Abstract
• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the November 2011 closing plenary meeting.
doc.: IEEE 802.11-11/1561r0
Report
Attendance Summary by Group
Nov 2011
Adrian Stephens, Intel CorporationSlide 3
Breakout MeetingsAvg Attendance
Sum Attendance Max AttendanceMin Attendance
802.11 MID-SESSION PLENARY 1 201
802.11 Newcomer Training 1 15
802.11 OPENING PLENARY 1 188
ARC 1 18
Editors Meeting 1 9
JTC1 3 6 20 7 6
Monday Tutorials 2 85 170 137 33
PAR Comments 3 7 22 9 4
Reg SC 1 38
TGaa 6 9 57 15 4
TGac 10 65 658 127 15
TGad 2 36 73 39 34
TGae 2 13 26 18 8
TGaf 7 51 357 131 16
TGah 8 90 723 140 39
TGai 8 43 345 67 24
TGmb 1 15
WG CAC 2 13 27 15 12
WNG 2 84 168 107 61
doc.: IEEE 802.11-11/1561r0
Report Slide 4
802.11 WG Editor’s Meeting (Nov ‘11)
Date: 2011-11-06
Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,
MS SJ-14-4, San Jose, CA 95134-1706
+1-408-527-0815 [email protected]
Authors:
Adrian Stephens, Intel Corporationfrom slide 1/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Slide 5
Volunteer Editor Contacts• TGmb – Adrian Stephens – [email protected]
• TGaa – Alex Ashley – [email protected]
• TGac – Robert Stacey – [email protected]
• TGad – Carlos Cordeiro – [email protected]
• TGae – Henry Ptasinski – [email protected]
• TGaf – Peter Ecclesine – [email protected]
• TGah – Minyoung Park – [email protected]
• TGai – Tom Siep – [email protected]
• Editors Emeritus:
– TGk – Joe Kwak– [email protected]
– TGp – Wayne Fisher –
– TGr – Bill Marshall – [email protected]
– TGs – Kazuyuki Sakoda – [email protected]
– TGu – Necati Canpolat – [email protected]
– TGv – Emily Qi – [email protected]
– TGw – Nancy Cam-Winget – [email protected]
– TGz – Menzo Wentink – [email protected]
Adrian Stephens, Intel Corporation
November 2011
from slide 2/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
802.11 Style Guide
• See 11-09-1034-03-0000-wg11-style-guide.doc
• Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts.
• Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual
• Note that the Style Guide evolves with our practice
Slide 6 Adrian Stephens, Intel Corporationfrom slide 3/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Slide 7
Editor Amendment Ordering
Amendment Number Task Group REVCOM Date802.11 Amendment 8 TGv Feb 2011
802.11 Amendment 9 TGu Feb 2011
802.11 Amendment 10 TGs Sept 2011
802.11 Revision 802.11mb Mar 2012*est.
802.11-2011 Amendment 1 TGae Jun 2012
802.11-2011 Amendment 2 TGaa Jun 2012
802.11-2011 Amendment 3 TGad Dec 2012
802.11-2011 Amendment 4 TGaf Sept 2013
802.11-2011 Amendment 5 TGac Dec 2013
802.11-2011 Amendment 6 TGah July 2013
802.11-2011 Amendment 7 TGai Sept 2013
• Data as of Nov 2011• See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm
Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!
Adrian Stephens, Intel Corporationfrom slide 4/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Most current
doc shaded green.
TG Published or Draft Baseline DocumentsSource MEC
Style Guide Editor
Snapshot Date
Published
mb ae aa ad af ac ah ai
mb Y 12.0 Frame 9.0 Yes 2009 Adrian Stephens 8-Nov
ae Y 11.0 6.0 libreoffice 3.3
Yes 2009 Henry Ptasinski 10-Nov
aa Y 12.0 6.0 7.0 Word Yes 2009 Alex Ashley 9-Nov
ad Y 10.0 5.0 6.0 5.0 Word Yes 2009 Carlos Cordero 10-Nov
af Y 12.0 5.0 6.0 5.0 1.04
Frame 9.0 No 2009 Peter Ecclesine 6-Nov
ac Y 9.0 4.0 5.0 3.0 1.0 1.0 Frame 9.0 No 2009 Robert Stacey 19-Jul
ac Y 12.0 9.0 4.0 5.0 3.0 1.0 1.0 No 2009 Minyoung Park 19-Jul
ah Frame 10.0
No 2009 Tom Siep 22-Sep
Changes from last report shown in red.
