Henderson DUSEL Conceptual Design
Mark Kuchta Mining Engineering Department
Colorado School of Mines
Lee Petersen, CNA Consulting EngineersGreg Hulne, Miller Dunwiddie Architects
Dale Holland, Dunham AssociatesJohn Jenkins, ILF
Craig Covil, ARUP
2
Capst
one W
ork
shop
Engineering Design Team
Colorado School of Mines: Mark Kuchta, Scott Kieffer, (Mining Engineering, Geotechnical Engineering)
Henderson Mine: Chip deWolfe, +
Staff (Mining Engineering, Safety)
CNA Consulting Engineers: Lee Petersen(Engineering Team Leader, Civil Engineering)
Dunham Associates: Dale Holland(Mechanical/Electrical Engineering)
Miller Dunwiddie Architecture: Greg Hulne(Architect)
ILF Consultants: John Jenkins(Internal Shaft Design)
ARUP:(Cost review, construction management plan)
3
Capst
one W
ork
shop
Conceptual Design Overview
•Shared Mine Infrastructure
•Mine Services Summary
•Rock Conditions
•DUSEL Access Ramps
•Campus Layouts (Upper, Central, Lower,
Outposts)
•Development Sequence
•System Design
•Fire and Life Safety Concepts and Code
Review
•Surface Facilities
4
Capst
one W
ork
shop
Shared Mine Infrastructure
Overriding design criteria
•Safety
•Share infrastructure that is of benefit to share
•Keep the DUSEL and mine operations as separate as possible
5
Capst
one W
ork
shop
Site Overview
6
Capst
one W
ork
shop
Shared Mine Infrastructure
Ventilation
•150,000 cfm available for DUSEL
Electricity
•14 MW with 14MW backup available for DUSEL.
Mine Dewatering
•About 3000 gpm pumping capacity available for DUSEL
•DUSEL estimated need 500 gpm
URAD Water Treatment
•About 2000 gpm in excess capacity available for DUSEL
7
Capst
one W
ork
shop
Shaft Schedule: Man Cage
Double Deck Man Cage
•Capacity 100 people•Overall availability about 93.5%•Normally available 24/7
Service Cage•Capacity 100 People•30 Ton capacity•Sling 50 tons with crosshead•Cage – 23 ft. long X 8.5 ft Wide X 13 ft high
•Can move DUSEL supplies at 1140 tons/week to 7500 tons/week depending on shift schedule used.
(SNOLab: 336 tons/week)
8
Capst
one W
ork
shop
Rock Handling System
80 ton trucks dump rock at crusher.
Gyratory crusher reduces to –4 in.
1 mile PC1 and 10.5 mile long PC2 underground conveyors.
4 mile long PC3 surface conveyor to mill site.
•40,000 tons per day capacity
•Mine currently producing about 30,000 tons per day
•Maximum planned DUSEL production 3,000 tons per day
•DUSEL rock will be dumped at the crusher on the 7065 level,
•A fee ($/ton) will be charged for rock removal
9
Capst
one W
ork
shop
Henderson DUSEL Layout
Central Campus Elev. 6800 ft, (4300 mwe)
Midway CampusElev. 5850 ft, (5100 mwe)
Lower CampusElev. 4900 ft. (5800 mwe)
Internal Shaft
Access Ramps
EarthLab/GeoscienceArea
Silver PlumeGranite
Silver PlumeGranite
Urad Porphyry
7065 Level
7500 Level
Shaft
Red Mountain Porphyry
Henderson Granite
Primos
Porphyry
Henderson Orebody
Harrison MountainElev. 12,300 ft
Red MountainElev. 12,300 ft
1st Drill Hole
2nd Drill Hole
10
Capst
one W
ork
shop
RQD DUSEL Exploration Hole 001
Section
Plan
RQD90-10075-9050-7525-50< 25
Average RQD = 92 (Very Good)Three < 10 ft fracture zones
11
Capst
one W
ork
shop
LA Ramp
Primary Access Ramp
Central CampusElev. 6,800 ft(4300 mwe)
Secondary Access Ramp
PC2 Conveyor to Mill Site
7065 LevelCrusher
7500 shaft station
DC1 Ramp
7625 shaft station
PC1 Conveyor
Dedicated Exhaust Drift
Exhaust air
Fresh air
Henderson DUSEL Central Campus Access
12
Capst
one W
ork
shop
Access Ramps
Central Campus Elev. 6800 ft
Midway Campus Elev. 5850 ft
Lower Campus Elev. 4900 ft
EarthLab/GeoscienceArea
7500 Level
7065 Level
Internal Shaft 2nd Drill Hole
1st Drill Hole
Secondary Access Ramp
Primary Access Ramp
13
