Download - Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

Transcript
Page 1: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

1

CommentMatrix:SECU0002,AComplianceReportrelatedtotheBusinessCalltoActionProjectSocialandEnvironmentalComplianceUnit,OAI,UNDP

Row Paragraph

#/Section/GeneralofReport

Comment Submittedby SECUResponse

1.

General

We believe that the report shouldrecommend that Bidco be removedfrom Business Call to Action eitherpermanently or until further duediligenceisdoneonthecompany.Webelieve that this is the right decisionbased on the results of the draftreport, which suggests that internalUNDPduediligenceprocedureswerelackingandthatBidcocouldbeariskypartner.

BugalaFarmersAssociation,JohnMuyisa

ReportrevisedtoincludearecommendationthatUNDPprovidedocumentationconsistentwithUNDP’sfullPolicyonDueDiligenceandPartnershipswiththePrivateSector,completeRiskAssessmentTool,andGuidance,toensurethatduediligencewithrespecttoBidco’smembershipinBCtAisadequateandoutcomesofduediligencesupportBidco’smembershipinBCtA.

2.

General

Despiteawell-publicizedinvestigativephase:theDraftComplianceReportstubbornlyrefusestoacceptandpubliclyacknowledgevitalfactssuchas:ThattheallegationsmadeinthecomplainttoUNDPareWIDLYexaggerated.

BidcoAfricaandBidcoUganda,PharisKimaru

AsnotedintheTORfortheinvestigationandinthedraftinvestigationreport,adetailedexaminationofhumanrights-relatedconcernsunderpinningthecomplaintwerebeyondthescopeoftheinvestigationandnotwithinSECU’smandate.SECUismandatedtoexaminecompliancewithUNDPstandards,themostofrelevantofwhich,inthiscontext,werethoserelatedtoduediligence.SECUexaminedallegationsrelatedtoduediligence–thisexaminationrevealedthathumanrights-relatedconcernsdidnotappeartobeconsideredfullyduringduediligence.SECUpursuednodetailedexaminationoftheseissues,andthereportdrawsnoconclusionsrelatedtoanyunderlyinghumanrightsclaimsoranyissuesrelatedtolegalcasespendingbeforetheUgandancourts.

3. General

TheDraftreportconvenientlyfailstoreportthatoutoftheacquisitionof

BidcoAfricaandBidco

Seeresponseabove.SECUdidnotmakeanydeterminationsrelatingtoland-grabbing/humanrightsviolations,including

Page 2: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

2

8,500acresonly25hectaresisindispute.

Uganda,PharisKimaru

theamountoflandindispute(numbersprovidedtoSECUvariedwidely,anditwasoutsidethescopeofSECU’sinvestigationtodeterminethecorrectnumberindispute).

4.

General

ThatthelandindisputehasnotbeenusedortouchedfortheOilPalmProject.(Evidenceofthiswasprovidedtotheinvestigators.)Thatthereforetheclaimsoflandgrabbingandgrossviolationofhumanrightsarenotapplicabletothissetoffactswhichthereportdoesnotdisputeorcontradict.

BidcoAfricaandBidcoUganda,PharisKimaru

Asnotedinthereport,duediligencerelatingtoapotentialpartnertoBCtAincludesconsiderationnotonlyofactivitiesproposedunderthepartnership,butalsootheractivitiesthatraisehumanrights-relatedconcerns.

5.

General

ThatthereisnobodyknownastheBugalaFarmersAssociationinBugalaandtherestillexistsnonetodate.

BidcoAfricaandBidcoUganda,PharisKimaru

ThecomplainantsrefertothemselvesastheBugalaFarmersAssociation.ItisbeyondthescopeofSECU’sinvestigationtodetermineifthisisaformal,registered,orlegallyrecognizedentity.SECU’sreferencetothisgroupisnotanendorsementofitslegalstatus.

6.

General

ThattheOilPalmProjecthastransformedKalangaladistrictsociallyandeconomicallyincludingmillionsofdollarsininfrastructureprojects-ferries,roadsandanultra-modernpowerplant.

BidcoAfricaandBidcoUganda,PharisKimaru

TheinvestigationreportnotespreviousevaluationsthatindicatedbenefitsoftheOilPalmProject.Itwasbeyondthescopeoftheinvestigation,however,todeterminetherelativebenefits,costs,andrisksofthatproject.

7.

General

That1,800farmersarebenefittingfromtheprojectandearningBillionsofUgandanShillingseverymonth.AlltheabovearethefundamentalfactsofthesituationinUgandabutlackingfromtheDraftComplianceReport

BidcoAfricaandBidcoUganda,PharisKimaru

Seeresponseabove.

8. General

BidcoAfricaandBidcoUganda,

Page 3: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

3

PharisKimaru

9.

General

Indeedthereportonmostoccasionsseemstoarguewiththefacts:ForInstance:ThatBidcoAfricaistherelevantmemberoftheBusinessCalltoActionandnotBidcoUganda;

BidcoAfricaandBidcoUganda,PharisKimaru

ReportrevisedtoincludeadditionalinformationoutliningthetiesbetweenBidcoAfricaandBidcoUganda.Asexplainedintheinvestigationreport,forpurposesofBCtA/UNDPconductingitsduediligenceandriskassessment,thetiesconnectingBidcoAfricawithBidcoUgandaaresufficientsuchthatUNDPshouldhaveconsideredbothentities’activitiesandriskswhendecidingwhethertoacceptBidcointotheBCtAalliance.Itwasbeyondthescopeoftheinvestigationtodeterminetheexactlegalandfinancialrelationshipbetweenthetwocompanies.

10.

General

ThatBidcoUgandaisnotasubsidiaryofBidcoAfricabutaseparateentityonitsown;

BidcoAfricaandBidcoUganda,PharisKimaru

Seeresponseabove,andadescriptionintheinvestigationreportofrelevantconnectionsbetweentheentities.TheinvestigationreportcitestolanguageintheBidcoAfricawebsitedescribingOilPalmUgandaLimitedasoneofBidcoAfrica’soperations.InarecentdecisioninalawsuitrelatingtolandacquiredfortheOPULpalmoilproject,theHighCourt’sjudgmentnotedthatnotonlyBidcoUgandaandOPUL,butalsoBidcoOilRefineriesLtd(BidcoAfrica’spriorname)werevaliddefendantsinthesuit–givenBidcoAfrica’sparticipationintheagreementwiththeUgandangovernment.

11.

General

ThatBidcoAfricahasnooperationalcontrolofBidcoUganda.

BidcoAfricaandBidcoUganda,PharisKimaru

SeeresponseabovenotingthecleartiesbetweenBidcoAfricaandBidcoUganda.

12.

General

WEREITERATEANDCLARIFYTHAT:BidcoUgandalimitedwasneverassociateddirectlyorindirectlyinacquisitionoflandforproject.TheresponsibilityofGovernmentof

BidcoAfricaandBidcoUganda,PharisKimaru

TheinvestigationreportnotesthatBidcoUgandawasnotdirectlyinvolvedintheacquisitionoflandfortheproject,butratherrelyingontheacquisitionofthisland-includingacquisitionofthe‘nucleusestate’apparentlysupportedbyandbenefitingBidcoUganda.Thereportdescribeswhythisis

Page 4: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

4

UgandawastoacquirelandfreeoffanyencumbrancesandprovidefortheprojectonleaseholdbasisforthedevelopmentofOilPalmandweareawareofprocessoflandacquisitionprocessfollowedbythegovernmentasdetailedbelow.Alandacquisitiontaskforce,composedofrepresentativesof1.KalangalaDistrictLocalGovernment2.MinistryofAgriculture,AnimalIndustryandFisheries3.MinistryofLands,HousingandUrbanDevelopment(representedbyCommissionerLandRegistration)4.NationalEnvironmentManagementAuthority5.MinistryofFinance,PlanningandEconomicDevelopment6.MinistryofJusticeandConstitutionalAffairs7.UgandaInvestmentAuthority8.ChiefGovernmentValuer,representingallstakeholdersimpactedbythelandacquisition.

relevanttotheduediligenceanalysis.

13.

General

Theinvestigatorsfailedtoproperlyinvestigateclaimsmadeininterviewstakinginformationatfacevalue:Meetingswithagroupofindividualsincludedassertionsthat29familieswerewronglydisplaced.QuestionsFromwhatlandspecifically?Howweretheydisplaced?Bywhom?Whatisthepresentstateoftheland?Havetheysoughtanylegalredress?

BidcoAfricaandBidcoUganda,PharisKimaru

SECUdidnotinitsreportacceptas‘true’theassertionsthatillegallandacquisitionsandhumanrightsviolationstookplace.SuchafindingisoutsidethescopeoftheinvestigationandoutsidethescopeofSECU’sinvestigatorymandate.Thereportdidnotethatweheardtheseviews,aswellaschallengestotheseviews.ThepresenceoftheseconflictingviewsisrelevanttoBCtA’sduediligenceanalysisindecidingwhetherapartnershipwouldbeappropriate.

