“Building a Regional 100G Collaboration Infrastructure”
Keynote Presentation
CineGrid International Workshop 2015
Calit2’s Qualcomm Institute
University of California, San Diego
December 11, 2015
Dr. Larry SmarrDirector, California Institute for Telecommunications and Information Technology
Harry E. Gruber Professor, Dept. of Computer Science and Engineering
Jacobs School of Engineering, UCSDhttp://lsmarr.calit2.net 1
Vision: Creating a West Coast “Big Data Freeway” Connected by CENIC/Pacific Wave to Internet2 & GLIF
Use Lightpaths to Connect All Data Generators and Consumers,
Creating a “Big Data” FreewayIntegrated With High Performance Global Networks
“The Bisection Bandwidth of a Cluster Interconnect, but Deployed on a 20-Campus Scale.”
This Vision Has Been Building for 25 Years
Interactive Supercomputing End-to-End Prototype: Using Analog Communications to Prototype the Fiber Optic Future
“We’re using satellite technology…to demo what It might be like to have high-speed fiber-optic links between advanced computers in two different geographic locations.”― Al Gore, Senator
Chair, US Senate Subcommittee on Science, Technology and Space
Illinois
Boston
SIGGRAPH 1989“What we really have to do is eliminate distance between individuals who want to interact with other people and with other computers.”― Larry Smarr, Director, NCSA
NSF’s OptIPuter Project: Using Supernetworks to Meet the Needs of Data-Intensive Researchers
OptIPortal– Termination
Device for the
OptIPuter Global
Backplane
Calit2 (UCSD, UCI), SDSC, and UIC Leads—Larry Smarr PIUniv. Partners: NCSA, USC, SDSU, NW, TA&M, UvA, SARA, KISTI, AIST
Industry: IBM, Sun, Telcordia, Chiaro, Calient, Glimmerglass, Lucent
2003-2009 $13,500,000
In August 2003, Jason Leigh and his
students used RBUDP to blast data from NCSA to SDSC
over theTeraGrid DTFnet,
achieving18Gbps file transfer out of the available 20Gbps
LS Slide 2005
Integrated “OptIPlatform” Cyberinfrastructure System:A 10Gbps Lightpath Cloud
National LambdaRail
CampusOpticalSwitch
Data Repositories & Clusters
HPC
HD/4k Video Images
HD/4k Video Cams
End User OptIPortal
10G Lightpath
HD/4k TelepresenceInstruments
LS 2009 Slide
So Why Don’t We Have a NationalBig Data Cyberinfrastructure?
“Research is being stalled by ‘information overload,’ Mr. Bement said, because data from digital instruments are piling up far faster than researchers can study. In particular, he said, campus networks need to be improved. High-speed data lines crossing the nation are the equivalent of six-lane superhighways, he said. But networks at colleges and universities are not so capable. “Those massive conduits are reduced to two-lane roads at most college and university campuses,” he said. Improving cyberinfrastructure, he said, “will transform the capabilities of campus-based scientists.”-- Arden Bement, the director of the National Science Foundation May 2005
DOE ESnet’s Science DMZ: A Scalable Network Design Model for Optimizing Science Data Transfers
• A Science DMZ integrates 4 key concepts into a unified whole:– A network architecture designed for high-performance applications,
with the science network distinct from the general-purpose network
– The use of dedicated systems for data transfer
– Performance measurement and network testing systems that are regularly used to characterize and troubleshoot the network
– Security policies and enforcement mechanisms that are tailored for high performance science environments
http://fasterdata.es.net/science-dmz/
