EDEX Platform
Energy Data Exchange Platform
Erik Wolfs
Erik Wolfs
Working as IT project leader for ELIA – Belgium TSO
Convenor CWE MC IT group
Convenor ENTSO-e MADES Workgroup
Who am I
• Purpose• Components• Future development
• Questions
Agenda - EDEX
Purpose - EDEX:
Cluster 1: Pan-European Grid architectureNovel approaches to develop a pan-European Grid
Cluster 2: Power technologiesAffordable technologies to make the transmission system more clever and flexible
Cluster 3: Network management and controlCritical building blocks to operate the interconnected transmission system in real-time and reliably
Cluster 4: Market rulesMarket simulation techniques to develop a single European electricity market
SM
AR
T G
RID
SFu
ncti
on
al le
vel
Level 1: Smart pan-European
Functional projects
T1. A toolbox for new network architecture assessment
T2. Tools to analyze the pan-European network expansion options
T14.Innovative approaches to improve the public acceptance of overhead lines
T3. Demonstrations of power technologies for more network flexibility
T4. Demonstrations of power technologies for new architectures
T5. Demonstrations of renewable integration
T6. Tools for pan-European network observability
T7. Tools for coordinated operations with stability margin evaluation
T8. Improved training tools for improved coordination
T9. Tools for pan-European network reliability assessment
SMART GRIDS MODEL
T10. Tools for pan-European balancing marketsT11. Advanced tools for congestion managementT12. Tools for renewable market integration of
active demandT13. Tools to study market integration of active
demand
• Forecast calculations become more and more important for modern TSO’s
• Actual used methods are no more adequate for guaranteeing the security on future Electrical Grids
• More dynamic and flexible studies needed
• More (continuous) intraday dynamic calculations needed between D-1 and Real-time
• More correct and continuously updated data needed during the complete forecasting cycle
• Access to the correct data becomes critical
• More and more platforms appear (TSC CTSS, 20’s, CWE CS, Entso-e PowerSystem DB…….)
Purpose - EDEX:
Standardization
•EDEX wants to provide interface specifications basic functionality and best practices to the Energy world to :
•Create a standardized platform to transmit ENTSO-e messages and process them :
• CIM Messages
• Market Messages
• Any binary Message
Purpose - EDEX:
Components
•ECP : Energy Communication Platform
MADES compliant External communication platform
•EPP : Energy Process Platform
Central Process handler and integrator
•Client Toolbox
Decentralised process handler and local integrator
EDEX:
MADES (Market Data Exchange Standard)
What for?
• Harmonization of a communication software for the European electricity (or energy) market, including the following services:
- guarantee of delivery- electronic signature- uniform method for data encryption
• Defines the platform used for external communication
Components - communication MADES
Components - communication MADES
Components - communication MADES
Components - communication MADES
Components - communication MADES
Components - ECP
• ECP, (Energy Communication Platform),
• Reference package for MADES standard
• ECP was developed by CWE TSO’s
• Transfer of the ownership of ECP to Entso-e on-going
• Licenses for all TSO’s available
• Already used by 13 TSO’s
Components - ECP
Components – EPP Message Processing
• EPP, (Energy Process Platform),
• Based on Open Source Components (JBoss)
• EPP was developed by CWE TSO’s for the MC CS
• Availability of licenses for all TSO’s on-going
• Uses a canonical model
• ESB, Process Orchestrator, Message Validators
• ECP integrated for external communication
• Standardized interfaces for functional modules and data containers
Components – EPP Message Processing
Components – EPP Message Processing
Components – EPP Message Processing
Next Step – Client Toolbox
Next Step – Client Toolbox
Next Step : Client Toolbox
• Message Validation (CIM, Market….)
• Standardised Interfaces
• Distributed calculations – so less need for model transfers
• Can run as standalone system
• Intelligent data gathering provided as a Service
• Data Security and confidentiality :
• On the Communication via ECP
• Owner of data decides who has access
• Local Data Storage for models with subscription service
And now:
Schedule
Questions ?