SIARAN KHAS
Special Release
MALAYSIA
DISEMBER 2011
DECEMBER 2011
3
(UNTUK KERJA-KERJA MEKANIKAL DAN ELEKTRIKAL)
(For Mechanical and Electrical Works)
JABATAN PERANGKAAN MALAYSIA DEPARTMENT OF STATISTICS, MALAYSIA
ISSN 1985-739X
Tarikh : 16 Januari 2012
Date: 16th January 2012
Muka SuratPage
Jadual 1 : Indeks harga seunit bagi Copper Cables 1
Table 1 : Unit price index for Copper Cables
Jadual 2 : Indeks harga seunit bagi Switchgears 4
Table 2 : Unit price index for Switchgears
Jadual 3 : Indeks harga seunit bagi Transformers 6
Table 3 : Unit price index for Transformers
Jadual 4 : Indeks harga seunit bagi Generators 7
Table 4 : Unit price index for Generators
Jadual 5 : Indeks harga seunit bagi Lightning Protection System and 8
Earthing System
Table 5 : Unit price index for Lightning Protection System & Earthing
System
Jadual 6 : Indeks harga seunit bagi Air Conditioning System 9
Table 6 : Unit price index for Air Conditioning System
Jadual 7 : Indeks harga seunit bagi Motor (Pumpset) 12
Table 7 : Unit price index for Motor (Pumpset)
Nota teknikal 13
Technical notes
Kandungan
Contents
- i -
JADUAL
TABLE
Semenanjung
Malaysia
Peninsular
Malaysia
(1) Copper Cables
1.1) Concealed/Surface wiring using 2010 Dis. 134.9 154.8 152.4
G.I conduit (per unit point) 2011 Jan. 139.4 155.2 161.3
Feb. 140.1 164.3 165.4
Mac 144.7 164.3 165.4
Apr. 143.9 164.3 161.4
Mei 143.9 164.3 161.4
Jun 143.8 164.3 160.1
Jul. 143.5 171.7 160.1
Ogos 144.7 172.3 161.7
Sept. 146.1 172.3 159.2
Okt. 145.7 172.3 153.6
Nov. 146.2 172.3 156.9
Dis. 144.2 172.3 156.9
1.2) Cables in galvanized trunking 2010 Dis. 134.9 154.8 152.4
(per meter run) 2011 Jan. 139.4 155.2 161.3
Feb. 140.1 164.3 165.4
Mac 144.7 164.3 165.4
Apr. 143.9 164.3 161.4
Mei 143.9 164.3 161.4
Jun 143.8 164.3 160.1
Jul. 143.5 171.7 160.1
Ogos 144.7 172.3 161.7
Sept. 146.1 172.3 159.2
Okt. 145.7 172.3 153.6
Nov. 146.2 172.3 156.9
Dis. 144.2 172.3 156.9
1.3) Cables laid underground (per meter run) 2010 Dis. 147.3 165.2 162.6
(i) 120 sq. mm and above 2011 Jan. 153.0 169.6 166.4
Feb. 154.7 173.4 174.1
Mac 154.7 175.4 174.1
Apr. 154.3 175.4 171.5
Mei 154.3 175.4 171.5
Jun 155.1 175.4 169.7
Jul. 156.2 179.5 170.2
Ogos 156.4 180.2 169.4
