5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
1/31
Chinar
Shipping &Infrastructure (India) Pvt. Ltd.An ISO 9001:2008 Company
REGISTERED ADDRESS:Chinar Shipping & Infrastructure (I) Pvt. Ltd.
410 Bharat Chambers, 52 Baroda Street,
Carnac Bunder, P. D' Mello Road,Mumbai 400 009.
TELEPHONE: +91 22 4213 8130 / 21
FAX : + 91-22-4213 8131
EMAIL:[email protected]
Website: -http://chinarshippinginfratech.com/
Regional Offices:-New Delhi
Uttar Pradesh
Bihar
mailto:[email protected]:[email protected]:[email protected]://chinarshippinginfratech.com/http://chinarshippinginfratech.com/http://chinarshippinginfratech.com/http://chinarshippinginfratech.com/mailto:[email protected]5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
2/31
Chinar Shipping and Infrastructure (I) Pvt. Ltd. Established in 2002, and incorporated in 2006,
Chinar is an ISO 9001-2008 IRQS Certified company. Our service oriented outfit is registeredwith D G Shipping, Government of India (RPSL No.: RPSL-MUM-118) & registered shipping
agency in Mumbai Port Trust (Lic. No. C0282).
Chinar apart from its O & M contracts has expanded its operations in the field of Dredging
and Infrastructure developments works, and is a reputed organization in handling dredging
activities in India and overseas along with Civil construction works.
We are one of the leading O & M contractors in the field of dredging and ship management.
Our dedicated team of engineers, ex naval officers and master mariners have achieved the
goals as targeted by our esteemed clients. The executed contracts and ongoing projects
under our management is the proof of our dedication and commitments towards the
satisfaction of our clients.
Companys Profile
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
3/31
Chinar Shipping and Infrastructure (I) Pvt Ltd aims to be the leader in the field of dredging, civil
engineering and Infrastructure works.
We are committed to achieving consistent quality works and believe in making the extra effort to
provide superior operating results and above all, delivering on time to our customers.
We continuously upgrade, maintain and acquire equipment to the latest technology to increase
productivity and improve cost effectiveness as to satisfy the expectations of customers,
shareholders and employees.
We believe and commit fully to the highest standards of safety, health and environmental
responsibility
CORE VALUES
We ensurecompliance with
agreedcommitments
Honesty
&
Dedication
Mission
CORE VALUES
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
4/31
We would like to introduce our company Chinar Shipping and Infrastructure (India). Pvt. Ltd an,
ISO 9001:2008 CertifiedInfrastructure Company as one of the fastest growing enterprise in the
field of Dredging, Infrastructure developments and Technical management. We are proud to be
associated to some of the best known Government organization & companies in the industry. As
registered RPS License holders with D.G. Shipping we have been providing technical support to
various ship owners and ship management companies.
About Us
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
5/31
We have adequate number of HEME and Dredgers under our management for prompt and
efficent service.
CSD - Ravikiran Beaver 1200 CSD - ASR-3 - American 300 Survey boats, wooden boats
List of Equipment with Chinar and its sisterconcern
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
6/31
We feel proud to be associated with. Shipping corporation of India (SCI) & Oil and Natural Gas
Corporation of India (ONGC) for the past 3 Years. We have served them in their offshore
activities.
Chinar Shipping has successfully completed dredging projects as an O&M contractor for Norsea
Global Offshore Pvt Ltd.Singapore in 2010; we have operated one of the largest Cutter Suction
Dredger CSD Portofino a 3000 M3dredger for the three years at different dredging projects in
India and Overseas.