Science DMZCoined 2010
The DOE ESnet Science DMZ and the NSF “Campus Bridging” Taskforce Report Formed the Basis for the NSF Campus Cyberinfrastructure Network Infrastructure and Engineering (CC-NIE) Program
Creating a “Big Data” Freeway on Campus:NSF-Funded CC-NIE Grants Prism@UCSD and CHeruB
Prism@UCSD, Phil Papadopoulos, SDSC, Calit2, PI (2013-15)CHERuB, Mike Norman, SDSC PI
CHERuB
A UCSD Integrated Digital Infrastructure Project for Big Data Requirements of Rob Knight’s Lab – PRP Does This on a Sub-National Scale
FIONA12 Cores/GPU128 GB RAM3.5 TB SSD48TB Disk
10Gbps NIC
Knight Lab
10Gbps
Gordon
Prism@UCSD
Data Oasis7.5PB,
200GB/s
Knight 1024 ClusterIn SDSC Co-Lo
CHERuB100Gbps
Emperor & Other Vis Tools
64Mpixel Data Analysis Wall
120Gbps
40Gbps
1.3Tbps
Based on Community Input and on ESnet’s Science DMZ Concept,NSF Has Funded Over 100 Campuses to Build Local Big Data Freeways
2012-2015 CC-NIE / CC*IIE / CC*DNI PROGRAMS
Red 2012 CC-NIE AwardeesYellow 2013 CC-NIE AwardeesGreen 2014 CC*IIE AwardeesBlue 2015 CC*DNI AwardeesPurple Multiple Time Awardees
Source: NSF
The Pacific Research Platform Creates a Regional End-to-End Science-Driven “Big Data Freeway System”
NSF CC*DNI Grant$5M 10/2015-10/2020
PI: Larry Smarr, UC San Diego Calit2Co-Pis:• Camille Crittenden, UC Berkeley CITRIS, • Tom DeFanti, UC San Diego Calit2, • Philip Papadopoulos, UC San Diego SDSC, • Frank Wuerthwein, UC San Diego Physics
and SDSC
What About the Cloud?
• PRP Connects with the 2 NSF Experimental Cloud Grants– Chameleon Through Chicago– CloudLab Through Clemson
• CENIC/PW Has Multiple 10Gbps into Amazon Web Services– First 10Gbps Connection 5-10 Years Ago– Today, Seven 10Gbps Paths Plus a 100Gbps Path
– Peak Usage is <10%– Lots of Room for Experimenting with Big Data
– Interest from Microsoft and Google as well
• Clouds Useful for Lots of Small Data• No Business Model for Small Amounts of Really Big Data• Also Very High Financial Barriers to Exit
PRP Allows for Multiple Secure Independent Cooperating Research Groups
• Any Particular Science Driver is Comprised of Scientists and Resources at a Subset of Campuses and Resource Centers
• We Term These Science Teams with the Resources and Instruments they Access as Cooperating Research Groups (CRGs).
• Members of a Specific CRG Trust One Another, But They Do Not Necessarily Trust Other CRGs
FIONA – Flash I/O Network Appliance:Linux PCs Optimized for Big Data
UCOP Rack-Mount Build:
FIONAs Are Science DMZ Data Transfer Nodes &Optical Network Termination Devices
UCSD CC-NIE Prism Award & UCOPPhil Papadopoulos & Tom DeFanti
Joe Keefe & John Graham
Cost $8,000 $20,000
Intel Xeon Haswell Multicore
E5-1650 v3 6-Core
2x E5-2697 v3 14-Core
RAM 128 GB 256 GB
SSD SATA 3.8 TB SATA 3.8 TB
Network Interface 10/40GbEMellanox
2x40GbE Chelsio+Mellanox
GPU NVIDIA Tesla K80
RAID Drives 0 to 112TB (add ~$100/TB)
John Graham, Calit2’s QI
FIONAs as Uniform DTN End Points
Existing DTNs
As of October 2015
FIONA DTNs
UC FIONAs Funded byUCOP “Momentum” Grant
Ten Week Sprint to Demonstrate the West Coast Big Data Freeway System: PRPv0
Presented at CENIC 2015 March 9, 2015
FIONA DTNs Now Deployed to All UC CampusesAnd Most PRP Sites
PRP Timeline
• PRPv1 (Years 1 and 2)– A Layer 3 System – Completed In 2 Years – Tested, Measured, Optimized, With Multi-domain Science Data– Bring Many Of Our Science Teams Up – Each Community Thus Will Have Its Own Certificate-Based Access
To its Specific Federated Data Infrastructure.