Slide 8
Nov 2011 Draft Development Snapshot
Slide 8 Adrian Stephens, Intel Corporation
November 2011
from slide 5/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 9
Closing ReportDate: 11-11-11
Name Company Address Phone email
Clint Chaplin Samsung Electronics 3000 Orchard Parkway San Jose, Ca 95134
+1 408 544 2740 firstname dot lastname at gmail dot com
Authors:
from slide 1/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 10
Abstract
Closing report for WNG SC for November 2011, Atlanta, Georgia, USA
from slide 2/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 11
• Presentations at November 2011 meeting– Flexibility on Channel Access Allocations (11-11-1485-00-0wng Flexibility
on Channel Access Allocations.pptx) – Antonio de la Oliva– 802.11s Issues with Adhoc Mode in Mesh Networking (11-11-1492-00-0wng
802.11s Issues with Adhoc Mode in Mesh Networking.ppt) – Romana Challans
– Update to Improving the Case for Wireless LAN Transmit Power Control - Including to better service Mobile Telephones? () – Lawrence Zuckerman
– The better spectrum utilization for the future WLAN standardization (11-11-1464-00-0wng-the-better-spectrum-utilization-for-the-future-wlan-standardization.pptx) - Yasuhiko Inoue
– Discovery of ESS Services (11-11-1507-00-0wng-discovery-of-ess-services) - Stephen McCann
– Efficient Device and Service Discovery for Peer-to-Peer (P2P) scenarios (11-11-1517-00-0wng-efficient-device-and-service-discovery-for-peer-to-peer-p2p-scenarios.pptx) - Santosh Abraham
• Minutes– 11-11-1580-00-0wng
• Plans for January 2012– 1 2 hour session
from slide 3/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 12
ARC Closing Report Date: 2011-11-09
Name Affiliations Address Phone email Mark Hamilton Polycom, Inc. 1765 W 121st Ave,
Westminster, CO, 80234
720-872-7445 [email protected]
Authors:
from slide 1/5 of 11-11/1569r0 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Abstract
This document is the closing report for ARC SC, November 2011, Atlanta meeting
Adrian Stephens, Intel CorporationSlide 13from slide 2/5 of 11-11/1569r0 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 14
Work Completed• 802 Overview and Architecture Draft 1.2 letter ballot
– Discussed status of comment resolutions– Two items of interest to 802.11:
• Bit error rate and Packet error rate• OUI-36 per 802.11p usage
– Will likely need 802.11 WG consolidated comments for next letter ballot in next couple of months – probably will schedule a teleconference once dates are known.
• P1905.1– Intent is to ‘glue’ together technologies for in-home networks– Make request to EC to request a formal liaison with P1905,
explicitly to include document sharing.
• Minutes are in 11-11/1537
from slide 3/5 of 11-11/1569r0 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 15
Teleconferences• No specific plan, will schedule with 10 days notice• Topic(s):
– Next letter ballot on 802 Overview and Architecture– P1905.1 liaison comments
from slide 4/5 of 11-11/1569r0 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 16
January 2012 Goals• One 802.11 meeting slot planned to discuss 802 O&A comments
from slide 5/5 of 11-11/1569r0 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 17
JTC1 ad hoc closing report (Nov 11)Date: 2011-11-11
Name Company Address Phone email
Andrew Myles Cisco [email protected]
Authors:
from slide 1/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 18
Abstract
Closing report for JTC1 ad hocfor Nov 2011, Atlanta
from slide 2/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
JTC1 ad hoc focused on preparation for upcoming SC6 meeting
• Progress in Atlanta (Nov 2011)– Review liaisons to SC6
• Recently 11ae, 11aa, 11mb were liaised
– Review status of WAPI in SC6 (802.11i replacement)• Currently in NP comment resolution
• IEEE 802 focused on removing claims about 802.11i security
• Reviewed proposals from US & Swiss NBs
• Next CRM on 21 Nov
– Review status of 802.1X/AE and 802.16 security replacements• No progress
• IEEE 802 focused on incorrect claims about 802.1X/AE and 802.16
• Unknown if NP proposals will be made at next SC6 meeting
Adrian Stephens, Intel CorporationSlide 19from slide 3/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
JTC1 ad hoc focused on preparation for upcoming SC6 meetong
• Progress in Atlanta (Nov 2011)– Review status of N-UHT (802.11ac replacement)
• Currently being considered as National Standards by MIIT
• IEEE 802 focused on incorrect claims about 802.11n/ac and the threat to access to 5GHz spectrum in China
• Unknown if NP proposal will be made at next SC6 meeting
– Review plan for ISO/IEC 8802• Agreed to send IEEE 802 standards to ISO/IEC as long as IEEE 802
retains responsibility to maintain and extend
