Project number: 101855
Cleburne State Park Concession/Bathhouse & Group
Camp Improvements
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
2 | P a g e
BID DOCUMENT
PARTICIPANTS:
RITESH KUMAR ARJUN SINGH
SHAIK JOHNNY BASHA
CHETAN BIRADAR
SHIVAM PATEL
MANSOOR TAJ MOHAMMED
RAJESH DONKA
INSTRUCTOR
Dr. NILO TSUNG
Teaching Assistant: Amir Tabesh
CE 5379: CONSTRUCTION COST ESTIMATING
Submission Date: 6th December, 2016.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
3 | P a g e
ABSTRACT
Our team has been developing a bid for the new men’s and women’s barracks at Cleburne
State Park. The objectives of this project are to get to know the pre-construction process which
includes estimating, scheduling, reviewing plan details and specifications, completing bid forms,
obtaining insurance bonds, collaborating with key personnel, managing the workflow process of
the pre-bid phase, breaking down work into sub-categories in WBS, linking all the construction
activities to come up with least number of days, quantifying all the construction activities, and
finally pricing out all activities. We gained experience in formulating the information using
Timberline, Vu360 and Primavera P6 R15.1(software programs) Also, this class project simulated
the experience of bidding a construction project from the solicitation phase all the way up to the
tendering of the project proposal for evaluation as well as the possibility of a follow up owner-
contractor negotiation meeting. This project gave us a realistic experience to understand the
general bidding process and steps needed to create a complete bid proposal. The project has helped
us to understand the real world working procedure of getting quotes at the end moment, like just
before the bidding day, which created a lot of pressure and last moment changes. All in all this
project has given a glimpse of our construction industry.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
4 | P a g e
TABLE OF CONTENTS
BID DOCUMENT 2
ABSTRACT 3
TABLE OF CONTENTS 4
INTRODUCTION 7
FACILITIES 7
METHODOLOGY 8
ASSUMPTIONS 8
CONCLUSION 10
REFERENCES 10
KEY STAFF 10
MEETING MINUTES 15
RECOMMENDATIONS FOR SUSTAINABILITY AND VALUE ENGINEERING 20
APPENDIX A: FINAL QUOTE 22
APPENDIX B: BID FORM 24
APPENDIX C: COMPANY PROFILE 25
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
5 | P a g e
APPENDIX D: KEY PERSONNEL 26
APPENDIX E: BID ASSESSMENT MEMO 27
APPENDIX F: PROJECT WBS 29
APPENDIX G: SUBCONTRACTOR LOG 31
APPENDIX H: MATERIAL SUPPLIER LOG 37
APPENDIX I: QUANTITY TAKEOFF CALCULATIONS 39
APPENDIX J: DETAILED ESTIMATE 54
APPENDIX K: LIST OF MAJOR EQUIPMENT AND MAJOR CONSTRUCTION MATERIAL 67
APPENDIX L: HIGH LEVEL PIE CHART SCHEDULES 68
APPENDIX M: SITE VISIT REPORT AND PHOTOGRAPHS 69
APPENDIX N: TIMBERLINE OUTPUT 74
APPENDIX O: ONSCREEN TAKEOFF OUTPUT 75
APPENDIX P: MAP OF SITE RELATED TO COMPANY OFFICE 79
APPENDIX Q: COPIES OF CORRESPONDENCE WITH CONTRACT ADMINISTRATOR 80
APPENDIX R: COPIES OF CORRESPONDENCE WITH SUPPLIER AND SUBCONTRACTOR 81
APPENDIX S: LETTER OF REFERENCE 83
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
6 | P a g e
APPENDIX T: MWBE AFFIDAVIT 84
APPENDIX U: PROOF OF INSURANCE 85
APPENDIX V:CERTIFICATE OF INSURANCE 86
APPENDIX W: PERFORMANCE BOND 87
APPENDIX X: PAYMENT BOND 88
APPENDIX Y: CONTRACTORS PROGRESS PAYMENT AFFIDAVIT 89
APPENDIX Z: CONTRACTORS FINAL PAYMENT AFFIDAVIT 90
APPENDIX AA: CONSENT OF SURETY COMPANY TO FINAL PAYMENT 91
APPENDIX AB: HUB SUB-CONTRACTING PLAN 92
APPENDIX AC: AGREEMENT BETWEEN OWNER AND CONTRACTOR 93
APPENDIX AD: CONTRACTORS QUALIFICATION STATEMENT 94
APPENDIX AE: BID BOND 95
APPENDIX AF: PLANS 96
APPENDIX AG: ADDENDA 101
APPENDIX AH: OVERHEAD CALCULATIONS 104
APPENDIX AI: GENERAL 105
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
7 | P a g e
INTRODUCTION
This Project Improvements to Park Structures-Concessions/Bathhouse has provided us opportunities to develop a
bid for the Men and Women Barrack. The main purpose of this project was to learn more about project bids and to
work together as a team. It also gave us opportunities to work on software’s such as Timberline and Primavera P6.
Also this term-project gave us the exposure to Bid and Schedule and present it for project proposal to evaluate as
well as the possibility for owner-contractor agreement.
Our Detailed estimate includes:
1. Quantity Takeoff
2. Pricing Subcontractor’s Work
3. Pricing General Expenses
4. Summary and Bid.
History of Cleburne State Park
Cleburne State Park is named for the nearby town of Cleburne, Texas. It was opened in 1939 after purchase from
the city.
FACILITIES
Cleburne State Park has a variety of campsites. All sites include a picnic table, grill and a campfire ring. Restrooms with hot showers are available nearby all camping areas.
Tent and parking space with water are common.
Back-in campsites with utilities and shelters accommodate up to 8 people and combination of motor vehicles/trailers.
Group Camp consists of a 2-group barracks with twin beds and mattresses sleeping a total of 44 people. The dining hall and kitchen seat approximately 70 people and has some cooking equipment. All buildings are heated but no air-conditioning.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
8 | P a g e
METHODOLOGY
Improvements to Park Structures is a project for the City of Cleburne. Our team was assigned with bidding on the project by following proper guidelines as stated in the project’s specifications.
Quantity Take-off was done by using the knowledge which we gained in our class. Timberline and RS-Means database were used for pricing the Labor, Material, and Equipment costs.
We went through the plans and identified the improvements to be done to the park.
The bid was based solely based on the items which were provided in the plan.
The price costs for labor material and equipment which were obtained from Timberline and RS Means Database are the latest and up to data prices.
The bid which the subcontractors provided are true and can be included in the bid.
Planning and Scheduling of the equipment and machinery which will be required during the project must be carried out thoughtfully, as the cost will affect the performance. Hence the use of machinery should be used such that it can be maximized during the given period to be cost efficient.
We did not do any site visit for the project as there was no suitable time available for us to go for site visit. Though we dint do site visit we could roughly figure out the idea of the Barracks from Cleburne State Park’s Website.
ASSUMPTIONS
● Assuming notice to proceed on Jan 2nd 2017.
● Survey is done for the project site before the construction phase.
● Assuming there is no water table within 4 feet of excavation in building site.
● Assuming the top soil to be lump free, having sufficient bearing capacity.
● Assuming there is no electric line below and above the construction site.
● Excavating 3 feet more along the boundary of building only for stripping of the top soil.
● Assuming soil to be in moderate plastic limit, we have considered a working area of 1ft x 1ft on each
side and provided a formwork of 1 feet depth.
● Since the barracks are of single floor no need of any forklift required.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
9 | P a g e
● Assuming that the site is accessible to the storage, we are not assuming any lead and lift charges.
● Extra supports have been provided at 2 feet throughout the slab, since we are concreting using direct
chute.
● Markings for blockwork to be done after 2 days of curing time of SOG.
● Assuming the air gap between the two walls in masonry to be 2 inches.
● Assuming the wastage for concrete and CMU blocks to be 5%.
● Assuming there is no lag and lead in our project.
● Assuming all the materials and equipment have been passed the quality standards and test.
● Assumed hook bar length as per ACI standards (if number<=6, 12 inch to be provided).
● Lapping to be considered only is if the length each individual bar exceeds 20 feet
● Assuming the rafter length, purlin length, hip length to be same throughout the joints in roof during
calculation of quantities whereas practically it is reducing. These are considered in wastages.
● Assuming the wastage of steel as 5%.
● Assuming there is steel yard at site and scrap steel can be used.
● Assuming the height of pony wall to be 2 feet on both the outer walls.
● If there is any irregular shaped area or triangular area, then the average height is taken for calculation
purposes.
● Considering all the hardware to be of A1 quality.
● Assuming 5-day calendar with standard holidays.
● Risk Assumption:
● The probability of having bad weather condition is assessed by structural and earthwork calendars
which have been incorporated into planning software calenders.
● Inflation in cost of construction material.
● Late availability of material on site.
● It is very unlikely that we will be held back due a delay in resource delivery.
● Scheduling for both barracks are schedule same and assume to be completed on the same day.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
10 | P a g e
CONCLUSION
Our team has been able to successfully develop the bid for the Improvements to Park Structures in Cleburne. Our
objectives were accomplished and we could familiarize ourselves with the project’s bid preparation and learnt to
work as a team under immense pressure in short period of time.
