DCP/DICP UPDATES
DepED Technical ServiceArt TuazonOIC, DCP/DICP
DepED Schools
School Type BOSY 2011
ES, multi-grade 7,521ES, mono grade 30,980High School 7,470TOTAL 45,971
1. DepED Comptzn Program
• Aims to install computer packages in Elem and HS nationwide• Started in 2007 (early as 2001 with DTI)• Package Types• ES: 1 host + 6 Thin Clients• HS: 7 sets of ES package (Lab Model)
Power Availability
School Type BOSY 2011
ES, multi-grade 7,521ES, mono grade 30,980High School 7,470TOTAL 45,971
With No Power40%
11%4%
14%
6,564schools
ICT Provision
School Type BOSY 2011
ES, multi-grade 7,521ES, mono grade 30,980High School 7,470TOTAL 45,971
With Computers
9%61%88%57%
26,026schools
1. DepED Internet Connectivity
• Provides HS with Internet Subscription Costs to their OpEx Budgets• PhP 48,000 or US$ 95/month
• Mix of ISPs• Digital Subscriber Line (DSL)• Fixed Wireless (Canopy, WiMax)• 3G/HSDPA (USB transceivers)• Satellite-based
Internet Access
School Type BOSY 2011
ES, multi-grade 7,521ES, mono grade 30,980High School 7,470TOTAL 45,971
With Internet
1%8%
40%12%
5,579schools
DCP status using BY2010
• ES and HS Computer Pkges (3 Lots)• 2 awarded as of 09 Nov• 1 for rebid• DBM-PS managing the procurement• Enhancements in TOR/Specs• Better after-sales requirements• ‘Whole package’ warranty
DCP and DICP next steps
• Reliability issues with certain ISPs• Review of DCP ES/HS specs•Monitoring system (draft by Dec 2012)• Review policies on DCP/DICP (Dec 2012)• Download 2012 budgets to Divisions• Empowerment (RA 9155), Local knowledge,
Leverage.
Satellite-based Internet
Teacher Hands On
Teachers try out an interactive learning resource that can be found in DepEd's Learning Resource Management and Development System (LRMDS). For the purposes of the training, the file was made available locally as there was no internet connection available.
3. The LRMDS• Learning Resources Management and
Development System• Part of AusAID TA piloted in Regions 6,7,8
(Visayas Islands) and in Region XI• Means of distributing materials for repro in
division LRCs• To date, 2400+ learning resources in the
portal• Vetting process
LRMDS Main Page
Challenges
• Power Availability, Internet Coverage• Obsolescence• Market monitoring and package review • What is the next ICT use model? Is current
model sustainable?• Green Computing• Green Procurement• Professional Dev’t and New Content
Top Related