Page 5: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

5

14.

General

Anyonecanmakeaclaim.Theroleofaninvestigationistoascertaintheveracityoftheclaimsnottousethemtomakefreshassertions.

BidcoAfricaandBidcoUganda,PharisKimaru

ThepurposeofthisinvestigationwastoreviewUNDP’scompliancewithitspolicies,particularly,inthiscontext,policiesrelatedtoduediligence.SeeresponseinRow2.

15.

General

TheUgandanHighCourthassinceclearedtheOilPalmProjectandBidcoUgandaofenvironmentaldegradationcharges.(LCDSCaseno215of2007)Judgmentattached.

BidcoAfricaandBidcoUganda,PharisKimaru

NotedthatBidcoUganda,OPUL,andBidcoOilRefineries(akaBidcoAfrica)wereclearedofenvironmentaldegradationchargesinthatcase.

16. General

TheDraftComplianceReportgoesoutofitswaytolegitimizeandnormalizetheexaggeratedclaimsinthecomplaint:‘Buttherehavealsobeensomelesspositiveoutcomes.Manyofthenewjobopportunitieshavebeenfilledbymigrants,puttingpressureonlocalhealthandeducationservices.Therisingpriceoflandasaresultofthedevelopmenthasincreasedtensionsandledtorisingconflicts,particularlyassomeabsenteelandownershavebeguntoreturn.Thereareconcernsaboutlonger-termimpactsonhouseholdfoodsecuritywhentheoilpalmtreesbecometoolargetoallowintercropping.Andtheenvironmentalimpactshaveledtoagreatdealofpublicscrutiny,particularlygiventhesizeoftheinvestment.Finally,athouseholdlevel,therehasbeenareportedincreaseindomesticconflict,althoughmorepositiveimpactsareevidentintermsof

BidcoAfricaandBidcoUganda,PharisKimaru

ThequotationreferencedisexcerptedfromareportissuedbyIFADandIDS.TheinvestigationreportincludesbothpositiveandnegativeobservationsbyIFADandIDS.Seeparas.111to116.

17.

General

Page 6: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

6

women’sempowermentandbuildingcapacityoffarmers’organizations.”NoneoftheseoutcomesareBidcoUgandaspecificandtheyarenothingclosetotheexaggeratedclaimsof‘grossviolationofhumanrightsandlandgrabbing”attributedtoBidcoUgandainthecomplaint.

18. 1

19.

2

PleasenotethatBCtA’srolecharacterizationasaplatformthat“willfacilitateandsupportengagementbetweenprivatesectorandlowincomepeople”isinaccurate.AsmentionedinthefeedbacktotheTORsofthisinvestigationonMay19,2016,BCtAdoesnotlinkprivatesectorcompaniestolowincomepopulationsasitdoesnotprovidematchmaking/linkagesservicesbetweencompaniesandfarmersoranytargetbeneficiaries.Rather,asstatedintheprojectdocument,inadditiontodrivingprivatesectorcommitments,facilitatingimpactmeasurementandknowledgecaptureetc.,itfacilitateslinkagesandreferralsbetweenbusinesses,knowledgepartners,funders,andotherresourcesthroughperiodicpeer-to-peerlearningopportunitiesthroughworkshops,webinars,and

OnbehalfoftheBureauforPolicyandProgrammeSupport(BPPS),UNDPDevelopmentImpactGroupandIstanbulInternationalCenterforPrivateSectorinDevelopment,(hereafterreferredtoasUNDPBPPS/DIG/IICPSD)

TheinvestigationreportdoesnotindicatethatUNDPprovidesmatchmaking/linkagesservices–weremovedthisspecificlanguageinresponsetocommentsontheTOR.However,‘drivingprivatesectorcommitments’explicitlyincludesdrivingprivatebusinesscommitmentstoengagelow-incomepeopleas‘consumers,producers,suppliers,anddistributors.’Inthissense,UNDPisatleastencouragingandsupportingengagementbetweenprivatesectorandlowincomepeople–albeitnotprovidinglinksbetweenspecificbusinessesandspecificindividuals.Wehaverevisedthetexttoreflectthis.

Page 7: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

7

thePractitionerHubpartnership.

20. MobilizeSelectCountry-levelInclusiveBusinessEfforts.PleasenoteIDB’sOpportunityfortheMajorityInitiativeisnolongeracollaboratinginstitution.

UNDPBPPS/DIG/IICPSD

Noted.Reportrevisedaccordingly.

21. Accordingly,suggestreplacingthefollowingsentence“Theprojectispremisedontheideathattheplatformwillfacilitateandsupportengagementsbetweenprivatebusinessesandlow-incomepeople….”with“CompaniesjointheBusinessCalltoActionbymakinginclusivebusinesscommitmentstoimprovethelivesandlivelihoodsofmillionsofpeoplelivingatthebaseoftheeconomicpyramid(BoP)byengagingthemasconsumers,producers,suppliersanddistributorsofgoodsandservicesintheirvaluechains.”ThiswouldbeconsistentwithBCtA’sProDocwhichstatesthefollowing:"BCtAisaglobaljointadvocacyplatformprovidingpublicrecognitionfortheprivatesector'scontributiontodevelopment.BCtA'smissionistochallengecompaniestoadvancecorebusinessactivitiesthatareinclusiveofcorepopulations.TodosoBCtA:o DrivesPrivateSectorCommitmentsforPro-PoorInclusiveBusiness

UNDPBPPS/DIG/IICPSD

TheInvestigationreportwillincludetheproposedlanguageascomplementary(notreplacement)languagetotheexistingsentence,whichisintendedtodescribebrieflynotwhattheBCtAis(astheproposedlanguagedoes),butwhatitaccomplishes.WhenBCtAseekscommitmentsfromprivatebusinesstoengagepoorpeople,itspurposeisclearlytosupportandencourageengagementsbetweenprivatebusinessandlow-incomepeople.

Page 8: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

8

o FacilitatesImpactMeasurementandKnowledgeCaptureo OffersLinkagestoServices,Finance,andPeertoPeerLearning

22. 3

23.

4

Pleaseusetheexactinstitutionaltitle:UNDPInternationalCenterforPrivateSectorDevelopmentto“UNDPIstanbulInternationalCenterforPrivateSectorinDevelopment”.

UNDPBPPS/DIG/IICPSD

Reportrevisedaccordingly.

24. Pleaseindicatewhich“otherrelevantstakeholders”wereinterviewed.ForinstanceBCtAhadprovidedalistincluding:KalangalaOilPalmGrowersAssociation,aformalassociationof1,800farmersinKalangalaDistrictinvolvedintheoilpalmdevelopmentproject;KalangalaDistrictLocalGovernmentasthedistrictlevelgovernmententityinKalangala;OilPalmUgandaLimited;IFCasthemaininvestorinBidcoAfricabusinessactivitiesrelatedtoBidcoAfrica’scommitmenttoBCtAto“integrateover30,000Kenyansmallholderfarmersintoagriculturalvaluechainsandcreateover60,000directandindirectjobsbytheendof2019throughopeningitsvaluechainsforsmallscaleentrepreneursby2019.”;andUgandaMinistryofAgriculture,

UNDPBPPS/DIG/IICPSD

Attachedtotheinvestigationreportisalistofstakeholdersinterviewed.SECUinterviewedstakeholdersitbelievedwouldinformitsunderstandingoftheextenttowhichUNDPcompliedwithitspolicies.

Page 9: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

9

AnimalIndustryandFisheriesasthemaingovernmentpartnerofOPULandtheVegetableDevelopmentOilProjectthroughthePPP.

25.

5

Underparagraph5,itisstatedthat“Theinvestigations,includingfieldwork,wasfocusedontheadequacyofUNDP’sduediligenceandrelatedtransparencyinthecontextoftheBCtAproject–noonwhetherBidcohasorhasnotviolatedhumanrightsoriscomplicitinhumanrightsviolations.Thelatterdeterminationsisbeyondthescopeofthereport”,thereportseemstosuggestthatBidcointentionallyorknowinglyincolveditselfindeprivingthepublicoftheirlandandlivelihood,whichwefindtobeuntrue.

MinistryofAgriculture,AnimalIndustryandFisheries;VegetableandOilDepartmentProject(VODP),C.M.Masaba

TheinvestigationreportnotesexplicitlythatSECUisnotdrawinganyconclusionsrelatedtothisissue.Thereportdescribestheland-rights-relatedissuesonlytoindicatethatthesewereoutstandingissuesthatdidnotappeartobeconsideredfullybyUNDPduringitsduediligenceprocess.