REFERENCES
1. Handouts prepared by Dr. Agustin Villafana for CE5388 Construction Planning and Scheduling at the University
of Texas at Arlington for fall 2016
2. RS means Building Construction Cost Data 2003. 61st Annual Edition 2003.
3. Photos were taken from http://tpwd.texas.gov/state-parks/ website
4. History and other information were taken from https://en.wikipedia.org/wiki/Cleburne_State_Park
KEY STAFF
1.Ritesh Kumar Arjun Singh
M.S Civil Engineering, UT Arlington
2.Mansoor Taj Mohammed
M.S Civil Engineering, UT Arlington
3.Chetan Biradar
M.S Civil Engineering, UT Arlington
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
11 | P a g e
4.Shaik Johnny Basha
M.S Civil Engineering, UT Arlington
5.Shivam Patel
M.S Civil Engineering, UT Arlington
6.Rajesh Donka
M.S Civil Engineering, UT Arlington
SHIVAM PATEL
Experience summary
Mr. Patel, a Senior Scheduler has over 1 year of Job Experience with Ajay Engineering Infrastructure Pvt. Ltd. in a
Bridge Construction work. He has done the proposed scheduling using Primavera P6 for the Cleburne State Park
Project.
Professional Highlights
Served as a Junior Engineer at Ajay Engineering Infrastructure Pvt. Ltd.
Job Roles were:
Responsible for the overall field operation, coordination, and direction of subcontractors and skilled labors
and Managing and Interpreting the contract design documents and implementing it.
Monitored and controlled construction activities like excavation, PCC, foundation, RCC and shuttering work,
steel fixing, casting concrete, masonry for brick works and plastering.
Done Planning and estimating various stage of Bridge Construction project to ensure the most efficient, safe
and economical form system are incorporated into the project design.
Education:
1. Master of Construction Management: August 2016 – Present
University of Texas at Arlington, Texas
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
12 | P a g e
2. Bachelors of Technology in Civil Engineering: July 2011 – May 2015
Pandit Deendayal Petroleum University, India GPA – 3.5/4.0
CHETAN BIRADAR
Professional Experience:
Nirmithi Kendra, Bidar, India| March 2015 – November 2015
Site Engineer:
Supervise employees, including in-house, external contractors, and sub-contractors
Quality checking and estimation
Providing data in respect of variation of orders and site instructions
Work closely with process engineers for follow up and evaluation, and presented reports on trial materials according
to designated schedules
Education:
UNIVERSITY OF TEXAS AT ARLINGTON Arlington, Texas
Masters in Construction Management
UNIVERSITY VISVESVARAYA COLLEGE OF ENGINEERING – GPA 2.3/4.0 Bangalore, India
Bachelor of Civil Engineering
RAJESH DONKA
Professional Summary
Education:
University of Texas at Arlington
Ms in Civil Engineering
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
13 | P a g e
GITAM University
Bachelor of Technology, Civil Engineering
Graduated in April’16 with a CGPA of 7.9 on a scale of 10.
Work History:
Confederation of Indian Industry – Hyderabad, Telangana
Worked at CII-IGBC for developing NBC (National Building Code) for Green Buildings
Visited project sites during construction to monitor progress and consult with contractors
and on-site engineers.
Inspected project sites to monitor progress and adherence to design specification, safety
protocols and state sanitation standards
Visited project sites during construction to monitor progress and consult with contractors
and on-site engineers.
RITESH KUMAR ARJUN SINGH
Education:
University of Texas at Arlington
Master of Construction Management
Datta Meghe College of Engineering
Bachelor of Engineering, Civil Engineering
Work History
Worked as junior engineer on a 3 - 80 story high rise building construction project in
Mumbai, India for Omkar Pvt. Ltd.
Responsible for managing and inspecting the whole on site construction work.
Coordinating with Architect, General Contractor, and Subcontractor.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
14 | P a g e
SHAIK JOHNNY BASHA
EDUCATION:
University of Texas at Arlington
Master of Construction Engineering and Management
MVSR Engineering College
Bachelor of Engineering, Civil Engineering
Work History
Worked as an Assistant Project Coordinator at Hiranandani Developers.
Job Roles were:
1. Assisting project manager with planning of different phases of residential
construction work.
2. Communicating with subcontractors and Labor and coordinating &
Inspecting the work as per the Drawings.
3. Estimating for different tasks of Construction work.
Mohammed Mansoor Taj
Education:
University of Texas at Arlington
Master of Construction Management SRM UNIVERSITY
B.Tech in Civil Engineering
Work Experience:
Worked as an Implant trainee at Tamil Nadu Housing Board for 1 year and his Job
responsibilities were as follow:
1. Execute onsite material testing for checking physical properties
2. Handling and inspecting the work of labor and subcontractor
3. Design structural foundation of building using Revit and Autocad.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
15 | P a g e
MEETING MINUTES
Introductory Meeting Minutes
Project: - Cleburne State Park Concession/Bathhouse & Group
Project Number: - 101855
Meeting Date and Time: October 20, 2016 from 2:30 pm to 4:00 pm
Meeting Location: 701 S Nedderman Dr, Arlington, TX 76019 Sapphire room
Participants: -
RITESH KUMAR ARJUN SINGH
SHAIK JOHNNY BASHA
CHETAN BIRADAR
SHIVAM PATEL
MANSOOR TAJ MOHAMMED
RAJESH DONKA
Discussions:
• Group members introduced themselves and got to know one another.
Action Items:
• Obtain drawing and specifications and study them in preparation for the kickoff meeting.
• Kickoff meeting scheduled for October 21, 2016 from 1:00 pm to 3:30 pm at 701 S Nedderman Dr, Arlington, TX
76019 Sapphire room
.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
16 | P a g e
Kick-Off Meeting Memo
Project: - Cleburne State Park Concession/Bathhouse & Group
Project Number: - 101855
Meeting Date and Time: October 21, 2016 from 4:30 pm to 6:00 pm
Meeting Location: 701 S Nedderman Dr, Arlington, TX 76019 Sapphire room
Participants:
RITESH KUMAR ARJUN SINGH
SHAIK JOHNNY BASHA
CHETAN BIRADAR
SHIVAM PATEL
MANSOOR TAJ MOHAMMED
RAJESH DONKA
Discussions:
● Discussion on qualification criteria, drawings and specifications
● Head estimator/scheduler selected and responsibilities assigned
● Estimate, reviews, reality checks and documentation preparation scheduled
● Checklists for detailed estimating prepared
● Bid Memo and Letter of interest documents are prepared
● Project specific job and management factors selected
● Discussion for preparation of query list
● Discussion on company background
Action Items:
● Next meeting scheduled for October 25, 2016 from 3:00 pm to 5:30 pm at 701 S Nedderman Dr,
Arlington, TX 76019 Emerald room
● Each individual is asked to give at least 10-12 of queries
● to prepare kick-off meeting report company background and profile.
● Giving each individual to do QTO
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
17 | P a g e
● Shivam Patel on WBS & scheduling.
Progress Meeting Memo -1
Project: - Cleburne State Park Concession/Bathhouse & Group
Project Number: - 101855
Meeting Date and Time: October 25, 2016 from 3:00 pm to 5:30 pm
Meeting Location: 701 S Nedderman Dr, Arlington, TX 76019 Sapphire room
Participants:
RITESH KUMAR ARJUN SINGH
SHAIK JOHNNY BASHA
CHETAN BIRADAR
SHIVAM PATEL
MANSOOR TAJ MOHAMMED
RAJESH DONKA
Discussions:
● Company background and Bid assessment memo were approved.
● Final query list was reviewed and ready for submission.
● Reviewed progress on QTO.
● Reviewed WBS and finalize WBS.
● Discussed about further QTO of CMU wall, truss work and finishes work.
Action Items:
● Next meeting scheduled for November 10, 2016 from 8:30 pm to 10:00 pm at 701 S Nedderman Dr,
Arlington, TX 76019 Room Sapphire.
● To prepare and finalize Invitation to Bid.
● Review and discuss on scheduling.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
18 | P a g e
● Review completed work on QTO of CMU wall, truss work and finishes work.
Progress Meeting Memo-2
Project: - Cleburne State Park Concession/Bathhouse & Group
Project Number: - 101855
Meeting Date and Time: November 10, 2016 from 8:30 pm to 10:00 pm
Meeting Location: 701 S Nedderman Dr, Arlington, TX 76019 Room Sapphire
Participants:
RITESH KUMAR ARJUN SINGH
SHAIK JOHNNY BASHA
CHETAN BIRADAR
SHIVAM PATEL
MANSOOR TAJ MOHAMMED
RAJESH DONKA
Discussions:
● Invitation for bid reviewed and finalize for submission.
● Reviewed QTO of CMU wall, truss work, finishes work and discussion for any queries.
● Discussed and review the final scheduling and started working on Primavera Scheduling.
● Started working on subcontractor and supplier log.
● Started working on final report preparation.
Action Items:
● Next meeting scheduled for November 24, 2016 from 5:30 pm to 8:30 pm at 701 S Nedderman Dr,
Arlington, TX 76019 Room Emerald.
● Complete work on pricing on Timberline.
● Review and finalize every document to add in final report for submission.
● Review and finalize subcontractors and suppliers log.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
19 | P a g e
Progress Meeting Memo-3
Project: - Cleburne State Park Concession/Bathhouse & Group
Project Number: - 101855
Meeting Date and Time: November 24, 2016 from 5:30 pm to 8:00 pm
Meeting Location: 701 S Nedderman Dr, Arlington, TX 76019 Room Emerald
Participants:
RITESH KUMAR ARJUN SINGH
SHAIK JOHNNY BASHA
CHETAN BIRADAR
SHIVAM PATEL
MANSOOR TAJ MOHAMMED
RAJESH DONKA
Discussions:
● Reviewed and finalized work on pricing on Timberline for submission.
