7/23/2019 Detailed Scheduling and Planning (Lesson 6)
1/41
Detailed Scheduling and Planning
Unit2
Unit 2Detailed Scheduling and
Planning
UUnnii tt 22
DDeettaaii lleedd SScchheedduull ii nngg aannddPPllaannnniinngg
LLeessssoonn 66
TThhee PPrroocceessss ooffDDeettaaii lleedd CCaappaacciittyy PPllaannnniinngg
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
2/41
Copyright Leading Edge Training Institute Limited i i
Detailed Scheduling and Planning
Unit2
2004 e-SCP -The Centre for Excellence in Supply Chain ManagementNo portion of this publication may be reproduced in whole or in part.The Leading Edge Group will not be responsible for any statements, beliefs, or opinions expressed by theauthors of this workbook. The views expressed are solely those of the authors and do not necessarilyreflect any endorsement by The Leading Edge Training Institute Limited.
This publication has been prepared by E-SCP under the guidance of Yvonne Delaney MBA, CFPIM,CPIM. It has not been reviewed nor endorsed by APICS nor the APICS Curricula and CertificationCouncil for use as study material for the APICS CPIM certification examination.
The Leading Edge Training Institute LimitedCharter House
CobhCo CorkIreland
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
3/41
Copyright Leading Edge Training Institute Limited ii i
Detailed Scheduling and Planning
Unit2
Preface............................................................................................................4
Course Description................................................................................................................. 4
Lesson 6 The Process of Detailed Capacity Planning....................................5 Introduction and Objectives.................................................................................................. 5Capacity Planning and Priority Planning ............................................................................ 5Manufacturing Environments............................................................................................... 8
Production Methods ............................................................................................................... 8Process-Oriented Production Structures ........................................................................... 11
Data Needed for Capacity Planning ................................................................................... 12Lead Time ............................................................................................................................. 13Distributing Lead Time ....................................................................................................... 14
Work Centers........................................................................................................................ 15Calculating Capacity............................................................................................................ 16
Capacity and Load Sources................................................................................................. 17Queuing ................................................................................................................................. 18Scheduling Strategies........................................................................................................... 19
Calculation of Load Profiles................................................................................................ 22Finite Capacity Planning Techniques................................................................................. 23
Scheduling of Manufacturing and Logistics Operations .................................................. 25Mixed Manufacturing .......................................................................................................... 29Capacity-Oriented Materials Management (Corma) ....................................................... 30
Summary............................................................................................................................... 32Further Reading ................................................................................................................... 32
Review ................................................................................................................................... 33Whats Next? ........................................................................................................................ 34
Appendix.......................................................................................................35
Answers to Review Questions.............................................................................................. 36
Glossary........................................................................................................38
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
4/41
Copyright Leading Edge Training Institute Limited 4
Detailed Scheduling and Planning
Unit2
Preface
Course Description
This document contains the sixth lesson in the Detailed Scheduling and Planning unit, which isone of five units designed to prepare students to take the APICS CPIM examination. Before
completing the Detailed Scheduling and Planning unit, you should complete the Basics ofSupply Chain Management unit or gain equivalent knowledge. The five units that cover theCPIM syllabus are:
Basics of Supply Chain Management
Detailed Scheduling and Planning
Master Planning of Resources
Execution and Control of Operations
Strategic Management of Resources
Please refer to the preface of Lesson 1 for further details about the support available to youduring this course of study.
This publication has been prepared by E-SCP under the guidance of Yvonne Delaney MBA,
CFPIM, CPIM. It has not been reviewed nor endorsed by APICS nor the APICS Curricula and
Certification Council for use as study material for the APICS CPIM certification examination.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
5/41
Copyright Leading Edge Training Institute Limited 5
Detailed Scheduling and Planning
Unit2
Lesson 6 The Process of Detailed Capacity Planning
Introduction and ObjectivesThis lesson examines the characteristics and methods used to ensure sufficient capacity tosupport the material plan. The lesson also looks at how work center and routing data is used and
explains the use of efficiency and utilization ratios in the determination of rated capacity. Thebalance of demand and capacity, time availability and due dates are examined along with finiteand infinite capacity planning techniques. Finally, the lesson explains the integration of
scheduling and capacity planning with material planning for order release and control.
On completion of this lesson you will be able to:
Explain detailed capacity planning at an intermediate level
Explain the effect of the manufacturing environment on the choice of planning techniqueand information requirements
Describe the steps by which work center and routing data are used to schedule orders andidentify resource loads in each time period
Use efficiency and utilization ratios to determine the rated capacity of a work center
Identify load sources for planned and released orders
Explain the effects of queuing on job-shop production
Describe planning, scheduling, and order release preparation techniques in a variety ofproduction environments
Capacity Planning and Priority Planning
Planning for capacity takes place at severaldistinct stages in the planning and execution
hierarchy. Initial top-level resource planningoccurs alongside the sales and operations
priority plan. Once the master schedule iscomplete, a rough cut capacity plan verifies thevalidity of the master schedule. Detailed
scheduling and planning must be balanced bydetailed capacity requirements planning. Note
that the ultimate validation of the plan issuccessful execution, which is referred to asdemonstrated capacity.
Capacity Requirements Planning (CRP) takesplace at the MRP level of the overall planning
process. CRP is used to validate the material plan.
Capacity Definition
Capacity is the ability of a resource to produce output per time period. Capacity required
represents the system capability needed to make a given product mix (assuming technology,
product specification, etc.).
Sales and Operations
Plan
Master Production
Schedule
Material
Requirements
Planning (MRP)
Purchasing and
PAC
Resource Requirements
Plan (RRP)
Rough-Cut Capacity
Plan (RCCP)
Capacity
Requirements
Plan (CRP)
Input/Output Control
Operation Sequencing
Priority Planning Capacity Planning
Sales and Operations
Plan
Master Production
Schedule
Material
Requirements
Planning (MRP)
Purchasing and
PAC
Resource Requirements
Plan (RRP)
Rough-Cut Capacity
Plan (RCCP)
Capacity
Requirements
Plan (CRP)
Input/Output Control
Operation Sequencing
Priority Planning Capacity Planning
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
6/41
Copyright Leading Edge Training Institute Limited 6
Detailed Scheduling and Planning
Unit2
Capacity Planning Definition
Capacity planning is the process of calculating required capacity in each workstation to
manufacture sufficient material to meet requirements. This process may be performed at an
aggregate or product-line level (resource planning) at the master schedule level (rough-cutcapacity planning) and at the detailed or work center level (capacity requirements planning).
Load
The load of a work center, production line, or plant is the amount of work scheduled for and
released to it for a specific time period. The load is usually a measure of standard hours of workor units or production. The load is also referred to as the workload.
MRP
CRP
Capacity
Requirements
Plan
Work CentersRouting
Information
MRP
CRP
Capacity
Requirements
Plan
Work CentersRouting
Information
Capacity Planning IssuesCRP receives all manufacturing orders from MRP and breaks these down into individual
operations. CRP calculates the standard hours required for each batch at each work center. Thesehours are then totalled for each work center in each time period and compared to available hoursfor each work center. For effective capacity planning and consequently efficient production,
manufacturing and service industries need to calculate:
The capacity required to implement master planning effectively
The necessity or otherwise of extra shifts, overtime, short-time work, part-time work orother capacity changing strategies, and the times and places such strategies will berequired
The areas in capacity and orders where adjustments can be made
The possibility of reducing lead times and numbers of orders
Aims and Objectives of Capacity Planning
Capacity planning, like materials planning, aims to ensure high service levels, short deliverytimes, high delivery reliability rates, and flexibility in responding to customer requests. In
addition, it aims to minimize invested capital by reducing work-in-process inventory levels andoptimizing waiting times.
