CALYPSO Project FINAL MEETING PROJECT SEMINAR
University of Malta, Valletta Campus, Old University Building, St Paul Street, Valletta29 August 2013
Beyond CALYPSO – Prospects for the future
Calypso Project Sicilian Focal Point - UNIPA
GIUSEPPE CIRAOLO
FULVIO CAPODICI and ALBA ABBATE
INFO:www.capemalta.net/calypso
FRAMEWORK
1. The installation process of the Pozzallo HF antenna, within the Pozzallo Port was a long and complex task from several point of view
2. More than 15 authorizations have been obtained by ARPA before to start the installation
3. The role of the UNIPA Focal Point was crucial to take care and to follow all these processes (from technical and administrative point of view)
4. All the bureaucratic processes are clear now
5. The experiences and the lessons learnt during last 28 months will be useful in the future to speed up NEW future installations (if any)
The Pozzallo HF installation
The Pozzallo HF antenna completed the CALYPSO HF
network
The installation has been completed on 13th of August
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
first radial map(August 13, 2013)
Some radial map reached the Malta island after few acquisition days
The Pozzallo HF system: first data
The system seems acquiring data correctly (but not calibrated yet)
1) Antenna Pattern Measurements (APM) (ARPA + CUTGANA + Qualitas)
2) Integration and combination of the Pozzallo HF data within the Malta combine station, to produce surface velocities maps on the whole area at hourly scale
3) Drifters release (validation)
4) ADCP survey (validation)
The Pozzallo HF system: actions to be performed
Including the third HF system will:
- Increase the monitored surface
- Improve the data quality and the reliability of the measurements
Expected improvement
The CALYPSO network will be maintained up for at least 5 years During this period CALYPSO data will be useful in:- improving the reliability of sea currents forecasting- oil spill chain response (forecasting of the oil fate and mitigation)
Other applications- search and rescue- sea fishing- boat routing
OIL SPILL MITIGATION
OIL SPILL MITIGATION
INITIAL OIL
SPILL POSITOI
N
INITIAL OIL
SPILL POSITOI
NINITIAL SEA
STATE
INITIAL SEA
STATE
FUTUREOIL SPILL POSITOIN
FUTUREOIL SPILL POSITOIN
FUTURESEA
STATE
FUTURESEA
STATE
FUTUREWEATHE
R
FUTUREWEATHE
R
CALYPSO
REMOTE SENSING
Expected use of the system
Why CALYPSO in the Malta channel
Oil spills in the 1999-2004 period: 18.947 spills
Why CALYPSO in the Malta channel
Oil spills in the 1999-2004 period: 18.947 spills
OIL SPILL MONITORING USING REMOTE SENSING (COSMO-SKYMED)
7– June 2010
-30
-10
-20
-25
-15
°VV (dB)
Low Winds or currents
Suspected oil
29– June 2010
-30
-10
-20
-25
-15
°VV (dB)
Suspected oil
Suspected oil
winds
Winds?
OIL SPILL MONITORING USING REMOTE SENSING (COSMO-SKYMED)
MALTA CHANNEL FROM COSMO-SKYMED
10– Jul. 2010
-30
-10
-20
-25
-15
°VV (dB)
oil
winds Currents or other false positive
9– Aug. 2010
-30
-10
-20
-25
-15
°VV (dB)
Suspected oil
OIL SPILL MONITORING USING REMOTE SENSING (COSMO-SKYMED)
CALYPSO 2: to extend the CALYPSO coverage 3 hypotheses for the next HF system position
Scoglitti Gela Licata
Future expansion of the System
Advantages: redundancy increased coverage better quality of the maps
Future expansion of the System
DREAMING A FULL HF COVERAGE FOR THE SICILIAN COAST
Future expansion of the System
Meeting a Ragusa21Novembre 2011
Conclusions
• The system management for the next 5 year will require a certain effort from economical point of view (and not only)
• An amount of 8-10 thousand € per year is required to maintain the Pozzallo system (frequency authorization, insurance, system maintenance, energy supply, internet connection)
• Periodic field survey would be needed to test the accuracy of the system
• An agreement on the use of the data by external customer is needed
• New funds have to be found to finance and expand the network
INFO:www.capemalta.net/calypso
Meeting a Ragusa21Novembre 2011
Acknowledgements
For their support to the project I sincerely thank:• All the project sicilian partners (ARPA,CNR,CUTGANA) • Dr. Aldo Vernengo of the Demanio Marittimo – Regione
Siciliana• Cdr Paolo Cafaro and Cdr Marco Mancini of the Comando
Generale Guardia Costiera - ROME• Cdr Andrea Tassara and Capt. Marco Tognazzoni of the
Capitaneria di Porto di Pozzallo• Dr. Giovanni Arnone and Dr. Vincenzo Falgares of the
Regione Siciliana• The STC and ADG staff
INFO:www.capemalta.net/calypso
Acknowledgements
And last but not least… my special thank to these two guys…
INFO:www.capemalta.net/calypso
ALBA
.. because their inexhaustible energy, effort and perseverance
FULVIO
Meeting a Ragusa21Novembre 2011
CALYPSO Project FINAL MEETING PROJECT SEMINAR
University of Malta, Valletta Campus, Old University Building, St Paul Street, Valletta29 August 2013
THANKS FOR LISTENING
GIUSEPPE [email protected]
INFO:www.capemalta.net/calypso