● Final price was reviewed and approved.
● Ask subcontractors and suppliers to reduce prices.
● Editing and final changes for report.
Action Items:
● Attach all latest addendums to final bid report.
● Submit the final bid report.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
20 | P a g e
RECOMMENDATIONS FOR SUSTAINABILITY AND VALUE ENGINEERING
The project already has minimum impact on the existing conditions present on the site. There is little to
no site grading, however, erosion and sediment control measures will be implemented during construction by
provision of barriers. This is to alleviate the impact of storm water during rainfall events during construction.
During the demolition process the noise pollution and dust emission will be reduced by provision of noise reducing
sheets. Proper sound barriers and silt fencing will be done so that there is no sound pollution. Regular sprinkling of
water so that the dust is kept under control.
The scope of the project does not present a lot of opportunity for value engineering. With the permission
of the design engineer we can reduce the thickness of the plywood which is in the interior of the roof, however the
pricing is as per regulation.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
21 | P a g e
A
APPENDIX
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
22 | P a g e
APPENDIX A: FINAL QUOTE
Item no.
Description labor material Equipment
Subcontract Total Subtotal Subtotal Subtotal
1 Abatement And Demolition $ - $ - $ - $9,718 $9,718
2 Earth work $ - $ - $ - $23,444 $23,444
3 Cast-in-place-Concrete $ - $14,908 $ - $16,000 $30,908
4 Concrete Masonry Units $26,961 $19,786 $16,158 $ - $62,905
5 Carpentry $11,286 $12,186.00 $ - $23,472.00 $23,472
6 Trusses $ - $ - $ - $1,895.00 $1,895.00
7 Termite Protection $ - $ - $ - $1,368 $1,368
8 Metal Roofing $ - $ - $ - $18,432 $18,432
9 Radiant Heating $ - $ - $ - $16,689 $16,689
10 Mechanical $ - $ - $ - $21,979 $21,979
11 Plumbing $ - $ - $ - $15,500 $15,500
12 Electrical $ - $ - $ - $57,250 $57,250
13 Accessories and Specialties $ - $ - $ - $14,509 $14,509
14 Doors and Windows $ - $ - $ - $10,415 $10,415
15 Architectural finishes $ - $ - $ - $9,800 $9,800
$38,247 $46,880 $16,158
For Men’s Barrack $318,284
Overhead $32,910.54
Profit 10 % $35,119.42
Division General Requirements $216,520
$602,834
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
23 | P a g e
Alternate Bid 1: (For Women’s Barracks)
Item no.
Description labor material Equipment
Subcontract Total Subtotal Subtotal Subtotal
1 Abatement And Demolition $ - $ - $ - $9,718 $9,718
2 Earth work $ - $ - $ - $23,444 $23,444
3 Cast-in-place-Concrete $ - $14,908 $ - $16,000 $30,908
4 Concrete Masonry Units $26,961 $19,786 $16,158 $ - $62,905
5 Carpentry $11,286 $12,186.00 $ - $23,472.00 $23,472
6 Trusses $ - $ - $ - $1,895.00 $1,895.00
7 Termite Protection $ - $ - $ - $1,368 $1,368
8 Metal Roofing $ - $ - $ - $18,432 $18,432
9 Radiant Heating $ - $ - $ - $16,689 $16,689
10 Mechanical $ - $ - $ - $21,979 $21,979
11 Plumbing $ - $ - $ - $15,500 $15,500
12 Electrical $ - $ - $ - $34,755 $34,755
13 Accessories and Specialties $ - $ - $ - $15,308 $15,308
14 Doors and Windows $ - $ - $ - $10,415 $10,415
15 Architectural finishes $ - $ - $ - $9,800 $9,800
$38,247 $46,880 $16,158
For Women’s Barrack $296,588
Bid for both Men’s and Women’s Barracks combined:
ITEM PRICE
For women's Barrack $296,588
For men's Barrack $318,284
Overhead $63,577.70
Profit 10 % $67,844.91
General Requirements $216,520
Grand Total $962,814
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
24 | P a g e
APPENDIX B: BID FORM
APPENDIX B BID FORM
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
25 | P a g e
APPENDIX C: COMPANY PROFILE
1. Headquarters: Arlington, TX
2. Company size: 7 Employees
3. Annual sales: $6,000,000
4. Type of work: Estimating, Scheduling, Planning, Research.
5. Bondable: Up to $6,000,000
6. Types Bond: Bid Security, Payment Bonds, and Performance
7. Insurance: General liability – $ 1 Million/Occurrence $3 Million/Aggregate
Commercial Automotive - $ 1 Million
Worker’s compensation - $1 million/Accident/Employee, $1 Million Limit
Umbrella Insurance-in progress of obtaining a quote
Builder’s risk – yes
8. Experience: 5 Years
Contact:
Ritesh Kumar Arjun Singh
Phone: 682-256-4323
e-mail: [email protected]
Other information: Universal Contractors has its own team members who can complete the operations in
estimating and scheduling (add more if needed). We are a small company in Arlington, TX but have good
experience in handling projects statewide.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
26 | P a g e
APPENDIX D: KEY PERSONNEL
Ritesh Kumar Arjun Singh
M.S Civil Engineering, UT Arlington
Mansoor Taj Mohammed
M.S Civil Engineering, UT Arlington
Chetan Biradar
M.S Civil Engineering, UT Arlington
Shaik Johnny Basha
M.S Civil Engineering, UT Arlington
Shivam Patel
M.S Civil Engineering, UT Arlington
Rajesh Donka
M.S Civil Engineering, UT Arlington
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
27 | P a g e
APPENDIX E: BID ASSESSMENT MEMO
Project Name: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project Number: 101855 Date: 6th December 2016
Type of Project: Lump sum Estimator: Managing Director
Scope of Project: This project involves rejuvenating the existing camping barrack which is located at Cleburne State
Park in Cleburne, Texas. A Men’s barrack and a women's barrack are needed to be constructed and It will involve
demolition, earthwork, concrete, masonry, roofing, electrical and landscaping
Project Valuation: $ 1 Million (approx.)
Estimated Duration: 5 months
Bid Due Date: 7:20 pm. Dec 6, 2016
Project Owner: Mr. Agustin Villafana/ Dr. Nilo Tsung
Project Managers
UTA Arlington
Phone: 817-272-9164
Email- [email protected] / [email protected]
Pre-Bid Conference Available - Yes
Location: 500 UTA Boulevard
Arlington TX 76013
Time: 7:20 pm
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
28 | P a g e
Date: Dec 1, 2016
Interest in Bidding: Yes
Notes:
Project includes one alternative
Alternative #1 Women's barracks
Prices must be good for 60 davs from the date of the bid.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
29 | P a g e
APPENDIX F: PROJECT WBS
Cle
bu
rne
Stat
e Pa
rk p
roje
ctProject
management
Procurement
Abatement
Earthwork
Concrete
Masonry
Carpentry
Roofing
Electrical
Architectural Finishes
Mechanical
Plumbing
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
30 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
31 | P a g e
APPENDIX G: SUBCONTRACTOR LOG
MEP SUBCONTRACTORS LOG
Project: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project No. 101885 Date: 04-Nov-2016
Company Name: Dugger electric Contact Person: Darrell Davis
Address: 505 S. Caddo Street Phone: (817) 774-9473
Cleburne, TX 76031 (817) 641-9473
Website: www. duggerelectric.com Email: [email protected]
Trades: MEP Certifications: None
Bidding: Yes Responsive: Yes
Notes: Dugger Electric is a full service electrical contractor that has been serving Cleburne, Burleson, Joshua and surrounding areas in the Fort Worth Metroplex for over 10 years
Quote: TBD
Company Name: 3i Contact Person: Charlene Cade
Address: 1111 W. Mockingbird Ln. Phone: (214) 231-0675
Suite 1050
Website: www.3iconstruction.com Email: [email protected]
Trades: MEP Certifications: None
Bidding: Yes Responsive: Yes
Notes : 3i is electrical contractor that has been serving Cleburne and surrounding areas in the dallas for over 15 years
Quote: TBD
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
32 | P a g e
PAINTING SUBCONTRACTORS LOG
Project: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project No. 101885 Date: 04-Nov-2016
