8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
1/60
Clearing Wreckage To Inject U4 SFP
Cooling Water
1
Debris Was Blocking
Pumper Access to SFPDebris Cleared For Pumper
By Manual Tank-BulldozerL. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
2/60
Established Pool Recirculation Cooling
L. Barrett Consulting LLC 2
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
3/60
Release Periods Based On Site Gamma
Levels
L. Barrett Consulting LLC 3
U2 Internal Explosion?
U3 Gray Smoke?
U3 Explosion?
U3 White Smoke?
uSv/h@Gate@1
Km
U1 Explosion?
U4 Building Explosion?
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
4/60
Establishing Core Recirculation Cooling
In Early July
Turbine
Building
Need Water RecirculationSystem To Stop Feed & Bleed
Venting & Radioactive Water
Creation~30M gallons High Rad Water
4
Cable/Pipe Tunnels Leakage
L. Barrett Consulting LLC
New Chemical/Radiological
Purification SystemWater
Purificatio
n
Reactor
Vessel Leak
Primary
ContainmentLeak
Intake Strctrs
Heat
Sea
Damaged Reactor Building
Flooded Basement
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
5/60
Recirc Core Cooling
L. Barrett Consulting LLC 5
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
6/60
L. Barrett Consulting LLC 6
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
7/60
Current Primary Containment Integrity
Oxygen-Hydrogen Risk
7
Hydrogen & Steam Atmosphere
Currently In Primary Containments
As System Cools May Draw Air with
Oxygen Back Into the Containment
and Could Become Explosive
Currently Injecting Inert nitrogen to
Prevent Oxygen In-leakage, however
Unit 3 has significant containment
leakage
L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
8/60
Current Primary Containment Integrity
Seismic Risk
8
Primary Containments are Partially
Flooded with Core Feed Water Outflow
Well Beyond Design Basis Levels
Earthquake Aftershocks Add
Increased Dynamic Stress to Higher
than Design Static Stress
Reactor Building Structure Has Likely
Been Degraded by Explosions and
initial Earthquake To an Unknown
Degree
Containment Integrity Margins being
Evaluated
L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
9/60
Current Unit 4 Reactor Building
Structural Integrity Seismic Risk
9
Explosions Have Weaken RB Structure
A Large Earthquake Aftershock May
Cause Building Failure
Keeping Pool Water Level at a
Minimum to reduce Loads
Adding
Steel &
Concreteunder PoolHigh
Gamma
Field
Causing
DelaysL. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
10/60
Gather Data Inside Reactor Buildings
10
Adapted Military Drones With
Thermal & Radiation Capabilities L. Barrett Consulting LLC
Inside Reactor Buildings
~1-100R/Hr & U2 High Vapor
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
11/60
Working Conditions are ChallengingRestoring Power In High Radiation & Contaminated Areas
11L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
12/60
Control Room Power Restoration
12
Before Power Restored After Power Restored
L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
13/60
Working In Contaminated Buildings
13
Entering Waste
Processing Building
Worker Showing TB Basement
Floor Water Level
L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
14/60
Reactor Building Air FiltrationAccess to Calibrate Reactor Water Level Instrumentation
L. Barrett Consulting LLC 14
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
15/60
U2 Reactor Building Conditions
L. Barrett Consulting LLC 15Water 4M deep in Basement
Ground RB Floor
Robots First
Personnel Second
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
16/60
U3 Reactor Building Conditions
L. Barrett Consulting LLC 16
Reducing 5-18R/hr Gamma Fields
For N2 Containment Injection
Robotic Vacuum Cleaner
50-20mm Steel Plate Floor Shielding
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
17/60
Airborne Mitigation
17L. Barrett Consulting LLC
Dust Suppression Resin Application
Unit 1 Fabric Enclosure55M High & 47M X 42M
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
18/60
Unit 1 Canopy Design/Construction Process
L. Barrett Consulting LLC 18
Laser Measure Existing Building Laser Image New Enclosure
Construction Sequence PlaningMockup Const Training
New Fast Const Concepts
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
19/60
Minimizing Building Rain In Leakage
Unit 1 Turbine Building RoofPatchTo Reduce Radioactive Water Overflow
Current Rainy Season: Typhoon Ma On with 4 last week
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
20/60
Contaminated Water Accumulating
Feed & Bleed Core Cooling Flushed Large
Amounts of Highly Radioactive Water into
Building Basements
Approximately 30 Million Gallons Now
Approximately 25 Million Curies
Increasing at ~100,000 gallons per day
Rainy Season Adding More
L. Barrett Consulting LLC 20
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
21/60
Effluent Release Flow PathsReactor Building-Turbine Building-Intake -Sea
21L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
22/60
Contaminated Water ContainmentOverflow from U2 Reactor Bldg to Turbine Bldg to
Intake Structure Wall Crack to Sea~ 27,000 Ci Cs-137 Released this Path 4/1-6
-Reference Chernobyl was 2MCi Cs-137 released
22
Leak Reduced 11-04-04
Leak Sealed 11-04-06
Sodium Silicate Injection
Non-Safety Grade
intake Structure
Radioactive Water
Leak 11-04-02
L. Barrett Consulting LLC
C i d W C i
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
23/60
Contaminated Water ContainmentHow the Intake Wall Crack Leak was Stopped
23
Leak Sealed 11-04-06
Sodium Silicate InjectionCable Chase Path
