CB4Formation Architects
SK(0)28_rev02 - Phasing Plan
R2
S1
O13
O14
O15
O16O17
4+1
8+16+1
O9
O10
O11
4
4
O12
T1T2
R7
450 parking spaces for NR100 additional parking spaces
328 cycle parking spaces
96 cycle parking spacesHotel
Freightliner
Office Quarter (O8 - O17)
Tree-lined pedestrian / cycle path
Residential Buildings (R1 - R7)
Boulevard
78 Cycle parking spacesStudent Accommodation (S1-S5)
Station squareNew Chesterton station
WATER WORKS
CAMBRIDGEBUSINESS PARK
WATER WORKS
LAFARGE
Access to Lafarge site
Tree-lined boulevard with open drain between lanes
Guided bus drop offCanopy
Guided bus turning circle
NR storage area
CHESTERTON
5+1
5+1
HOTEL
Family Quarter (T1 - T8)
4
4
O8
4
4
4
4
4
4
R3
4+1
R44+1
R54+1
R6
4+1
S2
5+1
S3
5+1
S4
5+1S5
T3T4
T5T6
T7T8
Pedestrian/cycle link Nature
Reserve
Shirley School
Allotments
Central Park
Pedestrian/cycle link to River Cam
Phase 1 - End 2016
Phase 2 - End 2017
Phase 3 - End 2018
Phase 4 - End 2019
Phase 5 - End 2020
Key:
CSR office (35,000sqft)(4+1 floors)140 CSR parking spaces
Potential 20m easement for trunk sewer