To fulfil these aims, capacity planning must ensure:
Efficient use of available capacity through good capacity utilization at a constant level
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
7/41
Copyright Leading Edge Training Institute Limited 7
Detailed Scheduling and Planning
Unit2
Prediction of bottlenecks
Ability to adapt to changing conditions
Minimal fixed costs in production
Minimal administration costs
To meet the aims and objectives outlined above, large bodies of data from open and planned
orders must be considered. Often, detailed capacity planning is sufficiently complex to requirecomputer software to ensure the optimal balance between conflicting objectives of high service
levels and low costs are met.
Capacity planning aims ultimately to balance the load arising through orders with the capacityavailable to process those orders. The general principles of capacity planning remain the same
despite the planning priorities and manufacturing environments. However, the manufacturingenvironment and planning priority have an effect on determining the technique used and the kind
of master data used as input data. For example, rough-cut routing data may be used for long-termplanning, whereas detailed and accurate routing data will be used in shorter term planning.
Capacity cannot be stored. Therefore, capacity or quantity and due dates must be considered and
planned together. In an ideal situation, the load will always match the available capacity. Evenwhen the capacity varies, due to holidays for example, the load must be adjusted to match.
Conversely, when the load varies, due to seasonal trends for example, capacity must match theload.
Costs of Poor Capacity Planning
Poor capacity planning can lead to an ever-worsening spiral of cause and effect
that adversely affects all aspects of production and, ultimately, customer service.If the number of customer orders increases, the number of work orders to theproduction floor will also increase, leading to an increased load on capacity.When the number of orders is higher than the available capacity, queues of work-
in-process inventory will build up behind each work center.
This leads to a lengthening lead time for each order. As a result the orders are unlikely to meet
there due date (the delivery date required by the customer). To alleviate this problem, plannersmay increase lead times, particularly queue times, to plan more realistically. This results incustomer orders being released earlier, which further increases the load on capacity. The only
way to alleviate the problem at this stage is to increase capacity.
Increased
orders
Increased
orders
11
Greater load onwork centers
Greater load on
work centers
22
longer queueslonger queues
33
Longer actuallead times
Longer actual
lead times
44
Failure to meet
due dates
Failure to meetdue dates
55
Plannersincrease
standard leadtimes
Plannersincrease
standard leadtimes
66
Orders arereleased early
Orders arereleased early
77
Cycle of PoorCycle of Poor
CapacityCapacity
Increased
orders
Increased
orders
11
Greater load onwork centers
Greater load on
work centers
22
longer queueslonger queues
33
Longer actuallead times
Longer actual
lead times
44
Failure to meet
due dates
Failure to meetdue dates
55
Plannersincrease
standard leadtimes
Plannersincrease
standard leadtimes
66
Orders arereleased early
Orders arereleased early
77
Cycle of PoorCycle of Poor
CapacityCapacity
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
8/41
Copyright Leading Edge Training Institute Limited 8
Detailed Scheduling and Planning
Unit2
By planning work center loads ahead of time, queues can be reduced, thereby resulting in shorterlead times, ensuring that orders can be released on time.
Manufacturing Environments
Although material and capacity planning is required in every type of manufacturing
environment, the need for material and capacity may be determined differently depending on thetype of environment. Each environment has the same basic requirements but the relativeimportance of each requirement differs according to the environment. This has a major effect on
the operation of MRP and CRP.
Make-to-Order
Either of the following approaches may be implemented in this environment:
The company produces or purchases standard products which they then modify to meet
particular customer requirements. Effectively, the standard products are made to stockbut are then customized for particular orders.
The company forecast demand and stock materials such as raw material and components
from which they make their products. This shortens the lead time to the customer.
Engineer-to-Order
This type of environment has a very long lead time as all elements of production from initial
product design are part of the customer lead time. The raw materials and other requirements areordered only when a customer order is received. This approach is used for high value productssuch as large specialized machinery.
Assemble-to-Order
In this environment all sub-assemblies are manufactured and stocked as
inventories, using forecasts to determine amounts. The final assemblyinto finished goods is triggered when a customer order is received. Afinal assembly schedule is used to ensure customer orders are fulfilled on
time. Car manufacturers typically use this approach.
Make-to-Stock
A make-to-stock company uses finished goods warehouse replenishment orders or distributionrequirements planning to determine what should be produced. It maintains specified levels offinished goods to meet forecast customer demand. The products are then distributed from
finished goods warehouses. Examples include manufacturers of window frames, cereal, soap andcleaning products.
Production Methods
Many companies may employ several production methods at once. The choice of method is
influenced by the quantity required and the operating philosophy of company management.Where high quantities are needed a dedicated production facility may be set up for a particularitem. Where quantities are low, the item may be produced in a more general purpose facility
along with other items.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
9/41
Copyright Leading Edge Training Institute Limited 9
Detailed Scheduling and Planning
Unit2
Project Production
AutoCon is a typical project production company. IT employees highly
qualified engineers to design and build custom automation solutions for large
process-oriented manufacturers. AutoCons main business is with breweries.It provides the vats, pipes, valves and software control systems when a
brewery decides to expand its operations. As the product must closely matchcustomer requirements, each design is unique.
Most projects of this nature require custom design. Processes are very flexibleand can provide a broad range of product designs. In such environments, the program evaluationand review technique (PERT) or the critical path method (CPM) are used to evaluate capacity
requirements.
PERT uses an algorithm to identify the critical path of a project, in other words, the
sequence of activities that will determine the completion time. PERT time estimates are
probable figures, based on time estimates for each activity in the critical path, andoffering a range that incorporates pessimistic, most likely, and optimistic estimates.
CPM identifies each activity in a project along with its estimated completion time. Fromthis information, the critical path, or longest path to completion, can be identified. This is
the path that will constrain the overall time for the project.
Load must be planned with capacity at the level of production planning. Detailed capacityplanning is of little use here as capacities must be sufficiently flexible to adjust to the schedule
calculated by CPM.
Job-shops
Job shops are usually characterised by intermittent production. Intermittent production makesitems to match customer specifications. However, this is not typically one-of a kind production.The constraining work center may vary based on the product mix and order volumes.
Detailed planning is very important in a job shop environment where work centers must beflexible in order to adapt to continual load changes and queues. Planning and scheduling capacity
issues ahead of time helps eliminate excess lead time and provide alternative plans to avoidbottlenecks. The techniques discussed in this lesson are most useful with job shop or intermittentproduction, unless capacity is inflexible, in which case, the techniques presented in the
Execution and Control of Operations module are of use.
Kilners pottery company employs a job shop manufacturing environment
to produce customized pieces of pottery. These are based on basic designssuch as vases, urns, jugs and charger plates, but are individua l pieces intheir use of colour and surface pattern. The product mix varies
considerably depending on the time of year and the type of customer.
Batch Production
Batch production is used to produce items of similar design in varied amounts.Usually, the items ordered are a repeat of previous items. A batch manufacturer
may require some days or several weeks to produce an order. This means thatproduction cycle times may be considerably less than elapsed time from order
receipt to order shipment. CRP is useful when the product mix and volumechanges.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
10/41
Copyright Leading Edge Training Institute Limited 10
Detailed Scheduling and Planning
Unit2
Typical examples of batch manufacturing include the manufacture of soft drinks, biscuits, andvitamin tablets or over-the-counter pharmaceutical medicines.
Assembly Lines
Repetitive manufacture relies on line balancing to adjust production to a specific cycle rate.Repetitive methodologies aim for minimal setups, inventories and lead times. In repetitive
production work orders are unnecessary and production scheduling and control deals withproduction rates. Available capacity is calculated at the level of the MPS rather than to test the
validity of the material plan. The master schedule sets the productionrate, thereby determining the load. Capacity must be adjusted along theassembly line to maintain that rate. Beyond rough cut capacity planning,
there may be no further need of capacity planning in repetitivemanufacture.
Many car manufacturers employ assembly lines to build their products,
as do manufacturers of other mass-produced electronic goods such askettles, CD players, televisions, etc.