Company Name: Jonsco Inc Contact Person: John Zimmerer
Address : 1225 W College Ave, Suite #408 Phone: 972 323 6899
Carrollton, Texas 75006 Email: [email protected]
Website: http://www.jonsco.com Certifications:
Products Supplied: Interior & Exterior Painting Responsive: Yes
Bidding: Yes
Exclusions: None
Quote: TBD
Company Name: Jonsco. inc Contact Person: Mark Youden
Address : 624 W. University Dr. Phone: 972 335 9113
Ste. 251 Email: [email protected]
Denton, TX 76201 Certifications : WBE
Website: Responsive: Yes
Products Supplied: Interior & Exterior Painting
Bidding: Yes
Exclusions: None
Quote: TBD
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
33 | P a g e
MASONRY SUBCONTRACTOR LOG
Project: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project No. 101885 Date: 04-Nov-2016
Company Name: AHI Supply Contact Person: Joe Wilson
Address: 400 N Highway 377, Denton Street, Phone: 817 430 0228
Roanoke, TX 76262 Email: [email protected]
Website: www.ahi-supply.com/ Certifications: None
Products Supplied: Masonry Works Bidding: Yes
Exclusions: None Responsive: Yes
Quote: TBD
Company Name: Cambridge Fence Services Contact Person: Chad Dunaway
Address: Cambridge Fence 4338 Hwy 276 Ste C Phone: 214 299 4820
Rockwall, TX 75032 Email: [email protected]
Website: http://www.cambridgefence.net/ Certifications: None
Products Supplied: Masonry Works Bidding: Yes
Exclusions: None Responsive: Yes
Quote: TBD
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
34 | P a g e
ABATMENT SUBCONTRACTOR LOG
Project: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project No. 101885 Date: 04-Nov-2016
Company Name: Blue Ribbon Industries Contact Person: Jeff Magid
Address: 408 Singleton Blvd, Dallas, TX 75212 Phone: 972 243 5956
Website: www.blueribbonindustries.com Email: [email protected]
Products Supplied: Hazmat Abatement Certifications:
Bidding: Yes Responsive: Yes
Notes: Professional Demolition Services Since 1997
Quote: TBD
Company Name: Matrix Excavation & Demolition Contact Person: Rodney Mays
Address: 1350 E Fm 1187, Aledo, TX 76008 Phone: 817 458 9907
Website: www.matrixdemolition.com Email: [email protected]
Products Supplied: Hazmat Abatment Certifications: BBB Accredited
Bidding: Yes Responsive: Yes
Exclusions: None
Quote: TBD
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
35 | P a g e
ARCHITECTURAL FINISH SUBCONTRACTOR LOG
Project: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project No. 101885 Date: 04-Nov-2016
Company Name: jasmine Engineering Contact Person: Mary G Serna
Address: DBA Constructions Phone: 212-227-3000
San Antonio, TX - 78205 Email: [email protected]
Website: www.DBAconstrmanagement.com Certifications: None
Trades: Architectural Finishes Responsive: Yes
Bidding: Yes
Notes: Jasmine Engineering is a pioneer in finishes, there finishing has been rated very high. Quote: TBD
Company Name: The Nerold Company Contact Person: Nelson Rodriguez
Address: 3109 Lubbock Avenue Phone: 817-922-9000
Fort Worth, TX -76109
Website: www.neroldfinishes.com Email: [email protected]
Trades: Architectural Finishes Certifications: None
Bidding: Yes Responsive: Yes
Quote: TBD
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
36 | P a g e
CARPENTRY SUBCONTRACTOR LOG
Project: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project No. 101885 Date: 04-Nov-2016
Company Name: Finish and Trim Carpenters Contact Person: Elena Elgar
Address: Garland, Cleburne, TX 75046. Phone: 221-849-2359
Website: www.jhwastemanagers.com Email: [email protected]
Products Supplied: Carpentry Materials Certifications: Nil
Bidding: Yes Responsive: Yes
Exclusions: None
Quote: TBD
Company Name: The Arcus Company LLC Contact Person: Williams Seran
Address: 2422 n hwy,
Phone: 827-732-2568
Dallas, TX 75252
Website: www.thearcuscompany.com Email: [email protected]
Products Supplied: Carpentry Materials Certifications: Nil
Bidding: Yes Responsive: Yes
Exclusions: None
Quote: TBD
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
37 | P a g e
APPENDIX H: MATERIAL SUPPLIER LOG
STEEL SUPPLIER LOG
Project: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project No. 101885 Date: 04-Nov-2016
Company Name: Helford Steel Contact Person: Dale Louis
Address: 3001 W. Pafford St., Fort Worth, TX 76110 Phone: 817-869-2301
Website: www.h-steel.com Email: [email protected]
Products Supplied: Steel and Reinforcing Materials Certifications: SBE, HUB
Bidding: Yes Responsive: Yes
Notes: Industry leader with quality products and outstanding customer service for over 40 years.
Exclusions: None
Quote: TBD
Company Name: Southern Steels Contact Person: Wilford Ramsey
Address: 603 Causley Ave, Fort Worth, TX 76110 Phone: 817-869-2301
Website: www.Southernsteel.com Email: [email protected]
Products Supplied: Steel and Reinforcing Materials Certifications: SBE, HUB
Bidding: Yes Responsive: Yes
Exclusions: None
Quote: TBD
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
38 | P a g e
CONCRETE SUPPLIER LOG
Project: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Project No. 101885 Date: 04-Nov-2016
Company Name: J&J FOUNDATION CO.LLC Contact Person: Jesse Santos
Address: J&J Foundation 1111 N. Irving Heights Dr. Phone: 972-871-7663
Irving, TX 75061 Email:
Website: http://www.jjfoundation.com/ Certifications: DBE & HUB
Products Supplied: Concrete Responsive: Yes
Bidding: Yes
Exclusions: None
Quote: TBD
Company Name: Doall Construction inc Contact Person: Richard Woodall
Address : 4305 E. Belknap St. Fort Worth Phone: 817 222 3515
TX 76117 Email: duane@do-
allconstruction.com
Website: http://www.do-allconstruction.com/ Certifications: VFW & WBE
Products Supplied: Concrete Responsive: Yes
Bidding: Yes
Exclusions: None
Quote: TBD
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
39 | P a g e
APPENDIX I: QUANTITY TAKEOFF CALCULATIONS
CLEBURNE STATE PARK - MEN'S BARRACK
BASE BID: BID SCHEDULE
Earthworks
Sno Item Description Quantity Units
1 Site Stripping - Top Soil 82.28 BCY
2 Site Leveling - Excavation 19.04 BCY
3 Site Leveling - Backfill & Compaction 52 CCY
4 Building Pad - Excavation 239.47 BCY
5 Building Pad - Select Fill 39 CCY
6 Bulding Pad - Grade Beam Trenching 57.08 BCY
7 Backfill & Fine Grade Site 84.3 BCY
8 Hauling of Spoils 407.64 LCY
9 Cushion Sand 2.31 CCY
10 Silt Fence 425 LF
11 Rock Berm 12 LF
Concrete
14 3/4" Edge Form 114 LF
15 4" Edge Form - LF
16 5" Edge Form 68.4 LF
17 8" Edge Form 155 LF
18 12" Edge Form - LF
21 3000 psi Concrete 100 CY
22 3500 psi Concrete - CY
23 4000 psi Concrete - CY
24 #3 Reincorcing - C Shape Ties 86 EA
25 #3 Reinforcing - Stirrup Ties 301 EA
26 #3 Reinforcing 680 Lbs
27 #4 Reinforcing 3161 Lbs
28 #5 Reinforcing 360 Lbs
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
40 | P a g e
29 #6 Reinforcing 4151 Lbs
30 6"x6" W1.4xW1.4 4.18 CSF
31 #4 - 24" Smooth Dowels 6 EA
32 #4 - 2' x 2' Hook Slab Reinforcing Bars 57 EA
33 #4 - 2' x 2' Corner Bars 220 EA
34 Dowel Sleeves 6 EA
35 1/2" Red Wood Expansion Joint 9 LF
36 Joint Sealant 9 LF
37 Subgrade Chairs 600 SF
38 10 Mil Poly Vapor Barrier 2486 SF
39 Control Joints 112 LF
40 Machine Trowel Finish 71 SF
41 Med Broom Finish 2415 SF
42 Sprayed Curing Compound 25 CSF
43 Tie wire 70 lbs
43 Burlap Curing 25 CSF
Masonry
44 8x8x16 CMU Normal Weight Blocks 3360 EA
45 4x8x16 Split Face CMU 956 EA
46 4x8x16 Smooth Single Scored CMU 878 EA
47 Cut Stone Drip Sill 282 LF
48 Cut Stone Lintel 72 LF
49 Cut Stone Shoulder Cap 5 EA
50 Fire Brick 110 SF
51 Flue Liner 13 VLF
52 3 1/2" x 3 1/2" x 1/4" Loose Lintels 63 LF
53 4" x 3 1/2" x 1/4" Loose Lintels - LF
54 7" x 4" x 3/8" Loose Lintels 18 LF
55 CMU Lintels - One Course 53.33 LF
56 Cmu Lintels - Two Courses 18 LF
57 #4 Lintel Reinforcing 100 Lbs