Capst
one W
ork
shop
Ramps
Central Campus Elev. 6800 ft
Primary Access Ramp(to main shaft)
Ramp to Midway Campus
Secondary Access Ramp(to crusher)
Internal Shaft
Exhaust Drift
14
Capst
one W
ork
shop
Internal Shaft (winze) – Top at Central Campus
•20 ft diameter
•Concrete lined
•Capacity 5 ton
•Capacity 20 people
•Sink top down
•Keep sinking bucket for hoisting Lower Campus excavation rock
15
Capst
one W
ork
shop
Shaft Cross Section
16
Capst
one W
ork
shop
Access Ramp Cross Sections
Muck Haulage Shipping Container
17
Capst
one W
ork
shop
Upper Campus Layout
8100 Shop(2500 mwe)
7500 Level(3300 mwe)
#2 Shaft
Ventilation Shaft
Mining Area
PC2 Conveyor to Mill Site
18
Capst
one W
ork
shop
Upper Campus Layout
19
Capst
one W
ork
shop
Central & Lower Campus Isometric
20
Capst
one W
ork
shop
Central & Lower Campus Building Blocks
21
Capst
one W
ork
shop
Central Campus Layout
22
Capst
one W
ork
shop
Central Campus Layout w/ Large Multi-Purpose Detector
23
Capst
one W
ork
shop
Lower Campus
24
Capst
one W
ork
shopInfrastructure Design Life Criteria
• Suggested initial design life (capacity only)• Lab life—50? years
• Drift cross section—sized for full expansion
• Duct size—20 years
• Power conductors—20 years
• Power transformers—10 years
• Chiller piping—20 years
• Chiller plant—10 years
• Communications—10 years
25
Capst
one W
ork
shop
Lab vs. Infrastructure Development Plan
Lab Infrastructure
Day 1
Year 5
Year 10
Year 20
Year 300
2
4
6
8
10
12
0 5 10 15 20 25 30 35
Year
La
b &
In
fra
str
uc
ture
Siz
e
Lab Infrastructure
26
Capst
one W
ork
shop
Development Sequence
27
Capst
one W
ork
shop
Fire & Life Safety Concept
28
Capst
one W
ork
shopLower Campus FLS Provisions
29
Capst
one W
ork
shopLower Campus FLS Provisions
30
Capst
one W
ork
shop
Fire & Life Safety Next Steps
• Meeting with MSHA and OSHA Regional offices on March 30, 2006
• Meeting with Clear Creek County building code officials on March 31, 2006
• Objective—MOU defining jurisdictions, codes, etc.
31
Capst
one W
ork
shop
Henderson DUSEL System Design
• Ventilation System
• Electrical System
• Incl. redundant, backup and emergency systems
• Fire and Life Safety
• Compartmentalization
• Monitoring & alarm
• Fire suppression
• Fire separations
• Egress routes & exit indicators
• Security stations
• Refuge Chambers
• Evacuation Routes
• Water & Wastewater Systems
• Data Systems
• Personnel control
• Control room w/ CCTV
• Cameras
• Personnel monitors
• Paging system
• Emergency & rescue systems
• Ambulance & fire truck
• Emergency cabinets
• Blast doors
32
Capst
one W
ork
shopSystem Conceptual Design
• Basic services:• Provided to occupied Upper, Central and Lower campus
areas
• Power, air, potable water, fiber communications, lighting, emergency safety systems and selected drainage
• Ventilation systems:• Provided to Upper, Central & Lower Campuses
• Basic normal and emergency ventilation
• Distribution systems
• Central services:• Terminate at the experiment caverns for tenant connections
• Fresh air, chilled water, power, process piping, communications, and safety systems
33
Capst
one W
ork
shop
Ventilation & Cooling Design Criteria
• Virgin rock surface temperatures:• 90°F at upper campus
• 107°F at central campus
• 142°F at lower campus
• Projection of bore hole temperature readings
• Heat transfer coefficient• 0.098 Btu / hr-ft2 -°F after 720 days
• Based upon published data
• Mine ventilation air• Supplied to the central campus at 78°F
34
Capst
one W
ork
shop
Ventilation Systems
• Access & egress tunnel ventilation
• Normal Upper, Central & Lower campus ventilation• Interconnecting drifts ventilated using mine air (no A.C.)