26. 6

27. 7

28. 8

29.

9

PleasenotethattheProDocwasreviewedbythePACJuly2014;endorsedbyDSCSeptember2014;andduetotherestructuringandrelocationofBCtAtoIstanbul,theProDocbudgetandlogframewereupdatedinMarch2015.TheenddateoftheProDocisJune2017.

UNDPBPPS/DIG/IICPSD

SECUhasincludedinthereportallinformationavailabletoitregardingthetimelineofthePACandProdocapprovalprocess.

Page 10: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

10

30. 10

31. 11

32. 12

33. 13

34. 14

35.

15

Asperthecommentaboveregardingparagraph2,pleasecorrectthepremisethatBCtA’sroleisto“facilitateandsupportengagementsbetweenprivatesectorbusinessesandlow-incomepeople…””.

UNDPBPPS/DIG/IICPSD

SeeresponseinRow21.

36.

16

Annex2iscurrentlyunavailableonSECU’swebpageforthiscase. UNDPBPPS/

DIG/IICPSD

SECUhasaddedablankversionoftheUNDP/PSDformusedbytheBCtAwhenitscreenedBidcoforadmission.PleaseseetheCaseRegistry.

37. Thereferenceto“BCtA’sexclusionarycriteria”shouldsay“UNDP’sexclusionarycriteria,”asreferencedinProDoc,Annex2,p.70,footnote14.

UNDPBPPS/DIG/IICPSD

Thelanguageisadirectquotefromp.70,para.1oftheProdoc–‘checkingthecompanyagainsttheBCtA’sexclusionarycriteria.’And,onpage70,theapparentscreenshotofthe‘BCtARiskScreeningProcess’includesonlythreeoftheelevenexclusionarycriteriaUNDPisrequiredtouse–thesamethreeintheUNDP/PSDformusedbytheBCtASecretariat.

38.

17

“Thisformcontainsasummary….applicationformfilledthatisfilledinbythecompany”(removerepetitive“filled”)

UNDPBPPS/DIG/IICPSD

Reportrevisedaccordingly.

39. Changethewordingfrom“excerptedfromtheUNDP/PSDform”to

UNDPBPPS/DIG/IICPSD

ThefullrequiredUNDPRiskAssessmentToolwasnotapplied-ashortcomingdescribedintheinvestigationreport.The

Page 11: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

11

“excerptedfromtheUNDPRiskAssessmentTool”.

informationwasexcerptedfromtheUNDP/PSDformusedbyBCtA.

Muchoftheinvestigationreportdescribesdifferencesbetweentheformused–theUNDP/PSDform–andtherequiredform–theUNDPRAT–andtheimplicationsofnotusingtherequiredform.

40. 18

41.

19

Aconsistentstyleandprotocolshouldbeadoptedthroughoutthereportinregardstomentioningthenamesofstakeholders.Inthedraftnostakeholder(internalorexternal)arementionedbynameexceptforMr.Sohbani.Ifnameswillnotbeusedforallstakeholders,Mr.Sobhanicanbereferredtoasthe“GlobalProgrammeAdvisorandactingBCtAProgrammeManageratthetime”.

UNDPBPPS/DIG/IICPSD

Reportrevisedaccordingly.

42.

20

PleasenotethatapplicationtoBCtAhas2separatesteps.Thefirstistheduediligenceprocess.Thesecondstepisinrelationtothecriteriamentionedinparagraph20,whichassessestheeligibilityoftheInclusiveBusinessCommitmentofthecompany

UNDPBPPS/DIG/IICPSD

Noted.Reportrevisedtoensurethatpointisclear.

43.

21

PleasenotethatthespecificinclusivebusinesscommitmentfromBidcotoBCtAinKenya(anddifferentfromtheUgandaPalmOilmodel)is:

UNDPBPPS/DIG/IICPSD

Noted.

Page 12: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

12

“ThroughtheBidcoFullValueChainInitiative,thecompanyisexpandinglocalsourcingofrawmaterials(wheat,maize,sunflower,soya,rice,pulses,sugarcaneandtomatoes)fromsmallholderfarmers.Bidcooffersfarmersoff-takecontractsthatspecifyupfrontmarketpriceandsupplyconditions,aswellasoffertechnicaltrainingtoensureincreasedproductivity.”

44.

22

It’simportanttomakethedistinctionthattheinitiativewasnotapilotbutratherascale-upofanalreadyexistinginclusivebusinesseffortsthathadalreadydemonstratedbenefitstothelocalcommunities.TheBCtAinitiativeaimedtofurtherthesebenefitstoalargernumberoffarmers.Thewaypoint22iscurrentlyphrasedleadsthereadertobelieveUNDPisapprovingastart-upinitiativewithtenuousbenefits.

UNDPBPPS/DIG/IICPSD

Reportrevisedaccordingly.

45. 23

46.

24

Bidco’scommitment,alongwith4otherapplications,wassenttotheDSCforreviewonSeptember11th.Thereviewemail“askedtoprovidefeedbackandcommentsbacktotheBCtASecretariatbySeptember16th”andstatedthat“ifnoobjectionsariseduringthereview,theSecretariatwillextendmembershiptothe

UNDPBPPS/DIG/IICPSD

ReportrevisedtoreflectlanguageintheSeptember11email.ReportfurtherrevisedtoreflectthatlanguageinthisemailisnotconsistentwiththeprocessforDSCapprovalasdescribedinaletterdated11March2016fromMr.SobhanitoDr.Bissell(SECULeadComplianceOfficer),whichnotesthatpartnershavetwoweekstoreviewandraiseanyobjections.Thereportisfurtherrevisedtoindicatethatalthough‘no

Page 13: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

13

applicants.”TheacceptanceemailtoMr.ShahwassentonSeptember18th,afterallquestionswereaddressedand“noobjections”responsewassecuredfromallDSCmembers.

objections’weremadeby16September(thecitedapprovaldate)theSIDArepresentativetotheDSCraisedaquestionon16SeptemberrelatedtoBidcoandpalmoil,andaresponsewasprovided17September–afterBCtAapprovedBidco’smembership.TheDSCrepresentativerespondedwithabriefthankyounoteon18September.

47. 25

48. 26

49.

27

Thatthedisputeisincourtandthereareonly3officialplaintiffsinthecourtrecords.Theclaimof100farmersmadeinthecomplaintisthereforeanexaggerationaswell.Clause27oftheDraftcompliancereportbuys100%intothisexaggeration:Thecomplaintclaimsthat100suchfarmershaveaccusedaBidcoAfricaLtdventureinUganda,OilPalmUgandaLimited(OPUL)of'violatinghumanrights,destroyingtheenvironmentandgrabbinglandfromsmallholderfarmers'.Atthetime,thesefarmerswereattemptingtosecurearesponsetotheseconcernsinthecontextofthisUgandaproject,andwereawaitingacourtdecisionintheirlawsuitagainstOPUL.

BidcoAfricaandBidcoUganda,PharisKimaru

Theinvestigationreportnotesthatitisonlya‘claim’thereare100suchfarmers.Itwasbeyondthescopeofthereporttodeterminetheprecisenumber.Weagree,however,thatitwouldbeclearernottousethephrase‘thesefarmers’asitcouldbereadassupportiveoftheclaim.Wehaverevisedthetextaccordingly.

50. 28

InordertoclarifytheUNGlobalCompactroleandposition,wewouldrecommendtoincludeanadditional

UNGlobalCompact,TulsiByrne

Reportrevisedwiththeproposedlanguage.

Page 14: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

14

paragraphonpg.28thatreadsasfollows:AsmentionedontheUNGlobalCompactwebsites"TheUNGlobalCompactisnotaperformanceorassessmenttool.Itdoesnotprovideasealofapproval,nordoesitmakejudgmentsonperformance".ItisalsoexplainedthatnewapplicationsforparticipationarecheckedagainstaglobaldatabasetoseeifthecompanyconcernedisthesubjectofasanctionorothermeasurebytheUNSecurityCouncilorotherinternationalinstitution,whichisreasonforexclusion,aswellasbeinginvolvedinthemanufacture,saleetc.ofanti-personnellandminesorclusterbombs.AnyotherinformationfromthedatabaseissharedwiththeLocalNetworkwherethecountryislocatedaskingifthereisanygoodreasontheyareawareofwhythecompanyoughtnottobepermittedtojointheinitiative.NoobjectionswereraisedonBidcoAfricaattimeofitsapplicationtojointheUNGlobalCompact,hencethecompanywasadmittedasaparticipantinOctober2009.However,itshouldbenotedthatthecomplaintthatistheobjectofthisreportwasnotraisedatthe

Page 15: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

15

timeofthecompany'sapplicationtojointheinitiative.