Sept. 155.0 180.2 168.1
Okt. 153.9 180.2 165.0
Nov. 154.1 180.2 167.1
Dis. 153.2 180.2 167.1
Tempoh
Sabah Sarawak
Item
Jadual 1: Indeks harga seunit bagi copper cables
Region
(December 2007=100)
Table 1: Unit price index for copper cables
(Disember 2007=100)
Kawasan
Period
-1 -
Semenanjung
Malaysia
Peninsular
Malaysia
(1) Copper Cables
1.3) Cables laid underground (per meter run) 2010 Dis. 156.8 171.9 169.2
ii) Below 120 sq. mm 2011 Jan. 162.9 177.0 176.9
Feb. 164.3 185.6 182.8
Mac 168.6 186.4 183.1
Apr. 168.2 186.4 180.3
Mei 168.1 186.4 180.3
Jun 168.2 186.4 174.0
Jul. 168.0 194.1 180.2
Ogos 168.8 197.0 182.1
Sept. 169.4 197.0 179.6
Okt. 169.0 197.0 171.8
Nov. 169.4 197.0 178.5
Dis. 167.3 197.0 178.5
1.4) Cables on tray/ladder (per meter run) 2010 Dis. 147.3 165.2 162.6
i) 120 sq. mm and above 2011 Jan. 153.0 169.6 166.4
Feb. 154.7 173.4 174.1
Mac 154.7 175.4 174.1
Apr. 154.3 175.4 171.5
Mei 154.3 175.4 171.5
Jun 155.1 175.4 169.7
Jul. 156.2 179.5 170.2
Ogos 156.4 180.2 169.4
Sept. 155.0 180.2 168.1
Okt. 153.9 180.2 165.0
Nov. 154.1 180.2 167.1
Dis. 153.2 180.2 167.1
1.4) Cables on tray/ladder (per meter run) 2010 Dis. 156.8 171.9 169.2
ii) Below 120 sq. mm 2011 Jan. 162.9 177.0 176.9
Feb. 164.3 185.6 182.8
Mac 168.6 186.4 183.1
Apr. 168.2 186.4 180.3
Mei 168.1 186.4 180.3
Jun 168.2 175.4 174.0
Jul. 168.0 194.1 180.2
Ogos 168.8 197.0 182.1
Sept. 169.4 197.0 179.6
Okt. 169.0 197.0 171.8
Nov. 169.4 197.0 178.5
Dis. 167.3 197.0 178.5
Tempoh
Sabah Sarawak
(Disember 2007=100)
Region
PeriodItem
Jadual 1: Indeks harga seunit bagi copper cables (samb.)
Table 1: Unit price index for copper cables (cont'd)
(December 2007=100)
Kawasan
-2 -
Semenanjung
Malaysia
Peninsular
Malaysia
(1) Copper Cables
1.5) Busduct 2010 Dis. 161.8 158.0 154.1
2011 Jan. 161.9 158.0 154.2
Feb. 161.9 158.0 154.2
Mac 161.9 158.0 154.2
Apr. 162.0 158.0 154.2
Mei 162.0 158.0 154.2
Jun 162.0 158.0 154.2
Jul. 163.0 158.0 154.2
Ogos 163.0 158.0 154.2
Sept. 163.0 154.0 154.2
Okt. 165.9 154.0 154.2
Nov. 165.9 154.0 154.2
Dis. 165.9 154.0 154.2
Item
Tempoh
Kawasan
Region
Period
Sabah Sarawak
(Disember 2007=100)
(December 2007=100)
Jadual 1: Indeks harga seunit bagi copper cables (samb.)