JIT Production
As with repetitive manufacture, capacity planning in a JIT environment is mainly complete at
MPS level. It involves determining the type and number of Kanban cards needed for eachKanban feedback loop. However, the principles of infinite loading apply to JIT-Kanbanproduction. The Toyota factory is the ultimate example of a JIT production environment. Toyota
was the originators of the Just-in-Time philosophy.
Continuous Process or Flow ProductionThe physical design of many process facilities mayitself be a constraining factor in planning. Capacitywill mainly depend on the construction of the plant
as there are minimal interruptions in the actualprocessing. The choice of materials often tends to be
limited. Both material and detailed capacity planningmust consider specific data structures and schedulingtechniques compared to those suitable for job shops.
In this type of industry Execution and Control of Operations is probably more important than
capacity requirements planning. Oil refineries and electricity generating plants are examples ofcontinuous process manufacturing environments.
Combinations
Some companies incorporate several different manufacturing
environments under one roof. For example, a manufacturer ofconfectionary products may have continuous production of chocolate and
candy which are the components of batch-produced items such as boxesof soft centers or chocolate-covered toffees.
It is unlikely that a single system would satisfy the planning needs in such an environment. The
best approach is to choose the most appropriate tools for each production environment althoughthis may necessitate maintenance of several different systems.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
11/41
Copyright Leading Edge Training Institute Limited 11
Detailed Scheduling and Planning
Unit2
1. Which of the following statements about CRP are correct?
A. It balances and validates detailed scheduling and planning at the MRP levelB. It provides a detailed plan of scheduled operations
C. It aims to ensure good capacity utilization at a constant levelReview Q
D. Poor CRP leads to increased queues and lead times
Process-Oriented Production Structures
Some of the typical characteristics of the process industry are by-products, production structures
with cycles, and continuous flow production. Material and capacity are equally valuable in
production processes. Process-oriented production sheets (also called process structures, processtrains, or production models) are often used in process-oriented industry. The following diagramis an example of a process-oriented production structure.
Process 1
Step 1 Flow resources Step 2 Flow resources Step 3
Flow resources
Process 2
Step 1 Flow resources Step 2 Flow resources Step 3
Primary
Product
Raw Material
Energy
Capacity
Equipment
By-product
By-product
Stage 1
Stage 2
Process 1
Process 2
Stage 3
Final Product
Components Waste
Process 1
Step 1 Flow resources Step 2 Flow resources Step 3
Flow resources
Process 2
Step 1 Flow resources Step 2 Flow resources Step 3
Primary
Product
Raw Material
Energy
Capacity
Equipment
Raw Material
Energy
Capacity
Equipment
By-product
By-product
Stage 1
Stage 2
Process 1
Process 2
Stage 3
Final Product
Components Waste
An item in production goes through several stages and each stage often produces by-products. As
it may not be possible to stock intermediate products during the stage, flow resources must bedefined.
A production stage can be split into individual processes. Items, capacity and production
equipment are allocated to a process, which is divided into steps or unit operations. Each stepcorresponds to an individual operation in a routing sheet.
For example, ABC Beverages produce fruit smoothies. This involves 3 production stages:squeezing and crushing fruits, combining and treating the ingredients, and finally, packaging.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
12/41
Copyright Leading Edge Training Institute Limited 12
Detailed Scheduling and Planning
Unit2
In the first stage, each individual fruit is prepared as a smoothieingredient. This may involve a combination of washing, peeling,
crushing or squeezing depending on the type of fruit. This stageinvolves manual labour, machinery, and power to transform the
raw materials into fruit juice. The by-products at this stage arepeels and pulp.
In stage 2, these fruit juices are mixed with the aid of machinery
and then pasteurised. There is little waste at this stage.
The final stage of production involves filling bottles, sealingbottles, and labelling them. Although mostly automated, it
requires manual supervision. Some waste can occur due tomachine unreliability. Usable resources include fruit, capacity
and equipment.
Data Needed for Capacity Planning
Routing
A products routing information is the data detailing the specific method of manufacture for thatitem, including:
The operations to be performed
The sequence of those operations
The work centres used to perform the operations
The standards required to set up and run the operationsPossibly information on tooling, operator skills, inspection and testing.
Each part, assembly, or product has its own routing information. Products may follow differentpaths through the work centers. Often the number of possible routes is large. For example, apharmaceutical company has four tablet rooms, three blister packing stations, 2 bottling stations,
and 1 final packaging room. Any item produced there could follow one of 20 routes.
Routing Data
Routing data includes information on the sequence of operations needed to complete amanufacturing order.
The routing data includes:
An operation identification code (often numbered in units of 10 to allow for extraoperations)
Operation description (identifies work to be done)
Planned work center (usually along with the operation description)
Standard setup and tear-down time
Standard run time per unit
Tooling requirements.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
13/41
Copyright Leading Edge Training Institute Limited 13
Detailed Scheduling and Planning
Unit2
2. At the MRP/CRP level, which of these techniques are used in job shop
production?
A. CPM
B. PERT
C. Backward schedulingReview Q
D. Level production planning
Lead Time
In materials management, lead time is a basic part of manufactured and purchased products. The
Bill of material and routing sheet for each item generally contain all the information required toestablish lead times.
Definition
Lead tie is the span of time required to perform a process or series of operations. In this section,
we are looking at lead time as it relates to the total time needed to produce an item. Lower-levelpurchasing lead time is not considered.
Elements of Manufacturing Lead Time
Manufacturing lead time comprises several elements, some of which are more flexible and
subject to change than others. Each element is discussed below.
Queue time Setup Run Wait MoveQueue time Setup Run Wait Move
Queue Time
Queue time refers to the amount of time which is spent waiting at a work center before work isactually performed. This element of manufacturing lead time is particularly prone to increasewhen efficiency of production is lost. Queue time is often assumed to account for 90% of total
manufacturing lead time. In many job shop environments, great efforts are made, employing JITtechniques, to reduce queue time.
Queue times can vary greatly and are therefore difficult to estimate. Queue time is affected bythe balance between load and capacity, unplanned downtime, absenteeism and rework. Atdetailed capacity planning, an approximate estimate of load between time periods is attempted. It
is unnecessary to go any further than that.
Queues can be reduced by reducing setup times, leading to reduced batch sizes. It can also be
reduced by ensuring that a work center is not working to complete capacity so that it can speedup to reduce any queues. Sometimes extra employees are sent to work centers where queuesbegin to build.
Queue management aims to control lead time and fully utilize bottlenecks. The first step is to
examine the nature of the queues at the work center and then apply techniques such as operationoverlapping and operation splitting where required.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
14/41
Copyright Leading Edge Training Institute Limited 14
Detailed Scheduling and Planning
Unit2
The following diagrams show the types of queue that may be encountered.
Excessive Queues
0
20
40
60
80
10 0
1 2 3 4 5 6 7 8 9 1 0
Days
Queueleng
th(hours)
Managed Queues
0
2 0
4 0
6 0
8 0
1 0 0
1 2 3 4 5 6 7 8 9 10
Days
Queueleng
th(hours)
Uncontrolled Queues
0
20
40
60
80
10 0
1 2 3 4 5 6 7 8 9 1 0
Days
Queuelength(hour
Excessive Idle Time
0
2 0
4 0
6 0
8 0
1 0 0
1 2 3 4 5 6 7 8 9 10
Days
Queuelength(hour
Excessive Queues
0
20
40
60
80
10 0
1 2 3 4 5 6 7 8 9 1 0
Days
Queueleng
th(hours)
Managed Queues
0
2 0
4 0
6 0
8 0
1 0 0
1 2 3 4 5 6 7 8 9 10
Days
Queueleng
th(hours)
Uncontrolled Queues
0
20
40
60
80
10 0
1 2 3 4 5 6 7 8 9 1 0
Days
Queuelength(hour
Excessive Idle Time
0
2 0
4 0
6 0
8 0
1 0 0
1 2 3 4 5 6 7 8 9 10
Days
Queuelength(hour
Setup Time
The time needed to prepare a machine or other resource for the operation it is to perform is
called set up time. It is measured from the time of production of the last good piece of one itemuntil the time of production of the first good piece of the next item.