Other Similar Leakage Paths To SealL. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
24/60
Sealing Other Leakage Paths to Sea
L. Barrett Consulting LLC 24
Concreting One of ~37 Cable & Pipe Chase Paths
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
25/60
Mitigate Basement Leakage Into
Groundwater Paths To Sea
L. Barrett Consulting LLC 25
Planning Underground Barrier Walls to Bed Rock
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
26/60
Water Retention Tank FarmsUnderground Tanks Under Construction
L. Barrett Consulting LLC 26
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
27/60
Accident Water Management
27
Silt Fence
20-50 Million Gallons Of Highly Radioactive Water To Be Transferred To Onsite Tankage
Relative
Low Activity
Released
Sluice Gates
&
Zeolite Bags
L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
28/60
Water Release MitigationContain/Retard Intake Structure Cs/Sr
Contamination
28
Zeolite Bags To Adsorb Cs/SrSluice Gate to Minimize Outflow
To OceanL. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
29/60
Water Release MitigationSilt Fence to Retard Cs/Sr Release to Sea
29L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
30/60
Process Intake Canal Water Through
Zeolite Beds to Remove Released Cesium
L. Barrett Consulting LLC 30
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
31/60
US Fresh Water Barge On Site-April
31
Japanese Tow Operators
Japanese ship hauling US Navy water barge
L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
32/60
New Water Barge On Site-June
32
2.5 Million Gallon Capacity BargeL. Barrett Consulting LLC
A id W T Pl
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
33/60
Accident Water Treatment Plans
~30 Million Gallons in Basements
L. Barrett Consulting LLC 33
1200T/day (330Kgal/day or 200gpm) Rate Goal with 1E3 DF Startup Late June
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
34/60
Water Recirculation Processing Plan
L. Barrett Consulting LLC 34
Four Stage System
1. Oil Removal: Toshiba
2. Cesium Removal: Kurion3. Fission Products Removal: AREVA
4. Salt Removal: Hitachi
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
35/60
Oil Removal
L. Barrett Consulting LLC 35
Separator InternalsSeparator Unit
Cesium Removal Stage
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
36/60
Cesium Removal Stage
L. Barrett Consulting LLC 36
Individual Zeolite Beds
Shielded Skids
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
37/60
Fission Product Precipitation Stage
L. Barrett Consulting LLC 37
Installed Co-Precipitation UnitChemical Injection Tanks
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
38/60
Process System Locations
L. Barrett Consulting LLC 38
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
39/60
Water Tank & Systems Locations
L. Barrett Consulting LLC 39
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
40/60
Water Processing Difficulties
With First Kurion/AREVA System
Many Systems Leaks & Issues
~60% Capacity
High Rad Sludge Management Challenges Will Emerge
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
41/60
New Water Processing System
Simplified Active Water Retrieve and Recovery System (SARRY)
Toshiba Lead
2 Lines of 8 Larger (24Ton) Zeolite/Silicate Filter Beds to
replace/augment Initial Kurion/AREVA System
Planned August Operation
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
42/60
Site Needs Extensive Decon
L. Barrett Consulting LLC 42
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
43/60
Debris Hotspots100R/hr
L. Barrett Consulting LLC 43
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
44/60
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
45/60
Decontamination Cleanup Solids
45
Remote Debris Removal
-90R/Hr Concrete Piece
Remote Debris Transporter
With Solid Waste Container
L. Barrett Consulting LLC
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
46/60
Onsite Solid Storage Area
L. Barrett Consulting LLC 46
~300+ 4M3 Containers to June
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
47/60
Solid Waste Handling Equipment
L. Barrett Consulting LLC 47
Shielded Fork Lift Remote Controlled Equipment
i l ili i
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
48/60
On Site Personnel Facilities
L. Barrett Consulting LLC 48
Change House
Shielded Work Areas
Rest Areas
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
49/60
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
50/60
Personnel Exposures
~4,000 Onsite Personnel
Most are < 100 mSv (10R)
~100 are >100mSv (10R) < 250mSv (25R)
~6 are ~ 500-600mSv (50 to 60R)
Over Exposures
Internal Ingestions Issue
More Likely
L. Barrett Consulting LLC 50
Off i i
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
51/60
Offsite impacts
L. Barrett Consulting LLC 51
Offsite Cs/Sr Contamination
School Playground Dose
Remediation
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
52/60
H F li & R ti
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
53/60
Human Feelings & Reactions
53L. Barrett Consulting LLC
TEPCO ROADMAP SEQUENCE 06-17
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
54/60
54L. Barrett Consulting LLC
C t & E i I
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
55/60
Current & Emerging Issues Maintain Sustainable Closed Cooling
After Shock Structural Integrity Containment Degradation
High Rad Water Containment~30+ Million Gallons
Highly Rad Water Processing Sludge ~1,000R/hr range
20-100 Mega Curie Amounts (TMI~1MCi)
Impact Site Recovery
Building Containment/Filtration
Offsite Remediation Management Restructure
Regulatory Restructure
Finance?