• Letter in preparation for consideration by EC
– Select delegation for SC6 meeting• Will have prep meeting next week
• See motion
Adrian Stephens, Intel CorporationSlide 20from slide 4/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
IEEE 802 members are encouraged to participate in their SC6 NBs
• SC6 P-Members– Korea - KATS
– Spain – AENOR
– France – AFNOR
– USA – ANSI
– UK – BSI
– Germany – DIN
– Greece – ELOT
– Russia - GOST R
– Luxemburg – ILNAS
– Tunisia – INNORPI
– Japan - JISC
– Kazakhstan – KAZMEMST
– Kenya – KEBS
– Belgium - NBN
– Netherlands – NEN
– China – SAC
– Canada – SCC
– Finland – SFS
– Switzerland – SNV
– Czech Republic - UNMZ
Adrian Stephens, Intel Corporation
Slide 21from slide 5/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
JTC1 ad hoc will prepare for next SC6 meeting in Jacksonville
• Plans for Jacksonville (Nov 2011)– Review results of WAPI comments resolution meetings
– Prepare for next SC6 meeting (Feb 2012 in China)
– ...
Adrian Stephens, Intel CorporationSlide 22from slide 6/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Motion to empower HoD
• Motion– The JTC1 ad hoc recommends that Bruce Kraemer be appointed
as HoD to the SC6 meeting in Feb 2012 and the WAPI CRMs and be authorised to:• Appoint the IEEE 802 delegation
• Approve any necessary submissions
• Call any necessary preparation teleconferences
• Note: equivalent motion in ad hoc passed 8/0/0
• Moved:
• Seconded:
Adrian Stephens, Intel CorporationSlide 23from slide 7/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 24
IEEE 802.11 Regulatory SCAtlanta Closing Report
Date: 2011-11-11
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Authors:
from slide 1/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 25
AbstractThis presentation is the closing report for the November
8, 2011 IEEE 802.11 Regulatory Standing Committee meeting in Atlanta.
from slide 2/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Regulatory Summary – North America
• US– FCC 5 GHz rules changes update; NPRM due in December
– Discussed FCC rules and multi-band operation planned in TGad, TGaf, TGai
– John Notor discussed the waiver requested by Progeny for LMS in the 902 – 928 MHz band
• Canada– TVWS Consultation update closed November 4th
Slide 26 Adrian Stephens, Intel Corporationfrom slide 3/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Regulatory Summary – European Union
• Ofcom – Completing first round of TVWS trials
– Meeting December 12th to discuss results, the day before the start of the next SE43 ( ) meeting
• ETSI ERM TG11 meeting December 6 – 10 to review responses from PE on EN 300 328 revision to complete the work item
• ETSI BRAN bringing sharing mechanisms adopted in EN 300 328 to EN 301 893 (5 GHz bands)
Slide 27 Adrian Stephens, Intel Corporationfrom slide 4/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Regulatory Summary - Asia
• UHT and EUHT
– China CCSA approved and passed the standards to MIIT
– MIIT studying the responses from industry
– USITO meeting Nov 14, 15 attended by FCC chair
Slide 28 Adrian Stephens, Intel Corporationfrom slide 5/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Critical Action Issues
• We had an extensive discussion of the impact of FCC regulations, specifically Parts 15.15 and 15.202, on planned multi-band operations that are part of TGad, TGaf and TGai
Adrian Stephens, Intel CorporationSlide 29from slide 6/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
November 2011
Adrian Stephens, Intel CorporationSlide 30
Smart Grid SC Closing Report– November 2011
Date: 10 November 2011
Discussion topics during November Atlanta Session
Name Company Address Phone emailBruce Kraemer Marvell 5488 Marvell Lane,
Santa Clara, CA, 95054
+1-321-751-3988 [email protected]
Tuesday Abstract:
1 – Tutorial https://mentor.ieee.org/802.15/dcn/11/15-11-0802-00-0000-802-november-2011-sg-tutorial-composite-r0.pptx
2 - NIST PAP23 – NIST Framework
from slide 1/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
November 2011
Atlanta Agenda
High level
• PAP02 GOALS, Work plan, Schedule,
– Rewrite of Section 4, 5, 6
• Procedure to apply for Catalog of Standards
NIST Framework document – comment period open
Adrian Stephens, Intel CorporationSlide 31from slide 2/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
November 2011
Guideline Sections
• Sect 2 Acronyms and Definitions
• Sect 3 SG Conceptual Model & Business Requirements
• Sect 4 Wireless Technology
• Sect 5 Modeling & Evaluation Approach
• Sect 6 Factors to Consider
• Sect 7 Conclusions
• Sect 8 References
• Sect 9 Bibliography
• Annex (e.g. A, B, C, D, E)
Adrian Stephens, Intel CorporationSlide 32from slide 3/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
