Adi BornheimAdi BornheimCalifornia Institute of TechnologyCalifornia Institute of Technology
July 25, 2007July 25, 2007
CMS ECAL Status, Test Beams, CMS ECAL Status, Test Beams,
Monitoring and IntegrationMonitoring and Integration
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 2
Outline
ECAL Integration Status
Monitoring Project
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 3
CMS ECALLead-Tungstate Crystal Calorimeter~6.35 m
2.6 m
0.45 m 90 t of PbW04
~76000 Channels
Barrel segmented in 36 SuperModules (SM), each endcap in 2 Dee’s, endcap equipped with a Preshower detector.
Design resolution 0.5% above 100 GeV.
Dynamic range 0.04 GeV to >1000 GeV.
Very powerful detector for all lepton and photon base physics.
Crucial for H
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 4
Electronics Integration
All 36 SMs have been equipped with electronics and pre-calibrated with cosmic rays.
Very tight quality control. Spotted per-mille level problems which were fixed.
Tight schedule was kept with substantial help from the entire ECAL collaboration. Caltech students worked shifts for 4 months.
Y. YangECAL Integration Center
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 5
ECAL Insertion at LHC Point 5
One half of barrel ECAL (EB-) has been inserted into CMS in June. The second half is being inserted now (1 SM every 2 days). Expect to finish by the end of the week.
More than 99.9% of all channels are functioning perfectly.
Barrel ECAL will be cabled in September, to be fully integrated in global data taking soon after.
V. TimciucT. OrimotoECAL Insertion P5
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 6
CMS ECAL Endcap
Endcap assembly now in high gear. Dee’s are equipped with crystals, electronics, monitoring etc.
One third of all endcap crystals are at CERN; confident that all crystals will be delivered in time.
Goal is to insert both endcaps for physics running in 2008. Extensive test beam in 2007.
J. Veverka ECAL Endcap Monitoring Fibers
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 7
ECAL Preshower
Preshower EE
The Preshower assembly (part of the ECAL endcap) is now also getting on an accelerated schedule.
Testbeam 2007 with preshower, ECAL endcap and HCAL and possibly with endcap only for precision tests.
Caltech group is studying the preshower utilization. It is an integral part of ECAL which has yet to be brought to the same level of integration and understanding as the barrel ECAL.
Y. Ma
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 8
CMS ECAL Timeline
Insertion of last SMs is ongoing now.
Cabling of barrel ECAL done by September 2007.
Participation in CMS global runs starting October 2007.
Assembly and integration of Endcaps between now and March 2008.
Insertion of Endcaps shortly before closure of detector in 2008.
Preshower on a very similar time scale.
Start commissioning with physics data with the first collisions in 2008
Reach design performance in 2009.
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 9
All Supermodules have been pre-calibrated with cosmic rays with an average accuracy of 1.5%
Testbeam measurements and MC simulation agree at the level of 0.1%
ECAL Performance in the Test Beam
≤1% effect due to crystals “staircase” geometry predicted by simulation is measured in data with 1‰ accuracy
Comparison of inter-calibration coefficients obtained with the beam (Cbeam) and with cosmic rays (Ccosm)
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 10
Laser Monitoring Performance in Test Beam
Monitoring system has been operated at design specification during test beam 2006 for more than 1000 hours.
Transparency corrections have been studied and tested.
Caltech students have served several 100 hours of shifts in the test beam campaign 2006.
Monitoring stability
better than 0.1%
Restoring design resolution after
irradiation
C. Rogan
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 11
ECAL Crystals are radiation hard, but do change transparency under irradiation by several percent.
Measure transparency change every 20 minutes with a precision of better than 0.1 %.
Correct all physics data to ensure that the inter-calibration of all ECAL channels is not affected.
ECAL Laser Monitoring
Test Beam Data
Recovery RecoveryDamage DamageAPD
VPT
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 12
Laser Monitoring Project
In 2006 we processed all test beam data in quasi-online mode at CERN. Precision stability better 0.3% available within 15 minutes after data taking, better than 0.1% offline.
Since 2007 we are responsible for the entire ECAL monitoring project (jointly with Saclay) with Bornheim as the task leader.
Three students (Timciuc, Ma, Veverka) and Orimoto work on the monitoring project at CERN to fulfill their service requirements.
