7/30/2019 DISENO ESTRUCTURA METALICA
1/27
UNIVER
G 300 100 35
G 200 80 30
Columnas
O 100 100 3
5.09
1.- CUANTIFICACIN DE CARGAS Longitudes: L
8.9
f'c= 210 kg/cm fy= 2550
Peso/m 144
Correas TIPO H (mm) b (mm) c (mm) e (mm)
G 300 100 35 6
Peso/m 8.77
Peso/m 6.04
Super panel
Peso/m 19.2
TOTAL= 178.01 kg/m
* Carga viva
60 kg/m
* Carga muerta
Malla electrosoldada R385
* Carga ceniza volcnica
7/30/2019 DISENO ESTRUCTURA METALICA
2/27
75 kg/m esp. (m)= 0.05
Peso cen.= 1500 kg/m
Vel= 80 km/h 22.22
= 16.7 = -16.7
c= 1,2Sen-0,4 c= 1,2Sen-0,4
c= -0.055167376 c= -0.744832624
q= 0,0671*V
q= 33.13580247
Wy= c*q Wy= c*q
Wy= -1.83 kg/m Wy= -24.68
CT= 337.69 kg/m
1.- CLCULO DE CORREAS
L= 890 d= L
30
d= 29.67 45
0.75 m
H (mm)
A= 31.8
Ix= 4170
Sx= 278
rx= 11.4
Peso= 25.79
CT=CM+CV+Ccen+Cw
* Carga ceniza volcnica
Apoyoa a cada:
150
200
250
300
7/30/2019 DISENO ESTRUCTURA METALICA
3/27
W=
W= 279.06 kg/mMomentos:
M= WL/8
M= 2763.02 kg-m
Reacciones:
P= WL/8
P= 1241.81
* Capacidad a flexin corte combinado
fbw= (M*c)/I c= 15
fbw= 993.89 kg/cm
Fbw= 0,6*fy
Fbw= 1530 kg/cm
fv= P/h*t t= 0.6
fv= 68.99 h= 30
Fv= 0,4*fy
Fv= 1020 kg/cm
(fbw/Fbw) + (fv/Fv) < 1
0.43 < 1
CUMPLE
fbw < Fbw fv
993.89 < 1530 68.99
CUMPLE
* Chequeo de esbeltez
k= 1 (k*l)/r < 240
78.07 < 240
CUMPLE
* Chequeo de la flecha
fmax= 5WL Fadm=
384*E*I
C.T.*Anch. Coop.+Ppviga
7/30/2019 DISENO ESTRUCTURA METALICA
4/27
fmax= 2.60 Fadm=
fmax < Fadm
2.60 < 3.71
CUMPLE
* CLCULO DE LA VIGA
Num de vigas= 3
P= 1241.81
= 11.00
W=(P*sep. Entre correas*# vigas)/
w= 2846.36
Momentos:Mmx= W*L
8
Mmax= 4358.49
Reacciones:
V= W*L
2
V= 7244.00
7/30/2019 DISENO ESTRUCTURA METALICA
5/27
* Mdulo de la seccin
S= Mmx Vigas TIPO
0,66Fy GS= 258.97
H (mm)
A= 22.83
Ix= 4170
Sx= 278
rx= 11.4
Peso= 25.79
fbx= Mmx fv=
S
fbx= 1567.80 fv=
fbx 640.63
CUMPLE
* DISEO DE PLACAS DE APOYO Y ANCLAJE
P= 7340.81 kg
p=30*30p= 900
Fp=0,25f'c
Fp= 52.5 kg/cm
Ar= P
Fp
2
2
12
23
r
kl
EFe
Fe
faGaG
3
3
8
1
8
3
3
5
Cc
r
kl
Cc
r
kl
Fs
Fs
Fy
Cc
r
kl
Fa
2
2
21
7/30/2019 DISENO ESTRUCTURA METALICA
9/27
Ar= 139.824934
fp= P
pfp= 8.16
fp < Fp
8.16 < 52.50CUMPLE
7/30/2019 DISENO ESTRUCTURA METALICA
10/27
IDAD TCNICA DE AMBATO
Facultad de Ingeniera Civil y Mecnica
PRESUPUESTO DE ESTRUCTURA METLICA
6 154.74 85
6 109.56 66
32
TOTAL
4.7
B
9.79
E= 2100000
7/30/2019 DISENO ESTRUCTURA METALICA
11/27
kg/m
b (mm) c (mm) e (mm) A (cm) Ix (cm) Sx (cm) rx (cm)
2 5.34 179.00 23.80 5.79
3 7.81 255.00 34.00 5.72
4 12.15 399.35 53.24 5.73
5 14.12 477.76 63.70 5.67
6 17.43 547.95 73.06 5.61
2 6.36 356.00 35.60 7.56
3 9.31 507.00 50.70 7.45
