07.21.2016 Inspection. Punch List. R1 pg. 1
#3 - Toilet joint yet to be grouted
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:19
Miguel Lopez01 Aug 19:19
Toilet joint yet to be grouted
#1 - Inconsistente Joint width. It is more evident in reflection.
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1 |#UticaProposed.
Task messages (time in PDT)
Miguel Lopez01 Aug 19:13
Miguel Lopez01 Aug 19:14
Inconsistente Joint width. It is more evident in reflection.
07.21.2016 Inspection. Punch List. R1 pg. 2
Miguel Lopez01 Aug 19:14
Miguel Lopez01 Aug 19:16
#UticaProposed. Painting the top joint black.
Miguel Lopez01 Aug 19:23
#5 - Clear silicone used at perimeter joint between mirror anadjacent surfaces.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:27
Clear silicone used at perimeter joint between mirror anadjacent surfaces.
07.21.2016 Inspection. Punch List. R1 pg. 3
Miguel Lopez01 Aug 19:28
#4 - Sink and faucet yet to be installed
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1 |#UticaProposed.
Task messages (time in PDT)
Miguel Lopez01 Aug 19:20
Sink and faucet yet to be installed
Miguel Lopez01 Aug 19:22
Miguel Lopez01 Aug 19:23
#UticaProposed. Installing faucet offset closer to tub inlieu of door.
07.21.2016 Inspection. Punch List. R1 pg. 4
#2 - Inconsistent finish at opening. Plaster had been chipped toallow for lack of tolerance of radiator cover.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:17
Inconsistent finish at opening. Plaster had been chipped toallow for lack of tolerance of radiator cover.
Miguel Lopez01 Aug 19:18
Spall at wall finish from removal of cover
Miguel Lopez01 Aug 19:18
#52 - Robe hooks installed over tile are glued in lieu of drilled.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez03 Aug 08:27
Robe hooks installed over tile are glued in lieu of drilled.
Miguel Lopez03 Aug 08:27
07.21.2016 Inspection. Punch List. R1 pg. 5
#46 - Silicone seal around drain
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO B | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez03 Aug 08:00
Silicone seal around drain pending.
#25 - Inconsistent finishes at perimeter tub mirror.
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 20:01
Miguel Lopez01 Aug 20:01
Miguel Lopez03 Aug 07:51
Inconsistent finishes at perimeter tub mirror.
Miguel Lopez03 Aug 07:52
#typical
Miguel Lopez03 Aug 07:52
Joint btw toilet and floor yet to be grouted
07.21.2016 Inspection. Punch List. R1 pg. 6
#28 - Inconsistent silicone finish? Between marble sills, mirror andfinished wall.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 20:03
Miguel Lopez03 Aug 07:49
Miguel Lopez03 Aug 07:49
Inconsistent silicone finish? Between marble sills, mirrorand finished wall.
Miguel Lopez03 Aug 07:50
#consider. White polyurethane silicone fillet bead aroundentire perimeter of mirror..?
07.21.2016 Inspection. Punch List. R1 pg. 7
#29 - Seal all through tile penetrations
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 20:03
Miguel Lopez01 Aug 20:04
Seal all through tile penetrations
#49 - FyI Robe hooks installed in lieu of shower curtain are gluednot drilled.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez03 Aug 08:06
Robe hooks installed in lieu of shower curtain are gluednot drilled.
Miguel Lopez03 Aug 08:07
#typical
Miguel Lopez03 Aug 08:07
07.21.2016 Inspection. Punch List. R1 pg. 8
Miguel Lopez03 Aug 08:07
#clarify. Can be removed if requested.
#51 - Light fixture yet to be installed.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez03 Aug 08:25
Light fixture yet to be installed.
Miguel Lopez03 Aug 08:26
#15 - Original baseboard at curved corner. Voids btw cuts needsto be refinished
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | COMEDOR | CeaBermudez primero 2-ANEXO 2R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:45
07.21.2016 Inspection. Punch List. R1 pg. 9
Miguel Lopez03 Aug 07:45
Original baseboard at curved corner. Voids btw cuts needsto be refinished
#14 - Radiator cover installed.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | COMEDOR | CeaBermudez primero 2-ANEXO 2R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:44
Miguel Lopez03 Aug 07:45
Radiator cover installed.