November 2011
PAP02 Guideline - Schedule Overview
• Wireless Guideline 1 published – Jan 13, 2011
• Finalize wireless model – Oct 7, 2011
• Revise Sections 2,3,4,5,6,7,8,9,Annex - March 16, 2012
• Collect all details on modeling scenarios – Nov 4, 2011
• Exercise, refine, output model results – Feb 3, 2012
• PAP02 vote on Guideline 2
• Submit Guideline 2 to CoS process – April 16, 2012
• Wireless Guideline 2 published – Aug 10, 2012
Adrian Stephens, Intel CorporationSlide 33from slide 4/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
November 2011
Wireless Guideline Version 1
Adrian Stephens, Intel CorporationSlide 34
Attribute Standard Information Identifier of the standard NIST IR 7761 Title of the standard Guidelines for Assessing Wireless Standards for Smart Grid
Applications Name of owner organization NIST Latest versions, stages, dates 1 URL(s) for the standard http://collaborate.nist.gov/twiki-sggrid/pub/SmartGrid/PAP02Objective3/
NIST_PAP2_Guidelines_for_Assessing_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf
http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/SGIPCosSIFNISTIR7761
from slide 5/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
November 2011
Goals of Guideline 1 to 2 Changes
• Provide a significantly better method for analyzing/comparing the performance of a wireless technology in a representative physical environment with a specified data load scenario
– Utilize realistic data loading (developed by OpenSG)
– Significantly extend the technology modeling (SDO sub com)
– Correct definitions contained in Section 4
Adrian Stephens, Intel CorporationSlide 35from slide 6/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
November 2011
Framework Release 2.0
• SGIP calls for Comments on Draft NIST Framework and Roadmap for Smart Grid Interoperability Standards, Release 2.0
• Released for public comments via Federal Register Notice on October 25, 2011
• Click HERE for the NIST Framework and Comments page. Click HERE for the Draft Release 2.0 [PDF, 5.3 MB].
• The deadline for public comments is November 25, 2011 at 5:00 PM Eastern Time.
http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/IKBFramework#Draft_NIST_Framework_and_Roadmap
from slide 7/7 of 11-11/1582r0
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 37
November 2011 Closing Report -TGmbDate: 2011-11-09
Name Affiliations Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave
Sunnyvale, CA 94089
+1 630-363-1389
Authors:
from slide 1/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 38
Abstract
This document contains the TGmb closing report for November 2011.
from slide 2/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 39Slide 39
Accomplishments
• Developed and approved report to EC requesting conditional approval to proceed to RevCom
• Recirculation on D12.0 currently underway– Closes November 13th
• Teleconference calls – November 15, 18, December 2
– 10am Eastern (7am Pacific), 1 hour
from slide 3/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 40Slide 40
Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion Jan 2011 – Sponsor Recirc. Start• Nov 2011 – WG/EC Final Approval• March 2012 – RevCom/SASB Approval
from slide 4/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 41Slide 41
Goals for Nov - Jan 2011
• Recirculation Sponsor Ballot on D12.0
• Comment resolution on any comments received on D12.0
• Recirculation SB on D12.0 (unchanged) or D13.0 (if needed)
• Submit draft to RevCom, via continuous process
• January meeting– Standards Board continuous process follow-up
from slide 5/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 42
References
from slide 6/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 43
802.11aa –Robust Audio Video Transport Streaming Atlanta Closing Report
Date: 2011-11-10
Authors:
Name Affiliation Address Phone email Graham Smith DSP Group 2941 Sunrise Blvd, #100
Rancho Cordova , CA +1 916 379 8709 [email protected]
Alex Ashley NDS Ltd One London Road, Staines, Middlesex, TW18 4EX, England
+44 1784 848770 [email protected]
from slide 1/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 44
Work Completed
• Resolved all initial Sponsor Ballot comments (11/1382r3)• 147 comments
• Discussed 11/1417r1, “Ping-Pang Handoff” • Consensus that subject was not in PAR for 11aa
• Passed Motion to approve a 15-day Sponsor Group Recirculation Ballot of D 7.0
• Held a joint meeting with 801.AVB
Slide 44from slide 2/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 45
Joint meeting with 802.1AVB• Provided 11aa update
• New 802.1BA "Audio Video Bridging Systems" standard – Bridging and Metrics (latency/QoS) are the main topics of BA.