The project is now a task within the newly formed ECAL DPG group.
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 13
Laser Monitoring Workflow
CMS
Gap EventsFilterFarm/HLT Laser FarmDisk Buffer
Online DB
Offline DB
Offline Reconstruction
Online P5
OfflineTier0CAF
DAQ GT
LASER
Raw APD/PN
Corrected APD/PN
Repackage Laser Data
Y. Ma
V. Timciuc
J. Veverka
T. Orimoto
SaclayCALTECH
Saclay
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 14
Integration of Laser Source at P5
Time [s]
Las
er A
mp
litu
de
ECAL
CMSLaserSystem
Global Trigger
TTCciEMTC
Gap Events
Real Time Laser Trigger Sequence
Monitoring has to happen continuously during normal data taking.
Laser system and laser DAQ synchronized with LHC clock and CMS DAQ.
Monitoring data will be read during special calibration trigger and funneled into a dedicated stream.
Online processing of data to achieve fast feedback.
All hardware is commissioned and ready to go at P5.
Online Laser Data Processing Farm
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 15
Laser Monitoring: Online Data Flow
CMS Online DB
Offline DB
Offline Reconstruction
P5
OfflineTier0CAF
DAQ GT
LASERGap Events
FilterFarm/HLT Laser FarmDisk Buffer
Yousi Ma
Laser monitoring data will be acquired during LHC “gap” events. Gap events will arrive at the Filter Farm, containing, among other data, the ECAL laser event data.
One transparency measurement is based on a few hundred laser events on one light monitoring module. The ECAL laser data has to be extracted from the gap events and funneled into the CMSSW job running on the Laser Farm.
In particular, the data must be sorted into files containing all the laser events for one transparency measurement. This is being implemented in a standalone application by Y. Ma.
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 16
Laser Monitoring: Databases & Corrections
CMS
Gap EventsFilterFarm/HLT Disk Buffer
Offline Reconstruction
P5
OfflineTier0CAF
DAQ GT
LASER Laser Farm
OMDS
ORCON
ORCOFF
Once the laser data is sorted and processed to extract APD/PN values, this data must be inserted into the OMDS (the “online database”) located at Point 5.
The data must then be transferred using the online-to-offline (O2O) copy procedure, during which raw APD/PN ratios have to be normalized and corrected (eg. for the pulse width non-linearity).
The laser APD/PN ratios, reference values, and scale factors necessary to implement the transparency correction will be stored in the ORCON/ORCOFF “offline database”
V. Timciuc is currently developing software in the CMSSW framework for storing and transferring the data between databases, and J. Veverka will be joining him to work on the corrections
Vladlen TimciucJan Veverka
O2O
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 17
CMS
Gap EventsFilterFarm/HLT Disk Buffer
P5
OfflineTier0CAF
DAQ GT
LASER
ORCOFFOffline
Reconstruction
Laser Monitoring: Transparency Correction
The physics data has to be corrected for the effects of the crystal transparency change, and this will be done in the offline reconstruction.
For the correction, we will use the APD/PN ratios, reference values, and correction scale factors stored in the offline ORCOFF database.
The data will be interpolated in time in order to apply an accurate correction to physics events. The correction must be recalculated each time the interval of validity is updated.
We must develop a strategy to validate the laser transparency correction in-situ.
Currently working towards implementing the correction for CSA07.
Toyoko Orimoto
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 18
Monitoring Time Line to Physics Running
Participate in CSA07 with first offline transparency correction.
Participate in in CMS global runs with monitoring system starting in September 2007.
Implement and commission full monitoring scheme by early 2008.
Start routine running as soon as detector closed in 2008.
Start analysing data and tune performance as soon as beams circulate in LHC. Expected initial monitoring stability : ~0.3 %
Reach design performance for the monitoring 2008. Expected monitoring stability <0.1%.
Exercise synergies between monitoring effort and inter-calibration effort to maximize physics output of ECAL.
July 25, 2007 A.Bornheim - DOE Review 2007 - CALTECH 19
Summary
CALTECH is now in charge of the entire monitoring project.
ECAL integration is progressing smoothly. Expect to have a full ECAL available for physics data in 2008.
Extend our leadership further to ensure ECAL reaches design performance.