The activities involved in setup may include:
Preparation of equipment
Assembling a work stations
Tear-down of previous operation
Internal elements while the machine is switched off, for example, rethreading labels on alabelling machine.
External elements: activities performed while the machine is running, for example,calibrating the fill level on a bottling machine.
Run Time
Run time is the amount of time needed to perform an operation on a specific piece or lot oncesetup has been completed.
Wait Time
This is also called idle time and refers to the amount of time a job remains at a work center after
an operation has been completed but before it has been moved onto the next operation.
Move TimeMove time is the amount of time spent in transit from one operation to another.
Distributing Lead Time
Some of these elements of lead time represent a load on work centers while others do not. Queue
time and wait time for example, do not impose a load on any equipment or resources but setuptime and runtime do.
The total lead time for a manufacturing order is calculated by adding together all the lead time
elements across all the operations detailed in the routing. As the order progresses through theroute, the operation times in each work center can be recorded. The routing guides the detailed
capacity planning process in the same way as the BOM guides the MRP process.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
15/41
Copyright Leading Edge Training Institute Limited 15
Detailed Scheduling and Planning
Unit2
Operation and Interoperation times
Operation time is used to denote time that is used in setup and run of operations on a work
station making it unavailable for other use. Interoperation time includes wait time, move time,
and queue times. These use up space and transport facilities, but not work center facilities, andtherefore do not constitute load.
Sources of Lead Time Element Data
The different elements of manufacturing lead time can be found or measured in various ways.
Some of the typical sources of lead times are displayed in the following table:
Lead Time Element Source of Data
Queue time Average demonstrated queue time
Setup time An engineering standard value
Run time Engineering standard value
Wait time Estimation based on experience
Move time Distance to travel multiplied by the move rate
Note that the runtime and often the setup time create a load on the work centers. The other lead
time elements do not: they constitute interoperation time. Notably, only one of the elements ofmanufacturing lead time actually adds any value to the product: that is run time. The other
elements are of no value whatsoever to the customer.
Work Centers
A work center, or load center is a production area, usually comprising several people and
machines with identical capabilities, which counts as a single unit in capacity requirementsplanning. A more detailed definition of the term work center may be found in the APICS
Dictionary. In job shop environments, work centers are often separate departments.
A work center may be physical or virtual. For example, a company that employs tele-workers toprovide design documents for various publications will have a team of designers scattered across
the country or even internationally. However, a group of designers on a similar project will becounted as one work center.
Data on Work Centers
Detailed information on capacity and lead times related to each work center is crucial foreffective capacity planning. The information available on work centers usually includes the
following:
Work center identification code
Description of work center
Number of scheduled shifts
Number of machines, work stations, and/or operators, depending on which of these limits
capacity
Hours scheduled per shift
Workdays per period
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
16/41
Copyright Leading Edge Training Institute Limited 16
Detailed Scheduling and Planning
Unit2
Utilization and efficiency factors
Planned queue time (a timing factor used to calculate lead time)
Calculating CapacityCapacity may be defined and calculated in a variety of ways, usually involving measures such as
theoretical capacity, demonstrated capacity, rated capacity, utilization or efficiency quotients.Rated capacity is used when deciding on the load to be scheduled as it allows for setup and runtime.
Theoretical Capacity
Theoretical capacity is a simple calculation based on the amount of time a work station is
available. For example, if there are 4 machines available for one 8 hour shift on five days of theweek, the overall hours available will be 320 machine hours. Dividing figure this by the standardhours per unit (.2) gives a theoretical capacity of 1600 units.
Theoretical capacity = no. machines x no. hours available x standard hours per unit
Demonstrated Capacity
Demonstrated capacity is derived from historical records of the work station capacity to date. Itis usually an average figure based on several months worth of data.
Demonstrated Capacity = sum of output in last n periods
Number of periods (n)
For example, if the output of a unit in the months of January through June was 280, 220, 270,275, 290, and 265, the average output would be equal to 1600 divided by 6, or just under 267.
Rated Capacity
To find the rated capacity involves the use of utilization and efficiency quotients, which are
explained in more detail below. The basic principle behind rated capacity is that it considers theamount of time that a work station is actually used and its operating efficiency as well astheoretical capacity and standard hours per unit.
Rated Capacity = hours available x utilization x efficiency x standard hours per unit
Utilization
The utilization quotient is a measure of the amount of total hours available that were actuallyworked. This cuts out time spent on setup or repair during the production run. Only time whenthe machine is running productively is counted in this measure.
Utilization = Actual hours worked
Total hours available
Efficiency
The efficiency quotient measures the actual rate of production for a work center against thetheoretical measurement of standard hours produced. If an operation is running very efficiently it
may produce more units per hour than the rate recorded as standard for that work center.
Efficiency = Standard hours producedActual hours worked
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
17/41
Copyright Leading Edge Training Institute Limited 17
Detailed Scheduling and Planning
Unit2
3. What data is required for capacity requirements planning?
A. Forecast demand, lead times and work center capacity
B. MPS data, BOM information, utilization and efficiency ratings
C. Type of production environment, routing, BOM and MPS dataReview Q
D. Lead times, work center capacity, utilization, efficiency, and routing data
Capacity and Load Sources
Detailed capacity planning must take into
account all possible sources of load thatcan be predicted in advance. These include
items such as open and planned orders,rates of rework, scrap and yield, scheduleddowntime, testing time, and production of
extra material needed for testing.
Open Orders or Scheduled Receipts
Information on open orders is maintainedin an order status file in production control.
The information will include the due date,order quantity, and the number of
operations completed / outstanding for theorder.
Planned Orders
Planned order releases and firm planned orders may be directly taken from MRP to help in thecapacity requirements planning process. The information required includes the release date,
receipt date and order quantity for each planned order.
Other Load Sources
Although not always easy to predict, it is important to include allowances for other sources of
load such as rework, scrap, yield, downtime, production of samples, test material, or other non-saleable items.
Load
Input Rate
Orders
Capacity
Output
Manufacturing
Lead Time
Load
Input Rate
Orders
Capacity
Output
Manufacturing
Lead Time
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
18/41
Copyright Leading Edge Training Institute Limited 18
Detailed Scheduling and Planning
Unit2
Queuing
The primary objective of detailed capacity planning is to show a comparison between the loadimposed on a work center and the capacity of each work center over a period of time. In each
time period capacity overload or underload may be identified and, if necessary, replanning cantake place to redress the balance.
Capacity is the rate at which work can be accomplished. Therefore, the rate of flow into a work
center, which constitutes the load on that work center, must be determined so that it closelymatches the capacity of the work center. If the flow or orders exceeds available capacity, queues
will form at the beginning of the work center. If the flow of orders reduces or capacity isincreased, the load will then become stable or even decline.
Detailed capacity planning is an attempt to regulated the arrival of work orders and the capacity
of the work center in order to achieve a steady flow without buildup of queues. Queues lengthenwork center lead time and are to be avoided as this will contribute to the overall manufacturing
lead time for the item.
Job shops and Queues
In a job shop environment, good utilization of
capacity and short queue times are impossible toachieve simultaneously. If capacity utilization isclose to 100%, queue times increase
dramatically. For this reason, most job shops are
planned with capacity utilization significantlybelow 100%.
While it is often necessary to build up queues atbottleneck work centers in a process to ensure
high utilization, in a job shop where no one workcenter creates a bottle-neck or constraint on the
process, it is more important to reduce queuesthan to achieve high utilization.
Reasons for Queues before Work Centers
At any point where the rhythm of operation in a particular work center fails to correspond to therhythm in which orders are received, a waiting queue begins to build up. To minimize lead times,
excessive queues should be avoided, although there are certain valid reasons for maintainingqueues between workstations such as those listed below.
