Download - CIil OF TAREDO...2020/11/12  · CIil OF TAREDOlaREno, tgx[st7s5 ADDENDUM NO.INovember 3, 2020 Project: CDBG Santa Maria Bike Lane from Chicago St to Del Mar Blvd. -FY21-ENG-001All

Transcript
  • CIil OF TAREDO

    laREno, tgx[st7s5

    ADDENDUM NO.INovember 3, 2020

    Project: CDBG Santa Maria Bike Lane from Chicago St to Del Mar Blvd. -FY21-ENG-001

    All contractors, holders of plans and specifications, plan rooms and all interested parties on the above identifiedproject are hereby notified of the following revisions to the plans and specification, same taking precedenceover all previous declarations and notes made on the plans and specifications.

    CLARIFICATION: The following are responses to questions asked during and after the project pre-bidmeeting conducted on October28,2020 at 10:00 A.M.

    1) Question: When will be the last day for Bendicion Engineering (project consultant) to answer anyquestions on the project?Answer: November 4th shall be the last day for questions.

    2) Question: Is the "Bid Schedule" on Page 18 correct?Answer: Replace Page 18 ("Bid Schedule") with Pages 180-187.

    This addendum is being submitted to all contractors, holders of plans and/or specifications, plan rooms, and allinterested parties to the project and acknowledgement of same is required by inserting its number and date inthe proposal form.

    Bendicion Engineering, LLC19215 Deer Elk Crest

    San Antonio, Texas 78258(210) 392-0036

    sflores@bendicion-com p anies. com

    Salvador Flore S, P.E.

    I I l0 ltousrot{ tr. P.0. Box 579 raREDo, rExas 78040-0579(9561 791-7346 IAX (9551 791-7496

    Page 1 of 1