Intent of WorkTo tie and bond separated facing stone to brick backup construction using Helefix Tie reinforcement and asolidifying injected grout.
SuitabilityThe work described herein is best suited for conditions where the collar joint mortar bonding behind the outer leafof stonework has deteriorated to a degree that all bond has been lost it can be removed and replaced, but thecondition of the outer leaf is sufficiently sound that will allow tieback with frequently Helefix Ties without the needfor a supplemental dunnage system.
Required Materials, Products and EquipmentVoidSpan 600 Series PHLc70 Injection GroutMasonry mortar materials and potable waterVoidSpan 1200 Series Jetting WandsVoidSpan H1000 Series Helifix Ties VoidSpan 3000 Series Standpipe PiezometersVoidSpan 4000 Series Pressure Pot (or equivalent pressure regulating pump) with feed lines
Scope of work1. DEEPLY CUT AND BACKPOINT MASONRY.2. DRILL PILOT HOLES3. INSTALL HELIFIX WALL TIES SEE INSTALLATION GUIDE "H1"4. BEND OVER TIES TO HOOK ONTO BACK POINTING5. JET CLEAN WALL CAVITIES6. SEAL FLEX TUBE PORTS IN PLACE7. INSERT PORTS INTO PIEZOMETER AND HOOK UP PUMP OR POT8. GROUT INJECT UNTIL PIEZOMETER OVERTOPPED SEE INSTALLATION GUIDE "G2"9. CLAMP TUBES AFTER INJECTION10. REMOVE TUBES AFTER GROUT HARDENED11. FINISH POINT MASONRY AS NEEDED
ResponsibilityIt is the responsibility of the Specifying Engineer to determine the specifics of the structural design and use of theVoidSpan Reinforcement System and to confirm its appropriateness for the application. Note that the details andsuggested methods are presented herein as schematic representations only, and actual field conditions will vary.
It is the responsibility of the System Installer to understand the requirements of the installation and execute theinstallation in a safe and correct manner.
S P A NID
VO
© 2017/ VoidSpan Technologies, LLC / 60 Washington St., Salem, MA 01970 / 800966VOID / www.voidspan.com
VOIDSPAN INSTALLATION GUIDE #S12FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES
FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES Installation Guide # S12PLEASE NOTE: The information presented herein is the intellectual property of VoidSpan Technologies, LLC and may not be reproduced or distributed without prior authorization.
OUTLINE SPECIFICATION (See DETAILS on second page)
FACE STONE TO BRICK REBONDINGw/ BENT HELEFIX TIES
© 2017/ VoidSpan Technologies, LLC / 60 Washington St., Salem, MA 01970 / 800966VOID / www.voidspan.com
S P A NID
VO
FACE STONE TO BRICK REBONDING w/ BENT HELEIX TIES Installation Guide # S12PLEASE NOTE: The information presented herein is the intellectual property of VoidSpan Technologies, LLC and may not be reproduced or distributed without prior authorization.
Deeply cut andbackpoint the head bedjoints between stones
Create open gaps inhead and Tjoints forcleaning and groutinjection
Install helefix ties in heador bed joints to extend 2"to 2 1/2" out of face
Allow debris to flowout of lower ports
Clean out wallcavities withVoidSpan J3Pressure WasherJetting Wand
Bend Helefix tiesover onto mortarjoint with VoidSpanTieBender
VoidSpanStandpipePiezometer
Flexible feed tubefrom VoidSpanPressure Pot Kit
Grout levelfollowsPiezometer level
Seal temporaryinjection tubesinto head jointgaps
Crimp orclampInjection Tubesafter groutingto preventback flow.
Removeinjection tubesafter grout set,finish pointmasonry
Step 6. SEAL FLEX TUBE PORTS IN PLACE7. INSERT PORTS INTO PIEZOMETER ANDHOOK UP PUMP OR POT8. GROUT INJECT UNTIL PIEZOMETEROVERTOPPED
Finish 9. CLAMP TUBES AFTER INJECTION10. REMOVE TUBES AFTER GROUTHARDENED11. FINISH POINT MASONRY AS NEEDED
Step1. DEEPLY CUT AND BACKPOINT MASONRY.2. DRILL PILOT HOLES3. INSTALL HELIFIX WALL TIES
Step 4. BEND OVER TIES TO HOOK ONTOBACK POINTING5. JET CLEAN WALL CAVITIES