TheUNGlobalCompactisavoluntaryinitiative,andthereforedoesnotpoliceorenforcebehaviororactionsofcompanies.RathertheinitiativeencouragescompaniestoreporttheirsustainabilityactionstotheirstakeholdersthroughtheUNGlobalCompactplatform-theCommunicationonProgress(COP),anannualreportthatdetailsthecompany'sworktoembedtheTenPrinciplesintostrategiesandoperations,aswellaseffortstosupportsocietalpriorities.BidcolastsubmittedaCommunicationonProgresson25October2016andisactivestanding(COPthatmeetstheminimumrequirements).Thenextoneisdue25October2017.

51.

29

PleasenotethattheabbreviationofOilPalmUgandaLimited(OPUL)isincorrect(UPOL)inthisparagraphaswellasinparagraphs91and93.

UNDPBPPS/DIG/IICPSD

Reportrevisedaccordingly.

52. 30

53. 31

54.

32

*Commentonpara32-36*Paragraph32notesthat“SocialandenvironmentalcommitmentsthatapplytoUNDPprojectsarereflectedinUNDP’sPOPPandineachProdoc.”

UNDPBPPS/DIG/IICPSD

Paras.51to63oftheinvestigationreportindicatehowtheUNDPPolicyandhumanrightsandgenderconsiderationswererelevanttotheproject.ReportrevisedtoreflectacknowledgementthattheUNDPPolicyonDueDiligenceandPartnershipswiththePrivateSectorandthegenderand

Page 16: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

16

Basedonthisdefinition,thissectionshouldreferencetheUNDPPolicyonDueDiligenceandPartnershipswiththePrivateSector(inthePOPP)andthegenderandhumanrightsconsiderations(Annex6ofProdoc),askeysocialandenvironmentalcommitmentsrelatedtotheproject.

humanrightsconsiderationsinAnnex6ofProdocwerekeycommitmentsoftheproject.

55. 33

56. 34

57. 35

58. 36

59. 37

60. 38

61. 39

62.

40

TheinclusionofamandatoryduediligenceprocessandcommitmentsspecifictohumanrightsandgenderintheProdocconstitutethekeymanagementmeasuresaimedtoavoidandmitigatetherisksassociatedwiththeprivatesectorpartnersandtheirvoluntaryactions.

UNDPBPPS/DIG/IICPSD

TheProdocincludescommitmentstohumanrightsandgender,butdocumentationrelatedtoBidco’sadmissionintotheBCtAdoesnotindicatethatthesespecificcommitmentsweremetduringtheduediligenceprocess,i.e.,documentationrelatedtoBidco’sadmissionintotheBCtAdoesnotreflectexplicit,thoroughconsiderationofthehumanrightscriteriaand/orchecklistinAnnex6.Theinvestigationreportendeavorstodescribetheseshortcomings.Inotherwords,thepresenceofthislanguageintheProdocisnotevidencethatcommitmentsweremet.

Page 17: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

17

63. 41

64. 42

65. 43

66.

44

Pleasenotethatthehumanrightsandgendercommitments(Annex6whichispartoftheProDoc)states:“BCtAScreeningCriteriaandDueDiligenceProceduresforGenderandHumanRightsInclusion”TheBusinessCalltoActionSecretariatperformsaduediligencereviewofallcompaniespriortosubmittingtheirBCtAapplicationsformembershipconsideration.Thisduediligencereviewexaminesanymajorenvironmental,social,andgovernancecontroversiesassociatedwiththeapplicant,whichincludesanyhumanrightsviolations,and/orcontroversiesinvolvingvulnerableordiversegroupssuchaswomen,youth,andindigenouspeoples.Thisreviewresultsinadecisiontoeitherengageordisengagewiththecompany,withtheintentionoflimitinganyrisksofassociationwiththeBCtAanditssupportingPartners.

UNDPBPPS/DIG/IICPSD

Textinparas.71through91intheinvestigationreportreferencesthislanguageanddescribesshortcomingsrelatedtoUNDPattentiontothesecommitmentsandexistingUNDPPolicy.See,also,responseinRow62.ThepresenceofthislanguageintheProdocisnotevidencethatcommitmentsweremet.

Page 18: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

18

67. Gender:Theduediligencereviewalsoincludesanassessmentofanycontroversiesrelatedtodiscriminationatworkorsocialdiscrimination.Thisincludesanexplicitassessmentofthecompany’scommitmenttogenderequityandthereviewincludesanysignificantcriticismsfromlocalandglobalNGOsandmedia,localandglobalpartnersoftheUNDP,governmentalagencies/politicalparties,aswellasanassessmentofanylegalcasesorpublicdemonstrations.Ifanymajorcontroversiesarediscoveredandthecompanydoesnotappeartobeaddressingtheissue,BCtAwillfollowUNDP’spolicytodiscontinueengagementwiththecompany.”

UNDPBPPS/DIG/IICPSD

SeeresponseinRow62,anddescriptionintheinvestigationreportofshortcomingsrelatedtoduediligence.

68. Violationofhumanrightsorcomplicityinhumanrightsviolations:BasedontheUNGuidingPrinciplesonBusinessandHumanRights,responsibilityforrespectinghumanrightsrequiresthatcompaniesseektopreventormitigateadversehumanrightsimpactsthataredirectlylinkedtotheiroperations,productsorservicesbytheirbusinessrelationships(businesspartners,entitiesinitsvaluechain,othernon-StateorStateentity),evenifthe

UNDPBPPS/DIG/IICPSD

Thisinformationandquoteareinthedraftinvestigationreportinpara.76andfn7.

Page 19: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

19

companyitselfhasnotcontributedtothoseimpacts.Theseincludeviolationofhumanrightsorcomplicityinhumanrightsviolations,useortolerationofforcedorcompulsorylabor,anduseortolerationofchildlabor,amongothers.Shouldanyevidencebefoundofongoingviolationsduringtheduediligencereview,BCtAwillfollowUNDP’spolicytodiscontinueengagementwiththecompany.

69. 45 70.

46

Paragraph46shouldalsoacknowledgethattheduediligenceprocessandhumanrightsandgenderconsiderationsthatareintegratedintotheprojectwereintendedtoaddressthesocialandenvironmentalrisksassociatedwithengagement.

UNDPBPPS/DIG/IICPSD

SeeresponseinRow62.ThepresenceofthislanguageintheProdocisnotevidencethatcommitmentsweremet.

71.

47

SuggestingaCategory2seemsinaccurate.GivenBCtA’snatureasavoluntarycommitmentplatformoninclusivebusinessfromcompanies,whosespecificactivitiesincludedisseminationofresults,knowledgeexchange,communication,andtrainingitwouldmorelikelybeCategory1.UNDPESSPGuidanceNotedescribesCategory1:“Projectsthatincludeactivitiessolelyrelatedtoprocurement,reportpreparation,training,eventcoordination,communicationanddisseminationof

UNDPBPPS/DIG/IICPSD

BCtAisseekingactual(thoughvoluntary)commitmentsfromcompanies,promotingbrandrecognitionthroughaglobalplatform,andlendinglegitimacytocompaniesintheireffortstoincludepoorpeopleintheirsupplychains/business.Assuch,itappearstodomorethan‘disseminateresults’(eventhisactivityimpliesthatBCtAisattemptingtoproduceresultsrelatedtothecommitments),knowledgeexchange,communicationandtraining.IfBCtAisnotresponsibleforcommitmentsmadebycompanies,i.e.,ifthesecommitmentshavebeenmadealready,includingtofunderstocompanyactivities,thisshouldbeclear.

Page 20: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

20

resultswillbeCategory1projects)”.However,whethertheprojectwasCategory1or2,thiswouldnotchangetheneedtoensurestrongduediligenceprocessesareinplacepriortotheacceptanceofnewmembersintotheBCtA.

72.

48

StressingtheapplicationofthemandatoryUNDPPolicyonDueDiligenceandPartnershipswiththePrivateSectoraswellasthefocusongenderandhumanrightsintotheBCtAPhaseIIProdocwerepartlyinresponsetofeedbackreceivedfromnon-projectstaffduringtheappraisalprocess.Paragraph48doesnotacknowledgethattheseelementswereincludedintheprojectasaresult.

UNDPBPPS/DIG/IICPSD

Para.48isrevisedtonotethattheProdocwasrevisedtoincludetheseUNDPcommitmentsinresponsetofeedbackduringtheappraisalprocess.Paras.53and54oftheinvestigationreportalreadyindicatethattheProdocincludestheseUNDPcommitments.Note,however,beginningwithpara.61,theinvestigationreportdescribesSECUfindingsthatthesewerenotfullyappliedinthiscontext.Para.64andsubsequentparagraphsdescribehowwhatwasactuallydonebyUNDPcomparedtowhatwasrequiredundertheUNDPPolicyandrelativetohumanrights.

