Eelco KruizingaProject Manager
The European CCS Demonstration Project NetworkLessons on public engagement
eelco,[email protected]
| 2 | | | 10 Apr 2023
Our Network
Members have concrete plans to demonstrate operation of the full CCS value chain:
by end of 2015
on a minimum power plant capacity of 250 MW, or equivalent industrial output (500 kt avoided CO2 emissions per year)
with at least 85% capture rate of the treated flue gas stream
Supporting first movers
26 May2011
| 3 | | | 10 Apr 2023
Membership
| 4 | | | 10 Apr 2023
Reports
26 May2011
| 5 | | | 10 Apr 2023
Public engagement 2010: methodologies
National Energy Technology Laboratory (NETL) best practice guide for Public Outreach and Education for Carbon Storage Projects (Dec 2009)
1. Integrate Public Outreach into Project management
2. Establish a strong outreach team3. Identify key stakeholders4. Conduct and apply social characterisation5. Develop an outreach strategy and
communication plan6. Develop key messages7. Develop outreach material tailored to
audience8. Actively oversee the outreach throughout the
life of the CO2 storage project9. Monitor the performance of the programme
and changes in public perceptions and concerns
10. Be flexible, refine the outreach
26 May2011
| 6 | | | 10 Apr 2023
Public engagement 2011: issues
| 7 | | | 10 Apr 2023
Journey
Less of More of
Broad technology communication Compelling (local) value propositions
Climate Economy
Disseminating knowledge on CCS Fundamental understanding of CO2
Sending Dialogue
One message Messaging frameworks
Technology works Implementation works
Individual approaches Collaborative approaches