License Awarded BOARDS UNDER WHOM CHINAR IS REGISTERED
Registered with D G
Shipping,
Government of
India
RPSL No.:
RPSL-MUM-118
RegisteredShippingagency in
Mumbai PortTrust
Lic. No. C0282
Awarded byIndianRegistrar ofQualitySystems
ISO 9001:2008
Awarded bySmall ScaleIndustriesassociation
Memorandumno-27232200998
DELHI JAL
BOARD,Govt of
NCT,Delhi
DJB
MAHARASHTRA
MARITIME
BOARD,Govt Of
Maharashtra
MMB INLAND
WATERWAYS
AUTHORITY OF
INDIA, Ministry
of Shipping,GOI
IWAI
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
7/31
0
2000
4000
6000
8000
10000
12000
2010-11 2011-12 2012-13 2013-14 2014-15(Projected)
In Lacs
F inancial turn over
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
8/31
Total Achieved Dredging Quanti ty In River Ganga NW-01
NAME OF CSD Achieved dredgin g Quanti ty in M3
MAHANANDA 405425.55
ALAKNANDA 536406.81
JALANGI 534628.79
TAPI 602973.49
SHIPRA 309682.92
17%
23%
22%
25%
13%Mahananda
Alaknanda
Jalangi
Tapi
Shipra
Milestone
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
9/31
We consider ourselves as young and budding organization, small, but abundant with talent
and enthusiasm and a desire to work other such organizations to help each other to achieve
their individual goals.
We believe in our technical skills and share this knowledge to entities, so that they stay
focused on their principal objectives and concentrate on what they are better at doing
Project Management and Executionof contract for National Waterways 1, 2 & 3 dredging
projects worth INR 63 Crores through site offices located in Guwahati & Cochin, Contract
awarded By Inland Waterways Authority of India under Ministry of Shipping, GOI.
Dredging of River Yamuna Pondage area near Wazirabad, DelhiJal Board water treatment
plant worth INR 14.96 Crores awarded by DJB, Govt of NCT Delhi.
Supervising the Infrastructure project Commercial Complex building and road projects
awarded by Gorakhpur Development Authority, Govt of UP.
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
10/31
Chinar is a professional and experienced organization covering the Dredging, construction,
engineering, rail, mining & Infrastructure sector.
Our consultants & Engineers are experts within their field. We know our clients and most
important understand the requirements.
Our project coordinators work round the clocks to ensure coordination with the clients and
for timely completion of every project.
There is no institute in India producing manpower for dredging industry.
With that View Company selected 12 GETs (Graduate Engineer Trainees) from different
colleges.
With the emphasis that these young Engineers are trained to maintain & operate thedredger.
We take pride to mention that this is the 1stever scheme devised by any organization inIndia.
Why Chinar?
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
11/31
1. DREDGING
(a) Dredging & Reclamation
(b) Maintenance Dredging
(c) River Dredging
(d) Dredging & Excavation of Canals and Lakes
2. CIVIL CONSTRUCTION & INFRASTRUCTURE DEVELOPMENT
(a) Building Construction
(b) Drainage System
(c) Railways Earthwork, Blanketing & Track Linking
(d) Construction of Canals
(e) Road Construction
(f) Minor and Medium Bridges
(g) ROB (Rail Over Bridges)
(h) Excavation & Trenching
3. O&M (Operation & Maintenance) of
(a) Power Plants
(b) Dredgers
(c) Offshore supply Vessels
(d) Manning & Management of Vessels
OUR CORE BUSINESS
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
12/31
Ongoing Projects
The major work that is being carried out by M/s Chinar Shipping & Infrastructure (India) Pvt. Ltd.
on the National Waterways No. - 1, 2 & 3, awarded by Inland Waterways Authority of India
(Ministry of Shipping). We have been handling the total dredging operations required by IWAI.
By virtue of dredging on these National Waterways today we are one of the most experienced
organizations in India to carry out dredging work on any of the river and waterways. We have
Desc ri t io n Of wo rk:
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
13/31
well experienced staff in dredging these rivers who understand the operations and technical
aspects of dredging in rivers.
