigned, certify that on this ~ day of September, 2016, I have served by themanner indicated below the attached JOINT MOTION TO TERMINATE VARIANCE upon thefollowing persons:
John Therriault, Assistant ClerkIllinois Pollution Control Board
James R. Thompson Center100 West Randolph, Suite 11-500
Chicago, Illinois 60601(Via Electronic Filing)
Carol WebbHearing Officer
Illinois Pollution Control Board1021 North Grand Avenue East
P.O. Box 19274Springfield, Illinois 62794-9274
Carol.webb(~illinois.gov(Via Email)
Gina RoccaforteIllinois Environmental Protection Agency
1021 North Grand Avenue EastP.O. Box 19276
Springfield, Illinois 62794(Via U.S. Mail)
Andrew ArmstrongFaith Bugel
Environmental Law and Policy Center35 E. Waeker Drive
Suite 1600Chicago, Illinois 60601
(Via U.S. Mail)
By: /s/Claire A. Manning
BROWN, HAY & STEPHENS, LLPClaire A. ManningWilliam D. Ingersoll205 5. Fifth Street, Suite 700P.O. Box 2459Springfield, IL 62705-2459cmanning~bhslaw. [email protected]
Top Related