• 802.1AVB have been very happy with the liaison with 11aa and are looking for a continuing similar relationship to assist with the AV streaming aspects on the wireless side once 11aa is completed.
from slide 3/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 46
Goal for January Meeting
• Complete comment resolution of Sponsor Ballot recirculation comments
• Start new recirculation
from slide 4/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 47
Timeline 11aa1. First Recirculation -- Sep 10, 2010
2. Form Sponsor pool –May 2011
3. MEC Done – Aug 2011
4. Start Sponsor Ballot – Sep 2011
5. First Sponsor Recirculation – Nov 2011
6. Sponsor Ballot done (final WG approval) – Mar 2012
7. Final or conditional 802 EC approval – Mar 2012
8. RevCom/SA approval -- June 2012 (need to line up with appropriate RevCom/SA meeting dates)
from slide 5/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 48
TGac November 2011 Closing ReportDate: 2011-11-10
Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive,
Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw
ei.com
Authors:
from slide 1/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 49
Abstract
This document is the closing report for the TGac for the November 2011 session.
from slide 2/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Work Completed • Complete resolutions of LB 178 comments on D1.0.• Approved a motion to proceed to a 30-day WG letter ballot• Approved a motion to have a TG ad hoc meeting, March 7-9, 2012
in the Bay area.
Adrian Stephens, Intel CorporationSlide 50from slide 3/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 51
January 2012 Goals
• Comments resolution on Draft 2.0
from slide 4/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 52
Conference Call Times
• Previously Approved– Nov 17, Dec. 8
• 10:00 - 12:00 ET
– Dec 1, Dec 15
• 10:00-12:00 ET
• January 12, Feb 2nd , 2012– 10:00 – 12:00 ET
• January 26, Feb 9, 2012– 20:00 – 22:00
from slide 5/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
TGad November 2011 Closing Report
Adrian Stephens, Intel CorporationSlide 53
Date: 2011-11-11
Name Company Address Phone email Eldad Perahia Intel
Corporation
2111 NE 25th Ave Hillsboro, OR 97124
503-712-8081 [email protected]
Authors:
from slide 1/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Abstract
This document is the closing report for TGad for the November 2011 session.
Adrian Stephens, Intel CorporationSlide 54from slide 2/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Work Completed
• Resolved all comments on LB 185 this week
• TG and WG approved motion for recirculation letter ballot on D5.0
• LB186 started on Nov 9
• TG and WG approved Report to EC on Conditional Approval to go to Sponsor Ballot
• Proposal for working relationship with CWPAN, Bruce Kraemer, 11/1570
Adrian Stephens, Intel CorporationSlide 55from slide 3/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Proposal for working relationship with CWPAN (Summary of 11/1570) (1/2)
• Background: CWPAN wishes to modify the 11ad specification in ways that were not known of by 11ad during its development including such items as China specific spectrum allocations and channelization
• Summary of proposal:– Start a new project to amend 802.11+TGad, e.g. study group, new PAR,
new Task Group
– Mutual exchange of documentation between 802.11 and CWPAN
– Initial ideas on Task Group meeting locations in Asia, attendance, voting rights
– New task group led by CWPAN principle
• Details regarding the operation of the Task Group require work during the study group
Adrian Stephens, Intel CorporationSlide 56from slide 4/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Proposal for working relationship with CWPAN (Summary of 11/1570) (2/2)
• CWPAN response positive and supportive
• The IEEE SA staff and officers are aware of the project proposal and support it
• IEEE SA has recently signed an MOU with CCSA
• Strawpoll in TGad: Do you support the formation of a study group to establish a forum for developing the procedural framework, clarifying the technical goals and developing a PAR and 5C documents focused on CWPAN extensions to 11ad ?– yes/no/abs: 31/0/2
Adrian Stephens, Intel CorporationSlide 57from slide 5/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Motion to form China 60 GHz (C60G) Study Group
• Request approval by IEEE 802 LMSC to form an 802.11 Study Group to establish a forum for developing the procedural framework, clarifying the technical goals, and developing a PAR and five criteria focused on CWPAN extensions to P802.11ad