The priority and key focus of the project on National waterways -1 (River Ganga) is to maintain
the navigational channel for cargo, and coal movement for NTPC power plants located at Farakka
(W.B.), Kahalgaon, and Barh (Bihar) to accomplish the same, Chinar has been dredging at
different locations between Haldia , Patna & Varanasi to maintain the minimum LAD for safenavigation. The company with its skilled manpower and dedicated management team has been
able to dredge a quantity of 2.38 Million cubic meters since 2012.
IWAI : NW-01
IWAI :
NW-02
IWAI :NW-03
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
14/31
Delhi Jal Board under Government of NCT has awarded M/s Chinar Shipping the contract for
dredging 7,77,000 Cubic meter of silt and sand at their water intake channel located at
Wazirabad so that water shortage problem can be resolved during summers. We were given
Wazirabad water intake area which caters water need of 30% Delhis population. The dredging
has been successfully completed before the start of the flood season. The work is extended for
another one season to maintain the required depth for the water intakes.
Chinar has completed 2 years of successful dredging operations at different captive ports and
jetties for Maharashtra Maritime Board, Mumbai.
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
15/31
The three WTPs located at Wazirabad, Chandrawal and Okhla are supplied with raw water fromWazirabad intakes.
During closure of Moradnagar Conduit, raw water is also lifted for Bhagirathi and Sonia Vihar
Water Treatment Plant.
As a natural phenomenon, silt travels along with water especially during monsoon, resulting in
reduction of depth of water considerably in the pondage area.
Over a period of time large quantity of silt/sand got deposited within pondage area, thereby
reducing depth of water by over a meter.
No dredging has been done since last six years.
Deposited silt needs to be removed be mechanical means to retrieve the holding capacity of the
pondage.
Pondage acts as the buffer against the variation and release of water by Haryana in non-
monsoon period and also it takes care of the requirement for few days in emergency condition.
Backgroun d of The Scheme
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
16/31
AREA FOR WEED REMOVAL
AREA TO DREDGE
AREA FOR WEED REMOVAL
DETAILED SATELLITE IMAGE OF ENTIRE SITE
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
17/31
BATHEMETRIC CHART OF THE AREA SURVEYED PRIOR TO
THE COMMENCEMENT OF PROJECT (OCT 2013)
Depths are reduced to datum
& spot levels are with the
reference to Datum
The Bench mark value at
Yamuna East Bank to levels
+210.1 m with reference to
MSL
CD=205.47m - MSL
Bottom=201.47m - MSL
< - -1.0 M
-1.0 - -0.99 M
0.0 - 0.99 M
1.0 1.99 M
2.0 - 2.99 M
3.0 - 3.99 M
> = 4.00 M
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
18/31
WEED INFESTED AREA ON WAZIRABAD SIDE
WEED REMOVED/UPROOTED AREA ON WAZIRABAD SIDE
WEEDS WERE PRESENT
WEEDS WERE REMOVED
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
19/31
L&T WATER INTAKE BEFORE DREDGING
DREDGERS IN OPERATION
DREDGER RAVI KIRAN
IN OPERATION
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
20/31
The company also provides ship management, port operations, chartering services and
undertakes complete end to end operation and management contracts. We ensure every
necessary measure required to display results with zero percent hurdles and accidents, thus
providing additional comfort to the clients in the industry.
The company has maintained high standards of Key Personnel from the field of dredging, marine
and Infrastructure. We have maintained a dedicated and skilled team of Civil, Mechanical and
Electrical engineers who are permanent employee of the company.
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
21/31
OPEN DISCHARGE
OUR DREDGING STAFF AT WORK
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
22/31
The rapid growth and requirement in the infrastructure development of the country inspired
Chinar to venture and expand into different sectors. The company formed Northern Express
Infrastructure Pvt. Ltd a 100% subsidy company of Chinar. Northern has been actively involved in
construction of Government buildings, roads and irrigation projects. The company is registered
with Gorakhpur development authority (GDA) U.P.Irrigation under A class. The company
started with construction of a small building for a limited company and slowly moved with its
growth.