73. 49

74.

50

AsmentionedduringtheinterviewswiththeBCtAteam,BCtAbeganusingthelatestRATforminOctober2015.Thisincludes,assuggestedinParagraph50,theassessmentofcompanieswillingnessandcapacitytoaddresssocialandenvironmentalconcerns.BCtA’songoingimprovedpracticessinceOctober2015couldbeacknowledgedinthereport.

UNDPBPPS/DIG/IICPSD

RevisedtonoteUNDPstatementthatBCtAbeganusingthelatestUNDPRATforminOctober2015whenscreeningpotentialBCtAmembers.

Page 21: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

21

75.

51

Changethewordingto:“ComplementedbytheRiskAssessmentTool(SeeAnnex3)–designedtosupportimplementationofthePolicy-andtheGuidelinesforPrivateSectorPartnerRiskAssessmentTool(Guidelines)–designedtoguidethecompletionoftheRAT.”

UNDPBPPS/DIG/IICPSD

Reportrevisedtoincludemostoftheproposedlanguage.

76.

52

ThedocumentshouldmentionthatpriortotheRATbecomingamandatoryrequirementforallprivatesectorpartnerships,UNDP’sstandardwasthePSDduediligenceform.

UNDPBPPS/DIG/IICPSD

TheUNDPExecutiveOfficeindicatedthattheywereunabletofindintheirrecordsanyapplicableversionoftheUNDP/PSDformthatmatchedtheoneusedbytheBCtAtoscreenBidco.Additionally,theExecutiveOfficenotedthattherewasnothingintheirrecordsindicatingconsiderationofanyofficialPSDformpriorto2013.

77. 53

78. 54

79.

55

*Commentsonpara55-59*PleasenotethatwhencompaniesbecomemembersofBCtA,theyreceiveawelcomingletterfromBCtAonbehalfofallitspartners.NoMoUiseversignedwithUNDP.However,wedorecognizethatwithintheexistingpolicy,thereisnoclarificationonthistypeofmulti-partneralliance,withstand-alonebrandingandgovernance.Toaddressthis,apolicyreviewandupdatewillbeconductedin2017whichwillincludeconsiderationof

UNDPBPPS/DIG/IICPSD

Noted.

Page 22: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

22

howtoamendthePolicyonDueDiligenceandPartnershipswiththePrivateSectortoclarifyapplicationinmulti-partneralliances,wherestakeholdersdon’thaveorareperceivedtohaveadirectrelationshipwithUNDP.

80. 56

81. 57

82. 58

83. 59

84. 60

85.

61

Pleasenote,thatwhenBidcowasacceptedintotheBCtA,theUNDPPolicyonDueDiligenceandPartnershipswiththePrivateSectorwasapplied;however,bymistaketheRATformthatwasusedtorecordtheduediligencefindingswasanoutdatedversionoftheofficialUNDPduediligenceform(updatedtotheRATinNovember2014).

UNDPBPPS/DIG/IICPSD

Asdetailedintheinvestigationreport,projectdocumentationdoesnotsupporttheassertionthattheUNDPPolicywasfullyapplied.Tothecontrary,forthereasonsexplainedinthereport,itappearsitwasnot.

See,also,responseinRow76.

86.

62

PleasenotethatwhiletheBCtASecretariataddedthissentenceonthewebsite,theintentwasnottobeexcludedfromthepolicybutratherto

UNDPBPPS/DIG/IICPSD

Noted.ReportrevisedtoreflecttheSecretariat’sacknowledgmentthatthefullPolicyandRATapply.

Page 23: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

23

clarifytocompaniesandotherstakeholderstheirrelationshiptoBCtAasamulti-stakeholderpartnership.ThisisdemonstratedbythecontinuedapplicationofPolicyonDueDiligenceandPartnershipswiththePrivateSectorinthecontextofBCtA.

87. 63

88.

64

ThissectionshouldclarifythatUNDP/PSDformwasnot“anotherriskassessmenttool”butaformthatwaspartofUNDP’sduediligenceprocesspriortothedevelopmentandwidedisseminationofthecurrentRATform(launchedinNovember2014).ThePSDformcomplementedtheRiskAssessmentToolandprovidedanoverviewofcorporatecontroversiesandother,relevantcorporatesocialresponsibilityinformation.BCtAhaddiligentlyfollowedtheguidanceprovidedintheRiskAssessmentToolalbeititcontinuedtousetheoldformafterthenewonehadbeenapprovedanddisseminated.

UNDPBPPS/DIG/IICPSD

Asdetailedintheinvestigationreport,projectdocumentationdoesnotsupporttheassertionthattheUNDPPolicywasfullyapplied.Tothecontrary,forthereasonsexplainedinthereport,itappearsitwasnot.See,also,responseinRow76.

89. 65

90. 66

Page 24: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

24

91.

67

ThestatementthatPSDduediligenceform“appearsexplicitlytailoredforuseonlyinprescreening”isinaccurateasthePSDwasaUNDPduediligenceformusedpriortothecurrentRATform.

UNDPBPPS/DIG/IICPSD

Reportrevisedtoremovereferencetotheform’stailoreduseinprescreening.SeeresponseinRow76.

92. 68

93.

69

94.

70

95.

71

96.

72

Thestatementthatthe“BCtA’sexclusionarycriteriaincludeonlythreeofUNDP’sexclusionarycriteria”isinaccurate.TheProDoc,Annex2,p.70,whichtheSECUreportcites,listsall11exclusionarycriteria,inlinewithUNDP’sexclusionarycriteria.TheremighthavebeenaconfusionwiththefactthattheUNDP/PSDformonlyliststhreeexclusionarycriteria–tworelatingtothemanufactureofarmamentsandonerelatingto

UNDPBPPS/DIG/IICPSD

Despitementionofall11exclusionarycriteriaintheProdoc,all11werenotclearlyapplied.ThepresenceofthislanguageintheProdocisnotevidencethatcommitmentsweremet.Theonlyexclusionarycriteriaclearlyappliedwerethe3listedintheUNDP/PSDform.See,also,responsesinRows37and88.

Page 25: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

25

marketingofbreastmilk.However,theimportantdistinctionneedstobemade–UNDP/PSDformisnotaformdevelopedbytheBCtA,itwasaUNDPAgency-wideformpriortoNovember2014.Therefore,theProDocdoesnotintroducea“separate”BCtAlistofexclusionarycriteria.

97. 73

98.

74

Asperpointaboveonparagraph72,thisstatementisinaccurate.

UNDPBPPS/DIG/IICPSD

SeeresponseinRow96.

99. 75

100. 76

Page 26: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

26

101.

77

102. 78

103. 79

104. 80

105. 81

106. 82

107. 83

108.

84

TheUNDP/PSDformdidnotdifferentiatebetween“limited”and“normal”duediligence.TheBCtAconductedduediligenceinlinewiththeUNDPPolicyonDueDiligenceandPartnershipswiththePrivateSector.

UNDPBPPS/DIG/IICPSD

Asdetailedintheinvestigationreport,projectdocumentationdoesnotsupporttheassertionthattheUNDPPolicywasfullyapplied.Tothecontrary,forthereasonsexplainedinthereport,itappearsitwasnot.

109. 85

110. 86

TheFullValueChainInitiativesubmittedbyBidcoAfricatotheBusinessCalltoAction–hasnothing

BidcoAfricaandBidcoUganda,

Asnotedintheinvestigationreport,UNDP’sPolicyindicatesthatthe‘‘Growingofcrops,includingpalmoilorotherlargemonocultures’maybeconsideredhighrisk,andforsuchsectors,‘an

Page 27: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

27

todowithOilPalm.BidcoAfrica’sInitiativefocusesonSunflowerandSoyaBeansinKenya.Theextracarefulapproachisnotrequired.

extracarefulapproachisrequired’(Policy,pg.5).SECUnotesthisaspotentiallyrelevant,andworthyofconsiderationbyUNDP.

111.

86

Theinvestigatorsseemtorelyonanythingbutlegalandformaldocumentationtoestablishalinkbetweenthetwoorganizations:‘AUNDPstaffmemberwiththeBCtASecretariatindicatedinanemailthatBidcoUgandais‘ajointventurebetweenWilmarGroup…andBidco[Africa]withfinancingfromIFAD.’ThisstatementwouldmeanthatIFADisafinancierofBidcoUganda-anotherworldlyclaimbyanymeasure.IFADisonlyinvolvedintheVegetableOilDevelopmentProjectandfundsfarmersnotBidcoUganda.Point86representsthetrueeffectoffailingtoappreciatethisdemarcations.Itreads:BidcomadenofinancialcontributiontoBCtA,butthesectorofactivityatthecenterofthepartnershipmaybeconsideredrisky.Promotinginclusivebusinessisnotinherently‘highrisk,’butBidco’sproposedinitiativeforBCtAmembership–theFullValueChainInitiative–involvedagriculturesupplychains.AsnotedinthePolicy,the‘Growingofcrops,includingpalmoilorotherlargemonocultures’maybeconsideredhighrisk,andforsuch

BidcoAfricaandBidcoUganda,PharisKimaru

Thestatementthat‘BidcoUgandaisajointventurebetweenWilmarGroup…andBidcowithfinancingfromIFAD’isnotaSECUstatement.ItwasastatementfromaUNDPmemberoftheBCtASecretariattoaDonorSteeringCommitteemember.Theinvestigationreportisrevisedtoreflectthisdisagreementwiththisstatement.