• [TGad strawpoll result: 31-0-2]
Adrian Stephens, Intel CorporationSlide 58from slide 6/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
LB 186 ePoll
Adrian Stephens, Intel CorporationSlide 59
• Read instructions on: http://www.ieee802.org/11/LetterBallots/LB186ad/LB186_instructions.html, then click on “Cast Your Vote Here”
Click link:-“Add comment” for individual comment, -“Upload comments” for multiple comments
from slide 7/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Upload Multiple Comments
• New CVS template for comments; do not use old XLS file
Adrian Stephens, Intel CorporationSlide 60
Click link to download new CVS template
from slide 8/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Goals for January 2011
• Start Sponsor Ballot in December
• Comment resolution on initial Sponsor Ballot
Adrian Stephens, Intel CorporationSlide 61from slide 9/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Conference call times
• Previously approved conference calls– Oct 27, Nov 17, Dec 8
• 10:00 – 12:00 ET
– Oct 20, Nov 3, Dec 1, Dec 15• 20:00-22:00 ET
• New conference calls– Not overlap with TGac
– Dec 22, Jan 5, Jan 26, Feb 9• 10:00 – 12:00 ET
– Dec 29, Jan 12, Feb 2, Feb 16• 20:00-22:00 ET
Adrian Stephens, Intel CorporationSlide 62from slide 10/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 63
TGae Closing Report – November 2011Date: 2011-11-08
Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd.
Mississauga, ON. Canada. L4W 0B4
+1-905-629-4746 [email protected]
Authors:
from slide 1/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 64
Abstract
This document is the closing report for the TGae Task Group for the November 2011 session.
from slide 2/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 65
Work Completed• Comment Resolution for Sponsor Ballot Recirculation
on D6.0– https://mentor.ieee.org/802.11/dcn/11/11-11-1442-03-00ae-tgae-sb-recirc-1-
comment-resolutions.xls – Approved resolutions to 17 comments.– Approved a revised resolution to 1 comment that was rejected on the initial SB– Approval rating increased to 97% (3 no voters)
• Minutes:– https://mentor.ieee.org/802.11/dcn/11/11-11-1547-00-00ae-minutes-from-
november-plenary.docx
• Teleconferences:– Teleconferences on Wednesday Dec 14 and Jan 11 at 11am ET
for 1 hour.
from slide 3/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 66
TGae Timeline – November 2011
• Initial Working Group Letter Ballot: September ‘10
• Re-circulation Working Group Letter Ballot: January ‘11
• Form Sponsor Ballot Pool: May ’11
• Mandatory Editorial Check: May ’11
• Initial Sponsor Ballot: Aug ’11
• Sponsor Ballot Recirculation: Oct ‘11
• Final WG/EC Approval: Mar ‘12
• RevCom/Standards Board Approval: June ‘12
from slide 4/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 67
January 2012 Goals• Resolve comments from latest Sponsor Ballot recirculation• Prepare for a clean Sponsor Ballot recirculation
from slide 5/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 68
TGaf Atlanta Closing Report
Date: 2011-11-11
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Peter Ecclesine Cisco 170 W. Tasman Dr., San Jose, CA, 95134
+1-408-527-0815 [email protected]
Authors:
from slide 1/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 69
AbstractThis presentation is the closing report for the twelfth face-
to-face meeting of IEEE 802.11 TGaf taking place the week of November 7, 2011 at the IEEE 802 Plenary in Atlanta.
from slide 2/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Agenda
• Approve meeting and teleconference minutes
• Approve the LB171 comment spreadsheet in 11-11/277r20
• Approve draft P802.11af D1.04 as the working draft
• Review of the progress since September
• Comment resolution
• PHY planning
• Adjust the timeline as necessary
• Plan for January meeting, Ad Hoc and teleconferences
Adrian Stephens, Intel CorporationSlide 70from slide 3/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
TGaf Accomplishments • Resolved 237 comments
– 1168 of 1302 comments have Approved resolutions
– New (old) PHY direction will bring back over 100 comments
• Heard a PHY proposal from Ron Porat and Vinko Erceg
• Group decided to adjust our PPV/O for PHY change– Changed: “In order to meet international requirements and
facilitate the use of multiple contiguous or non-contiguous channels, use of TGac with changes for TGaf is our focus.” to “The starting point is to use the High Throughput PHY with scaling and modifications for the TV bands.”