Miguel Lopez03 Aug 07:45
Color does not match other wood.?
#8 - Wood finishes pending
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | DORMITORIO A | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:31
Wood finishes pending
07.21.2016 Inspection. Punch List. R1 pg. 10
Miguel Lopez01 Aug 19:32
#10 - Hardware pendiente to be instales.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | DORMITORIO A | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:40
Miguel Lopez01 Aug 19:41
07.21.2016 Inspection. Punch List. R1 pg. 11
Miguel Lopez01 Aug 19:41
Miguel Lopez03 Aug 07:39
Hardware pending to be installed.
Miguel Lopez03 Aug 07:39
#UticaClaims finishes are done
Miguel Lopez03 Aug 07:39
Perimeter trim needs refinishing
#50 - Chandelier chain pending to be shorten
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | DORMITORIO A | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez03 Aug 08:24
Chandelier chain pending to be shorten
#53 - FYI
CeaBermudez primero 2-ANEXO 2 R1
Priority 3 | Miguel Lopez | DORMITORIO A | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez03 Aug 08:28
Fyi
07.21.2016 Inspection. Punch List. R1 pg. 12
Miguel Lopez03 Aug 08:29
#21 - Spalls at trim anchors.
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:58
Miguel Lopez01 Aug 19:58
Spalls at trim anchors.
Miguel Lopez01 Aug 19:58
Pegs are not adjusted and "wiggle"
07.21.2016 Inspection. Punch List. R1 pg. 13
#45 - Detail at window
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez03 Aug 07:48
Detail at window
Miguel Lopez03 Aug 07:48
#24 - Door trim yet to be installed
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 20:00
07.21.2016 Inspection. Punch List. R1 pg. 14
#23 - 42cm btw pegs. Inconsistent with opposite wall.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 20:00
Miguel Lopez03 Aug 07:46
42cm btw pegs. Inconsistent with opposite wall.
#22 - Detail at door frame trim.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:59
07.21.2016 Inspection. Punch List. R1 pg. 15
Miguel Lopez01 Aug 19:59
Miguel Lopez03 Aug 07:47
Detail at door frame trim.
Miguel Lopez03 Aug 07:47
Note 52cm distance btwegs
Miguel Lopez03 Aug 07:47
Door trim yet to be finished
#47 - FYI
CeaBermudez primero 2-ANEXO 2 R1
Priority 3 | Miguel Lopez | PASILLO B | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez03 Aug 08:01
Fyi
Miguel Lopez03 Aug 08:02
07.21.2016 Inspection. Punch List. R1 pg. 16
#19 - Spalls at removed radiator cover anchors.
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:55
Spalls at removed radiator cover anchors.
Miguel Lopez01 Aug 19:56
Miguel Lopez03 Aug 07:53
#typical
Miguel Lopez03 Aug 07:53
#UticaProposed. Replacing anchors with Velcro?...
Miguel Lopez03 Aug 07:54
I have misgiving regarding Velcro and the wall finish..l
Miguel Lopez03 Aug 07:54
#consider.consider subframe.
#11 - Hardware pending to be installed.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:43
07.21.2016 Inspection. Punch List. R1 pg. 17
Miguel Lopez03 Aug 07:44
Hardware pending to be installed.
#12 - Chimney original finish is visible once dust is cleared.#
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:43
Miguel Lopez03 Aug 07:42
Chimney original finish is visible once dust is cleared.#
Miguel Lopez03 Aug 07:42
#clarify if more thorough cleaning is required.
#13 - FYI
CeaBermudez primero 2-ANEXO 2 R1
Priority 3 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:44
07.21.2016 Inspection. Punch List. R1 pg. 18
Miguel Lopez03 Aug 08:23
FYI
#20 - Inconsistent silicone finish? Between marble sills, windowand finished wall.
CeaBermudez primero 2-ANEXO 2 R1
Priority 3 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:56
Miguel Lopez01 Aug 19:57
Inconsistent silicone finish?
#17 - Exterior sill. Yet to be painted
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | Typical | CeaBermudez primero 2-ANEXO 2 R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:54
07.21.2016 Inspection. Punch List. R1 pg. 19
Miguel Lopez01 Aug 19:54
Exterior sill. Yet to be painted
#9 - Entrance door. All tasks pending.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | VESTIBULO | CeaBermudez primero 2-ANEXO 2R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:32
Miguel Lopez03 Aug 07:44
Entrance door. All tasks pending.