Table 1: Unit price index for copper cables (cont'd)
-3 -
Semenanjung
Malaysia
Peninsular
Malaysia
(2) Switchgears
2.1) HT Switchgears 2010 Dis. 112.5 118.0 118.0
2011 Jan. 112.5 118.0 118.0
Feb. 104.5 118.0 118.0
Mac 104.5 118.0 118.0
Apr. 104.5 118.0 118.0
Mei 104.5 118.0 118.0
Jun 104.5 118.0 118.0
Jul. 104.5 118.0 118.0
Ogos 104.5 118.0 118.0
Sept. 104.5 115.3 118.0
Okt. 104.5 115.3 118.0
Nov. 104.5 115.3 118.0
Dis. 104.5 115.3 118.0
2.2) LV Switchboards 2010 Dis. 101.6 101.6 101.6
(Incomer breaker 600A 2011 Jan. 101.6 102.1 101.6
and above) Feb. 101.6 102.1 101.6
Mac 101.6 102.1 101.6
Apr. 101.7 102.1 101.6
Mei 101.7 102.1 101.6
Jun 101.8 108.4 101.6
Jul. 101.5 108.4 101.6
Ogos 101.1 112.9 101.6
Sept. 100.9 112.9 101.6
Okt. 100.1 112.9 101.6
Nov. 100.1 112.9 101.6
Dis. 100.0 113.5 101.6
2.3) LV Switchboards and Sub 2010 Dis. 101.6 101.6 101.6
Switchboards (Incomer breaker 2011 Jan. 101.6 102.1 101.6
below 600A) Feb. 101.6 102.1 101.6
Mac 101.6 102.1 101.6
Apr. 101.7 102.1 101.6
Mei 101.7 102.1 101.6
Jun 101.8 108.4 101.6
Jul. 101.5 108.4 101.6
Ogos 101.1 112.9 101.6
Sept. 100.9 112.9 101.6
Okt. 100.1 112.9 101.6
Nov. 100.1 112.9 101.6
Dis. 100.0 113.5 101.6
Region
Kawasan
Tempoh
Sabah Sarawak
Period
Jadual 2: Indeks harga seunit bagi switchgears
Table 2: Unit price index for switchgears
(Disember 2007=100)
(December 2007=100)
Item
- 4 -
Semenanjung
Malaysia
Peninsular
Malaysia
(2) Switchgears
2.4) TPN & SPN Distribution Boards 2010 Dis. 100.0 100.0 100.0
(Incomer breaker 100A 2011 Jan. 100.0 100.5 100.0
and below) Feb. 100.0 100.5 100.0
Mac 100.0 100.5 100.0
Apr. 100.0 100.5 100.0
Mei 100.0 100.5 100.0
Jun 100.6 100.5 100.0
Jul. 100.4 101.3 100.0
Ogos 100.5 102.7 100.0
Sept. 100.5 102.7 101.2
Okt. 100.5 102.7 102.2
Nov. 100.5 102.7 102.3
Dis. 100.5 102.7 102.5
TempohRegion
Item
Jadual 2: Indeks harga seunit bagi switchgears (samb.)
Table 2: Unit price index for switchgears (cont'd)
(Disember 2007=100)
(December 2007=100)
Kawasan
Sabah Sarawak
Period
- 5 -
Semenanjung
Malaysia
Peninsular
Malaysia
(3) Transformers
3.1) Low loss cast resin transfomer 2010 Dis. 142.6 142.6 142.6
2011 Jan. 142.6 143.1 142.6
Feb. 142.6 143.1 142.6
Mac 142.6 143.1 142.6
Apr. 142.6 143.1 142.6
Mei 144.6 143.1 142.6
Jun 144.9 143.1 142.6
Jul. 144.9 143.1 142.6
Ogos 144.9 143.1 142.6
Sept. 144.9 137.3 142.6
Okt. 144.9 137.3 142.6
Nov. 144.9 137.3 142.6
Dis. 144.9 137.3 142.6
3.2) Low loss hermetically sealed 2010 Dis. 135.5 133.9 133.9
(oil filled) transfomer 2011 Jan. 135.5 133.9 133.9
Feb. 135.8 133.9 133.9
Mac 135.8 133.9 133.9
Apr. 135.8 133.9 133.9
Mei 135.8 133.9 133.9
Jun 135.8 133.9 133.9
Jul. 135.8 133.9 133.9
Ogos 135.8 133.9 133.9
Sept. 135.8 130.9 133.9
Okt. 135.8 130.9 133.9