Chinar was awarded with work order from TATA- ALDESA JV for earth work, blanketing and
construction of minor bridges on Ch No 1090-1115 (25 KM) for the. Dedicated freight Corridor
Corporation of India (Eastern corridor) under Indian Railways. The project is underway and the
progress is to the satisfaction of the client. A dedicated team of civil engineers with vast
experience are working round the clock for timely execution of the project.
Civil Construction and I nf rastructure Work
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
23/31
TATA / ALDESA (JV) EASTERN DEDICATED FREIGHT CORRIDOR PROJECT
SKETCH OF REQUIRED BLANK ETING WORK
ACTUAL SITE PHOTOGRAPHS OF TATA / ALDESA PROJECT
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
24/31
NAME OF WORK Earth Work/Blanketing of track formation for Eastern
Dedicated Freight Corridor
Formation for Heavy Axle Load for Eastern DFC including b ox
culver ts and minor br idg es.
3
DEDICATED FREIGHT
CORRIDOR NETWORK
MUMBAI
DELHI
CHENNAI
KOLKATA
LUDHIANA
VIJAYAWADASanctioned projects
Unsanctionedprojects
VASCO
DELHI
LUDHIANA
MUMBAI
DELHI
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
25/31
COMPANY NAME OF WORK OWNER DATE OF
START
COST OF
PROJECT
STATUS OF
PROJECT
I.W.A.I NOIDA DREDGING AT
VARIOUS STRECHES
OF RIVER GANGA(NW1) & RIVER
(NW2)
GOVERNMENT OF INDIA 18.10.2011 INR54,00,00,000
WORK INPROGRESS
I.W.A.I NOIDA DREDGING ATVARIOUS STRECHES
OF KOLLAM &UDYOGMANDALCANALS OF NW 3
GOVERNMENT OF INDIA Feb 2013 INR5,18,10,672
WORK INPROGRESS
I.W.A.I NOIDA MANNING,
OPERATION &MAINTENANCE OF
SURVEY LAUNCHESPATNA-ALLAHABADSTRETCH NW-1
GOVERNMENT OF INDIA Feb 2013 INR3,39,02,569
WORK IN
PROGRESS
I.W.A.I NOIDA MANNING,OPERATION &MAINTENANCE OFSURVEY LAUNCHES
DHUBRI-PANDUSTRETCH NW - 2
GOVERNMENT OF INDIA JUN 2013 INR2,73,16,923
WORK INPROGRESS
MAHARASHTRA
MARITIME
BOARD
MANNING,OPERATION & TECH.
MANAGEMENT OF 2CSD ATMAHARASHTRA
MAHARASHTRAMARITIMEBOARD
FEB2012 INR6,00,00,000
WORK INPROGRESS
SCI MANNING GOVERNMENT OF INDIA OCT 2011
INR28,80,00,000
WORK INPROGRESS
SICAL / CHCC RASALZOUR,
JUBAILK.S.A.
GOVERNMENT OF
SAUDI ARABIA
June 2008 INR6,00,00,000
Completed July 2009
DREDGING & MANNING PROJECTS BY CHINAR SHIPPING
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
26/31
DELHI JAL BOARDdredging of silt fromriver yamuna near
intake at wazirabadwater works
DELHI JAL BOARD Aug 2013 INR 40,00,00,000
WORK INPROGRESS.(IN JV WITH ASRDREDGING
SERVICES PVTLTD)
SICAL / MARG MargKaraikal Port MARG PORT March 2010 INR 3,50,00,000 Completed JAN 2011
TATA ALDESA
EARTHWORKINVOLVINGBLANKETING OFSTRETCH AND
CONSTRUCTION OF
MINOR BRIDGES
DEDICATED FREIGHTCORRIDOR,MINISTRYOF RAILWAYS
APRIL2014
INR47,00,00,000
WORK INPROGRESS
CLIENT/COMPANY CONTACT PERSON DESIGNATION CONTACT DETAIL
INLAND WATERWAYS AUTHORITY OFINDIA
Mr. S. Dandapat Director (P & M) +919717622733
DELHI JAL BOARD Mr. Yogendra Singh AE (Civil) 011-23681009
MAHARSHTRA MARITIME BOARD Mr. S. Shinde Chief Surveyor &Marine Engineer
+919819239727
THE SHIPPING CORPORATION OFINDIA
Mr. Phillip Mathews VP 022 2283 2671.