#18 - Voids and poorly patched areas at cabinet sour round.
CeaBermudez primero 2-ANEXO 2 R1
Priority 1 | Miguel Lopez | VESTIDOR A | CeaBermudez primero 2-ANEXO 2R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:54
07.21.2016 Inspection. Punch List. R1 pg. 20
Miguel Lopez03 Aug 07:57
Voids and poorly patched areas at cabinet sour round.
Miguel Lopez03 Aug 07:58
#7 - Radiator cover installed.
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | VESTIDOR A | CeaBermudez primero 2-ANEXO 2R1 | #consider.
Task messages (time in PDT)
Miguel Lopez01 Aug 19:30
Radiator cover installed.
Miguel Lopez01 Aug 19:30
Miguel Lopez01 Aug 19:31
#consider. Stronger hooks for engaging cover?
07.21.2016 Inspection. Punch List. R1 pg. 21
Miguel Lopez01 Aug 19:47
#6 - Wood finishes pending
CeaBermudez primero 2-ANEXO 2 R1
Priority 2 | Miguel Lopez | VESTIDOR A | CeaBermudez primero 2-ANEXO 2R1
Task messages (time in PDT)
Miguel Lopez01 Aug 19:29
Wood finishes pending
Miguel Lopez01 Aug 19:29
Miguel Lopez01 Aug 19:29
07.21.2016 Inspection. Punch List. R1 pg. 22
#40 - Fish mouths btw base board and wAll.
cb sk21
Priority 2 | Miguel Lopez | ZN BASE BOARD | cb sk21 | #consider.
Task messages (time in PDT)
Miguel Lopez02 Aug 10:16
Miguel Lopez02 Aug 10:19
Fish mouths btw base board and wAll.
Miguel Lopez02 Aug 10:19
#consider. Sealing top with fillet bead.
#41 - Base board detail at bottom of trim.
cb sk21
Priority 2 | Miguel Lopez | ZN BASE BOARD | cb sk21 | #pending.
Task messages (time in PDT)
Miguel Lopez02 Aug 10:17
Base board detail at bottom of trim. #pending.
Miguel Lopez02 Aug 10:17
07.21.2016 Inspection. Punch List. R1 pg. 23
#42 - Base tile at bathroom doors.
cb sk21
Priority 2 | Miguel Lopez | ZN BASE BOARD | cb sk21 | #pending
Task messages (time in PDT)
Miguel Lopez02 Aug 10:18
Base tile at bathroom doors. #pending
Miguel Lopez02 Aug 10:18
#32 - Inconsistent finishes at perimeter trim.
cb sk21
Priority 2 | Miguel Lopez | ZN CABINETRY | cb sk21 | #UticaClaims
Task messages (time in PDT)
Miguel Lopez01 Aug 20:15
Miguel Lopez02 Aug 06:37
Inconsistent finishes at perimeter trim.
Miguel Lopez02 Aug 06:37
Finish color not uniform.
Miguel Lopez02 Aug 06:38
#UticaClaims it was not uniform originally.??
07.21.2016 Inspection. Punch List. R1 pg. 24
Miguel Lopez02 Aug 06:39
Finish should be uniform and match all other wood withinsight.
#35 - Poor tooling at joint btw stones
cb sk21
Priority 1 | Miguel Lopez | ZN COCINA | cb sk21
Task messages (time in PDT)
Miguel Lopez02 Aug 08:26
Poor tooling at joint btw stones
Miguel Lopez02 Aug 08:26
#36 - Cabinet infill above dish washer pending
cb sk21
Priority 1 | Miguel Lopez | ZN COCINA | cb sk21
Task messages (time in PDT)
Miguel Lopez02 Aug 08:27
Cabinet infill above dish washer pending
07.21.2016 Inspection. Punch List. R1 pg. 25
#31 - Inconsistente Joint width between cabinet side and wall.
cb sk21
Priority 1 | Miguel Lopez | ZN COCINA | cb sk21 | #consider.
Task messages (time in PDT)
Miguel Lopez01 Aug 20:15
Miguel Lopez01 Aug 20:15
Miguel Lopez02 Aug 06:36
Inconsistente Joint width between cabinet side and wall.