Nov. 135.8 130.9 133.9
Dis. 135.8 130.9 133.9
Kawasan
Jadual 3: Indeks harga seunit bagi transformers
Table 3: Unit price index for transfomers
(Disember 2007=100)
(December 2007=100)
Item
TempohRegion
Period
Sabah Sarawak
- 6 -
Semenanjung
Malaysia
Peninsular
Malaysia
(4) Generators
4.1) Generator Ratings 2010 Dis. 129.3 131.6 131.6
Above 500kVA 2011 Jan. 129.3 131.6 131.6
Feb. 129.3 131.6 131.6
Mac 129.3 131.6 135.8
Apr. 129.3 131.6 135.8
Mei 129.3 131.6 135.8
Jun 129.3 131.6 135.8
Jul. 129.3 131.6 135.8
Ogos 129.3 131.6 135.8
Sept. 129.3 131.6 135.8
Okt. 129.3 131.6 135.8
Nov. 129.3 131.6 135.8
Dis. 129.3 131.6 135.8
4.2) Generator Ratings 2010 Dis. 128.2 126.8 126.8
500kVA and below 2011 Jan. 128.2 126.8 126.8
Feb. 128.2 126.8 126.8
Mac 128.2 126.8 130.7
Apr. 128.2 126.8 130.7
Mei 128.2 126.8 130.7
Jun 128.2 126.8 130.7
Jul. 128.2 126.8 130.7
Ogos 128.2 126.8 130.7
Sept. 128.2 126.8 130.7
Okt. 128.2 126.8 130.7
Nov. 128.2 126.8 130.7
Dis. 128.2 126.8 130.7
Kawasan
Jadual 4: Indeks harga seunit bagi generators
Table 4: Unit price index for generators
(Disember 2007=100)
(December 2007=100)
Item
TempohRegion
Period
Sabah Sarawak
-7 -
Semenanjung
Malaysia
Peninsular
Malaysia
(5) Lightning Protection System &
Earthing System
5.1) Lightning Protection System 2010 Dis. 131.4 144.5 142.3
2011 Jan. 147.4 148.6 157.0
Feb. 147.4 156.8 158.5
Mac 176.1 156.8 163.7
Apr. 176.1 156.8 163.7
Mei 176.1 156.8 163.7
Jun 177.3 156.8 163.7
Jul. 177.3 175.3 163.7
Ogos 177.3 180.2 163.7
Sept. 177.3 206.9 163.7
Okt. 177.3 206.9 163.7
Nov. 177.3 206.9 163.7
Dis. 177.3 206.9 163.7
5.2) Earthing System 2010 Dis. 131.4 144.5 142.3
i) Earthing System for 2011 Jan. 147.4 148.6 157.0
Main Switchboards and Feb. 147.4 156.8 158.5
Sub Switchboards Mac 176.1 156.8 163.7
Apr. 176.1 156.8 163.7
Mei 176.1 156.8 163.7
Jun 177.3 156.8 163.7
Jul. 177.3 175.3 163.7
Ogos 177.3 180.2 163.7
Sept. 177.3 206.9 163.7
Okt. 177.3 206.9 163.7
Nov. 177.3 206.9 163.7
Dis. 177.3 206.9 163.7
.
5.2) Earthing System 2010 Dis. 131.4 144.5 142.3
ii) Earthing System for 2011 Jan. 147.4 148.6 157.0
Distribution Boards Feb. 147.4 156.8 158.5
Mac 176.1 156.8 163.7
Apr. 176.1 156.8 163.7
Mei 176.1 156.8 163.7
Jun 177.3 156.8 163.7
Jul. 177.3 175.3 163.7
Ogos 177.3 180.2 163.7
Sept. 177.3 206.9 163.7
Okt. 177.3 206.9 163.7
Nov. 177.3 206.9 163.7
Dis. 177.3 206.9 163.7
Jadual 5: Indeks harga seunit bagi lightning protection system and earthing system
Table 5: Unit price index for lightning protection system and earthing system
(Disember 2007=100)
Tempoh
Kawasan
Region
(December 2007=100)
Sabah Sarawak
PeriodItem
- 8 -
Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
6. Air Conditioning System
6.1) Water Cooled Chiller 2010 Dis. 103.7 102.3