58 #5 Lintel Reinforcing 45 Lbs
59 #4 - 4'-8" Dowels 61 EA
60 #4 Reinforcing 1340 Lbs
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
41 | P a g e
61 #4 Corner Bars 40 EA
62 #5 Corner Bars 64 EA
63 Horizontal Reinforcing 22.6 CLF
64 Wall Ties 190 C
65 3/4" Anchor Bolts 40 EA
66 Type S Mortar 236.45 CF
67 2500 psi Grout 755 CF
68 Cleaning Masonry 2900 SF
Carpentry
69 2x4 Treated Base Plate 180.67 BF
70 2x4 Studs 506.25 BF
71 2x4 Top Plates 361.33 BF
72 2x4 Purlins 474 BF
73 2x4 Spacers 906.67 BF
74 2x4 Bridging 748 BF
75 2x4 Treated Base Plate 180.67 BF
76 2x8 Treated Base Plate 361.33 BF
77 2x6 Studs 506.25 BF
78 2x4 Top Plates 361.33 BF
79 2x8 Top Plates 722.67 BF
80 2x6 Rafters - BF
81 2x10 Rafters 2266.67 BF
82 2x10 Fascia 426.67 BF
83 4x12 Rough Cut Cedar Beam - LF
84 6x6 Posts 26.25 LF
85 Simpson CC66 Post Cap 5 EA
86 3 - 1 3/4 x 16 LVL Ridge Beam 435 LF
87 3 - 1 3/4 x 16 LVL Beams - LF
88 Timber Truss Type T-2 2 EA
89 Timber Truss Type T-1 4 EA
90 Simpson A34 Angles 135 EA
91 3/4" Plywood Sheathing - Walls 647 SF
92 1-1/2" Plywood Sheathing - Walls 647 SF
93 3/4" Plywood Sheathing - Roof/Ceiling 3517.5 SF
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
42 | P a g e
94 1x2 Battens 215 BF
95 1x6 Trim 128 BF
96 8 3/4" x 8 3/4" x 1/4" Galvanized Steel Plates - EA
97 1/2" x 6" S.S. Thru Bolts - EA
98 1/2" x 4" S.S. Anchor Bolts 68 EA
99 Sheet Vapor Barrier - Walls - SF
100 Sheet Vapor Barrier - Roof 2800 SF
101 Plastic Laminate Counter Top 30 SF
102 Plastic Laminate Counter Top Back Splash 27 LF
103 2 x 8 Hip 90 LF
Thermal & Moisture Protection
104 3 1/2" Batt Insulation 647 SF
105 6" Batt Insulation - SF
106 2" Rigid Insulation - Walls 647 SF
107 2" Rigid Insulation - Roof/Ceiling 2800 SF
108 1/2" Cualking Bead 283 LF
Openings
109 3'x7' Type A Doors - EA
110 3'x7' Type B Doors 5 EA
Hardware Group 10 DOOR B1
112 1-1/2 PR Hinges 1 EA
113 Deadlock 1 EA
114 Push Plate 1 EA
115 Pull Plate 1 EA
116 Closer 1 EA
117 Kickplate 1 EA
118 Stop 1 EA
119 Threshold 1 EA
120 Sweep 1 EA
121 Silencer 3 EA
Hardware Group 11 DOOR B2
122 1-1/2 PR Hinges 1 EA
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
43 | P a g e
123 Lockset 1 EA
124 OH Holder 1 EA
125 Threshold 1 EA
126 Sweep 1 EA
127 Seal 1 EA
128 Rain Drip 1 EA
Hardware Group 12 DOOR B3,B4
129 1-1/2 Pr Hinges 1 EA
130 Passage 1 EA
131 Closer 1 EA
132 Kickplate 1 EA
133 Stop 1 EA
134 Silencer 3 EA
Hardware Group 13 DOOR B8
135 1-1/2 Pr Hinges 1 EA
136 1 Lockset 1 EA
137 1 Closer 1 EA
138 1 Kickplate 1 EA
139 Stop 1 EA
140 Threshold 1 EA
141 Sweep 1 EA
142 Seal 1 EA
143 3'x7' Type SH Window 10 EA
144 Type Fixed Window - EA
145 Sky Lights - EA
Finishes
146 CMU Deco Finish 1638 SF
147 Ceramic Tile - Walls 388 SF
148 Ceramic Tile - Floors - SF
149 Wood Stain & Varnish - Walls (Interior) 647 SF
150 Wood Stain & Varnish - Walls (Exterior) 647 SF
151 Wood Stain & Varnish - Ceiling 897 SF
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
44 | P a g e
152 Paint - Doors - Type B 147 SF
153 Paint - Frames - Type B 125.3 LF
154 Paint - Louvers & Vents - SF
155 Stain Concrete Floor 1900 SF
156 Seal Concrete Floor 1942 SF
Specialties and Accessories
157 Lockers 22 EA
158 Benches 5 EA
159 36" Grab Bars 3 EA
160 42" Grab Bars 2 EA
161 Mirrors 80 SF
162 Toilet Compartments 2 EA
163 ADA Toilet Compartments 1 EA
164 Urinal 1 EA
165 Urinal Screen 1 EA
166
Paper Towel Dispenser/Waste Receptacle
Combo 1 EA
167 Paper Towel Dispenser 2 EA
168 Towel Bar 2 EA
169 Toilet Tissue Dispenser 2 EA
170 Liquid Soap Dispenser - Wall Mounted 2 EA
171 Liquid Soap Dispenser - Counter Top Mounted 2 EA
172 Diaper Changing Station 1 EA
173 Shelf Unit 1 EA
174 Mop and Broom Holder 1 EA
175 Robe Hook 2 EA
176 Shower Compartments 2 EA
177 Shower Curtain Rod 2 EA
178 Shower Curtain w/ Stainless Steel Hooks 2 EA
179 Exhaust fan 1 EA
ELECTRICAL
180 Description Details Numbers
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
45 | P a g e
181 special mtd surface light 12 ea
182
WALL BRACKET INCANDESCENT OR HID FIXTURE 4 EA
183 INCANDESCENT OR HID LTG FIXTURE 2 EA
184 TOGGLE SWITCH 4 EA
185 3 WAY TOGGLE SWITCH 4 EA
186 DIMMER SWITCH 1 EA
187 OCCUPANCY/MOTION SWITCH 1 EA
188
FLOURESCENT NIGHTLIGHT OR EMERGENCY LIGHT 27 EA
189 FIRE ALARM AUXILIARY RELAY 1 EA
190 HUNTER CEILING FAN(5) 2 EA
191 POWER
192
DUPLEX RECEPTAGLE MOUNTED HORIZONT 13 EA
193 GROUND FAULT INTERRUPTER 8 EA
194 SMOKE DETECTOR 2 EA
195 RADIANT FLOOR HEAT CABLE 4 EA
196 TELEPHONE WALL OUTLET 1 EA
197 MOUNT DISCONNECT 1 EA
198 Weatherproof Receptable WP 3 ea
199 HD 48" 2 ea
PLUMBING
200 Description Quantity Units
201 3/4" Dia Pipe 117.46 LF
202 1" Dia Pipe 62.99 LF
203 1-1/4" Dia Pipe 18.66 LF
204 1-1/2" Dia Pipe 71.54 LF
205 2" Dia Pipe 140.53 LF
206 4" Dia Pipe 222.14 LF
FIXTURES
Details Description Numbers
207 floor drain(finished areas) FD 1 4
208 floor drain(mechanical rooms) FD 2 4
209 double yard cleanout DYCO 1
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
46 | P a g e
210 value in box VIB 1
211 water closet WC 3
212 shower stall(48*35) SH 1 2
213 shower stall(62*34.25) SH 2 1
214 TMV 2
215 gas water heater GWH 1
216 floor cleanout FCO 1
217 lavatory L 2
218 vent through roof 2" VTR 1
219 vent through roof 4" VTR 1
220 wall hydrant (exterior surface mounted) WH-1 2
221 wall hydrant (interior washdown) WH-2 1
Alternate Bid no. 1
Earthworks
Sno Item Description Quantity Units
1 Site Stripping - Top Soil 82.28 BCY
2 Site Leveling - Excavation 0 BCY
3 Site Leveling - Backfill & Compaction 52.2 CCY
4 Building Pad - Excavation 156.58 BCY
5 Building Pad - Select Fill 52.2 CCY
6 Bulding Pad - Grade Beam Trenching 57.08 BCY
7 Backfill & Fine Grade Site 84.5 BCY
8 Hauling of Spoils 274.8 LCY
9 Cushion Sand 2.72 CCY
10 Silt Fence 425 LF
11 Rock Berm 12 LF
Concrete
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
47 | P a g e
14 3/4" Edge Form 114 LF
15 4" Edge Form - LF
16 5" Edge Form 68.4 LF
17 8" Edge Form 155 LF
18 12" Edge Form - LF
21 3000 psi Concrete 98 CY
22 3500 psi Concrete - CY
23 4000 psi Concrete - CY
24 #3 Reincorcing - C Shape Ties 86 EA
25 #3 Reinforcing - Stirrup Ties 301 EA
26 #3 Reinforcing 680 Lbs
27 #4 Reinforcing 3161 Lbs
28 #5 Reinforcing 360 Lbs
29 #6 Reinforcing 4151 Lbs
30 6"x6" W1.4xW1.4 3.56 CSF
31 #4 - 24" Smooth Dowels 6 EA
32 #4 - 2' x 2' Hook Slab Reinforcing Bars 57 EA
33 #4 - 2' x 2' Corner Bars 220 EA
34 Dowel Sleeves 6 EA
35 1/2" Red Wood Expansion Joint 9 LF
36 Joint Sealant 9 LF
37 Subgrade Chairs 600 SF
38 10 Mil Poly Vapor Barrier 2486 SF
39 Control Joints 112 LF
40 Machine Trowel Finish 71 SF
41 Med Broom Finish 2415 SF
42 Sprayed Curing Compound 25 CSF
43 Tie wire 70 lbs
43 Burlap Curing 25 CSF
Masonry
44 8x8x16 CMU Normal Weight Blocks 3360 EA
45 4x8x16 Split Face CMU 956 EA
46 4x8x16 Smooth Single Scored CMU 878 EA
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
48 | P a g e
47 Cut Stone Drip Sill 282 LF
48 Cut Stone Lintel 72 LF
49 Cut Stone Shoulder Cap 5 EA
50 Fire Brick 110 SF
51 Flue Liner 13 VLF
52 3 1/2" x 3 1/2" x 1/4" Loose Lintels 63 LF
53 4" x 3 1/2" x 1/4" Loose Lintels - LF
54 7" x 4" x 3/8" Loose Lintels 18 LF
55 CMU Lintels - One Course 53.33 LF
56 Cmu Lintels - Two Courses 18 LF
57 #4 Lintel Reinforcing 100 Lbs
58 #5 Lintel Reinforcing 45 Lbs
59 #4 - 4'-8" Dowels 61 EA
60 #4 Reinforcing 1340 Lbs
61 #4 Corner Bars 40 EA
62 #5 Corner Bars 64 EA
63 Horizontal Reinforcing 22.6 CLF
64 Wall Ties 190 C
65 3/4" Anchor Bolts 40 EA
66 Type S Mortar 236.45 CF
67 2500 psi Grout 755 CF
68 Cleaning Masonry 2900 SF
Carpentry
69 2x4 Treated Base Plate 180.67 BF
70 2x4 Studs 506.25 BF
71 2x4 Top Plates 361.33 BF
72 2x4 Purlins 474 BF
73 2x4 Spacers 906.67 BF
74 2x4 Bridging 748 BF
75 2x4 Treated Base Plate 180.67 BF