To guard against disturbance on a workstation such as scrap, rework, material shortage,
or absence of operator
To improve utilization of a constraining work center
To guard against imbalances in process time
To cushion disturbances around workflow, such as replenishment of materials or on-the
run maintenance of machineryTo balance flow around bottleneck work centers
100%
MeanQueue
Times
10
40
60
Utilization100%
MeanQueue
Times
10
40
60
Utilization
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
19/41
Copyright Leading Edge Training Institute Limited 19
Detailed Scheduling and Planning
Unit2
Queues to reduce production costs, for example, to save on setup time
To motivate workers as high queue levels tend to increase speed of work, although it is
important to ensure the queue is not big enough to demoralize workers
Queues may be deliberately planned to address some of the issues listed above. However, thoseplanning or tolerating queues must remain aware that queues result in increased lead times and
increased work-in-process (WIP) inventory. Both of these mean fewer inventory turns andtherefore a greater amount of money is tied up in WIP inventory. These disadvantages must be
weighed against the possible advantages of maintaining queues.
Scheduling Strategies
Using techniques such as scheduling strategies, load profile calculations, finite and infiniteloading, the capacity of a plant can be evaluated. By comparing and contrasting the results of thedifferent techniques, much can be learned about current operations and possible methods of
optimizing the operation.The method of scheduling used in an organization will depend on the following factors:
The volume of orders
The nature and complexity of operations
The need to minimize completion time
The need to maximize utilization
The need to minimize WIP
The need to minimize customer wait time
Backward Scheduling
With backward scheduling, the latest due date for an order is calculated. Then the lead time is
applied to determine the latest start date for the production of that order.
Forward Scheduling
Forward scheduling begins with the order start date (the earliest start date for the order) and
calculates the earliest due date for each operation and subsequently the earliest completion datefor the order.
OP 10 OP 20 OP 30 OP 40
Backward Schedul ing
OP 10 OP 20 OP 30 OP 40
Forward Scheduling
Earliest
possiblestart date
Latestpossibledue date
Time
OP 10 OP 20 OP 30 OP 40
Backward Schedul ing
OP 10 OP 20 OP 30 OP 40
Forward Scheduling
Earliest
possiblestart date
Latestpossibledue date
Time
It is a good idea to perform backward scheduling from a customers requested date to determine
a start date. If the start date has already passed, then it will be necessary to forward schedule
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
20/41
Copyright Leading Edge Training Institute Limited 20
Detailed Scheduling and Planning
Unit2
from the current date to provide an accurate due date, which can then be communicated to thecustomer.
Capacity requirements planning usually uses backward scheduling as this is the most efficient
use of time and resources while ensuring that the customers requested due date is met.
Central Point Scheduling
This technique combines both forward and backward scheduling. The central point date is thestart date of a critical operation, for example, one that is performed at a constraining work center.
This critical operation determines the rest of the lead time and therefore both the start and duedates. In other words, the start and due dates for the order are dependent on when the order canbe processed on the constraining work station.
Earliestpossible
start date
Latest
possible
due date
Time
OP 30 OP 40
Forward Scheduling
OP 10 OP 20
Backward Scheduling
Critical PointEarliestpossible
start date
Latest
possible
due date
Time
OP 30 OP 40
Forward Scheduling
OP 10 OP 20
Backward Scheduling
Critical Point
OP 30 OP 40
Forward Scheduling
OP 10 OP 20
Backward Scheduling
OP 10 OP 20
Backward Scheduling
Critical Point
From the central point, which marks the beginning of the critical operation, forward schedulingis used to set subsequent operation times and due dates, while backward scheduling is used todetermine the timing of all operations that must occur before the central point.
Forward scheduling tends to have all operations completed as soon as possible, thereby bringingforward the due date. Backward scheduling has the opposite effect, where operations are timed
to ensure that the order will be complete just in time for the latest possible due date. Datesdetermined by central point scheduling usually fall somewhere in between.
Central Point Scheduling and Theory of Constraints (TOC)
Central point scheduling is useful for constraint-oriented finite loading. The theory of constraintsinvolves drum-buffer and rope scheduling, where the drum is the constraining operation in the
process and therefore sets the tempo of the entire process. The buffers are queues in the processto guard against the constraining workstation operating at less than full capacity, and the rope isthe Kanban or other mechanism that moves work along the process. Performance measurement
of throughput, inventory and operating expense is important to ensure the process is running
smoothly, and thinking process tools are used to identify the root causes of any problems andpotential process improvements.
Optimized production technology (OPT) is a practical application of the theory of constraintswith which central point scheduling can be very effective.
Quite often the earliest start date is the current date, particularly for urgent customer productionorders or early released orders. In such cases, probably scheduling may be used.
Probable Scheduling
Like central point scheduling, dates determined by probable scheduling fall somewhere inbetween the extremes of first possible starting date and last possible due date as determined by
forward and backward scheduling respectively. Probably scheduling builds in slack time. Inbackward scheduling, slack time is the difference between the latest possible start date and the
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
21/41
Copyright Leading Edge Training Institute Limited 21
Detailed Scheduling and Planning
Unit2
earliest possible start date. In forward scheduling it is the difference between the earliest possibledue date and the latest due date.
Slack time provides for flexibility in planning. Positive slack time (where extra time is built in
between operations on top of expected wait, move, and queue times) leads to longer lead times.Negative slack time (where time periods between operations are shortened) requires that lead
times be shortened. The example below is of probable scheduling using positive slack time incomparison with forward and backward scheduling.
OP 10 OP 20 OP 30 OP 40
Backward Scheduling
OP 10 OP 20 OP 30 OP 40
Forward Scheduling
Earliest
possiblestart date
Latestpossible
due date
Time
OP 10 OP 20 OP 30 OP 40
Probable Scheduling
OP 10 OP 20 OP 30 OP 40
Backward Scheduling
OP 10 OP 20 OP 30 OP 40
Forward Scheduling
Earliest
possiblestart date
Latestpossible
due date
Time
OP 10 OP 20 OP 30 OP 40
Probable Scheduling
The technical process itself determines the duration of operations and the technical and
interoperation time. Slack time can only be gained by increasing or reducing non-technicalinteroperation times or administration times. Probable scheduling determines the lead time
stretching factor, a numerical factor by which the non-technical interoperation and administrativetimes are multiplied.
By combining several strategies, it is possible to build a powerful simulation of the capacity
scheduling process.
4. Which of the following is NOT a load source that must be accounted for inCRP?
A. Open orders and scheduled receipts
B. Planned orders from MRP
C. Rework, yield or downtimeReview Q
D. Sub-contracted orders
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
22/41
Copyright Leading Edge Training Institute Limited 22
Detailed Scheduling and Planning
Unit2
Calculation of Load Profiles
The load profile, as described in the APICSdictionary, is the future capacity requirements
based on released orders, planned orders, or bothover a specified time period. Often, the load profileis displayed as a bar chart, which helps to quickly
identify overload and underload. Detailed capacityplanning usually involves the development of load
profiles for each work center.
The next lesson in this module will demonstrate the mechanics and logic of lead timecalculation, forward scheduling, load calculation, and resulting load profiles.
Infinite and Finite Loading
Unless there is flexibility available in capacity and order due dates, it is not possible to resolve
planning problems through balancing load and capacity. By ensuring flexibility in either or both,capacity planning techniques may be employed to resolve planning problems. The techniquesused are based on either modifying times or modifying capacity. They can be classified as either
infinite loading (without regard for capacity) or finite loading techniques.
Both approaches are based on the fact that:
If enough overall flexibility is available, all orders can be planned using batch procedure without
the planner. Once planning is complete, the planner may intervene daily or weekly to resolve
unusual situations.
If there is little or no flexibility, planning takes place order for order with each new order addedto already planned orders. The planner may, at any point, change due dates or capacity levels.
