www.Protrain.com
“..Protrain is Engineering, Construction and Project Management (ECPM) e-Learning portal. We provide an opportunity for ECPM professionals to enhance their skills and knowledge to international standards while still being away from classrooms..”
For more information contact
Charu Kshetrapal Community and Marketing Manager, Protrain
Earned Value
Professional (EVP)
Review Course
Earned Value Professional (EVP) certification shall distinguish you
as a professional that has skills and knowledge that is benchmarked
with international Earned Value Management System (EVMS)
design and control. Join our ‘EVP Review Course’ today to be a
PSP Certified.
www.Protrain.com
Course Summary
Delivery Mode
100% Online Course. Online Classes, Discussion Board, Online Quizzes.
Nos. of Online Classes:
5 nos.
Sample Problems:
Yes
Course Duration:
- 15 + hrs of Online Classes
Course Subscription fees:
$275
Course Access Duration
Students will have complete access to the course contents for 6 months from the date of subscription.
Student-Trainer Interaction:
Online Study Group and Virtual Workshops.
Number of CPE:
15 PDU (Professional Development Units)/ 2.0 CEU (Continuing Education Units)
What is Earned Value Management?
“Earned value management (EVM), or Earned value project/ performance management (EVPM) is a project management technique for measuring project performance and progress in an objective manner.”
Earned Value Management (EVM) is probably the most important and needed project management tool. In Engineering, Construction and Project Management (ECPM) world where the need to deliver project within the budget and the timeframe is increasing forever, it will not be an exaggeration to say that EVM knowledge is a must for all the ECPM professionals.
What is ‘Earned Value Professional (EVP)’ Certification?
An EVP is a practitioner of Earned Value with demonstrated mastery of contract language as it relates to Earned Value application, the organization of a project’s scope into meaningful structure for execution; planning scheduling and budgeting the project work from initiation through close out using an integrated cost/schedule tool; proficient in monitoring project progress for performance measurement; an earned value management system (EVMS) and its related accounting components. The experienced EVP will have broad experiences in the interpretation of the EV data/metrics and possess the skills to provide, relevant communications (oral and written).
How this certification will help you?
EVM is the tool to measure project performance. However, merely conceptual understanding of EVM is not enough, project/ programme/portfolios needs a comprehensive system - Earned Value Management System (EVMS). EVP certification is based on American National Standards Institute/Electronic Industries Alliance Standard 748, Earned Value Management Systems (ANSI/EIA-748-current version) which comprehensively cover EVMS system design, implementation and management. So, being a certified EVP you will not only demonstrate EVM knowledge, but skills to design and implement an ANSI 748 compliant EVMS
www.Protrain.com
About the Trainer
Abey Mathew , PMP,EVP
Abey has a decade plus of construction project manag- ement experience in India and Middle East.
He holds a Bachelor’s Degree in Civil Engineering and a Master’s Degree in Construction Manag-ement. He is certified a Project Management Professional (PMP) and Earned Value, Planning (EVP).
Exam Information
EVP certification is conducted by AACE independently from us via their computer based testing service provider and has:
o 120 question. Multiple choice Objective type and one memo question
o 70% Passing Score is required
o Exam duration is 5 hours. There are no breaks.
Prospective Audience
Potential course audience would be Project Managers, Planning Engineers, Planning Managers Project Controls Managers, Project Managers and Cost engineers, System Managers and all those professionals who are associated with project management especially project controls. The course is also meant for senior professionals in the areas of project, programme and portfolio management.
About the ‘EVP Review Course’ offered by Protrain
This course is based upon ‘EVP Exam Study Guide’ by AACE International and ANSI Standard 748A/748B. This course is delivered through Instructor Led Online Classes, supported by Online Quizzes and an Online Study Group. Online Study Group helps to facilitate the student-to-student interaction and student-to-trainer discussions and knowledge sharing. Students can post all their queries for the trainer to respond, and discuss with the course participants. Course will start with detail introduction of EVP Certification followed by three knowledge modules:
Module 1: Earned Value Management (EVM) Concept Overview,
Module 2: Performance Management using Earned Value Management (EVM), and
Module 3: Implementing Earned Value Management System (EVMS)
Protrain is an Approved Education Provider (AEP) of AACE International. This course has been approved by AACE International Education Board. Upon successful completion of the course you will be issued a certificate for 15 PDU which can be used to fulfil the maintenance requirements of other certifications.
www.Protrain.com
Frequently Asked Questions About the PSP Certification
What are the eligibility requirements of EVP Certification?
In order to be eligible for EVP certification you must have least 8 full years of professional experience, of which up to 4 years may be substituted by a college/university degree. In other words, if you have a college/university degree of 4 years you need another 4 years of experience.
Related degrees include: engineering, building construction, construction technology, business, economics, accounting, construction management, architecture, computer science, mathematics, etc. At the time of filling in the EVP application you shall be required to provide a copy of experience and education certificate as evidence.
How can I register for the EVP Certification exam?
Please visit page here at AACE Website to know about how to Register and Schedule the Exam.
What are the test center locations?
CBT test is conducted by AACE International’s vendor, Kryterion. Test center location can be search at Kryterion website on this page.
Is this the right certification for me? What are the benefits of EVP certification?
EVP certification recognizes that you have understanding of EVM concepts, design and implementation of EVMS systems, and broad experiences in the interpretation of the EV data and possess the skills to provide, relevant communications (oral and written).
This certification is highly recommended for Project Managers, Planning Engineers, Planning Managers Project Controls Managers, Project Managers and Cost engineers.
About ‘EVP Certification Review Course’ by Protrain
I would like to know course outline or agenda?
The course will be covered in the duration of 5 weekends with 3 hours classes every week. Students are expected to spend 4-5 hours per week.
Below is the module time plan: Introduction and Housekeeping - 1:30 hours
Module 1: EVM Concept Overview - 2:00 hours
Module 2: Performance Management using EVM - 5:30 hours
Module 3: Implementing EVMS - 2:30 hours
Problem solving session - 3:30 hours
Total Course Duration 20:00 hours. 20 Professional Development Unit (PDUs) or Continued Education Unit (2.0).
Does taking this course guarantee EVP certification?
This course shall help you understand the PSP Certification requirements, give you complete coverage on the certification knowledge areas. However, taking the course does NOT automatically grant you PSP Certification from us.
Can I download lecture videos and listen offline as I do not have internet sometimes?
No. To avoid any copyright violation the download is restricted.
Do you provide any discount on the course?
Yes we do. We provide flat 10% discount on student from low wages/developing countries. We also provide group discount of 20%.
Is there a money back policy?
Yes, your choice to subscribe courses at Protrain is risk free. For any reason if you don’t want to pursue our course you can seek refund. Please refer to your refund policy for further details.
www.Protrain.com
“.... Protrain is Engineering, Construction and Project Management (ECPM) e-Learning portal. Protrain provides an opportunity for ECPM professional to
enhance their skills and knowledge to international standards while still being away from classrooms ....”
HOW IT WORKS?
Step: 1 Buy Course
Subscription
Step: 2 Watch Lectures &
Take Quizzes
Step: 3 Interact with
Trainer Online
Step: 4 Complete Course &
download certificate
Top Related