ADVANCED COATINGS TECHNOLOGY

Case History

Hessen Road Bridge, Deck WaterproofingCasco, Michigan

INTRODUCTION

St. Clair County Road Commission endorses pavement

preservation as a planned system for treating pavements

at the optimum time to maximize their useful life.

Bridge deck waterproofing is another line of defense

to protect the county bridge assets. Wasser and the

Road Commission installed Polyflex Hand Applied

Waterproofing Membrane on Hessen Road Bridge

in Casco, MI. The Commission was looking for a high

performance membrane that can be installed with their

existing work force.

The membrane is a three coat system with an easy 1:1

mix ratio for all components. The membrane process can

be completed in one day.

OWNERSaint Clair County Road

Commission

PROJECT

Bridge Deck

Waterproofing

CONTRACTORInstalled by County

Workforce

STRUCTURE

Concrete Box Beam Bridge

SUBSTRATE

Precast Concrete

APPLICATION METHOD

Rolled 1 coat of Wasser

Polyflex 111 PU Primer

and squeegeed 2 coats

Wasser Polyflex 57

DIMENSIONS

30’x57’

PROJECT DATE2017

SUBSTRATEPrecast Concrete