Capacity
Finite Loading
Capacity
Infinite Loading
Capacity
Finite Loading
Capacity
Infinite Loading
Infinite Loading
Infinite loading calculates work center loads by time period but does not take into considerationthe capacity of each work center. The main aim of infinite loading is to ensure scheduled due
dates are met with the optimal control of fluctuation in capacity requirements. It is useful whenmeeting due dates are prioritized over other factors as would be the case with customer order
production in a job-shop environment.
In many cases, where it is possible to modify capacity significantly on a day to day basis, infiniteloading techniques, which plan load by time period without regard to capacity, are the best
techniques for production activity control (PAC). Short-term flexibility of capacity is animportant principle in JIT manufacturing.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
23/41
Copyright Leading Edge Training Institute Limited 23
Detailed Scheduling and Planning
Unit2
Finite Loading
Finite loading does not allow any work station to be loaded beyond its capacity. To prevent this
occurring it may be necessary to change start or due dates. In finite loading, time rather than
capacity is the variable parameter. Finite loading aims to optimize capacity utilization over time.It is useful in continuous flow production and other environments where limited capacity is the
most pressing planning issue.
Finite Capacity Planning Techniques
Manufacturing environments that employ assembly line or process-flow production are oftensubject to inflexible capacity. In addition, many companies although flexible with regard to
capacity over the longer term, must firm up capacity levels in the short term. In these cases,finite loading techniques must be used at the detailed capacity planning level and often at higherlevels also, such as rough-cut capacity planning and resource planning. This is particularly true
of continuous flow production environments.
Finite capacity planning, where load never exceeds capacity, is most effectively illustrated by
portraying load as a horizontal bar, as in Gantt charts. This makes it easier to visualize the loadon each workstation and to identify problems of operation planning. For example, the diagrambelow shows how two operations for a new order are slotted into the existing planning
arrangements. Notice how, when accommodating earliest start date and the need forinteroperation time between the two operations required to complete the order, the secondoperation must be completed in two lots, before and after a previously scheduled operation.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
WS 1
WS 2
WS 3WS 4
WS 5
previously scheduled operationsoperation 232.20
operation 232.40
A key input in this type of scheduling is the priority of the order. Priority rules for operations andorder sequencing are important aspects of finite loading techniques. Many of them also providefor the rescheduling of previously scheduled orders. Most finite loading techniques are based on
the following methods.
Process-oriented finite loading
This approach aims to minimize delays suffered by individual operations and thereby reduces thepotential delay of the entire production order. Each operation is planned by time period on thebasis of order beginning with the start date determined by lead-time scheduling. This involves
determining order priority rules to ensure operations are scheduled, using sequencing rules, toachieve maximum throughput. Queues upstream of work centers must be monitored and
adjusted. This type of planning results in an actual working program for the duration of theplanning horizon.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
24/41
Copyright Leading Edge Training Institute Limited 24
Detailed Scheduling and Planning
Unit2
Order-oriented finite loading
The goal of order-oriented finite loading is to enable the completion of as many orders as
possible. Those orders that cannot be scheduled must be assigned new start and due dates and
then monitored. This technique is the most commonly used finite loading technique. It isexplained in more detail in the next lesson.
Constraint-oriented finite loading
This approach plans orders around bottleneck capacities. It uses optimized production
technology (OPT) to link scheduling dates and available capacity. To begin with, only orderswith a minimum batch size are generated. These lots come together at bottleneck capacities butare kept apart in other operations. After this, all operations at the bottleneck work stations are
scheduled. When this is complete, backward scheduling is used to schedule operations prior tothe bottleneck and forward scheduling is used to schedule those occurring after the schedule. The
backward and forward planning assumes normal lead times. This is a similar approach to the
central point scheduling theory explained earlier in this lesson.
To prevent overloading any workstation, finite loading techniques evaluate latest start dates,
earliest completion dates and various other combinations of start and end dates usingmathematical modelling techniques.
Rule-based and constraint-based finite schedulers are used for rapid problem-solving, usuallywith the aid of supply chain management software. Such software can maintain a description ofthe nature of a production and logistics network in a company along with constraints at any
point. Another module of the software will make use of this detailed description to performadvanced planning and scheduling within feasible planning time. The algorithms used by APS
software include mathematical modelling techniques such as branch and bound, linearprogramming, simulated annealing, and genetic algorithms, and newer techniques such asconstraint-based scheduling and case-based reasoning.
5. How is the utilization factor for a work center calculated?
A. Dividing the standard hours produced by the actual hours worked
B. Dividing the output over several periods by the number of periods
C. Dividing the actual hours worked by the total hours availableReview QD. Multiplying the number of hours worked by the standard hours per unit
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
25/41
Copyright Leading Edge Training Institute Limited 25
Detailed Scheduling and Planning
Unit2
Scheduling of Manufacturing and Logistics Operations
Its important that material planning, scheduling and capacity planning are all closely linked withthe common aim of optimizing costs and order delivery times. To ensure this happens, shop floor
control must be able to optimally distribute the amount of work to be completed within aparticular time period. Detailed capacity planning techniques such as finite loading techniques ormixed manufacturing techniques can help to achieve this outcome.
Load Levelling
Load leveling is important in shop floor control. This means that the
amount of work to be completed in a particular time period should beevenly distributed and readily achievable. Load leveling or capacity
smoothing as it is also called, is defined more comprehensively in theAPICS dictionary.
Order Oriented Finite Loading
Order-oriented finite loading achieves maximum capacity utilization or ensures that as manyorders as possible are executed on time with low levels of goods in process. Complete orders arescheduled one after the other in each time period. If a time period begins with an empty load, any
orders that have already started are scheduled first, and only those operations that have not yetbeen carried out are considered.
Strategy
Priority rules are determined that will enable the completion of as many orders as possible.Orders that cannot be scheduled must have their start and due dates modified and must be closely
monitored.
Process
There are seven main stages in the order-oriented finite loading decision process. Several of the
stages form decision points that loop back to previous process stages. Initially, orders areplanned and handled according to priority. The next stage involves handling, in the correct
sequence, the operations planned for a specific order, and loading each operation to theappropriate work center. At this point, if the capacity limit has been reached, an exception rule
must be applied.
This process repeats until all the operations for a specific order have been planned. The nextorder in the priority list must be determined and planned in the same way as before.
When all orders have been planned, or unloaded if sufficient capacity did not exist to plan themall, then the exceptions raised at earlier stages must be dealt with, either by raising capacities orshifting due dates or start dates. The following diagram illustrates the process, which is
explained in more depth below.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
26/41
Copyright Leading Edge Training Institute Limited 26
Detailed Scheduling and Planning
Unit2
2. Load workstation
4. Apply exception rule
1. Identify orders
and priorities
3. Capacity limit
reached?
5. All ops planned?No
No
Yes
Yes
6. All orders planned
or unloaded?
Yes
7. Are there
exceptions to deal
with?
Deal with
Exceptions
No
Start
Finish
2. Load workstation
4. Apply exception rule
1. Identify orders
and priorities
3. Capacity limit
reached?
5. All ops planned?No
No
Yes
Yes
6. All orders planned
or unloaded?
Yes
7. Are there
exceptions to deal
with?
Deal with
Exceptions
No
Start
Finish
1. Identify and Prioritise Planned Orders
The first step is to ensure that all necessary orders to be planned within the planning horizonhave been identified in the system. Once that is complete, the orders must be treated according todefined priorities. Generally orders already begun and all orders with start dates within the
chosen time limit will be planned. Orders might then be sequenced according to:
The proximity of the order start date, with fixed start date orders loaded first
Proximity of the order due date, using the earliest due date available
The ratio of order lead time divided by the time still available for the order. In otherwords, orders that will require a high level of operation time and little slack within the
available time must be scheduled first.
The ratio of remaining lead time for the order divided by the number of remainingoperations
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
27/41
Copyright Leading Edge Training Institute Limited 27
Detailed Scheduling and Planning
Unit2
Order priorities originating from external factors, such as a rush order for a key customer
Any combination of the above priority rules.