Page 28: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

28

sectors,‘anextracarefulapproachisrequired’(Policy,pg.5)

112.

87

Thestatementthat“notallexclusionarycriteriawereincludedandconsideredduringduediligence”isinaccurate.BCtAhadconductedtheduediligenceinlinewiththeRiskAssessmentToolguidancewhichlistsallrelevantexclusionarycriteria.Thus,allofthecriteriawereconsideredwhenassessingthecompany.

UNDPBPPS/DIG/IICPSD

Projectdocumentationdoesnotreflectfullandadequateconsiderationofallexclusionarycriteria.Tothecontrary,asdetailedintheinvestigationreport,documentationprovidedreflectsinadequateattentiontoUNDPPolicy.

113.

88

*Commentsforpara88-89and117-118*InadditiontothecarefulreviewofIFAD’sassessmentsofOPUL(a.ithejointventurebetweengovernmentofUgandaandBidco,financedbyIFAD),theBCtAteamalsoreliedonIFC’sEnvironmentandSocialReviewSummarythatpertainstothebank’sUS$36.5millionloantoBIDCOinJuly2014tosupportexpansionofthecompany’sconsumergoodsoperationsintonewmarketcategoriesandcreatemoreopportunitiesforsmallfarmerstoenhanceproductivityandearnbetterincomes.ThesefindingswerealsosharedwiththedonorsfollowingSIDA’sadditionalinquiry(asmentionedbySECUreportinpoint24).

UNDPBPPS/DIG/IICPSD

ThereportisrevisedtoreflectUNDPassertionsrelatedtorelianceonIFC’sduediligenceforIFC’sBidcoprojectandSECUfindingsrelatedtotheseassertions.

Findingsincludethefollowing:

BCtA’spublicBidco-relateddocumentationdoesnotmentiontheIFC-supportedBidcoprojectorrelianceonIFC’sduediligence.InterviewswithUNDPBCtASecretariatstaffindicateddiffering/conflictingviewsontheextenttowhichIFC’sduediligencewasused.Inanyevent,giventhattheIFC-supportedprojectwasnotmentionedinBCtABidco-relateddocumentation,therelationshipbetweenIFC’sduediligenceforBidco’sprojecttoconstructnewphysicalfacilitiesandBCtA’sduediligenceforBidco’sinitiativetouselow-incomefarmersforsourcesofrawmaterialsisnotapparent.IftheIFC-supportedprojectandBidco’sFullValueChainInitiativearerelated,claimsmadebyBidcoforeacheffortwouldneedtobereconciled,e.g.,claimsrelatingtopotentialoutcomes,includingthenumberofpeopletobeemployed.

Page 29: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

29

*IFCassignsthefollowingtypesofcategoriestoitsinvestmentprojects–CategoryA,B,CandFIs(forfinancialinvestmentactivities).CategoryAcoversprojectswithsignificantadverseimpacts,CategoryB–projectswithlimitedadverseimpactsthatcanbemitigated,andCategoryC–projectswithminimalornoadverseimpacts.ThesearetakenfromIFC’sESRProcedureManual.ThefindingsofIFC’sEnvironmentalandSocialReview,(whichincludedsitevisitsofBidcofactoriesinKenya,interviewswithkeypersonnel,reviewofdocuments,etc.)statedthat“theproposedinvestmentisexpectedtohavelimitedenvironmentalandsocialimpacts.Further,theimpactscanbeavoidedormitigatedbyadheringtorecognizedperformancestandards,procedures,guidelinesanddesigncriteriaasdescribedinthefollowingsections.ThisisthereforeaCategoryBprojectinaccordancewithIFC’sEnvironmentalandSocialSustainabilityPolicy.”InIFC’scategorizationlevel*,CategoryBisassignedtotheprojects“withpotentiallimitedadversesocialorenvironmentalimpactsthatarefewinnumber,site-specific,largelyreversible,andreadilyaddressedthroughmitigationmeasures.”

Page 30: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

30

114. IFCassessedthefollowingkeyissues(amongother):OHSstandards,adherencetoKenyanlaborlaw,workingconditions,standardsandOHSriskpreventionandmanagement,LandAcquisitionandInvoluntaryResettlement,BiodiversityConservationandSustainableNaturalResourcesManagement,IndigenousPeoplesandCulturalHeritage.Thelatterthreecategorieswereassessedasnotimpactedbytheinvestment.TheIFC’sassessmentalsoprovidedadetailedE&SactionplanthatBidcoweretoimplementtoimproveidentifiedpotentialcontroversiesandmitigatepotentialrisks.

UNDPBPPS/DIG/IICPSD

IFC’sduediligenceisnotreferencedinBCtA-relatedprojectdocumentation,and,therefore,itisunclearhowIFC’sduediligencefortheconstructionofphysicalfacilitiesrelatestoBCtA’sduediligencefortheFullValueChainInitiative.

SECUcouldnotfindwrittenassurancesthatcommitmentsBidcomadeinthecontextoftheIFCprojectwouldapplyinthecontextoftheFullValueChainInitiative.Anditisunclearhoworiftheycouldapply,e.g.,thegrievancemechanismfortheIFCprojectisnotclearlyapplicable.

See,also,responseinRow114.

115. 89

116. 90

117. 91

118. 92

119. 93

120. 94

Labor-rightsrelatedconcernsatBidcoAfrica’soperationinKenyaweregivenin-depthconsiderationand

UNDPBPPS/DIG/IICPSD

AsnotedinyourcommentinRow122,labor-rightsconcernsinvolvedmultipledisputes,notjustone.TheUNDP/PSDformnotes,‘BidcoAfricainKenyasufferedfromissueswithpoor

Page 31: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

31

researchatthetimeshowedthattherehadbeenonespecificdispute,whichhadbeenresolved.

workingconditionsforanumberofyears:2011workersstrikeparalyzedthefactory.ProtestsresurfacedinMarch2015.’Theinvestigationreportnotesthattheduediligenceformfailstodescribeiftheseissueswereignoredoraddressed.Iftheywereaddressed,thisshouldhavebeendescribedintheduediligenceform.

121.

95

Pleasenotethatasmentionedoncommentabovetoparagraphs88-89and117-118thefindingsfromIFC’sESreviewandIFAD’sassessmentofOPULwerealsoconsidered.

UNDPBPPS/DIG/IICPSD

SeeresponseinRow113.

122.

96

Pleasenotethatthesubtitleaboveparagraph96characterizinglandrelatedclaims“insignificant”isinaccurateandmisleading.Theduediligenceformmentions:“Thefollowingmoderate-riskcontroversieswereidentified:− LandgrabcontroversyinUganda:BidcowasaccusedoflandgrabbinginKalangalaDistrictinUganda,leavingthousandsdisplaced.Otherrelatedaccusationsincludedpoorlaborstandardsanddeforestation.However,UgandangovernmenthasclearedBidcoinlandclaim.Nevertheless,Ugandanfarmerswhowereevictedhavetakenthecasetocourt.Theproceedingsareongoing.IfthedecisionisnotinfavorofBidco,thereputationalrisksaresignificantgiventhecompany’scommitmenttoworkingwith

UNDPBPPS/DIG/IICPSD

Titlerevised,andreportrevisedtoindicatethatUNDPstaffcharacterizedcontroversiesas‘moderate-risk’,furthernotedthatreputationalriskswouldbe‘significant’ifthecourtdecidedagainstthecompany,andultimatelystatedthattheanalysisofperformanceandstrategy‘doesnotindicateanyreputationalrisksforBCtA;thecompanyisasolidcandidatetojointheglobalplatformofinclusivebusiness.’

Page 32: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

32

smallholderfarmers.− BidcoAfricainKenyasufferedfromissueswithpoorworkingconditionsforanumberofyears:2011workersstikeparalyzedthefactory.ProtestsresurfacedinMarch2015.− Taximproprietyallegationsin2012:BidcoAfricacontestedincourtahugetaxbillfromtheKenyanTaxAuthoritieswherethecompanylostthecaseandhadtopay.”

123. 97

124. 98

125.

