Data Management during GEOTRACES
Data Management sub-committee:
Reiner Schlitzer, Jing Zhang, Bill Jenkins, Chris Measures
http://www.geotraces.org/
Scientific Committee on Oceanic Research
International Council for Science Sponsored by
And many national agencies.
Data policies for GEOTRACES
British Ocean Data Facility,Liverpool, UK, 30th November- 2nd December, 2005
Representatives from data management facilities
BODC, PROOF, CCHDO, LDEO and the CIESEN
Largely recommendations from a meeting held at:
Raymond Pollard, Reiner Schlitzer, Jing Zhang, Ed Urban, Chris Measures
Objectives of Data Management in GEOTRACES
Ensure that all GEOTRACES data are made available to the entire geochemical and modelling community in a timely manner
Establish data standards for reporting and archiving the products of GEOTRACES cruises
Ensure the compilation and archiving of full international
GEOTRACES data set by providing access to effective data
management infrastructure for participating countries without
national infrastructure
Establish a mechanism for the validation and quality control of data
Establish timescales for data submission and release
Do not reinvent the wheel!
Ocean sections
Routine hydrography data, T,S, nutrients, oxygen, etc.Bottle parameters, TM rosette and regular rosetteMuch experience of handling these data types In particular, the CLIVAR and Carbon Hydrographic Data Office (CCHDO) at the Scripps Institution of Oceanography (SIO), originally the WOCE Hydrographic Data Assembly Centre (DAC), has considerable experience of handling vertical water profile data
Expected Data Types
More diverse than ocean sections. Some similar to but shorter than ocean sections Others will involve more varied types of data
e.g. video, pore water samplers, cores, sediment traps, mooring systems, etc.
Process studies will probably be co-operative ventures involving several countries with varying capabilities and resources
Some studies will be subject to Exclusive Economic Zone (EEZ) data-release restrictions.
Process studies
Terms of Reference of Data Management Committee DMC)
Oversee the work of the GEOTRACES Data Assembly Centres (DACs)
and the Data Liaison Officer in the International Project Office
Ensure that GEOTRACES creates and maintains an integrated,
international data and cruise inventory
Oversee the compilation and archiving of data
Ensure that all GEOTRACES data are made available
Monitor acceptance and compliance with GEOTRACES data policies
Report to and advise the GEOTRACES Scientific Steering Committee
(SSC)
Timescales for data submission
Metadata - as soon as created from the planning stage onwards
Data (not finalised) - within 1 month (of collection, or end of cruise),
with possible approved extension
Cruise report - within 6 months of the end of the cruise
Final detailed data report for each process study within 6 months of
the end of the process study
Final data - within 2 years, exceptions possible from the SSC
Timescales for data release
Participants in a particular cruise
- as soon as available at the DAC with knowledge and
permission of the relevant PI
Public release
- within two years of end of cruise
(+ extra time for particular data type as approved by SSC)
Validation and quality control
Individual PIs are responsible for quality control of their data
Questionable data should be flagged rather than discarded
Comparison with other parameters or comparison between data sets
at the same location
Data users report questionable data to the DACs
DACs will pass data quality problems back to the PIs.
Groups of PIs expert in a particular parameter (for example Fe) will
be encouraged to apply further quality controls, such as cruise
intercalibration.
Archiving
GEOTRACES data must be preserved for posterity
multiple copies e.g. DVDs
media degrade, formats and specifications change
The World Data Centres (WDCs) preserve data for the long term
and periodically update the media
Data sharing policies
Fundamental trade-off
Protection of the intellectual effort of original PIs
Need to compare various data sets and data types to check consistency
Need to make multi-tracer data available so that we learn new things about geochemical processes in the ocean
Participating scientists submit metadata to the Data Liaison Officer
at the DAC as soon as they are available
Preliminary metadata and data produced during the cruise made
available to participating scientists during the cruise
Basic hydrographic parameters- public a short time after cruise
Preliminary TEI data submitted to DAC within one month
2-year “publication rights period.”
Data made publicly available no later than 2 years from collection,
Extension of period for parameters that require extensive processing
Some nations will not permit release of data collected within EEZs
Prior to public release, all data will be considered preliminary
Such data will be available to participating scientists, who should
consult the data originator about its status.
Data should be shared with other cruise/process study participants as
soon as they become available during or after a cruise or process study
Data are the proprietary material of the originating scientist and may
not be used without their permission.
However, for non-participating scientists the data can be obtained only
with the permission of the responsible participating scientist.
The recipient DAC will not publicly redistribute such data, or a
derivative containing most of the information during the publication
rights period
The receiving investigator should not publish any paper based
predominantly on the received data during the publication rights period
Should co-author results with the originating investigator, and should
not redistribute the data
Adherence to this data policy is expected of all scientists participating
in national and international GEOTRACES activities
How shall we fund this?
International DAC
US- NSF 0.5FTE, another 0.5 FTE from another hero country
Short term
Long term
Subscriptions from member countries generating data
NSF and other funds to International Project Office