Joint Venture
between
the environmental arm of the Saffelberg group, Belgium
and
investment-construction group, leader in Turkey
– Thermal: 1270MW realised or co-realised– Hydro: 765 MW realised– Geothermal: 48 MW realised, 162 MW in progress– 5 Wind farms for 253MW realised + 70MW by 2013
The Project
• 250 MW wind farm, 780 GWh/year• Cutting-edge technology Gamesa G125-4.5MW• 56 wind turbines in 2 stages• Connection and construction permit obtained• Mandate letter signed with ERBD and IFC• 125MW by beginning 2015• 125MW by end 2016
The location
Environmental Impact
• Avoiding the emission of 688,216.4 T of CO2 per year
• Avoiding the consumption of an equivalent of 477 mln m3 of (imported) gas
• Highest environmental standards
Commitment to Community
• Full support of local communities and republican authorities
• Integration into the strategy for the sustainable development of the district
• Public consultation by international standards• 350 000 € at full operation for economic and
social projects (focus on self-supporting projects), of which 50 000 € in 2013.
Economic and Social Impact
• 220 direct and indirect jobs during construction (until end 2016), including nacelle assembly (local content)
• 50 permanent jobs during operations (>2030)• By 2030 95 mln € of profit taxes and 235 mln €
of VAT
Thank you for your attention
Top Related