4 15.75 954.08 95.40 7.745 19.35 1153.81 115.38 7.72
6 22.83 1338.56 133.85 7.66
4 19.35 1862.42 148.99 9.81
5 23.85 2266.82 181.34 9.75
6 28.23 2647.38 211.79 9.68
30 4 21.30 2860.00 191.00 11.60
5 26.90 3560.00 237.00 11.50
6 31.80 4170.00 278.00 11.40
Dimensiones
1550
30
15
30
30
60
50
80
100
35100
7/30/2019 DISENO ESTRUCTURA METALICA
12/27
< Fv
< 1020
CUMPLE
L
240
7/30/2019 DISENO ESTRUCTURA METALICA
13/27
3.71
7/30/2019 DISENO ESTRUCTURA METALICA
14/27
H (mm) b (mm) c (mm) e (mm)
200 80 30 6
b (mm) c (mm) e (mm) A (cm) Ix (cm) Sx (cm) rx (cm)
2 5.34 179.00 23.80 5.79
3 7.81 255.00 34.00 5.72
4 12.15 399.35 53.24 5.73
5 14.12 477.76 63.70 5.67
6 17.43 547.95 73.06 5.61
2 6.36 356.00 35.60 7.56
3 9.31 507.00 50.70 7.45
4 15.75 954.08 95.40 7.74
5 19.35 1153.81 115.38 7.72
6 22.83 1338.56 133.85 7.66
4 19.35 1862.42 148.99 9.81
5 23.85 2266.82 181.34 9.75
6 28.23 2647.38 211.79 9.68
30 4 21.30 2860.00 191.00 11.60
5 26.90 3560.00 237.00 11.50
6 31.80 4170.00 278.00 11.40
V A1= 2(H-4e)e
A1 A1= 21.12 cm
342.99
Fbw= 0,66Fy
Fbw= 1683
Fbw
1683.00
Dimensiones
50 15
60 30
50 15
80 30
100 30
10035
7/30/2019 DISENO ESTRUCTURA METALICA
15/27
7309.63 6749.56
3.4 Lv= 4.7 Lc=
P= W*Lv
2
P= 6749.56 kg
7/30/2019 DISENO ESTRUCTURA METALICA
16/27
cm
22.83 cm
4170 cm
278 cm
11.4 cm
25.79 kg/m
= 0.06
0.00073892 T 0.58128513 = 0
EL COMANDO roots
7/30/2019 DISENO ESTRUCTURA METALICA
17/27
7/30/2019 DISENO ESTRUCTURA METALICA
18/27
7/30/2019 DISENO ESTRUCTURA METALICA
19/27
7/30/2019 DISENO ESTRUCTURA METALICA
20/27
Peso (kg/m)
4.19
6.18
9.72
11.88
13.94
4.99
7.31
12.6015.48
18.26
15.48
19.08
22.58
16.80
21.10
25.79
7/30/2019 DISENO ESTRUCTURA METALICA
21/27
7/30/2019 DISENO ESTRUCTURA METALICA
22/27
7/30/2019 DISENO ESTRUCTURA METALICA
23/27
Peso (kg/m)
4.19
6.18
9.72
11.88
13.94
4.99
7.31
12.60
15.48
18.26
15.48
19.08
22.58
16.80
21.10
25.79
7/30/2019 DISENO ESTRUCTURA METALICA
24/27
6749.56
2.95
7/30/2019 DISENO ESTRUCTURA METALICA
25/27
Correas TIPO H (mm) b (mm) c (mm)
G 300 100 35
Vigas TIPO H (mm) b (mm) c (mm)G 200 80 30
Columnas TIPO H (mm) b (mm) c (mm)
O 100 100 3
ELEMENTOS ES
7/30/2019 DISENO ESTRUCTURA METALICA
26/27
PESO KG/6M PESOKG/M LONGITUD PESO KG COSTO KG
m
e (mm)
6 154.74 25.79 85 2192.15 1.27
e (mm)6 109.56 18.26 66 1205.16 1.27
e (mm)
55.02 9.17 32 293.44 1.27
TOTAL
UNIVERSIDAD TCNICA DE AMBATO
Facultad de Ingeniera Civil y Mecnica
PRESUPUESTO DE ESTRUCTURA METLICA
TRUCTURALES
7/30/2019 DISENO ESTRUCTURA METALICA
27/27
COSTO TOTAL
2784.0305
1530.5532
372.6688
4,687.25$
Top Related