* MODSIM UNIT DESIGN REPORT *
*****************************
UNIT EQUIPMENT DATA SHEET - GYRATORY CRUSHER
********************************************
Unit number 1 MODSIM model name GYRA
Job name: erick fernandez
Tonnage to be processed 360.0 tons per hour
Open side discharge setting 15.00 cms
Size distribution in feed
Size % passing
cms
0.421 100.000
0.297 100.000
0.210 100.000
0.149 100.000
0.105 100.000
0.743E-01 100.000
0.526E-01 100.000
0.371E-01 100.000
0.263E-01 100.000
0.186E-01 100.000
0.131E-01 100.000
0.929E-02 100.000
0.657E-02 99.999
0.465E-02 99.939
0.328E-02 99.203
0.232E-02 95.878
0.164E-02 87.792
8/2/2019 eladio minerales
2/12
0.116E-02 75.029
0.821E-03 59.966
0.581E-03 45.337
0.411E-03 32.868
0.290E-03 23.117
0.205E-03 15.922
0.145E-03 10.811
0.00 0.000
Top size in feed is approximately 0.00 cms
Dimension A of crusher must be at least 0.00 cms
Minimum head diameter required to handle the tonnage.....
"Fall through" material in feed NaN percent.
Size distribution in product
Size % passing
cms
0.421 5.629
0.297 4.223
0.210 3.163
0.149 2.366
0.105 1.767
0.743E-01 1.319
0.526E-01 0.984
0.371E-01 0.734
0.263E-01 0.5470.186E-01 0.408
0.131E-01 0.304
0.929E-02 0.227
0.657E-02 0.169
0.465E-02 0.126
0.328E-02 0.094
0.232E-02 0.070
0.164E-02 0.052
0.116E-02 0.039
0.821E-03 0.029
0.581E-03 0.021
0.411E-03 0.016
0.290E-03 0.012
0.205E-03 0.009
0.145E-03 0.007
0.00 0.000
Impact work index of the material is 10.88 kWhr/ton
80% passing size in feed is 0.01 mms.
8/2/2019 eladio minerales
3/12
80% passing size in product is 216.88 mms.
Estimated power requirements -.107E+05 kW
Power requirement to allow for 35% surge capacity-.1447E+05 KW.
Crusher selected.....
Crusher capacity from manufacturer's tables.....tons per hour.
Number of crushers required......
8/2/2019 eladio minerales
4/12
Distribucin de tamao de la alimentacin:
Distribucin de tamao de la salida:
8/2/2019 eladio minerales
5/12
Problema 2:
*****************************
* MODSIM UNIT DESIGN REPORT *
*****************************
UNIT EQUIPMENT DATA SHEET - GYRATORY CRUSHER
********************************************
Unit number 1 MODSIM model name GYRA
Job name: erick
Tonnage to be processed 100.8 tons per hour
Open side discharge setting 15.00 cms
Size distribution in feed
Size % passing
cms
0.421 90.433
0.297 89.186
0.210 84.999
0.149 76.308
0.105 63.897
0.743E-01 50.183
0.526E-01 37.435
8/2/2019 eladio minerales
6/12
0.371E-01 26.876
0.263E-01 18.777
0.186E-01 12.875
0.131E-01 8.719
0.929E-02 5.857
0.657E-02 3.911
0.465E-02 2.600
0.328E-02 1.724
0.232E-02 1.144
0.164E-02 0.759
0.116E-02 0.502
0.821E-03 0.332
0.581E-03 0.220
0.411E-03 0.146
0.290E-03 0.097
0.205E-03 0.064
0.145E-03 0.042
0.00 0.000
Top size in feed is approximately 33.97 cms
Dimension A of crusher must be at least 42.47 cms
Minimum head diameter required to handle the tonnage.....
"Fall through" material in feed 98.28 percent.
Scalping of the feed is recommended.