2011 Jan. 103.7 102.3
Feb. 112.2 122.3
Mac 112.2 122.3
Apr. 112.2 122.3
Mei 112.2 122.3
Jun 112.2 122.3
Jul. 112.2 122.3
Ogos 112.2 122.3
Sept. 112.2 122.3
Okt. 112.2 122.3
Nov. 112.2 122.3
Dis. 112.2 122.3
6.2) Air Cooled Chiller 2010 Dis. 102.0 102.0
2011 Jan. 102.0 102.0
Feb. 129.0 135.6
Mac 129.0 135.6
Apr. 129.0 135.6
Mei 129.0 135.6
Jun 129.0 135.6
Jul. 129.0 135.6
Ogos 129.0 135.6
Sept. 129.0 135.6
Okt. 129.0 135.6
Nov. 129.0 135.6
Dis. 129.0 135.6
6.3) Water Cooled Package 2010 Dis. 103.2 107.4
2011 Jan. 103.2 107.4
Feb. 108.5 116.3
Mac 108.5 116.3
Apr. 108.5 116.3
Mei 108.5 116.3
Jun 108.5 116.3
Jul. 108.5 116.3
Ogos 108.5 116.3
Sept. 108.5 116.3
Okt. 108.5 116.3
Nov. 108.5 116.3
Dis. 108.5 116.3
Kawasan
Jadual 6: Indeks harga seunit bagi air conditioning system
Table 6: Unit price index for air conditioning system
(Disember 2007=100)
(December 2007=100)
Item
TempohRegion
Period
- 9 -
Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
6. Air Conditioning System
6.4) Air Cooled Package 2010 Dis. 104.3 106.8
2011 Jan. 104.3 106.8
Feb. 107.6 115.5
Mac 107.6 115.5
Apr. 107.6 115.5
Mei 107.6 115.5
Jun 107.6 115.5
Jul. 107.6 115.5
Ogos 107.6 115.5
Sept. 107.6 115.5
Okt. 107.6 115.5
Nov. 107.6 115.5
Dis. 107.6 115.5
6.5) Split Unit System 2010 Dis. 104.9 105.4
i) Wall Mounted 2011 Jan. 104.9 105.4
Feb. 106.2 115.8
Mac 106.2 115.8
Apr. 106.2 115.8
Mei 106.2 115.8
Jun 106.2 115.8
Jul. 106.2 115.8
Ogos 106.2 115.8
Sept. 106.2 115.8
Okt. 106.2 115.8
Nov. 106.2 115.8
Dis. 106.2 115.8
6.5) Split Unit System 2010 Dis. 98.6 98.8
ii) Ceiling Cassette / Mounted 2011 Jan. 98.6 98.8
Feb. 101.1 101.9
Mac 101.1 107.4
Apr. 101.1 107.4
Mei 101.1 107.4
Jun 101.1 107.4
Jul. 101.1 107.4
Ogos 101.1 107.4
Sept. 101.1 107.4
Okt. 101.1 107.4
Nov. 101.1 107.4
Dis. 101.1 107.4
Jadual 6: Indeks harga seunit bagi air conditioning system (samb.)
Table 6: Unit price index for air conditioning system (cont'd)
(Disember 2007=100)
(December 2007=100)
Tempoh
Item
Kawasan
Region
Period
- 10 -
Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
6. Air Conditioning System
6.6) VRV System 2010 Dis. 104.5 102.6
i) Indoor 2011 Jan. 104.5 102.6
Feb. 107.5 109.1
Mac 101.0 103.1
Apr. 101.0 103.1
Mei 101.0 103.1
Jun 101.0 103.1
Jul. 101.0 103.1
Ogos 101.0 103.1
Sept. 101.0 103.1
Okt. 101.0 103.1
Nov. 101.0 103.1
Dis. 101.0 103.1
6.6) VRV System 2010 Dis. 104.6 102.7
ii) Outdoor 2011 Jan. 104.6 102.7
Feb. 107.1 110.2
Mac 114.3 116.8
Apr. 114.3 116.8
Mei 114.3 116.8
Jun 114.3 116.8
Jul. 114.3 116.8
Ogos 114.3 116.8
Sept. 114.3 116.8
Okt. 114.3 116.8
Nov. 114.3 116.8
Dis. 114.3 116.8
(Disember 2007=100)
(December 2007=100)
Kawasan
Tempoh
Jadual 6: Indeks harga seunit bagi air conditioning system (samb.)