99

Paragraph99seemstoimplythatBidcowasactivelyinvolvedintheprocessoflandacquisition.TheroleofthelandacquisitionsolelyrestedontheGovernmentasperthecooperatingagreementbetweenGovernmentofUgandaandBidcothatwassignedinApril2003.IndeedGovernmentacquired8,500hectaresoflandforthenucleusestate,fromwhichBidcowasabletoestablish6,200hectaresoilpalmplantation.Outofthisland,onlyabout25hectaresoflandiscontestedandissubjectofthecaseinCourthererefereedto.Thisis0.29%ofallthelandacquired.Thisshouldsayalotonthematerialityofthelandindispute

MinistryofAgriculture,AnimalIndustryandFisheries;VegetableandOilDepartmentProject(VODP),C.M.Masaba

SeeresponseinRow12.

Page 33: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

33

inrelationtothewholeproject.Consideringhowmanysmallholderfarmerareinvolvedintheprojectcurrently(1,800)withanassuredaccesstomarketfortheproduceandamonthlyincomefromsaleoftheircrops,thisisoneofthefewsuccessfulcasesofinclusiveinvestment.Farmershavea10%shareholdinginOilPalmUgandaLimited(OPUL)andtwopositionsontheBoardofDirectors.Thereisapricingformulainplacethatensuresfairpricingforfarmers’oilpalmfreshfruitbunches,henceaddressingchallengesassociatedwithamonopoly,andBidcohassignedofftheagreementacceptingtofollowtheformula.Thecompanyensuresthatfarmersusethesamequalityofinputsusedbythecompanylikeseedingandfertilizersandinaddition,providestechnicalknowhowtothefarmers.Thecompanymeetswithfarmerleaderseverymonthtodiscussthepricethroughapplicationofthepricingformulaandanyotherissuespertainingtotheoilpalmbusiness.Thecompanyprovidestheinputsoncreditthatispaidbytheprojectoveraperiodofoneyear.Theseeffortsensureinclusivenessofthebusinessbyinvolvingsmallholderfarmersintheproductionchainandalso

Page 34: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

34

protectingtheirinterest.

126. DespiterecordingandacknowledgingthatBidcoUgandawasnotdirectlyinvolvedinanylandtransactionsthedraftreportgoestoARGUEagainstthisfact:InformationgatheredduringtheinvestigationindicatedthatwhileBidcoUgandawasnotdirectlyinvolvedinacquiringlandforcropsforitsrefinery,itknewof,reliedon,andencouragedthispurchasebythegovernment.BidcoUgandaalso,apparently,wasengagedindecisionsanddiscussionsrelatedtothepurchase.Whatinformationisthisreferredinclause99?

BidcoAfricaandBidcoUganda,PharisKimaru

See,also,responseinRow12.

127. Tothebestofourknowledge,therewasnocompulsoryacquisitionofland,andallthelandprovidedbythegovernmentwasacquiredonwillingbuyerwillingsellerbasisfollowingChiefGovernmentValuer’svaluationandinputsfromtheothermembersofthetaskforce.Therewerenoevictionsofpeopleonthelandacquiredfortheproject.TheProjecthasaclearmandatethatensuredtakingpossessionofsuchlandwhichisfreeoffanyencumbrances.Wereconfirmthatcompanyhavenottakenpossessionofanylandwhich

BidcoAfricaandBidcoUganda,PharisKimaru

SeeresponseinRow2.

Page 35: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

35

hasanyeconomicorcommercialcropValue.Thisisevidentfromthefactthatthoughthegovernmentacquired8500Haoflandfortheproject,only6200hasbeenusedforthedevelopmentofOilPalmundertheprojectleaving1,500Hatowardsenvironmentalzoneand800Hatocommunitiestocontinuewiththeireconomicactivities.Doestheinformationgatheredreferredtoinclause99contradictordisputethisnarrative?

128. Thefactthatthereiscross-shareholdingbetweenthetwocompaniesisnotenoughtodismisstheabovedemarcationsasreadinclause99:“However,BidcoAfricahasatleastfinanciallinkstoBidcoUgandaandtheKalangalaoilpalmprojectreferencedinthecomplaint.”

BidcoAfricaandBidcoUganda,PharisKimaru

SeeresponsesinRow9.

129. Underparagraph100,itisstatedthat“ItisnotgoodforBidcoeventiftheyweren’tinvolvedinlandacquisition,itlooksbad.Theyhavetitle(lease)byUgandaLandCommission.EvenifBidcowinsthecase,ifalocalmanisnothappy,itdoesn’tlookgood”.Whilethisisacommentbyanindividualentitledtohisorherviews,itisnottenableforthecompanyorgovernmenttostopactivitiesbecause

MinistryofAgriculture,AnimalIndustryandFisheries;VegetableandOilDepartmentProject(VODP),C.M.Masaba

Theinvestigationreportusedthisquoteasoneexampleoftheimportanceofrobustduediligencetoreputationalrisk.Nevertheless,thereporthasbeenrevisedtodeletethequote.

Page 36: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

36

ofanyandeverycomplaintorclaimraisedwithoutconsideringthemeritoftheissue.Otherwise,itwillnotbepossibletoimplementtheprojectoranyotherdevelopmentinitiative.Eachcasehastobeconsidereddependingonhowmaterialitis.Inthiscase,onlyabout0.29%ofthelandisundercontention.

130.

100

Clause100seekstoassignreputationalresponsibilitytoBidcoUgandabasedonnothingbuttheviewofoneindividual.“ItisnotgoodforBidco.Eveniftheyweren’tinvolvedinlandacquisition,itlooksbad.Theyhavetitle(lease)byUgandaLandCommission.EvenifBidcowinsthecase,ifalocalmanisnothappy,itdoesn’tlookgood.’’

BidcoAfricaandBidcoUganda,PharisKimaru

Reportrevisedtoclarify.SeeresponseinRow129.

131.

101

Paragraph101seemstoimplythatthereareotherareaswheretherearecomplaintsconcerningthelandacquiredfortheproject.Italsoquotes29familiesthatweredisplacedandwomenwithfamilieswhohavebeendeprivedoflivelihood.Thisistoclarifythattothebestofourknowledge,onlyonepieceoflandhasbeencontestedandisabout0.29%ofthetotallandacquired.Inaddition,factsofsurveyoftheareabeforeacquisitionshouldhavebeenreceivedbyyourteamfromKalangalaDistrictheadquarters

MinistryofAgriculture,AnimalIndustryandFisheries;VegetableandOilDepartmentProject(VODP),C.M.Masaba

Reportrevisedtoindicatethisstrongdisagreementwiththeclaimsthat29familiesweredisplaced.

Page 37: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

37

thatledthelandidentificationprocess.Factsofnohousesandcommercialcroppingfoundonthelandshouldhavecomeup.OneneedstoappreciatethatinthispartofUganda,atenanthasrightofuseontheareathatiscultivatedandnotareasthatareforestedbecausethelandbelongstotheregisteredowner.Fromourrecords,therewere11peoplethathadsubsistenceagriculturalactivitiesonabout45acresland,withouttheknowledgeofthelandowner.Duringtheprocessofnegotiationswiththelandowner,theseissuesoftenantsonlandwereraisedandthelandlordagreedtoputaside49acresoflandforcommunity,andlease330acresofthelandthatwasnotutilized,totheproject.Inaddition,hecompensated10tenantswhoacceptedpaymentsandonlyoneturneddowntheoffertobecompensated.Thecomplainantsstillliveonthelandbelongingtothislandowner.Thepracticeofatenantbeingrecognizedbytheregisteredlandownerisknowninthearea.Atokenpay‘kanzu’issupportedtobemadetothelandlord,forthetenanttoberecognizedbythelandlord.Itishopedthatduringtheresearch,thesefactswerecollectedandthereforeinformedthereport.The29families

Page 38: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

38

supposedlydisplacedarethereforeasurprisetotheProject.Suchclaimsneedtobecheckedoutwiththeleadersofthecommunityintheareaandthedistrictandcorroboratedbeforetheycanbewrittendownasfacts.

132. Thisparagraphisunclear,asitismixingpossibleimpactonindividualswithnumberofgeographicallocations.Publicrecordsindicateonlyonelocation–Kalangaladistrict,BugalaIsland.

UNDPBPPS/DIG/IICPSD

ReportrevisedtoindicatethatallconcernsrelatetoKalangaladistrict.

133. 102

134. 103

135. 104

136. 105

137. 106

138.

107

PleasenotethatthecourtcaseisadisputebetweenMuyisa(thecomplainant)andthelandlord(asrespondent1)andOPUL(asrespondent2).

UNDPBPPS/DIG/IICPSD

Commentnoted.

Page 39: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

39

139. 108

140. 109

141.