76 2x8 Treated Base Plate 361.33 BF
77 2x6 Studs 506.25 BF
78 2x4 Top Plates 361.33 BF
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
49 | P a g e
79 2x8 Top Plates 722.67 BF
80 2x6 Rafters - BF
81 2x10 Rafters 2266.67 BF
82 2x10 Fascia 426.67 BF
83 4x12 Rough Cut Cedar Beam - LF
84 6x6 Posts 26.25 LF
85 Simpson CC66 Post Cap 5 EA
86 3 - 1 3/4 x 16 LVL Ridge Beam 435 LF
87 3 - 1 3/4 x 16 LVL Beams - LF
88 Timber Truss Type T-2 2 EA
89 Timber Truss Type T-1 4 EA
90 Simpson A34 Angles 135 EA
91 3/4" Plywood Sheathing - Walls 647 SF
92 1-1/2" Plywood Sheathing - Walls 647 SF
93 3/4" Plywood Sheathing - Roof/Ceiling 3517.5 SF
94 1x2 Battens 215 BF
95 1x6 Trim 128 BF
96 8 3/4" x 8 3/4" x 1/4" Galvanized Steel Plates - EA
97 1/2" x 6" S.S. Thru Bolts - EA
98 1/2" x 4" S.S. Anchor Bolts 68 EA
99 Sheet Vapor Barrier - Walls - SF
100 Sheet Vapor Barrier - Roof 2800 SF
101 Plastic Laminate Counter Top 30 SF
102 Plastic Laminate Counter Top Back Splash 27 LF
103 2 x 8 Hip 90 LF
Thermal & Moisture Protection
104 3 1/2" Batt Insulation 647 SF
105 6" Batt Insulation - SF
106 2" Rigid Insulation - Walls 647 SF
107 2" Rigid Insulation - Roof/Ceiling 2800 SF
108 1/2" Cualking Bead 283 LF
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
50 | P a g e
Openings
109 3'x7' Type A Doors - EA
110 3'x7' Type B Doors 5 EA
Hardware Group 10 DOOR B1
112 1-1/2 PR Hinges 1 EA
113 Deadlock 1 EA
114 Push Plate 1 EA
115 Pull Plate 1 EA
116 Closer 1 EA
117 Kickplate 1 EA
118 Stop 1 EA
119 Threshold 1 EA
120 Sweep 1 EA
121 Silencer 3 EA
Hardware Group 11 DOOR B2
122 1-1/2 PR Hinges 1 EA
123 Lockset 1 EA
124 OH Holder 1 EA
125 Threshold 1 EA
126 Sweep 1 EA
127 Seal 1 EA
128 Rain Drip 1 EA
Hardware Group 12 DOOR B3,B4
129 1-1/2 Pr Hinges 1 EA
130 Passage 1 EA
131 Closer 1 EA
132 Kickplate 1 EA
133 Stop 1 EA
134 Silencer 3 EA
Hardware Group 13 DOOR B8
135 1-1/2 Pr Hinges 1 EA
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
51 | P a g e
136 1 Lockset 1 EA
137 1 Closer 1 EA
138 1 Kickplate 1 EA
139 Stop 1 EA
140 Threshold 1 EA
141 Sweep 1 EA
142 Seal 1 EA
143 3'x7' Type SH Window 10 EA
144 Type Fixed Window - EA
145 Sky Lights - EA
Finishes
146 CMU Deco Finish 1638 SF
147 Ceramic Tile - Walls 388 SF
148 Ceramic Tile - Floors - SF
149 Wood Stain & Varnish - Walls (Interior) 647 SF
150 Wood Stain & Varnish - Walls (Exterior) 647 SF
151 Wood Stain & Varnish - Ceiling 897 SF
152 Paint - Doors - Type B 147 SF
153 Paint - Frames - Type B 125.3 LF
154 Paint - Louvers & Vents - SF
155 Stain Concrete Floor 1900 SF
156 Seal Concrete Floor 1942 SF
Specialties and Accessories
157 Lockers 22 EA
158 Benches 5 EA
159 36" Grab Bars 3 EA
160 42" Grab Bars 2 EA
161 Mirrors 80 SF
162 Toilet Compartments 2 EA
163
Paper Towel Dispenser/Waste Receptacle
Combo 1 EA
164 Paper Towel Dispenser 2 EA
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
52 | P a g e
165 Towel Bar 2 EA
166 Toilet Tissue Dispenser 2 EA
167 Liquid Soap Dispenser - Wall Mounted 2 EA
168 Liquid Soap Dispenser - Counter Top Mounted 2 EA
169 Sanitary Napkin Vendor 3 EA
170 Sanitary Napkin Disposal 3 EA
171 Diaper Changing Station 1 EA
172 Shelf Unit 1 EA
173 Mop and Broom Holder 1 EA
174 Robe Hook 2 EA
175 Shower Compartments 2 EA
176 Shower Curtain Rod 2 EA
177 Shower Curtain w/ Stainless Steel Hooks 2 EA
178 Exhaust fan 1 EA
ELECTRICAL
179 Description Details Numbers
180 special mtd surface light 12 ea
181
WALL BRACKET INCANDESCENT OR HID FIXTURE 4 EA
182 INCANDESCENT OR HID LTG FIXTURE 2 EA
183 TOGGLE SWITCH 4 EA
184 3 WAY TOGGLE SWITCH 4 EA
185 DIMMER SWITCH 1 EA
186 OCCUPANCY/MOTION SWITCH 1 EA
187
FLOURESCENT NIGHTLIGHT OR EMERGENCY LIGHT 27 EA
188 FIRE ALARM AUXILIARY RELAY 1 EA
189 HUNTER CEILING FAN(5) 2 EA
POWER
190
DUPLEX RECEPTAGLE MOUNTED HORIZONT 13 EA
191 GROUND FAULT INTERRUPTER 8 EA
192 SMOKE DETECTOR 2 EA
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
53 | P a g e
193 RADIANT FLOOR HEAT CABLE 4 EA
194 TELEPHONE WALL OUTLET 1 EA
195 MOUNT DISCONNECT 1 EA
196 Weatherproof Receptable WP 3 ea
197 HD 48" 2 ea
PLUMBING
198 Description Quantity Units
199 3/4" Dia Pipe 117.46 LF
200 1" Dia Pipe 62.99 LF
201 1-1/4" Dia Pipe 18.66 LF
202 1-1/2" Dia Pipe 71.54 LF
203 2" Dia Pipe 140.53 LF
204 4" Dia Pipe 222.14 LF
FIXTURES
Details Description Numbers
205 floor drain(finished areas) FD 1 4
206 floor drain(mechanical rooms) FD 2 4
207 double yard cleanout DYCO 1
208 value in box VIB 1
209 water closet WC 3
210 shower stall(48*35) SH 1 2
211 shower stall(62*34.25) SH 2 1
212 TMV 2
213 gas water heater GWH 1
214 floor cleanout FCO 1
215 lavatory L 2
216 vent through roof 2" VTR 1
217 vent through roof 4" VTR 1
218 wall hydrant (exterior surface mounted) WH-1 2
219 wall hydrant (interior washdown) WH-2 1
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
54 | P a g e
APPENDIX J: DETAILED ESTIMATE
Top Soil
top soil area of building including 3' boundary line 3315.67
depth 0.67
volume
2221.499 CF
82.28 CY
site levelling
Men’s barracks CF CY
Volume 1 cut 514 19.04
Volume 2 fill 330 12.22
Volume 3 fill 288 10.67
Volume 4 fill 529 19.59
Volume 5 fill 184 6.81
cut volume 19.04
fill volume 49.30
TOTAL 51.89 CCY
levelling of barracks
finished floor elevation= 806.15 required level=805.73
assume the required level as 804.5 level finished level area cut or fill vol of cut/fill
806.25 805.73 66.8 0.52 34.736 805 805.73 1914 -0.73 -1397.22
803.5 805.73 414 -2.23 -923.22 802.5 805.73 92 -3.23 -297.16
haul out -2582.864
-95.66162963 CY
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
55 | P a g e
EXCAVATION FOR SPECIAL FILL
FROM SHEET C-11 AVERAGE EXISTING LEVEL 805
FINISHED FLOOR ELEVATION 806.15
DEPTH OF TOP SOIL TO BE STRIPED 8"
EXISTING GROUND DEPTH AFTER REMOVAL OF TOP SOIL 805-8"= 804.33
REQUIRED FILL PAD DEPTH 801.73
DEPTH OF TOP SOIL TO BE EXCAVATED 2.6
BUILDING AREA 2486.8
VOLUME OF EXCAVATION 6465.68 CF
TOTAL 239.47 CY
EXCAVATION FOR FOOTINGS
Footings length (LF) width(LF) depth(LF) volume(CF) VOLUME(CY)
footing 1 167 1.33 2.08 461.99 17.11
footing 3 63.00 1 2.08 131.04 4.85
footing 5 167.00 1 2.08 347.36 12.87
footing 6 73.00 1 2.08 151.84 5.62
footing 7 73.00 1 2.08 151.84 5.62
footing 8 3.00 1.33 2.08 8.30 0.31
footing 9 5.00 2 2.08 20.80 0.77
footing 10 18.00 1.33 2.08 49.80 1.84
footing 11 18.00 1.5 2.08 56.16 2.08
footing 12 18 4.33 2.08 162.12 6.00
TOTAL 1541.24 57.08
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
56 | P a g e
backfill
building area
sum 2486.8
depth 4
volume 9947.2
volume(CY) 368.4148148
volume after compaction(CCY) 387.81
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
57 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
58 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
59 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
60 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
61 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
62 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
63 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
64 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
65 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
66 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
67 | P a g e
APPENDIX K: LIST OF MAJOR EQUIPMENT AND MAJOR CONSTRUCTION MATERIAL
List of Major Equipment & Construction Materials
Planning of equipments:
Planning and scheduling the equipment needed along with machinery should he carried out with much concerns,
as the cost of each equipment has a direct correlation to the increased cost of performing the activity. Hence, the
projects should be planned so that the use of the machinery can be maximized during a given period of time,
making it as cost-effective as possible for the benefit of us.