2. Handle and load operations in order
Once the orders have been identified and listed in order of priority, the operations are loaded towork centers, working wither from start date forward, or from due date backward. Interoperation
times such as setup and move time are factored in but queues are not considered.
3. Apply Exceptions
When an operation must be started on a work center that has already reached full capacity for theperiod in question there are three exception rules that can be applied:
Load without considering available capacity, which may be useful if the operation to be
performed is quite short or the order has already begun.
Defer the operation until the next period where the work center has available capacityUnload the entire order and demote it down the list or priorities.
5, 6, and 7. Check the planning status
At step 5, an operation has been loaded and the system must check for any outstanding
operations for that order. If there are further operations to be planned for the order, the nextoperation is selected and steps 2 and 3 are repeated. When all operations for an order have been
completed the system moves on to the next check.
The second check is performed when the operations for an order have been planned. The systemmust now check to see if all orders have been planned or otherwise dealt with. When there are
more orders to plan, step 1 is completed to identify the next order in the priority list. Steps 2 and3 are completed for each operation in that order. Only when all orders are planned or unloaded,
does the system finally break out of the loop and perform the final check.
The last check is for any outstanding exceptions that have not already been dealt with. If these donot exist, the planning process is complete. Where they do exist, contingency plans must be
applied.
Apply Contingency Plans
Some of the contingency plans that may be adopted include the following:
For every capacity that is overloaded in a particular time period, either provide morecapacity, or unload orders.
For orders that will not be completed on time defer the order of deliberately increasecritical capacity in order first to unload the order.
For every unloaded order, bring forward the start date or, if the due date is flexible, deferthe order. It may also be possible to increase critical capacities so that the order can beloaded again.
Any unloaded orders remaining after such contingencies have been applied will then berescheduled. This can either be performed at the end of the planning process or in
conjunction with the process each time an order is unloaded.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
28/41
Copyright Leading Edge Training Institute Limited 28
Detailed Scheduling and Planning
Unit2
Limitations of Order-Oriented Finite Loading
The technique of order-oriented finite loading requires that capacity and load figures are reliable
so that planned schedules and reported progress of work will closely tally. Otherwise, calculated
due dates will quickly become invalid.There must be some flexibility with due dates, particularly if operations are to be deferred each
time maximum capacity is reached on a work center. Occasionally, by random chance, one ortwo orders will be delayed way beyond their expected lead times when such an approach is used.
With these requirements in mind, the limitations of order-oriented finite loading are:
The further into the future plans extend, the higher the chance that the planning forecastwill be in error. Therefore, the technique should be used for short planning horizons and
regularly repeated.
Regular and efficient replanning is needed
Depending on the exception rules used, the technique does not always allow for localreactive replanning to ensure that all scheduled operations are completed during thespecified period.
By deferring operations either forward or backward until the next period with availablecapacity is found, the best use of capacity is achieved. However, this may be at the
expense of long queues, leading to an increase in tied capital.
By unloading entire orders where it is found that one of the operations in the order cannotbe performed on the designated work station due to capacity issues, the plan that results
will definitely be within capacity. However, this approach may lead to lower utilizationof capacity because the load that would have been caused by other operations in the
dropped order will be taken away. Where no other orders are entered, this is wastedcapacity. In addition, deferred orders will be subject to long delays and it may beimpossible to accept new orders, even though the system is not working to full capacity.
Applications of Order-Oriented Finite Loading
When order-oriented finite loading defers operations that create an overload to periods of
available capacity, it is suitable for serial production over a long period or in a monopoly orsellers market where the customer due date is of reduced importance as they are unlikely to goelsewhere for the product.
When the technique overloads work stations where necessary and defers orders where necessary,
it is suitable for any manufacturing industry capable of meeting the requirements of quantitativeflexibility in capacity and due dates.
In shop floor control, the technique provides either an actual work program for the next fewdays, or an acceptable work program that allows a degree of flexibility, depending on the
exception rules that are implemented. Individual orders can often be replanned very efficientlyon a Gantt chart that shows available space on each work center.
The technique is a highly visible and easily manipulated tool, which lends itself to long termplanning of a few high-value added orders so long as regular planning and replanning iscompleted.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
29/41
Copyright Leading Edge Training Institute Limited 29
Detailed Scheduling and Planning
Unit2
6. Which scheduling technique results in scheduling toward the earliestpossible due date for an item?
A. Forward Scheduling
B. Backward Scheduling
C. Critical point schedulingReview Q
D. Probable Scheduling
Mixed Manufacturing
Mixed manufacturing organizations produce products with a variety of market strategies and
logistics objectives. Some may produce and sell mass-produced goods, holding WIP and finished
goods inventories. The goal of such organizations is to ensure maximum capacity utilizationwhile at the same time producing a wide variety of products to meet customer demand. Shortlead times are very important in mixed manufacturing.
Load-Oriented Order Release (LOOR)
LOOR is a type of rough-cut order-oriented finite loading method that aims to adapt the load tothe available capacity. The matching of load to capacity can be limited to one time period. A
single time period is multiplied by the loading percentage. This is then balanced against the loadswhich will arise in this and later periods. A conversion factor is then applied to progressivelyconvert the loads of all subsequent operations as these will not be loaded with full work contents.
The main aim of LOOR is to maintain high loads. Apart from this, it also aims to minimizework-in-process, shorten lead times, and improve reliability of delivery.
Steps Involved in LOOR
Step 1.
The first step is the scheduling of orders. For example, the planner for a clothing manufacturer
must add five new orders to the existing workload. Initially, each of the five orders are showntogether with their operations on a time axis. Each operation is labelled with the work center
where it should be executed. Each order has a scheduled start date. LOOR uses a time filter, ortime limit to eliminate all orders with a start date later than the time limit. In the example givenbelow, 2 of the orders are eliminated using this time filter and are set as not urgent. The rest of
the orders are designated urgent are passed to the next step.
Order 1
Order 2
Order 3
Order 4
Order 5
WC100 WC300 WC210 WC400
WC100 WC300 WC210 WC400
WC100 WC300 WC210 WC400
WC100 WC300 WC210
WC100 WC300
Time LimitTime
Urgent
Not
Urgent
Order 1
Order 2
Order 3
Order 4
Order 5
WC100 WC300 WC210 WC400WC100 WC300 WC210 WC400
WC100 WC300 WC210 WC400WC100 WC300 WC210 WC400
WC100 WC300 WC210 WC400
WC100 WC300 WC210
WC100 WC300
Time LimitTime
Urgent
Not
Urgent
Step 2.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
30/41
Copyright Leading Edge Training Institute Limited 30
Detailed Scheduling and Planning
Unit2
In this step, the load of each operation in each of the urgent orders is converted by a factor. Thefactor is used in an attempt to account for the fact that the further out you try to plan, the less
certain the planned load of a job will consume the planned capacity. The greater the number ofoperations before a particular operation, the greater the chance that the operation will not be
completed on time. In the example shown, the factor is 50%. This means that the load of the firstoperation is taken fully into account. With the second operation, only 50% is taken intoconsideration. The graph below shows the load profile of one of the orders, both original and
converted, on each work center. Note that the operations are shown in work center order ratherthan in the order that they are performed. This is done in preparation for the final LOOR step.
0
2
4
6
8
10
12
14
100 210 300 400
converted
Order
Step 3.
In step 3, the existing preload for each workstation and the additional load of the new orders arecombined. The preload stems from different periods on the time axis and may be greater than the
scheduled output capacity for any one time period. A loading percentage for each workstation is
chosen, for example 200%. This sets the load limit for each work center. The orders are thenloaded in start date sequence. When the addition of a new order results in an excessive load on
the work center the entire order is unloaded. The load limit in step 3 is therefore acting as afurther load filter. So, for example, due to the preload on workstation 100 and the load limit set
for that workstation, it is not possible to load order 3, even though it passed through the filter instep 1.