• PRPv2 (Years 3 to 5)– Advanced IPv6-Only Version with Robust Security Features
– e.g. Trusted Platform Module Hardware and SDN/SDX Software
– Support Rates up to 100Gb/s in Bursts And Streams– Develop Means to Operate a Shared Federation of Caches
Why is PRPv1 Layer 3 Instead of Layer 2 like PRPv0?
• In the OptIPuter Timeframe, with Rare Exceptions, Routers Could Not Route at 10Gbps, But Could Switch at 10Gbps. Hence for Performance, L2 was Preferred.
• Today Routers Can Route at 100Gps Without Performance Degradation. Our Prism Arista Switch Routes at 40Gbps Without Dropping Packets or Impacting Performance.
• The Biggest Advantage of L3 is Scalability via Information Hiding. Details of the End-to-End Pathways are Not Needed, Simplifying the Workload of the Engineering Staff.
• Also Advantage of L3 is Engineered Path Redundancy within the Transport Network.
• Thus, a 100Gbps Routed Layer3 Backbone Architecture Has Many Advantages:– A Routed Layer3 Architecture Allows the Backbone to Stay Simple - Big, Fast, and Clean. – Campuses can Use the Connection Without Significant Effort and Complexity on the End Hosts.– Network Operators do not Need to Focus on Getting Layer 2 to Work and Later Diagnosing End-to-
End Problems with Less Than Good Visibility.– This Leaves Us Free to Focus on the Applications on The Edges, on The Science Outcomes, and
Less on The Backbone Network Itself.
These points from Eli Dart, John Hess, Phil Papadopoulos, Ron Johnson, and others
Pacific Research PlatformMulti-Campus Science Driver Teams
• Jupyter Hub• Biomedical
– Cancer Genomics Hub/Browser– Microbiome and Integrative ‘Omics– Integrative Structural Biology
• Earth Sciences– Data Analysis and Simulation for Earthquakes and Natural Disasters– Climate Modeling: NCAR/UCAR– California/Nevada Regional Climate Data Analysis– CO2 Subsurface Modeling
• Particle Physics• Astronomy and Astrophysics
– Telescope Surveys– Galaxy Evolution– Gravitational Wave Astronomy
• Scalable Visualization, Virtual Reality, and Ultra-Resolution Video 19
PRP First Application: Distributed IPython/Jupyter Notebooks: Cross-Platform, Browser-Based Application Interleaves Code, Text, & Images
IJuliaIHaskellIFSharpIRubyIGoIScalaIMathicsIaldorLuaJIT/TorchLua KernelIRKernel (for the R language)IErlangIOCamlIForthIPerlIPerl6IoctaveCalico Project • kernels implemented in Mono,
including Java, IronPython, Boo, Logo, BASIC, and many others
IScilabIMatlabICSharpBashClojure KernelHy KernelRedis Kerneljove, a kernel for io.jsIJavascriptCalysto SchemeCalysto Processingidl_kernelMochi KernelLua (used in Splash)Spark KernelSkulpt Python KernelMetaKernel BashMetaKernel PythonBrython KernelIVisual VPython Kernel
Source: John Graham, QI
PRP Has Deployed Powerful FIONA Servers at UCSD and UC Berkeley to Create a UC-Jupyter Hub 40Gbps Backplane
FIONAs Have GPUs and Can Spawn Jobs to SDSC’s Comet
Using inCommon CILogon Authenticator Module
for Jupyter.Deep Learning Libraries
Have Been InstalledAnd Run on Applications
Source: John Graham, QI
Jupyter Hub FIONA:2 x 14-core CPUs
256GB RAM 1.2TB FLASH
3.8TB SSDNvidia K80 GPU
Dual 40GbE NICsAnd a Trusted Platform Module
Cancer Genomics Hub (UCSC) is Housed in SDSC CoLo:Large Data Flows to End Users at UCSC, UCB, UCSF, …