In this project, we Universal Contractors own a roller, compactor and backhoe loader, we will just rent an auger
boring machine for future uses.
Methodology:
The suitable applications and procedures are to be identified during construction stage in order to ensure a co-
ordinated and timely project
We decided to have a subcontractor for steel structure, masonry, landscaping and electrical works Earthwork,
concrete, carpentry and painting will be done by our company.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
68 | P a g e
APPENDIX L: HIGH LEVEL PIE CHART SCHEDULES
Abatement And Demolition
2%Earth work
4% Cast-in-place-Concrete5%
Concrete Masonry Units10%
Carpentry4%
Trusses0%
Termite Protection0%Metal Roofing
3%
Radiant Heating 3%
Mechanical3%
Plumbing 2%
Electrical 9%Accessories and
Specialties2%
Doors and Windows2%
Architectural finishes 2%
For Men’s Barrack50%
HIGH LEVEL PIE CHART SCHEDULE
Abatement And Demolition
Earth work
Cast-in-place-Concrete
Concrete Masonry Units
Carpentry
Trusses
Termite Protection
Metal Roofing
Radiant Heating
Mechanical
Plumbing
Electrical
Accessories and Specialties
Doors and Windows
Architectural finishes
For Men’s Barrack
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
69 | P a g e
APPENDIX M: SITE VISIT REPORT AND PHOTOGRAPHS
Site Photographs:
Project Cleburne State Park concessions/Bathhouse & Group Camp Implements
Project Number: 101855 Estimator: Managing Director
Site Visit not done but collected photos from online sources.
Participants: Ritesh Kumar Arjun Singh, Mansoor Taj Mohammed, Chetan Biradar, FNU Shaik Johnny Basha, Shivam
Patel, Rajesh Donka
Site Address: 5800 Park Road 21. Cleburne. Texas 76033
History of Cleburne State Park
Cleburne State Park is a 528-acre park that encompasses a lively 116-acre, spring-fed lake. Located southwest of
Fort Worth in Johnson County, the park was acquired from the city of Cleburne and private owners in 1935-36 and
was opened in 1938.
The region surrounding Cleburne State Park was a favorite hunting ground for many Indian tribesmen, since it was
composed of dense woods surrounded by plains and included several clear springs. The Comanches used this area
as a trail from the northwest to raid the homesteads in the south. The Indians would lead two fresh horses as they
rode a third one, switching to a fresh horse as each was winded. In this manner, they would escape their pursuers.
Their concealed trail was last used for a raid on Kimbell, which was built in 1851 and was the first town in Johnson
County. Kimbell was established on the Chisholm Trail at its crossing on the Brazos River. Vast herds of cattle from
thesouthern ranches in Texas crossed at Kimbell Bend going north to the markets. The park, located eight miles
north of Kimbell Bend, was also a good campsite for the cowboys who drove cattle on the Chisholm Trail.
In 1934, this beautiful valley of springs was recognized as a picturesque place for a park. A group of local
businessmen, interested in its development, secured it for the State Parks Board to establish a state park. In
1935, Civilian Conservation Corps Company 3804 of the federal government moved into the park site to start
developing a park.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
70 | P a g e
The men built a small earthen dam to impound the park's 116-acre lake, with a beautiful masonry, three-level
spillway, and then cleared a three-mile scenic roadway around the lake. A concession building, boathouse and
bathhouse were built in 1936, with additions in 1940.
The park residence, water tower and interior furnishings display a variety of handcrafted wood and metal
ornaments.
Summary:
Cleburne Slate Park photos gave us much knowledge and a brief idea about how the state park’s barrack is going to
be constructed and also we learnt team work. As the photos were there we were able to comprehend our projects
plan with the available photos. We have attached the photos below. Our proposal is going to reflect the bid
documents and we hope that we did a good job.
Figure 1 Shows a view from the outside
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
71 | P a g e
Figure 2
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
72 | P a g e
Figure 3
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
73 | P a g e
Figure 4 Show the inside view of the Carpentry works
Source: http://tpwd.texas.gov/state-parks/cleburne/fees-facilities/group-facilties
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
74 | P a g e
APPENDIX N: TIMBERLINE OUTPUT
APPENDIX N TIMBERLINE OUTPUT
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
75 | P a g e
APPENDIX O: ONSCREEN TAKEOFF OUTPUT
Single Scored CMU
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
76 | P a g e
Split Face CMU
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
77 | P a g e
Slab On Grade
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
78 | P a g e
Masonry
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
79 | P a g e
APPENDIX P: MAP OF SITE RELATED TO COMPANY OFFICE
Our company ‘’Universal Contractors’’ is located at 57.1 miles from the construction site we can reach the place in
around 1.30 hours if we take highway 67.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
80 | P a g e
APPENDIX Q: COPIES OF CORRESPONDENCE WITH CONTRACT ADMINISTRATOR
Query List
Mr. Agustin Villafana
Project Manager
UTA Parks and Wlidlife
Cleburne, Texas 76033
Sub: Cleburne State Park Concession/Bathhouse & Group Camp Improvements Project NO: 101885
Dear Dr. Villafana
I would like to take this opportunity to excess how grateful all of us at Universal Contractors have been given the
opportunity to bid for UTA parks and Wildlife’s Cleburne State Park Concession/Bathhouse & Group Camp
Improvements. My team have come across with few doubts while reviewing the plans and the specifications of the
project. The list in the things for which clarification is required have been prepared in the form of a query list in the
following page. I would appreciate if you could get back to us at your earliest convenience
Thank You
Regards
Universal Contractors
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
81 | P a g e
APPENDIX R: COPIES OF CORRESPONDENCE WITH SUPPLIER AND SUBCONTRACTOR
25th November 2016
Mr. Agustin Villafana
Project Manager
UT Arlington.
Texas 76013
Subject: Reminder to Submit Bid for project owned by TWPD
Project Name: Improvements to Park Structures-Concessions/Bathhouse
Project Number: 101855
Address: 5800 Park Rd 21. Cleburne, Texas 76033
Project contact: FNU Shaik Johnny Basha- Senior Estimator. Ph 684-256-9464.
Dear Mr Villafana,
You are invited to submit a sealed bid for the construction of the project.
This project involves rejuvenating the existing camping barrack which is located at Cleburne State Park in Cleburne,
Texas.
The Scope is to be in accordance with the project’s document plans and specifications
We need the Supply of all steel and concrete work required for the project and supply all necessary material
required for all Landscaping. Painting. Carpentry. Steel framing, Electrical and Masonry work as shown in the plans
Copies of the entire plan set including drawings and specifications are available in this attachment. They can also
be viewed online at http:[email protected]
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
82 | P a g e
Please email your bid no later than 5:20 PM. 30th November 2016 to [email protected]
Thank you
Kindly acknowledge this invitation and let me know if you would or would not be interested in bidding for this
project
Regards,
FNU Shaik Johnny Basha
Senior Estimator, Universal Contractors
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
83 | P a g e
APPENDIX S: LETTER OF REFERENCE
From
Tim Byrne
Chief Executive Officer
Lincoln Property Company Dallas, Texas
Re: Reference for Universal Contractors
To whomsoever it may concern
I Highly recommend Universal Contractors as general contractor. We are Builders of residential communities and
we have worked with Universal Contractors a lot of times, recently on our residential apartment named 404
Border Apartment in Arlington which is completed in 2015. They are currently providing the pre-construction
services for our new residential apartment in Austin.
404 Border apartments was a challenging project and Universal Contractors was valuable throughout every phase.
They provide us with detailed estimates and they are very flexible when any additional funding resources were
brought in the last minute. 404 Border Apartments having a tight budget and a challenging site, and Universal
Contractors completed the construction on time and within the limit of the budget. Universal Contractor’s staff are
professional, organized and has very good relationships with the representatives of various funding resource
I am very confident that Universal Contractors will be an excellent choice of your team and you will be satisfied
with their work. If you have any question fell free to contact me at (757)-768-8767
Sincerely,
Tim Byrne
Chief Executive Officer
Lincoln Property Company
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
84 | P a g e
APPENDIX T: MWBE AFFIDAVIT
Dec 2nd , 2016
Re:
Project Name: Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Owner Project Number: 101855
OCT Project Number: A232670
This letter serves to certify that Universal Contractors. Bid complies with the city of Cleburne’s requirement that
15% of project total cost be awarded to Minority/Women Owned or Disadvantage Business. Universal Contractors
anticipates the following Minority/Women Owned or Disadvantaged Business participation for the UTA Parks and
Wildlife
IN WITNESS WHEREOF, I have hereunto set my hands this 2nd day of December 2016.