L. Barrett Consulting LLC 55
I t l A id t R Ph
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
56/60
Internal Accident Recovery Phases
1. Energy Heat Rejection Control
1. Much Improved with Closed Residual Heat Removal
Gas Release Control/Mitigation1. Containments
2. Filtration1. Liquid Release Control/Mitigation
1. Control Highly Radioactive Water in Basements
2. Initially Contain in Tanks
3. Create Effective Purification Systems
2. Solids/Contamination Control Materials Management1. Contain/package
2. Store/transport
3. Dispose56L. Barrett Consulting LLC
E t l Ph Of A id t
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
57/60
External Phases Of Accident
Plant Accident Recovery Period Impossible Information Demands
Stabilize/Remediate/Recover/Protect
Hours-Days-Weeks-Months-Years-Decades
Environmental Impact Period Public Perception/Impacts/Remediation (Offsite) Weeks-Months-Years
Societal/Institutional Reactions Period Cultural Political
Policy
Financial
Management57L. Barrett Consulting LLC
Personal Fukushima Observations
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
58/60
Personal Fukushima Observations
Not a Public Health Catastrophe Radiological Impacts Inconsequential Compared to Earthquake/Tsunami Impacts
Is An Industrial Plant Catastrophe Caused By A Natural Disaster The Tsunami was the Main Safety Issue
Three Melted Cores & Severely Damaged & Contaminated Buildings
Units 1-4 Complete Loss, Units 5 &6 Technically Recoverable
Cleanup Long & Expensive, but Technically Achievable (Much Larger than TMI)
Energy Dissipation is Getting Better, but Safety Challenges Aftershock Safety
System & Containment Degradation
Building Access Difficult
Environmental Release Mitigation is a Growing Challenge Water & Airborne Radioactive Effluents
Onsite & Offsite Environmental Impact Mitigation
Multiple Management, Social, Political & Economic Issues Ahead E.G. Waste & Spent Fuel Disposition Pathways
Lessons Learned Ahead58L. Barrett Consulting LLC
Personal U.S. Nuclear Safety Observations
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
59/60
e so a U S uc ea Sa ety Obse at o s Current Reactors Have Adequate Safety Margins
U.S. Tsunami Risks are Limited To Only A Few U.S. Sites
Past Risk Informed Severe Accident Improvements HaveAlready Addressed Many Fukushima Issues
Station Blackout & 911 Improvements
Systematic, Methodical, & Risk Informed Fukushima
Lessons Learned Evaluations Are Appropriate Industry
NRC
Resist Quick Fix Emotional Reactions
Continuous Improvement Culture Will Further Strengthen U.S. Capabilities
Lessons Learned From TMI Lessons Learned TMI Lessons Learned Greatly Improved US Nuclear Safety and Productivity
Most Painful Lessons are the Most Teachable
Fukushima Lessons Should Improve Safety and Advance Global & U.S. NuclearEnergy As Three Mile Island Lessons Learned Did Thirty Years Ago.
59L. Barrett Consulting LLC
L k H B tt
8/13/2019 Clearing Wreckage To Inject U4 SFP Cooling Water
60/60
Lake H. [email protected]
Lake Barrett is a part time independent consultant in the energy field. He hasworked in the nuclear energy and nuclear materials management areas for over 4decades, most recently as the former head of the US Department of Energys Officeof Civilian Nuclear Waste Management which is responsible for implementing theUnited Sates programs for spent nuclear fuel and high-level radioactive waste, asmandated by the Nuclear Waste Policy Act. In that capacity, he led the complexscientific Yucca Mountain Geologic Repository program through the statutory siteselection process culminating with the Presidential site designation and followingsuccessful House and Senate votes.
He also served at U. S. Nuclear Regulatory Commission, where he was directlyinvolved with the early response to the Three Mile Island reactor accident andbecame the Site Director, responsible for regulatory programs during thestabilization, recovery, and cleanup of the damaged reactor. He also has hadextensive managerial and engineering experiences in DOEs Defence Programs andprivate industry at both Bechtel Power Corporation, with commercial nuclear powerplants, and Electric Boat Division of General Dynamics with nuclear reactor andsubmarine systems design, operation, and decommissioning.