• Caverns have conditioned air (chilled water coils, electric heating coils to control humidity, filtration)
• Clean space ventilation system
• Safety ventilation systems• Compartmentalization smoke ventilation
• Smothering gas ventilation
• Central exhaust system
• Special exhaust system• Special process exhaust, toilets, flammable liquid, etc.
• 10,000 cfm each at Central & Lower Campus
35
Capst
one W
ork
shop
Cooling
• Each campus will have a chilled water loop
• Estimated Immediate Cooling Load• Upper Campus 25 Tons
• Central Campus 85 Tons
• Lower Campus 175 Tons
• Estimated Future Cooling Load• Upper Campus 90 Tons
• Central Campus 395 Tons
• Lower Campus 430 Tons
36
Capst
one W
ork
shop
Plumbing
• Water systems• Potable via bottles
• Non potable from mine system, stored in tanks
• Sanitary waste• Lift station to a holding tank, periodic transfer to surface
• Gray water• 500 gpm total flow
• Sumps at Central, Midway and Lower Campus
• Pumped into the Henderson mine water system
37
Capst
one W
ork
shop
Process Utilities & Fire Protection System
• Process utilities• Central nitrogen gas system
• Compressed gas system
• Clean dry compressed air
• Cryogen relief
• De-ionized water system
• Fire protection system• Each campus will have a wet pipe sprinkler system
• Drift standpipe systems
• Fire protection water storage tanks
38
Capst
one W
ork
shop
Lighting
• Normal lighting• Caverns 30 foot-candles (either metal halide or fluorescent
depending upon height)
• Office, lunch, shops at 50 fc
• Miscellaneous at 20 fc
• Egress routes at 1 fc
• Emergency lighting
39
Capst
one W
ork
shop
Power
• New feed from the surface at 13,800 V
• Unit substations at each campus• 277/480V for lighting & power to mechanical systems
• 120/208V for receptacles
• Demand• All campuses, immediate: 2975 kVA
• All campuses, future increment: 3990 kVA
• All campuses, total: 6965 kVA
40
Capst
one W
ork
shop
Emergency Systems
• Emergency power
• Fire alarm system
• Surveillance cameras
• Access control
• Security
• Duress alarm
• Asset locator
• Personnel emergency device & tracking
41
Capst
one W
ork
shop
Communications
• Backbone cabling• Single-mode fiber
• 10-gigabit Ethernet
• 192 strands of fiber from surface and to each campus
• Campus cabling• Category 6 unshielded twisted pair
42
Capst
one W
ork
shop
Site Placement
• Visitor Center – Interface with Public
• Parking – Relationship to Office
• Offices, Laboratories, Warehouse and Shops – Achieve a campus grouping of buildings
• Dormitory & Cafeteria - Location to be determined, near campus
• Future Expansion - Post Mine closure
43
Capst
one W
ork
shop
Surface Buildings
• Surface Building Program• Visitor’s Center total 50,000 sf to yr 15 30,000 sf
• Admin/Offices/Laboratories total 85,000 sf to yr 15 65,000 sf
• Dormitory & Cafeteria total 35,000 sf to yr 15 35,000 sf
• Assembly, Shops & Storage total 25,000 sf to yr 15 25,000 sf
• Existing Facilities (available after about 2026)• Office Building 87,759 sf
• Surface Shop 26,000 sf
• Shaft Hoist House 9,600 sf
• Surface Warehouse 14,000 sf
• Building reuse issues• DUSEL program needs & phased buildout
• Existing building locations