1G
8G
15G
Cumulative TBs of CGH Files Downloaded
Data Source: David Haussler, Brad Smith, UCSC
30 PB
Large Hadron Collider Data Researchers Across Eight California Universities Benefit From Petascale Data & Compute Resources across PRP
• Aggregate Petabytes of Disk Space & Petaflops of Compute
• Transparently Compute on Data at Their Home Institutions & Systems at SLAC, NERSC, Caltech, UCSD, SDSC
SLACData & Compute
Resource
CaltechData & Compute
ResourceUCSD & SDSC
Data & ComputeResources
UCSB
UCSC
UCD
UCR
CSU Fresno
UCI
Source: Frank Wuerthwein, UCSD Physics;
SDSC; co-PI PRP
PRP Builds on SDSC’s LHC-UC
Project
Two Automated Telescope SurveysCreating Huge Datasets Will Drive PRP
300 images per night. 100MB per raw image
30GB per night
120GB per night
250 images per night. 530MB per raw image
150 GB per night
800GB per nightWhen processed
at NERSC Increased by 4x
Source: Peter Nugent, Division Deputy for Scientific Engagement, LBLProfessor of Astronomy, UC Berkeley
Precursors to LSST and NCSA
PRP Allows Researchersto Bring Datasets from NERSC
to Their Local Clusters for In-Depth Science Analysis-see UCSC’s Brad Smith Talk
Dan Cayan USGS Water Resources Discipline
Scripps Institution of Oceanography, UC San Diego
much support from Mary Tyree, Mike Dettinger, Guido Franco and other colleagues
Sponsors: California Energy Commission NOAA RISA program California DWR, DOE, NSF
Planning for climate change in California substantial shifts on top of already high climate variability
SIO Campus Climate Researchers Need to Download Results from NCAR Remote Supercomputer Simulations
to Make Regional Climate Change Forecasts
Calit2’s Qualcomm Institute Has Established a Pattern Recognition LabInvestigating Using Brain-Inspired Processors
“On the drawing board are collections of 64, 256, 1024, and 4096 chips.
‘It’s only limited by money, not imagination,’ Modha says.”Source: Dr. Dharmendra Modha
Founding Director, IBM Cognitive Computing Group
August 8, 2014
UCSD ECE Professor Ken Kreutz-Delgado Brings the IBM TrueNorth Chip to Calit2’s Qualcomm Institute
September 16, 2015
A Brain-Inspired Cyberinstrument: Pattern Recognition Co-Processors Coupled to Today’s von Neumann Processors
“If we think of today’s von Neumann computers as akin to the “left-brain”
—fast, symbolic, number-crunching calculators, then IBM’s TrueNorth chip
can be likened to the “right-brain”—slow, sensory, pattern recognizing machines.”
- Dr. Dhamendra Modha, IBM Cognitive Computing
www.research.ibm.com/articles/brain-chip.shtml
The Pattern Recognition Laboratory’s Cyberinstrument Will be a PRP Computational Resource
Exploring Realtime Pattern Recognition in Streaming Media& Discovering Patterns in Massive Datasets
Collaboration Between EVL’s CAVE2 and Calit2’s VROOM Over 10Gb Wavelength
EVL
Calit2
Source: NTT Sponsored ON*VECTOR Workshop at Calit2 March 6, 2013
Optical Fibers Link Australian and US Big Data Researchers-Also Korea, Japan, and the Netherlands
Next Step: Use AARnet/PRP to Set Up Planetary-Scale Shared Virtual Worlds
Digital Arena, UTS Sydney
CAVE2, Monash U, Melbourne
CAVE2, EVL, Chicago
The Pacific Research Platform Creates a Regional End-to-End Science-Driven “Big Data Freeway System”