• Revised the P802.11af timeline
• Planned for January meeting, and weekly teleconferences– Tuesdays at 21:00 ET
Adrian Stephens, Intel CorporationSlide 71from slide 4/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Plans for January
• Complete comment resolution• Incorporate PHY changes• Prepare draft 2.0 and ask the WG to begin our
second Letter Ballot
Adrian Stephens, Intel CorporationSlide 72from slide 5/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 73
TGaf Timeline – Updated November 2011
• New
• Initial Working Group Letter Ballot: January 2011
• Second Working Group Letter Ballot: January 2012
• Recirculation Letter Ballot: May 2012
• Form Sponsor Ballot Pool: October 2012
• Initial Sponsor Ballot: November 2012
• Recirculate Sponsor Ballot: January 2013
• Final WG/EC Approval: July 2013
• RevCom/Standards Board Approval: September 2013
from slide 6/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Teleconferences
• Weekly on Tuesdays:
• Time: 21:00 ET for 120 minutes
Adrian Stephens, Intel CorporationSlide 74from slide 7/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 75
IEEE 802.11ah Closing Report forNovember 2011
Date: 2011-11-10
Name Affiliations Address Phone email David Halasz Aclara 2315 W. 9th Street
Austin, TX 78703 330-283-2715 dave.halasz@oaktreewirel
ess.com
Authors:
from slide 1/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Activity in TGah
• Work continued on specification framework– 11-11-1137-03-00ah-specification-framework-for-tgah.docx
– Modified South Korea channelization
– Added support for a new frame format for a short beacon
• Channel model document updated– 11-11-0968-02-00ah-channel-model-text.docx
– Outdoor device to device path loss model added
Adrian Stephens, Intel CorporationSlide 76from slide 2/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Going forward
•Update Specification Framework document, providing details on functional blocks
Adrian Stephens, Intel CorporationSlide 77from slide 3/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Teleconferences
• December 12th at 7 PM ET 1.5 hours
• January 9th at noon ET 1.5 hours
• Desire to have rolling time of noon, 10 AM and 7 PM
Adrian Stephens, Intel CorporationSlide 78from slide 4/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Timeline
• No update, see 11/285 for details– Internal Task Group Ballot : July 2012
– Initial Letter Ballot : November 2012
– Initial Sponsor Ballot : November 2013
– EC Approval : September 2014
– Revcom Approval : November 2014
Adrian Stephens, Intel CorporationSlide 79from slide 5/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 80
IEEE 802.11TGaiClosing Report
Date: 2011-11-09
Authors:
Name Company Address Phone email
Hiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN
+81-3-5719-7630 [email protected]
Marc Emmelmann Fraunhofer FOKUS
Fraunhofer FOKUSKaiserin-Augusta-Alle 3110589 BerlinGermany
+49-30-3463 7268
from slide 1/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report Adrian Stephens, Intel CorporationSlide 81
AbstractThis presentation is the closing report for the Atlanta
meeting of the IEEE 802.11 TGai.