Name: UNIVERSALCONTRACTORS
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
85 | P a g e
APPENDIX U: PROOF OF INSURANCE
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
86 | P a g e
APPENDIX V:CERTIFICATE OF INSURANCE
APPENDIX V CERTIFICATE OF INSURANCE
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
87 | P a g e
APPENDIX W: PERFORMANCE BOND
APPENDIX W PERFORMANCE BOND
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
88 | P a g e
APPENDIX X: PAYMENT BOND
APPENDIX X PAYMENT BOND
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
89 | P a g e
APPENDIX Y: CONTRACTORS PROGRESS PAYMENT AFFIDAVIT
APPENDIX Y CONTRACTORS PROGRESS PAYMENT AFFIDAVIT
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
90 | P a g e
APPENDIX Z: CONTRACTORS FINAL PAYMENT AFFIDAVIT
APPENDIX Z CONTRACTORS FINAL PAYMENT AFFIDAVIT
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
91 | P a g e
APPENDIX AA: CONSENT OF SURETY COMPANY TO FINAL PAYMENT
APPENDIX AA CONSENT OF SURETY COMPANY TO FINAL PAYMENT
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
92 | P a g e
APPENDIX AB: HUB SUB-CONTRACTING PLAN
APPENDIX AB HUB SUB-CONTRACTING PLAN
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
93 | P a g e
APPENDIX AC: AGREEMENT BETWEEN OWNER AND CONTRACTOR
APPENDIX AC AGREEMENT BETWEEN OWNER AND CONTRACTOR
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
94 | P a g e
APPENDIX AD: CONTRACTORS QUALIFICATION STATEMENT
APPENDIX AD CONTRACTORS QUALIFICATION STATEMENT
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
95 | P a g e
APPENDIX AE: BID BOND
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
96 | P a g e
APPENDIX AF: PLANS
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
97 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
98 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
99 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
100 | P a g e
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
101 | P a g e
APPENDIX AG: ADDENDA
TEXAS PARKS AND WILDLIFE DEPARTMENT
CLEBURNE STATE PARK – MEN’S BARRACKS
Addendum No 002 TPWD is issuing the following Addendum No 002 with the intent of answering questions that have been posted by any and all interested bidders. Any changes identified as part of this addendum shall be incorporated into the project documents and supersede the information on the project plans and specifications as applicable. 1. What is the scope of our project? Do we need to consider the alternatives A, B and C for the bidding? The scope of this project is limited to the work associated with the Men’s Barrack and Women’s Barrack, all other alternatives are not part of this project. 2. Do we need to consider the demolition of existing buildings for the bidding purpose? Yes, existing structures in the way of your construction must be appropriately removed. Please note that the existing structures contain environmental issues and as such must be abated per state and federal guidelines. 3. Should we consider the gravel below slab on grade? And what is the thickness of gravel? There is no drainage gravel layer below the slab. Construct the slab per the details in the drawings. 4. Should we consider the demolition of existing bathroom, ramp and stairs, retain existing structures? See answer to question 2 above. 5. Drawing S-0 shows that depth of select fill below slab on grade for barracks is 4 feet. But if I see the depth of all grade beams in drawing S-3, maximum depth is 2’6” less than the depth of selected fill. So how should we consider the excavation of grade beam means in option 1 – should we neglect the excavation of grade beam as the depth of selected fill is greater than the depth any grade beam. Or in option 2 – after excavating for selected fill we will fill it on the whole barrack building foot print and excavate again for grade beam? Means and methods of construction are left to the contractor’s discretion; however, contractors must abide by the project plans and specifications. In reference to the select fill, the project requires that 4-feet of select material must be built up as the building pads for the barracks. 6. Do we have to use 3000psi grade concrete for every concrete component? Concrete strength is to be per the project plans and specifications; reference the appropriate plan sheets and specification sections for the required concrete strength.
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
102 | P a g e
7. As part of the Bid package all interested bidders must also include the attached bid schedule completed accompanied by supporting calculations, diagrams, or notes. Make clear which calculation, diagram, or note pertains to each bid schedule quantity by labeling each with the corresponding bid schedule ID so that reviewers can easily verify the quantity provided.
Contact Information: For any questions contact Agustin Villafana, [email protected]. ISSUING AGENCY: Texas Parks and Wildlife Department, Infrastructure Division
Addendum No 003
TPWD is issuing the following Addendum No 003 with the intent of clarifying discrepancies in the project
documents. Any changes identified as part of this addendum shall be incorporated into the project documents
and supersede the information on the project plans and specifications as applicable.
1. Provide the following Toilet Accessories/Specialties for the project, final location of these items to be field verified at a later date:
Base Bid:
36” Grab Bars 3 EA
42” Grab Bars 2 EA
Paper Towel Dispenser/Waste Receptacle Combo 1 EA
Paper Towel Dispenser 2 EA
Towel Bar One for each shower
Toilet Tissue Dispenser 2 EA
Liquid Soap Dispenser - Wall Mounted One for each shower
Liquid Soap Dispenser - Counter Top Mounted 2 EA
Diaper Changing Station 1 EA
Shelf Unit 1 EA
Mop and Broom Holder 1 EA
Robe Hook One for each shower
Shower Curtain Rod One for each shower
Shower Curtain w/ Stainless Steel Hooks One for each shower
Alternate #1 Bid:
36” Grab Bars 3 EA
42” Grab Bars 2 EA
Paper Towel Dispenser/Waste Receptacle Combo 1 EA
Paper Towel Dispenser 2 EA
Towel Bar One for each shower
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
103 | P a g e
Toilet Tissue Dispenser 2 EA
Liquid Soap Dispenser - Wall Mounted One for each shower
Liquid Soap Dispenser - Counter Top Mounted 2 EA
Sanitary Napkin Vendor 3 EA
Sanitary Napkin Disposal 3 EA
Diaper Changing Station 1 EA
Shelf Unit 1 EA
Mop and Broom Holder 1 EA
Robe Hook One for each shower
Shower Curtain Rod One for each shower
Shower Curtain w/ Stainless Steel Hooks One for each shower
Contact Information: For any questions contact Agustin Villafana, [email protected].
ISSUING AGENCY: Texas Parks and Wildlife Department, Infrastructure Division
Addendum No 004
TPWD is issuing the following Addendum No 004 with the intent of clarifying discrepancies in the project
documents. Any changes identified as part of this addendum shall be incorporated into the project documents
and supersede the information on the project plans and specifications as applicable.
1. TPWD anticipates issuing NTP for the Men’s Barracks on January 16, 2017. 2. If Alternate No 1 is also accepted the successful contractor will have the option of starting the Women’s
Barrack construction concurrently. If awarded Alternate No 1 NTP will also be January 16, 2017.
Contact Information: For any questions contact Agustin Villafana, [email protected].
ISSUING AGENCY: Texas Parks and Wildlife Department, Infrastructure Division
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
104 | P a g e
APPENDIX AH: OVERHEAD CALCULATIONS
The Over-Head Percentage is 10.5%
Project number: 101855
Cleburne State Park Concession/Bathhouse & Group Camp Improvements
Universal Contractors 500 UTA Blvd,
Arlington Texas 76013.
105 | P a g e
APPENDIX AI: GENERAL REQUIREMENTS
Subcontract Total
Unit Price Subtotal Unit Price Subtotal Unit Price Subtotal
1 Project Manager 1 No's 10,000$ 50,000$ 50,000$
2 Office Engineer 1 No's 6,000$ 30,000$ 30,000$
3 Site Engineer 1 No's 6,500$ 32,500$ 6,500$
4 Book Keepers 1 No's 2,300$ 11,500$ 11,500$
5 Foremen 2 No's 4,500$ 45,000$ 45,000$
6 Admin 1 No's 3,500$ 17,500$ 17,500$
7 Training of Employees 1 No's 2,500$ 12,500$ 1,000$
8 Vehicles (Including Fuel) 1500 gal 1.9$ 2,850.0$ 2,850$
9 Project Staff Food 250 ea 100.0$ 25,000.0$ 25,000$
10 Safety Equipments (Helmets, Glove etc.) 25 sets $150 $3,750 3,750$
11 Office Trailer 2 ea $2,500 $5,000 5,000$
12 Storage Boxes 6 Months $130 $780 780$
13 Water Suppliers (Drinking) 3 ea $200 $600 600$
14 First Aid Kit 5 ea $150 $750 750$
15 Fire Extinguisher 4 ea $50 $200 200$
16 Utilities 2 ea $1,600 $3,200 4,800$
17 Phone 6 Months $50 300 300$
18 Site Clean 2 No's $450 $900 900$
19 Baricades 20 ea 31 620$
20 Insurances 70$
21 Mobile Toilets at site 3 800$ 2,400$
22 Charitable Contribution 2,000$
23 Legal and Professional Fees(Tax preparation, licence fees etc.) 5,000$
Total 199,900$ 31,800.0$ $10,630 216,520$
Division General Requirements
Main Office Personnel
Field Personnel
Miscellaneous
Travel
Equipments
Labor Material Equipment
Item No Description Qty Units