Miguel Lopez02 Aug 06:36
#consider. Sealing or providing trim?
#37 - Joints btw exhaust hood and wall are pending...Priority 2 | Miguel Lopez | ZN COCINA | cb sk21
Task messages (time in PDT)
Miguel Lopez02 Aug 08:29
Joints btw exhaust hood and wall are open,...
Miguel Lopez02 Aug 08:29
Pending directions on tiling
07.21.2016 Inspection. Punch List. R1 pg. 26
Miguel Lopez02 Aug 08:30
#38 - Exterior trim replacement pending
cb sk21
Priority 2 | Miguel Lopez | ZN COCINA | cb sk21
Task messages (time in PDT)
Miguel Lopez02 Aug 08:30
Exterior trim replacement pending
Miguel Lopez02 Aug 08:30
07.21.2016 Inspection. Punch List. R1 pg. 27
#34 - Head board installed.
cb sk21
Priority 1 | Miguel Lopez | ZN DORMITORIO | cb sk21
Task messages (time in PDT)
Miguel Lopez02 Aug 06:33
Head board installed.
Miguel Lopez02 Aug 06:33
Miguel Lopez02 Aug 06:33
Insufficient support at center.
Miguel Lopez02 Aug 06:34
Miguel Lopez02 Aug 06:34
Note fish mouth in joint with wall
Miguel Lopez02 Aug 06:35
07.21.2016 Inspection. Punch List. R1 pg. 28
Miguel Lopez02 Aug 06:35
Additional anchors/hooks required.
#43 - Radiator cover yet to be re installed.
cb sk21
Priority 2 | Miguel Lopez | ZN DORMITORIO | cb sk21
Task messages (time in PDT)
Miguel Lopez02 Aug 10:22
Miguel Lopez02 Aug 10:23
Radiator cover yet to be re installed.
Miguel Lopez02 Aug 10:23
Note SPALLS at anchors due to insufficient edge distance
#30 - Base board around "gabinete" yet to be finished.
cb sk21
Priority 2 | Miguel Lopez | ZN DORMITORIO | cb sk21
Task messages (time in PDT)
Miguel Lopez01 Aug 20:13
07.21.2016 Inspection. Punch List. R1 pg. 29
Miguel Lopez01 Aug 20:14
Miguel Lopez03 Aug 07:34
Base board around "gabinete" yet to be finished.
Miguel Lopez03 Aug 07:35
Fish mouth between baseboard and flooring.
#44 - Lack of tape at seams of plastic covers over furniture.
cb sk21
Priority 1 | Miguel Lopez | ZN SALON | cb sk21 | #UticaProposed.
Task messages (time in PDT)
Miguel Lopez02 Aug 10:24
07.21.2016 Inspection. Punch List. R1 pg. 30
Miguel Lopez02 Aug 10:24
Miguel Lopez02 Aug 10:24
Miguel Lopez02 Aug 10:25
07.21.2016 Inspection. Punch List. R1 pg. 31
Miguel Lopez02 Aug 10:25
Miguel Lopez02 Aug 10:40
Lack of tape at seams of plastic covers over furniture.
Miguel Lopez02 Aug 10:41
Plastic film thickness seemed insufficient.
Miguel Lopez02 Aug 10:41
#UticaProposed. Wrapping them in film.
#33 - Marble top yet to be installed.
cb sk21
Priority 2 | Miguel Lopez | ZN SALON | cb sk21
Task messages (time in PDT)
Miguel Lopez01 Aug 20:16
Miguel Lopez02 Aug 06:32
Marble top yet to be installed.
07.21.2016 Inspection. Punch List. R1 pg. 32
#39 - Height 180.
cb sk21
Priority 3 | Miguel Lopez | ZN SALON | cb sk21 | #ck
Task messages (time in PDT)
Miguel Lopez02 Aug 08:31
Height 180. #ck
Miguel Lopez02 Aug 08:31
07.21.2016 Inspection. Punch List. R1 pg. 33
cb sk21
07.21.2016 Inspection. Punch List. R1 pg. 34
31
5
4
252
46
25
28
2949
51
15
14
8
10
50
53
21
4524
23
22
471911
12
13
20
17
9
187
6
4041
42
32
35
36
31
37
38
34
43
30
44
33
39