1
CHAMBER PRO-DUCTION AT CERN 904RPC UPGRADE-MEETING, 08.JAN.2014DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAMDEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA
2Content
1. Status of 904 site2. Data Analysis3. Plan
31. Status of 904 site
Visual test – 17 BO Gaps Made 3 HV-Connector Still waiting a Gas back New india-student coming
42. Data Analysis
Study for Muon Efficiency at = 8TeV(Full pile-up events)
MC : MC : /DYToMuMu_M-20_CT10_TuneZ2star_v2_8TeV-powheg-pythia6/Summer12_DR53X-PU_S10_START53_V7A-v1/AODSIM RD : /SingleMu/Run2012A(B,C)-22Jan2013-v1/AOD Json file : Cert_190456-208686_8TeV_22Jan2013ReReco_Collisions12_JSON.txt
5
A B C Merge
20
40
2. Data Analysis For IDIso - μ+
6
A B C Merge
55
1000
2. Data Analysis For IDIso - μ+
7
A B C Merge
2. Data Analysis For IDIso - μ+
8
A B C Merge
20
40
2. Data Analysis For STA - μ+
9
A B C Merge
55
1000
2. Data Analysis For STA - μ+
10
A B C Merge
2. Data Analysis For STA - μ+
11
A B C Merge
20
40
2. Data Analysis For Tracking - μ+
12
A B C Merge
55
1000
2. Data Analysis For Tracking - μ+
13
A B C Merge
2. Data Analysis For Tracking - μ+
143. Plan
Calculate Trigger Muon Efficiency Leak test for the BO Gaps Dark-current test for the BO Gaps Make the HV-Connetor
Top Related