from slide 2/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Plan for this weekAtlanta, Nov 2011
• Official time slot – Monday AM1 (Joint Adhoc with REG-SC),PM1– Tuesday PM1,– Wednesday PM1,PM2– Thursday AM2,PM1,PM2
• Goals for the Meeting:– Joint Adhoc with REG-SC– Review and Approve the Okinawa and Teleconference meeting minutes– Presentation of submissions
• Submission of Initial technical contribution• General submission
– TIME line of task group– Plan for Jan & Teleconference
Adrian Stephens, Intel CorporationSlide 82from slide 3/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Accomplishments TGai 1/3• Review and approve Okinawa and Teleconference meeting
minutes.– September 2011 Okinawa Session Minutes
– https://mentor.ieee.org/802.11/dcn/11/11-11-1350-00-00ai-september-2011-okinawa-session-minutes.doc
– Oct-Nov Teleconference Minutes
– https://mentor.ieee.org/802.11/dcn/11/11-11-1389-02-00ai-oct-nov-teleconference-minutes.doc
Adrian Stephens, Intel CorporationSlide 83from slide 4/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Accomplishments TGai 2/4• Technical contribution
– 1414r2 Probe Request and Response in Tgai / Katsuo Yunoki (KDDI R&D Laboratories)
– 1413r0 Real air-time occupation by beacon and probe / Katsuo Yunoki (KDDI R&D Laboratories)
– 1415r0 AP status broadcast / Katsuo Yunoki (KDDI R&D Laboratories)
– 1436r0 Security requirements for TGai / Robert Sun (Huawei)
– 1488r0/1429r0 fils-auth-with-a-ttp / Dan Harkins (Aruba Networks)
– 1160r3 Fast Authentication for FILS / Cherian, Geroge (Qualcomm Inc.)
– 1426r0 Fast Security Setup / Dezhi Zhang(ZTE Corporation)
– 1453r0/1047r4 Using Upper Layer Message IE in TGai) / Ping Fang (HUAWEI TECHNOLOGIES CO.,LTD.)
– 0977r6 TGai Upper Layer Setup Proposal / Hitoshi Morioka (ATRD Root Lab)
Nov 2011
Adrian Stephens, Intel CorporationSlide 84from slide 5/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Accomplishments TGai 3/4• Technical contribution
– 1548r0 Proposal discovery / Paul Lambert (Marvell ) – 1525r0 IP address assignment indication / Cherian, George (Qualcomm) – 1565r0 AP status broadcast / Katsuo Yunoki (KDDI R&D Laboratories) – 1523r0 Access Enhancements for FILS: Network Discovery & Access congestion
Improvements / Santosh Abraham (Qualcomm Inc.) – 1498r1 GAS version control / Phillip Barber (Huawei)– 1499r0 GAS query optimization / Phillip Barber (Huawei)– 1500r0 Broadcast probe response / Phillip Barber (Huawei)– 1559r0 scanning goals and challenges / Jarkko Kneckt (Nokia)– 1521r0 network discovery enhancements AP / Marc Emmelmann (Fokus)– 1572r0 sec-prop-poll /Dan Harkins (Aruba Networks)– 11-1576r0 Scanning Enhancements for FILS – Normative Text /Marc Emmelmann
(Fraunhofer FOKUS)– 11-1014r2 IP address configuration during association / Gabor Bajko ( Nokia ) – 11-1575r0 Editors_recommendations_for_Submissions
Nov 2011
Adrian Stephens, Intel CorporationSlide 85from slide 6/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Accomplishments TGai 4/4
• Editors Report– 11-11-1527-00-00ai_TGai_Editors_Report.pptx will be uploaded
late tomorrow morning / Tom Siep (CSR)Approved Weekly Teleconference schedule
• Approved Time Line
• Approved Plan for January
Nov 2011
Adrian Stephens, Intel CorporationSlide 86from slide 7/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Time line of TGai– PAR Approved, Modified, or Extended 2010-12-08
– WG Letter Ballots Initial / Recirc Jul 12 / Nov 12
– Form Sponsor Ballot Pool / Reform May 13
– MEC Done May 13
– IEEE-SA Sponsor Ballots Initial / Recirc Jul 13/ Nov13
– Final 802.11 WG Approval May 14
– final or Conditional 802 EC Approval May14
– RevCom & Standards Board Final or Continuous Process Approval Sep 14
– ANSI Approved N/A
Adrian Stephens, Intel CorporationSlide 87from slide 8/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Teleconference Schedule • Motion:
– Approve the following schedule of weekly teleconferences. – Monday 23:59 EST (NY Time) continue from 21st Nov.– Duration 1Hour– Using WEB-EX that will be provided by Task Group Chair
• Moved: Marc Emmelmann , Seconded: Lei Wang• Result: 8 - 2 - 4 passes
Nov 2011
Adrian Stephens, Intel CorporationSlide 88from slide 9/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Plan for January
• Plan for January– Goal
• Close call for submissions
• Drafting draft 0.1
Nov 2011
Adrian Stephens, Intel CorporationSlide 89from slide 10/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r0
Report
Thanks to all who participated!
Adrian Stephens, Intel CorporationSlide 90from slide 11/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011