Size distribution in product
Size % passing
cms
0.421 5.629
0.297 4.223
0.210 3.163
0.149 2.366
0.105 1.767
0.743E-01 1.319
0.526E-01 0.984
0.371E-01 0.734
0.263E-01 0.547
0.186E-01 0.408
0.131E-01 0.304
0.929E-02 0.227
0.657E-02 0.169
0.465E-02 0.126
0.328E-02 0.094
0.232E-02 0.070
8/2/2019 eladio minerales
7/12
0.164E-02 0.052
0.116E-02 0.039
0.821E-03 0.029
0.581E-03 0.021
0.411E-03 0.016
0.290E-03 0.012
0.205E-03 0.009
0.145E-03 0.007
0.00 0.000
Impact work index of the material is 10.88 kWhr/ton
80% passing size in feed is 1.71 mms.
80% passing size in product is 216.88 mms.
Estimated power requirements -242. kW
Power requirement to allow for 35% surge capacity-326.3 KW.
Crusher selected.....
Crusher capacity from manufacturer's tables.....tons per hour.
Number of crushers required......
NOTES:
UNIT EQUIPMENT DATA SHEET - VIBRATING SCREEN
********************************************
Unit number 2 MODSIM model name SCRN
Job name: erick
There is/are 1 screen/s in parallel
Tonnage to be processed 100.8 tonnes/hr.
Tonnage in undersize product 90.72 tonnes/hr.
Mesh size 50.00 mms.
Surface water on deck oversize 0.0 %
Factors are calculated for horizontal screen.
Basic capacity = 76.150 tons per hour per square meter
Particle size distribution in the feed.
Size % passing
8/2/2019 eladio minerales
8/12
mms
4.21 5.629
2.97 4.223
2.10 3.163
1.49 2.366
1.05 1.767
0.743 1.319
0.526 0.984
0.371 0.734
0.263 0.547
0.186 0.408
0.131 0.304
0.929E-01 0.227
0.657E-01 0.169
0.465E-01 0.126
0.328E-01 0.094
0.232E-01 0.070
0.164E-01 0.0520.116E-01 0.039
0.821E-02 0.029
0.581E-02 0.021
0.411E-02 0.016
0.290E-02 0.012
0.205E-02 0.009
0.145E-02 0.007
0.00 0.000
Percent oversize in feed 62.69%
Oversize factor is 1.399Percent half size in feed 22.91%
Half-size factor is 0.658
Deck location factor 1.00
Specific gravity of material in feed 2.70
Bulk density of material in feed 1620. kgs/m**3
Bulk density factor is 1.013
Screen area required 1.420 sq meters
Particle size distribution in the overflow.
Size % passing
mms
4.21 5.629
2.97 4.223
2.10 3.163
1.49 2.366
1.05 1.767
0.743 1.319
0.526 0.984
8/2/2019 eladio minerales
9/12
0.371 0.734
0.263 0.547
0.186 0.408
0.131 0.304
0.929E-01 0.227
0.657E-01 0.169
0.465E-01 0.126
0.328E-01 0.094
0.232E-01 0.070
0.164E-01 0.052
0.116E-01 0.039
0.821E-02 0.029
0.581E-02 0.021
0.411E-02 0.016
0.290E-02 0.012
0.205E-02 0.009
0.145E-02 0.007
0.00 0.000
Particle size distribution in the underflow
Size % passing
mms
4.21 5.629
2.97 4.223
2.10 3.163
1.49 2.366
1.05 1.767
0.743 1.319
0.526 0.9840.371 0.734
0.263 0.547
0.186 0.408
0.131 0.304
0.929E-01 0.227
0.657E-01 0.169
0.465E-01 0.126
0.328E-01 0.094
0.232E-01 0.070
0.164E-01 0.052
0.116E-01 0.039
0.821E-02 0.029
0.581E-02 0.021
0.411E-02 0.016
0.290E-02 0.012
0.205E-02 0.009
0.145E-02 0.007
0.00 0.000
8/2/2019 eladio minerales
10/12
1.-Alimentacin:
2.-Entrada al triturador:
8/2/2019 eladio minerales
11/12
3.-Entrada al Tamizador:
4.-Reciclo:
8/2/2019 eladio minerales
12/12
5.-Finos: