OUTLINE
HISTORY OF THE ARCHITECTURAL PROFESSION
INFUSION AND DEVELOPMENT OF TECHNOLOGY
IMPACT TECHNOLOGY HAS ON THE PROFESSION
ADDITIONAL FACETS THE TECHNOLOGY OFFERS
WHAT THE FUTURE MAY HOLD...
Monday, March 26, 12
HISTORY
Monday, March 26, 12
“ARCHITECT”
LATIN:ARCHITECTURA
GREEK:ARKHITEKTON
“CHIEF BUILDER, CARPENTER,
MASON”
Monday, March 26, 12
TIMELINE
4000 BC 2000 AD
Monday, March 26, 12
TIMELINE
4000 BC 2000 AD
CA
D (
198
0) >
< B
IM (
200
0)
MASTER BUILDER
ARCHITECT+
CONTRACTOR
Monday, March 26, 12
TECHNOLOGY
Monday, March 26, 12
CAD
WAS INTRODUCED AS EARLY AS THE 1960’S BUT DID NOT BECOME WIDELY USED UNTIL THE 1980’S
ALLOWED EASY REPRODUCTION
ALLOWED EASY REVISIONS
WAS MORE ACCURATE THAN HAND-DRAFTING
MUCH LESS ARCHIVAL SPACE WAS REQUIRED
FILES COULD BE USED IN MACHINING/FABRICATION
Monday, March 26, 12
DRAFTER 1 DRAFTER 2
DRAFTER 3 DRAFTER 4
Monday, March 26, 12
LEGACY DELIVERABLES
Monday, March 26, 12
“3D”
ALLOWED ARCHITECTS TO EASILY COMMUNICATE WITH CLIENTS AND CONTRACTORS
ALLOWED MULTIPLE VIEWS
ALLOWED EASY REVISIONS
DID NOT CONTAIN PERTINENT INFORMATION
DID NOT PRODUCE CONSTRUCTION DOCUMENTS
Monday, March 26, 12
Monday, March 26, 12
BIM
PUTS THE EMPHASIS ON THE VIRTUAL MODEL RATHER THAN DOCUMENTATION
CONSTRUCTION DOCUMENTS ARE PRODUCED FROM THE VIRTUAL MODEL
VIEWS ARE LINKED AND DATA IS CONSISTENT
CHANGES ARE UNIVERSAL
INSTANT FEEDBACK
ALL INFORMATION CONTAINED IN A SINGLE DATABASE
Monday, March 26, 12
BUILDING DESIGN COURTESY OF DLA, LTD. © 2011
Monday, March 26, 12
BUILDING DESIGN COURTESY OF DLA, LTD. © 2011
Monday, March 26, 12
BUILDING DESIGN COURTESY OF DLA, LTD. © 2011
Monday, March 26, 12
BUILDING DESIGN COURTESY OF DLA, LTD. © 2011
Monday, March 26, 12
BUILDING DESIGN COURTESY OF DLA, LTD. © 2011
Monday, March 26, 12
IMPACT
Monday, March 26, 12
CHANGES
SHIFTING OF WORKFLOW BASED ON EXPERTISE
SHIFTING OF WORK LOAD
NEED TO (RE)DEFINE SCOPE OF WORK AND CONTRACTS
DEMAND ON COMPUTER HARDWARE AND SOFTWARE
DEMAND ON (NETWORK) CONNECTIVITY
Monday, March 26, 12
0
12.5
25
37.5
50
SD DD CD CA
CAD BIM
Monday, March 26, 12
MACLEAMY CURVEPATRICK MACLEAMY, FAIA
Monday, March 26, 12
LEVELS OF DEVELOPMENT
LEVEL 100 - CONCEPTUAL DESIGN. BASIC MASSING AND PROGRAMMING. VOLUMES ARE DEFINED BUT HAVE NO SUBDIVISIONS.
LEVEL 200 - DESIGN DEVELOPMENT. CIRCULATION, BUILDING COMPONENTS, AND SYSTEMS ARE DEFINED.
LEVEL 300 - CONSTRUCTION DOCUMENTS. ELEMENTS ARE DEFINED AND ALL NECESSARY INFORMATION FOR CONSTRUCTION IS PRESENT.
LEVEL 400 - FABRICATION. ALL INFORMATION REQUIRED TO FABRICATE OR INSTALL COMPONENTS IS INCLUDED.
LEVEL 500 - AS-BUILT. THIS IS A COMPLETE DOCUMENTATION OF NOT WHAT WAS PROPOSED, BUT ACTUALLY INSTALLED.
Monday, March 26, 12
COLLABORATION
MODELER 2 MODELER 1 MODELER 3
Monday, March 26, 12
COMPONENTS
2D (PLANS, ELEVATIONS, SECTIONS, DETAILS)
3D (VIRTUAL MODELS WITH X, Y, Z DIMENSIONS)
4D (TIME)
5D (COST)
6D (SUSTAINABILITY)
7D (FACILITY MANAGEMENT)
Monday, March 26, 12
TIMELINE
4000 BC 2000 AD
MASTER BUILDER
ARCHITECT+
CONTRACTOR
IPD
Monday, March 26, 12
Monday, March 26, 12
CAPABILITIES
Monday, March 26, 12
BENEFITS
IMMEDIATE VISUAL FEEDBACK TO CLIENTS
IMMEDIATE QUANTITATIVE FEEDBACK TO CLIENTS
IMMEDIATE QUANTITATIVE FEEDBACK TO CONTRACTORS
CONFLICT RESOLUTION BEFORE CHANGE ORDERS
COORDINATED DRAWINGS, DETAILS, SCHEDULES
Monday, March 26, 12
BUILDING DESIGN COURTESY OF DLA, LTD. © 2011
Monday, March 26, 12
ADDITIONAL FACETS
ENERGY MODELING
COST ESTIMATING
SPECIFICATION WRITING
FACILITY MANAGEMENT
FEASIBILITY STUDIES
MATERIAL TAKE-OFFS
ETC...
Monday, March 26, 12
FUTURE
Monday, March 26, 12
Monday, March 26, 12
Monday, March 26, 12
Monday, March 26, 12
Monday, March 26, 12
CONCLUSION
WE HAVE SEEN A SHIFT AWAY FROM THE “MASTER BUILDER” BUT ARE STARTING TO SEE A MOVE BACK IN THAT DIRECTION
BIM TECHNOLOGY GOES FAR BEYOND TRADITIONAL BUILDING DOCUMENTATION
BIM TECHNOLOGY ALLOWS US TO DESIGN BUILDINGS WE COULD NOT WITH TRADITIONAL MEANS
THE POSSIBILITIES ARE ENDLESS ONCE A VIRTUAL MODEL/DATABASE HAS BEEN CREATED