MTA Metro-North Railroad 1
Capital ProgramsContracting Opportunities
NYBC Conference May 2016
MTA Metro-North Railroad
MTA Metro-North Railroad 2
• 86 stations in NY State
• 387 route miles and 795 track miles
• 11 shops/yards facilities system-wide
MTA Metro-North Railroad 3
2010 – 2014 Capital Program = $1.5B
Grand Central Terminal, 6.0%
Outlying Stations/Parking, 9.5%
Track, 11.5%
Communication and Signals, 17.7%
Power, 6.8%
Shops and Yards, 19.6%
Miscellaneous, 4.9%
Structures, 5.0%West of Hudson Infrastructure,
3.1%
Rolling Stock, 15.9%
2015 – 2019 Capital Program = $2.3B
Rolling Stock, 22.9%
Grand Central Terminal, 9.0%
Outlying Stations/Parking, 8.3%
Track, 10.3%Structures, 6.5%
West of Hudson Infrastructure, 2.5%
Communications and Signals, 8.3%
Power, 4.3%
Shops and Yards, 20.3%
Miscellaneous, 7.5%
Small Business Development Program
4MTA Metro-North Railroad
Mamaroneck Station ‐ Bicycle ShelterEast View
It boasts a 32‐bike capacity – complementing the previously added 52 spots at the station
– giving customers a total of 84 safe parking spots
To Date Contract Value Number of Projects
SBMP Tier 1 $6.5M 14
Hartsdale Station Building ImprovementsWest Side of Building
The project at Hartsdale improved various station building components to prevent water infiltration through the
roofing systems, windows, and exterior walls.
Tarrytown Parking LotThe scope of work for the renovation of the TarrytownEmployee Parking consists of excavation and compacted backfill forlot, installation of new curbs, concrete island, hybrid solar‐windlighting, and concrete bollards.
5Tarrytown Parking LotWest View
6
Budget $ 2.4MScope This rehabilitation project will overhaul the interior of the station overpass with
• Ticket Office upgraded to include; new millwork, finishes, ceiling tiles, improved lighting, and a new ADA accessible counter and transaction tray
• New air-conditioning system • Upgraded bathrooms. • New wall panels, new floor tiles, new ceiling tiles throughout the station• New stair portals to tracks, and a brighter and more energy efficient LED lighting system• Build a new concession stand
Completion Date
June 2016
Croton Harmon Station
New concession standNew: Wall panels, floor tiles, ceiling tiles throughout the station, stair portals to tracks, and a brighter and more energy
efficient LED lighting system
To Date Contract Value Number of Projects
SBMP Tier 2 $2.4 M 1
6MTA Metro-North Railroad
MTA Metro-North Railroad 7
2015 – 2019 Commitment Asset Categories
SBMP Tier 1SMBP Tier 2
SBFP$39 M GCT, Stations, Parking, Structures,
Power, Shops & Yards
Small Business Development Program - Proposed
Grand Central Terminal
Forecast
DESCRIPTION Year Budget Range ($ millions)
Current YearGCT PA /VIS Head End, Big Boards and Display - Design-Build Q1 2017 $10-$50
GCT Train Shed/Tunnel Structure – Program Manager Services Q4 2016 $5-$10
Future YearsGCT Train Shed/Tunnel Structure (including Roof Expansion Joints) –Construction Services 2017-2019 $100-$150
8MTA Metro-North Railroad
MTA Metro-North Railroad 9
GCT Train Shed/Tunnel
MTA Metro-North Railroad 10
Prior condition of a structural steel member as a result of water seepage
Repaired structural steel member
GCT Train Shed
11
GCT PA /VIS Head End, Big Boards and DisplayExisting Proposed
Big Board Departure Board in the Main Concourse
Arrival/Departure Board in Historic Enclosure
Gateboard
MTA Metro-North Railroad 12
Customer Communications – Outlying Stations
Customer Communications project includes work to deploy the latest customer information technology and provide real-time information through departure boards and announcements.
The work will be split into various packages, grouped by stations.
13
Outlying Stations
Woodlawn Williams BridgeBotanical Garden
Forecast
DESCRIPTION Year Budget Range ($ millions)
Current YearCustomer Communication – Outlying Stations - Design-Build 2017 $10-$50
Enhanced Stations (Crestwood, Harlem-125th St., Port Chester, Riverdale, White Plains) – Design-Build Q4 2016 $5-$10
Port Chester Elevator – Construction Services Q3 2016 $1-$5
Mentoring Program – Harlem-125th St. Station - Construction Services Q4 2016 $1-$5
Future YearsLower Harlem Station Improvements Projects – Design-Build 2017 $10-$50
Upper Harlem Station Priority Repairs Projects 2017 $10-$50
Upper Hudson Station Priority Repairs Projects 2017 $10-$50
14
Track & Structures
6th Ave 14th Ave10th Ave Fulton
Forecast
DESCRIPTION Year Budget Range ($ millions)
Current YearUndergrade Bridge Rehabilitation – Bridge HA 61.06/61.36 Patterson Q4 2016 $10-$50
Rock Slope Remediation (East of Hudson) – Construction Services Q4 2016 $10-$50
Rock Slope Remediation (West of Hudson) – Construction Services Q4 2016 $10-$50
Future YearsUndergrade Bridge Rehabilitation Projects 2017-2019 $10-$50
Overhead Bridge Program (East of Hudson) Projects – Design-Build 2017-2018 $10-$50
MTA Metro-North Railroad
15
Communications & Signals
Synchronous Optical Network MUX Uninterrupted Power Supply
Forecast
DESCRIPTION Year Budget Range ($ millions)
Current YearNetwork Infrastructure Replacement - Materials Q4 2016 $5-$10
Future YearsHarmon to Poughkeepsie Signal Replacement System 2017-2019 $50-$100
Network Infrastructure Replacement - Construction 2017-2018 $10-$50
MTA Metro‐North Railroad
16
Power
Forecast
DESCRIPTION Year Budget Range ($ millions)
Three Substations Replacement (Pelham, Bronxville, Mt. Vernon) 2019 $10-$50
MTA Metro‐North Railroad
Typical Enclosed Substation
17MTA Metro‐North Railroad
Forecast
DESCRIPTION Year Budget Range ($ millions)
Harmon Phase V, Stage II – Design-Build 2018 $250-$500
Shops & YardsCroton-Harmon Main Shop Replacement, Phase V
– Stage II