110

Titleaboveparagraph110isunclearPleasenotethesourcesusedbyBCtAduringtheduediligenceincluded:o IFADreport,o IFCenvironmentandsocialassessmento GovernmentofUgandastatementsfromTheUgandanMinistryofAgriculture,AnimalIndustryandFisheries.o Comprehensiveinternetsearchandanalysisofpubliclyavailableinformation,including

UNDPBPPS/DIG/IICPSD

ReportrevisedtoincludethisinformationaswellasaSECUfindingthatthisinformationshouldhavebeenincludedinBCtA’sduediligencedocumentation.

Page 40: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

40

throughtopic-relatedwebsites,resourcecentersanddatabases(separateESGandControversyreportforBidcowasnotavailableintheSustainalyticsdatabase).

142. 111

143. 112

144.

113

TheDraftComplianceReportgoesoutofitswaytolegitimizeandnormalizetheexaggeratedclaimsinthecomplaint:InClause113itreads:However,asubsequentreportbyIFADandtheInstituteofDevelopmentStudies(IDS)highlightsnotonlymanyofthebenefitsdescribedintheearlierIFADreport,butalsoseveralnegativeunintendedconsequences–includingsomethatarereflectedinthecomplaint.

BidcoAfricaandBidcoUganda,PharisKimaru

Thereportendeavorstoincludeallperspectives,includingthosereflectedinbothIFADreports.

145. 114

146. 115

147. 116

148. 117

149. 118

PleasenotethatmembershipstatustoUNGlobalCompactispublicly

UNDPBPPS/DIG/IICPSD

SeeresponseinRow50providedbytheUNGlobalCompact,re:relianceonUNGlobalCompactmembershipaspartofdue

Page 41: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

41

availableontheirwebsite,andBidcohasbeenandisactiveandhasregularlysubmitteditsCommunicationonProgress(COP)forthepast6years.https://www.unglobalcompact.org/what-is-gc/participants/1314#cop

diligence.

150. Also,pleasenotethatIFC’sassessmentdoesfindthatBidcohasanestablishedgrievancemechanisminplace,andacommunitygrievancemechanismaspartofitsmanagementsystem.“BidcowilladoptaformalStakeholderEngagementPlanincorporatingaCommunityGrievanceMechanismaspartofitsEHSmanagementsystem,asarticulatedintheattachedESAP.Aspecificmanagementprocedurewillbedevelopedandimplementedbeforeconstructionphase.ItsimplementationwillbeassignedtotheCorporateCommunications&PublicRelations(CCPR)TeamLeaderwhoiscurrentlyresponsibleforcommunications”http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d006976ba/49fa276de3012f8285257ccd004e82c8?opendocument;http://ifcext.ifc.org/ifcext/spiwebsi

UNDPBPPS/DIG/IICPSD

ThegrievancemechanismestablishedaspartoftheIFCprojectisnotclearlyrelevantforlow-incomesupplierswhoaretheprimarystakeholdersoftheFullValueChainInitiative.IFCdocumentationforitsprojectinsupportofnewphysicalfacilitiesforBidconotesthefollowingregardingthismechanism:It‘hasbeenadoptedinordertoreceiveandtoaddressanyissuesand/orcomplaintsraisedbysurroundingstakeholdersandend-customersresultingfromproductionandtransportactivities.’Thismechanismappearstotargetthosepossiblyimpactedbyconstructionofthephysicalfacilitiesandcustomersofproducedproducts.Themechanismdoesnotappeartobeavailabletolow-incomesuppliersundertheFullValueChainInitiative.TheProdocdoesnotmentionthismechanism,muchlessdescribehowacommitmentbyBidcototheIFCtocreatesuchamechanismrelatestotheBCtAproject.See,also,responseinRow13.

151.

Page 42: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

42

te1.nsf/651aeb16abd09c1f8525797d006976ba/49fa276de3012f8285257ccd004e82c8?opendocument

152.

119

PleaseclarifywhichoutsidevendorhasassignedBidcoanaveragescore.

UNDPBPPS/DIG/IICPSD

ThereporthasbeenrevisedtoreflecttheUNGlobalCompact’sterminology.BidcolastsubmittedaCommunicationonProgresstotheUNGlobalCompacton25October2016andisin“Active”standing(COPthatmeetstheminimumrequirements).“Active”levelisthemiddleratingfortheUNGlobalCompact,above“Learner”andbelow“Advanced.”

153.

120

Pleasenoteitisinaccuratetostatethat“Staffappearedtorelyheavilyonassurancesfromthecompany…”BCtAreliedonthefollowingsources:o Deskreviewofpublicly

availablesourceso Expertiseoflocalconsultantso IFCenvironmentalandsocial

assessmento IFADreporto ActivemembershipinUN

GlobalCompacto LetterfromtheGovernment

ofUganda

UNDPBPPS/DIG/IICPSD

Revisedtoclarify.Thereliancementionedinthereportalsoreferstotheinitiativeitself,andnotexclusivelytheduediligenceprocess.DuringinterviewswithBCtAstaff,theteamresponsibleforconductingduediligenceonBidco’sapplicationindicatedrelianceonassurancesfromthecompanythatthecompanywouldresolveconcernsidentifiedbythereviewprocess.IntheUNDP/PSDform,underthesection“Whatsourceswerecheckedforthiscompany?”itsays“Mainmedia(NGOsandnewspapers),onlinesources,UNGC,BidcoAfricawebsite.”Itmakesnomentionofexpertiseoflocalconsultants,theIFCassessment,theIFADreport,oranyletterfromtheGovernmentofUganda.

Page 43: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

43

154.

121

PleasenotethatIFC’sassessment(IFCasaninvestorintheKenyaValueChainProject),includesprovisionsforcommunityengagement,suppliercodeofconduct,responsiblesourcing.http://ifcext.ifc.org/ifcext/spiwebsi

te1.nsf/651aeb16abd09c1f8525797d006976ba/49fa276de3012f8285257ccd004e82c8?opendocument

UNDPBPPS/DIG/IICPSD

SeeresponsesinRow113.

155. 122

156. 123

157. 124

158. 125

159. 126

160. 127

161. 128

162. 129

*Commentonpara129-130*Wearenotsurewhatismeantby

UNDPBPPS/DIG/IICPSD

Reportrevisedto‘assessmentoftheproject.’

Page 44: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

44

“assessment”oftheBCtAProdoc.AnenvironmentalandsocialimpactassessmentoftheProdocwouldnotberequired.

163.

130

Page 45: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

45

164.

131

PleasenoteadescriptionofeachinclusivebusinesscommitmentincludingobjectivesandmeasurabletargetshavealwaysbeenpubliclyavailableontheBCtAwebsite.

UNDPBPPS/DIG/IICPSD

ReportrevisedtoavoidperceptionthatnoinformationiscurrentlyavailableonBCtA’swebsiterelatedtomembercompanies’commitments.

165. 132

166.

133

AsmentionedduringtheinterviewwiththeSECUteam,sinceOctober2015BCtAhasbeenusingtheRAT.Werequestthatthisbestatedinthereport.

UNDPBPPS/DIG/IICPSD

ReportrevisedtoindicatethataccordingtotheBCtAtheRATformhasbeenusedsinceOctober2015.

167. 134

168.

135

PleasenotethatsinceBCtAdoesnothave/developcommunity-levelinitiativesitself,thisrecommendationdoesnotseemtoapplyorbeviable.However,wedoagreeandplantohaveinplaceapubliclyavailablerecoursemechanismtoreceiveconcernsfromcommunitiesrelatedtoBCtAmembercompanycommitments.

UNDPBPPS/DIG/IICPSD

Iflocalcommunitiesare‘keystakeholders’oftheBCtAproject,theirviewsmustsomehowbeconsidered.

169. 136

170. 137

171. 138

172.

139

SinceFebruary2016,tocreatesuchseparation,BCtAsharestheduediligenceRATformswiththeDIGteamfortheircommentsandreview.Thisistoaddress

UNDPBPPS/DIG/IICPSD

Noted.

Page 46: Comment Matrix: SECU0002, A Compliance Report … Comment Matrix: SECU0002, A Compliance Report related to the Business Call to Action Project Social and Environmental Compliance Unit,

46

thecurrentlackofclarityintheprivatesectorduediligencepolicyrelatedtomulti-partnerinitiatives.AspartofthepolicyreviewandupdatethatUNDPisplanningtoinitiatein2017,furtherclarityonthiswillbeconsideredintherevisedPolicyonDueDiligenceandPartnershipswiththePrivateSector.

173. 140

174.

141

WeacknowledgeandappreciatetheeffortsbyUNDPtoprotecttherightsofpopulationbutrequestthatthereportreflectsthefactsongroundandcorroboratedinformationgatheredfromcommunities,toreviseandfinalizethereport.

MinistryofAgriculture,AnimalIndustryandFisheries;

Noted.