Having worked through the LOOR steps, only orders 1 and 2 of the original set of orders have
passed and can be released. Order 3 must be dealt with as an exception and orders 4 and 5 will bedealt with in the next LOOR period.
Calculating Conversion Factors and Loading Percentages in LOOR
The conversion factors and loading percentages are key aspects of the LOOR method. They havebeen arbitrarily set in the example above. In most situations, the conversion factors and loading
percentages would be derived from historical data.
Capacity-Oriented Materials Management (Corma)
Corma is an operations management principle that enables mixed manufacturers to balance workin process against limited capacity and short deliveries. Corma comprises three parts:
Criterion for order release
Probable scheduling
Coupling of shop floor scheduling and materials planning.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
31/41
Copyright Leading Edge Training Institute Limited 31
Detailed Scheduling and Planning
Unit2
The Criterion for Order Release
Corma releases stock replenishment orders earlier than needed, that is before inventory levels hit
the order point. An early order release is considered as soon as there is available capacity in
work centers.
Probable Scheduling
This is required for shop floor control and gives priority to early released orders as needed. Thepriority is calculated by continually monitoring the lead-time-stretching factor of each order.
Coupling of Shop Floor Scheduling and Materials Planning
Stock replenishment orders are constantly rescheduled according to actual usage on the shopfloor. The current physical inventory is converted into an appropriate latest due date for open
replenishment orders. Stock replenishment orders of make-to-stock materials are treated as filler
loadings. They fill in capacity not required by other orders. However, this may mean productionearlier than required. Therefore the trade-off for improved capacity utilization is a higher level ofwork in process.
Corma aims to minimize capacity costs, work in process and warehouse stock levels by
performing continual balancing acts between material requirements and stock replenishmentorder production.
Effects of Corma
Orders that are released early are scheduled without priority. They are performed whenthere is available capacity on the required work centers and there are no more urgent
orders to process.
When unplanned customer orders are added to the schedule they take precedence over
stock replenishment orders in process. This may mean that these stock replenishmentorders will not be started until later.
Continual order rescheduling occurs and as the waiting orders are left closer and closer to
their latest due date, they are assigned smaller lead-time-stretching factors. This in turngives them higher priority in the order list.
If inventory stocks fall faster than expected the latest due date of some of the stockreplenishment orders may be advanced. This again reduces the lead-time-stretching factorand the order may be expedited. Alternatively, if stocks fall more slowly than expected
the latest due date will be postponed. This has the effect of increasing the lead-time-stretching factor and delaying the order as it is therefore lower in the priority list.
The Corma technique is useful for mixed production and manufacturing environments where on-the-spot planning is required.
Corma uses critical capacity available short-term to achieve balanced loading and reduce
queuing and lead times. Orders are generated periodically, providing for optimal sequencing andreducing setup times. They are released prior to inventory falling below order point levels, as
soon as there is available capacity to handle them. Replenishment orders take a lower prioritythan customer orders and are continually rescheduled according to the actual usage levels of thematerial to be replenished. They are therefore tightly coupled to the material plan.
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
32/41
Copyright Leading Edge Training Institute Limited 32
Detailed Scheduling and Planning
Unit2
Summary
In this lesson, the characteristics and methods used to ensure sufficient capacity to support the
material plan were examined. The lesson also looked at the use of work center and routing data,
and explained the calculation of rated capacity using efficiency and utilization ratios. Thebalance of demand and capacity, time availability and due dates were examined along with finiteand infinite capacity planning techniques. Finally, the lesson explained the integration ofscheduling and capacity planning with material planning for order release and control.
You should be able to:
Explain detailed capacity planning at an intermediate level
Explain the effect of the manufacturing environment on the choice of planning techniqueand information requirements
Describe the steps by which work center and routing data are used to schedule orders and
identify resource loads in each time periodUse efficiency and utilization ratios to determine the rated capacity of a work center
Identify load sources for planned and released orders
Explain the effects of queuing on job-shop production
Describe planning, scheduling, and order release preparation techniques in a variety of
production environments
Further Reading
Introduction to Materials Management,
JR Tony Arnold, CFPIM, CIRM and Stephen Chapman CFPIM5th edition, 2004, Prentice Hall
APICS Dictionary
10th edition, 2002
Manufacturing Planning and Control Systems,
Vollmann, T.E.; W.L. Berry; and D.C. Whybark
5th
edition, 2004, McGraw-Hill
Production & Inventory Management,
Fogarty, Donald W. CFPIM; Blackstone, John H. JR. CFPIM; andHoffmann, Thomas R. CFPIM2nd edition, 1991, South-Western Publishing Co., Cincinnati, Ohio
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
33/41
Copyright Leading Edge Training Institute Limited 33
Detailed Scheduling and Planning
Unit2
Review
The following questions are designed to test your recall of the material covered in
lesson 6. The answers are available in the appendix of this workbook.
7. Using which loading method are orders that are released early scheduled withoutpriority?
A. Order-oriented finite loading
B. LOOR
C. CORMA
D. Infinite Loading
8. Which scheduling technique builds in slack time and works within the time frame ofearliest possible start date and latest possible due date?
A. Forward Scheduling
B. Backward Scheduling
C. Probable Scheduling
D. Critical Point Scheduling
9. How is the efficiency of a work station calculated?
A. Dividing the sum of output over a number of periods by the number of periods
B. Multiplying the hours available by the standard hours per unit and the utilization quotient
C. Dividing standard hours produced by actual hours worked
D. Dividing actual hours worked by the total hours available
10. Calculate the rated capacity of a work center where there are 3 eight hour shiftsavailable, the work center is in use for 7 out of 8 hours. The work center produces 7 hours
of work against 6.5 standard hours.
A. 2637B. 19
C. 144
D. 8050
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
34/41
Copyright Leading Edge Training Institute Limited 34
Detailed Scheduling and Planning
Unit2
Whats Next?
This lesson introduced some concepts and techniques required in detailed capacity planning. At
this point you have completed 6 of the 9 lessons in the Detailed Scheduling and Planning unit.
You should review your work before progressing to the next lesson which is:
Detailed Scheduling and Planning Lesson 7 Detailed Capacity Planning Continued
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
35/41
Copyright Leading Edge Training Institute Limited 35
Detailed Scheduling and Planning
Unit2
Appendix
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
36/41
Copyright Leading Edge Training Institute Limited 36
Detailed Scheduling and Planning
Unit2
Answers to Review Questions
1. All except B
CRP is performed on the material plan to ensure that it is feasible. CRP is a detailed process that
calculates the work load for each work center during each MRP time bucket, taking into accountall operations required to fulfill the MPS. It is concerned with load balancing rather thanscheduling operations.
2. B
PERT and CPM are often used in project-based production. Level production planning is
completed at the master planning level. Backward scheduling, forward scheduling, or probablescheduling are suitable for job shop environments.
3. D
Capacity requirements planning requires information on work centers, particularly work centercapacity, utilization and efficiency levels, planned queue time and load sources. It also requires
item lead times and routing information. Although the type of production environment influencesthe choice of capacity planning technique, it does not affect the capacity planning activitysubsequently.
4. D
CRP must take into account all potential loads on production. This involves examining the orderstatus file in production control for details of open orders and scheduled receipts, the MRP for
information on planned orders, and examining historical records and other sources for likely
rework, yield, downtime and other factors affecting throughput.5. C
The utilization quotient is a measure of the amount of total hours available that were actuallyworked. This cuts out time spent on setup or repair during the production run. Only time when
the machine is running productively is counted in this measure. Utilization is used in thecalculation of rated capacity.
Utilization = Actual hours workedTotal hours available
7/23/2019 Detailed Scheduling and Planning (Lesson 6)
37/41
Copyright Leading Edge Training Institute Limited 37
Detailed Scheduling and Planning
Unit2
6. A
Forward scheduling assumes that an order will start as soon as possible. It then works forward,
calculating operations and lead times to estimate the earliest due date for the order.
7. C
The order-oriented finite loading method achieves maximum capacity utilization or