Table 6: Unit price index for air conditioning system (cont'd)
Item
Region
Period
- 11 -
Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
7. Motor (Pumpset)
7.1) Condenser Water Pump 2010 Dis. 119.9 119.9
2011 Jan. 119.9 119.9
Feb. 128.4 134.7
Mac 127.8 135.0
Apr. 127.8 135.0
Mei 127.8 135.0
Jun 127.8 135.0
Jul. 127.8 136.5
Ogos 127.8 136.5
Sept. 127.8 136.5
Okt. 127.8 136.5
Nov. 127.8 136.5
Dis. 127.8 136.5
7.2) Chilled Water Pump 2010 Dis. 121.0 121.0
2011 Jan. 121.0 121.0
Feb. 158.6 141.4
Mac 161.2 147.1
Apr. 161.2 147.1
Mei 161.2 147.1
Jun 161.2 147.1
Jul. 161.2 148.9
Ogos 161.2 148.9
Sept. 161.2 148.9
Okt. 161.2 148.9
Nov. 161.2 148.9
Dis. 161.2 148.9
7.3) Hose Reel Pump 2010 Dis. 116.0 116.0
2011 Jan. 116.0 116.0
Feb. 117.3 117.3
Mac 116.4 118.2
Apr. 116.4 118.2
Mei 116.4 118.2
Jun 116.6 118.2
Jul. 117.7 119.4
Ogos 117.7 119.4
Sept. 117.7 119.4
Okt. 117.7 119.4
Nov. 117.7 119.4
Dis. 117.7 119.4
Jadual 7: Indeks harga seunit bagi motor (pumpset)
Table 7: Unit price index for motor (pumpset)
(Disember 2007=100)
(December 2007=100)
Item
TempohRegion
Period
Kawasan
- 12 -
NOTA TEKNIKAL
TECHNICAL NOTES
- 13 -
NOTA TEKNIKAL TECHNICAL NOTES
Indeks Kos Komponen Kerja-kerja Mekanikal
dan Elektrikal adalah berasaskan kepada
tahun asas (Disember 2007=100). Indeks
harga seunit diterbitkan mengikut tiga (3)
kawasan iaitu Semenanjung Malaysia,
Sabah dan Sarawak.
Spesifikasi untuk komponen mekanikal dan
elektrikal terpilih disediakan oleh Jabatan
Kerja Raya (JKR) dan Lembaga
Pembangunan Industri Pembinaan Malaysia
(CIDB). Mulai Januari 2011, harga bagi
komponen elektrikal diperoleh dari pungutan
harga yang dibuat oleh Jabatan Perangkaan
Malaysia. Bagi komponen mekanikal, harga
diperoleh dari pembekal.
The Component Cost Index of the
Mechanical and Electrical Works is based
on the base year (December 2007=100).
The unit price indices are reported
according to three (3) regions, that is
Peninsular Malaysia, Sabah and Sarawak.
The specifications of the selected
mechanical and electrical components are
determined by Public Works Department
(JKR) and Construction Industry
Development Board Malaysia (CIDB).
Starting from January 2011, the prices for
electrical components are obtained from
the price collection conducted by
Department of Statistics, Malaysia. For
mechanical components, the prices are
obtained from the suppliers.
HARGA : RM 2.00
PRICE
BOLEH DIPEROLEH DARI:
OBTAINABLE FROM:
JABATAN PERANGKAAN MALAYSIA,
(DEPARTMENT OF STATISTICS, MALAYSIA)
PARCEL C, BLOK C6,
PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN,
62514 PUTRAJAYA,
MALAYSIA
Tel : 03 - 8885 7000
Faks/Fax : 03 - 8888 9248
E-mel/E-mail : [email protected]
Laman web/Homepage : http://www.statistics.gov.my
Diterbitkan dan dicetak oleh Jabatan Perangkaan Malaysia
Top Related