Lisboa, 22 Feb 2011
Joint forces for global welfare
Lisboa, 22 Feb 2011
Lisboa, 22 Feb 2011
VALUE BY DESIGN
Lisboa, 22 Feb 2011
MARKETS
Healthcare (A&E)
INTERNATIONAL FACTS & FIGURES
56 years of knowhow
200 professionals in Belgium
VK Astana: 30 professionals in Kazakstan
start-up local Vietnamese office
start-up local Russian office
multidisciplinary approach
pioneering in sustainable buildings
joint operations in Portugal with CPU
V K
Lisboa, 22 Feb 2011
V K W O R L D W I D E
Lisboa, 22 Feb 2011
CORE BUSINESS
Mission• architecture (healthcare)• masterplanning (healthcare)• reconversion / renovation• extension• new construction
Services• masterplanning• building services• civil & structural engineering• infrastructural studies• landscape design• industrial design
Sustainability• material lifecycle• energetical building behaviour• building simulation (CFD)• termal energy system• natural ventilation• concrete core activation
Lisboa, 22 Feb 2011
HEALTHCARE
Lisboa, 22 Feb 2011
Onze-Lieve-Vrouw Hospital, Aalst
� partnership OLV – VK since 1986� masterplanning (1995 - 2015)� extension of 45.000 m²� underground parking: 30.000m²
Lisboa, 22 Feb 2011
Onze-Lieve-Vrouw Hospital, Aalst
Lisboa, 22 Feb 2011
Military Hospital, BrusselsEuropean Reference center – Burns Unit
� heavy renovation� individual units: high & medium
care, low risk � period: 2008-2009
Lisboa, 22 Feb 2011
Military Hospital, Neder-over-HeembeekEuropean Reference center – Burns Unit
Lisboa, 22 Feb 2011
General Hospital Sint-Maarten, Mechelen
105,000sqm 105,000sqm -- 722 beds 722 beds -- on goingon going
� joining 3 campuses into one� clear separation of
hospitalisation and ambulant activities, of chronic and acute patients
� modular grid of 8,40m : compactness + maximum daylight
Lisboa, 22 Feb 2011
General Hospital Sint-Maarten, Mechelen
105,000sqm 105,000sqm -- 722 beds 722 beds -- on goingon going
Lisboa, 22 Feb 2011
General Hospital General Hospital HeiligHeilig HartHart,, RoeselareRoeselare
� new hospital� > 700 beds� 110.000 m²� under study
clear concept that matches strategic ambitions of the hospital:
• “central street” for circulation• pathological clustering • caring floors per cluster• structural grid of 8,10m• hotfloor concentrated on 1 level• standardised nursing units• exchangeability of day care and out-patientareas
Lisboa, 22 Feb 2011
General Hospital Heilig Hart, Roeselare
� steplike front in brick : timelessand peaceful appearance
� strict rhythm of facades due to extreme internal flexibility : possibility of internal wallsevery 135 cm
� maximum glazing of facades : vista’s + orientation722 beds 722 beds –– on goingon going
Lisboa, 22 Feb 2011
University Hospital Center Esneux, Liège
40 beds 40 beds -- 20102010
� revalidation center : hospitalisation, hydrotherapyand consultations
� ample physio- therapy areas
Lisboa, 22 Feb 201140 beds 40 beds -- 20102010
University Hospital Center Esneux, Liège
Lisboa, 22 Feb 2011
University Hospital Center Esneux, Liège
Lisboa, 22 Feb 2011
General Hospital Sint-Jan, Brugge
several renovation assignments
1. the bed wing + nursing units : 2. medical-technical block with an
important addition : the P block3. supporting services : new emergency
services, laboratory, central kitchen, restaurant, pharmacy, …
4. technical renovation projects: absorption cooling, boiler room, filling station, new ICT-backbone and server farm.
Lisboa, 22 Feb 2011
General Hospital Sint-Jan, Brugge
Lisboa, 22 Feb 2011
General Hospital Sint-Jan, Brugge
Lisboa, 22 Feb 2011
University Hospital, Brussels
spatial plan with special focus on:� reorganisation flows� extension and reorganisation of
most medical services� period: 2009-2011
Lisboa, 22 Feb 2011
ECO City, Hanoi
Lisboa, 22 Feb 2011
ROYAL MATERNITY HOSPITAL, KINGDOM OF BAHRAIN
May 2010
Royal Maternity, Bahrein
Lisboa, 22 Feb 2011
ROYAL MATERNITY HOSPITAL, KINGDOM OF BAHRAIN
May 2010
Royal Maternity, Bahrein
Lisboa, 22 Feb 2011
Pediatric Hospital Nha Thrang, Vietnam
Lisboa, 22 Feb 2011
SUSTAINABLE DNA
Recently VK has been officially acknowledged as 'BREEAM Assessor'. The international label proves the continuousefforts and the pioneering work that has been deliveredby VK in the domain of sustainable building. VK willcontinue to deliver its customers state-of-the art technology and engineering.
“Sustainable design provides for the demands of todaywhilst protecting the ability of future generations
to meet their own needs.”
(UN-Brundtland Report – 1987)
Lisboa, 22 Feb 2011
OBJECTIVATING SUSTAINABILITY THROUGH FIRST CLASS PROJECTS
International licensing standards for sustainable building taken into account by VK:
• BREEAM – UK
• HQE – FRANCE
• LEED – US
• DGNB – GERMANY (Deutsche Gesellschaft für Nachhaltiges Bauen)
• VALIDEO - SECO
water CO2 waste
energybio
diversity
resources enivronment
Lisboa, 22 Feb 2011
Natural ventilation
detailed CFD-simulations
INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY
Lisboa, 22 Feb 2011
HYBRID VENTILATION CONCEPT: each building is unique
INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY
Lisboa, 22 Feb 2011
CONCRETE CORE ACTIVATION
HEATING PRINCIPLE WHEN LOW TEMPERATURE
COOLING PRINCIPLE WHEN HIGH TEMPERATURE
INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY
Lisboa, 22 Feb 2011
INTEGRATED DESIGN AND EXECUTION
CONCRETE CORE ACTIVATION
INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY
Lisboa, 22 Feb 2011
Types:
Open source Vertical soilcollector Horizontal soilcollector
Geothermal Energy
INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY
Lisboa, 22 Feb 2011
INFRAX HEADQUARTERS, Torhoutlow energy office - WINNER 2020CHALLENGEWINNER 2020CHALLENGE
� architect: CBA� disciplines: civil & structural -
building services - infra� technological State-of-the-art� integration of techniques
- concrete core activation- hybrid ventilation concept- geothermal energy system- small footprint
Lisboa, 22 Feb 2011
Joint forces for global welfare
Av. 24 de Julho, 50
P - 1200-868 Lisboa
Portugal
T +351 21 39 39 000
F +351 21 39 39 061
Brugsesteenweg 210B – 8800 RoeselareBelgium
T +32 51 26 20 20
F +32 51 26 20 21
Top Related