TATA/ ALDESA(JV) Mr. Kamal Kishore
Singh
Chief Project Manager
Our Major ongoing Projects
Civ i l construct ion & Infrastructure Pro ject by Chinar
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
27/31
OUR CLIENTS
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
28/31
EPF ESIC
Fooding Accomodation
Travelling
Allowance
Connectivity of
communication
Bonus&Increment
Healthyenvironmentof Office
Office Amenities
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
29/31
Chinar Shipping & Infrastructure (India) Pvt Ltd, is m anaged by pro fessional ly eff ic ient Board ofDirectors
MANAGING DIRECTOR
Our board of directors
Managing Director
A.K TRIPATHI
Director
R.Dubey
Director
J.P Sharma
Director
Yogesh Sharma
Executive Director
Nitish Tripathi
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
30/31
Mr. Vineet Agarwal-President (Technical)
An accomplished and resourceful, self-motivated professional, with masters in engineeringpossessing over twenty five calendar years (more than 38 years based on man hours) of immaculateinternational experience in project execution, project management, claims management, tenderpreparation, tender submission, structural design, soil testing etc.
Mr. Rajeev Chawla-President (Business Development)-MastersDegree in civil engineeringAccomplished and integrity driven professional offering over 30 years of experience from nationaland multinational organizations, in the field of ZERO TOLARENCE WATERPROOFINGSYSTEMS,
CONSTRUCTION CHEMICALS and MECHANICAL SPLICING. CUT N BEND OF REBARS, BBS DESIGNCENTRE. CONSTRUCTION MANAGEMENT AND BUSINESS DEVELOPMENT, Expertise in Setting up ofCUT N BEND Plant and BBS Design Centre.
Prof Dr.S.M Mishra-(Dredging Head)Accomplished and integrity driven professional offering over 35 years of experience from nationaland multinational organizations in river conservation dredging, and preparation of DPR`S for stateGovt and other organisations
Mr. Anil Mani Tripathi Executive Director (Projects-TATA ALDESA)Mr. Tripathi is an Executive Director (Projects-TATA ALDESA) of Chinar Shipping & Infrastructure
(India) Pvt Ltd. A results driven professional with over 23 years of wide experience in Project
Implementation mainly in Steel Plant, Cement Plant, P&O Ports, Metro Rail, Highway Projects, OFC
Projects and Energy Sector. He holds a strong track record of success in spearheading and
implementing several Projects across India.
Our team of TechnocratsMr Vineet Aggarwal - Director (Technical) - Master's Degree in Civil Engineering
Mr Rajeev Chawla - Director (Business Development) - BE
Prof. Dr. S M Mishra - Dredging Head
Mr Anil Mani Tripathi - Executive Director (TATA ALDESA Project)
5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final
31/31
We are proud of our com petent work force and their s t rong comm itments
Capt.PK Srivastava Chief Operation Officer
Ms Reena Kanani Chief financial Officer
Mr.Ajay Tiwari DGM-Finance & Accounts
Ms Geeta Chawda GM-Human Resources
Mr.Umacharan Legal Advisor
Mr.R.S Peshwani Marine Engineering Head
Mr.R.M Shukla Chartered Accountant
Mr.Aniket Dwivedi Project Co-coordinatorMr.Anshuman Dubey Business Development
Our Adm inistrat ive Staff
http://www.oceansparkle.com/about-team.htmlTop Related