Page 1 of 4
Background / Profile:
Construction Management Professional with experience in residential, high-rise, condominium, hospitality, healthcare/laboratory, retail, commercial and theme park construction. Third generation builder that started in the industry as a laborer and has worked as a carpenter, project engineer, estimator, superintendent and project manager. Problem solver and relationship builder with owners, architects/engineers, subcontractors and industry professionals.
Coble Builders LLC2011-current President Multiple Projects/Clients
Responsible for management of Construction Management/General Contracting Firm specializing in Interior Build-outs, Project Organization, Scheduling, Cost Control and Punchlist. First client was Starwood Vacation Ownership at the St. Bal Harbour where our team performed Construction Management services for the Punchlist of over 240 high end residential units. Current projects include several high-end build-outs of residential units at the St. Regis - Bal Harbour.
Bal Harbour, FL
www.coblebuilders.com
Coastal Construction2011 Project Manager SLS South Beach Hotel - Ritz Plaza - Boutique Hotel & Restaraunts Miami Beach, FL
Responsible for all phases of project management for renovation of historic Ritz Plaza Hotel in the South Beach Art Deco District. Project includes over 140 hotel rooms, restaurants, pools and two story annex building and cabanas on the beach.
18+ million
www.slshotels.com/southbeach/
2010 Project Manager University of Miami - Miguel B. Fernandez Entrepreneurship Building - School of Business
Coral Gables, FL
Responsible for project management of preconstruction services and start-up of LEED project at the University of Miami. Responsible for Phase I buyout of Subcontracts and coordination with Owner and Design team to achieve LEED Silver Certification.
Pre-construction
http://www.michaelgraves.com/architecture/project/miguel-b-fernandez-building.html
2009-2010 Project Manager St. Regis Bal Harbour Resort & Residences - Luxury Condominiums Bal Harbour, FLResponsible for project management of all selections and revisions in 268 whole ownership residences across a three tower luxury condominium and pre-construction budgeting, planning, scheduling and construction for all custom units throughout project.
400+ million
www.stregisbalharbour.com
305.970.6618 cell
Brennon "Brent" Coble9703 Collins Avenue, Bal Harbour, FL 33154
Page 2 of 4
2006-2009 Project Manager Trump Dezer Development - Trump Royale - Luxury Condominiums Sunny Isles Beach, FL
Responsible for project management of 52 story luxury condominium tower consisting of 385 units including sitework, garage and hardscapes including elevated pools, fountains and spa. Tower height in excess of 530 foot and includes over 1.1 Million GSF.
165 million
www.trumpgrande.com/trump_royale.htm?M=3
The Clark Construction Group, LLC.
2003-2006 Sr. Project Manager
Johns Hopkins University - School of Medicine - David H. Koch Cancer Research Building (CRB II)
Baltimore, MD
Responsible for all phases of project management of world-class cancer research laboratory building, including supervision of senior M/E/P coordinator, field office manager, quality control manager and three project engineers. The CRB II project is a 272,000 SF structure comprised of 14 stories with interdisciplinary cancer research laboratories, biosafety level 3 (BL-3) laboratories, a full vivarium, and offices supporting the research labs.
72 million
Project received "Best of 2006 Award" for Healthcare and Research Facilities from Mid-Atlantic Construction.
midatlantic.construction.com/projects/MA_BestOf2006.pdf
Project received award for company wide "lowest general conditions" twice (2004 and 2005).
2003-2004 Sr. Project Manager
Johns Hopkins Real Estate - Data Center at Mount Washington Baltimore, MD
Responsible for bidding, purchasing, and project management of 20,000 SF Data Center project in occupied building at Johns Hopkins' Mount Washington Campus. Managed concurrently with the CRB II project.
3.5 million
2001-2003 Project Manager Children's National Medical Center - Multiple Hospital Renovations/Additions
Washington DC
Responsible for bidding, purchasing, and project management of multiple concurrent projects at Children's Hospital including 10,000 SF Cardiac Cath Lab Addition, multi-phased 10,000 SF MRI/CT Scan Suite Renovation, 10,000 SF Animal Research Facility Renovation, Dietary Renovation, and MIS Renovation. All projects required extensive planning around a fully operational hospital. The Cardiac Cath Lab Addition received "Excellence in Construction" award from Associated Builders and Contractors (ABC). The Dietary Renovation project received "Craftsmanship" award from ABC.
12 million
Page 3 of 4
Kelsey Construction
2000-2001 Project Manager Silver Crossings Publix Super Market, Retail Center and Sitework Ocoee, FLChampionsGate Publix Super Market, Retail Center and Sitework Kissimmee, FL
Responsible for concurrent project management of two projects in the Orlando area with a combined 160,000 SF of retail space and 18 acres of sitework.
11 million
1999-2000 Superintendent Middleburg Crossings Publix Super Market, Retail Center and Sitework Middleburg, FLSuperintendent responsible for all field activities of a 44,000 SF Publix Super Market, 30,000 SF Retail Center and 13 acres of sitework. Project included a foundation system of grade beams on top of auger cast piles and geo-grid mesh fabric at all paving/parking surfaces.
5.2 million
1999 Superintendent ITEC II Orlando, FLSuperintendent responsible for construction of 11,000 SF tilt-up concrete panel office building for high-tech/entertainment firm.
1/2 million
1998-1999 Project EngineerUniversal's Islands of Adventures - Toon Lagoon (Universal Studios Orlando)
Orlando, FL
Served as project engineer assisting the Senior Project Superintendent on a 13 acre site with over 500 workers. Responsible for RFI drafting and problem solving by serving as a conduit between the field and design engineers. Recorded meeting minutes and assisted with general field correspondence and resolution of design issues.
120 million
University of Florida1994-1995 Carpenter UF - School of Journalism Gainesville, FL
Served as part-time carpenter responsible for minor carpentry renovations/improvements in 250,000 SF School of Journalism while attending UF.
Kai-Nalu Door and Sash / BJ Mac ConstructionSummer 1992, 1993
Carpenter's Assistant
Multiple Residential Projects Oahu, HI
Carpenter's assistant on renovation of historic 1917 bungalows at Hickam Air Force Base adjacent to Pearl Harbor in Oahu. Assisted with fabrication and installation of wooden doors and windows for multiple high-end residences.
Page 4 of 4
Education: University of Florida, M.E. Rinker School of Building Construction
August 1997 Master of Science in Building Construction with Honors
December 1995 Bachelor of Science in Building Construction with Honors
Licenses: State of Florida - Certified General Contractor - CGC1518552
Organizations / Awards
Inducted into Student Leaders in Construction (Sigma Lamda Chi) Honor Society at University of Florida.Member of the Steering Committee of the Young Constructors Forum of the South Florida Associated General Contractors of America. www.sfagc.org/youngconstructors.php
Training: 2007 Primavera Annual Scheduling ConferenceMultiple Scheduling/CPM Courses/Training ClassesLEED Training Course30 Hour OSHA Course, 10 Hour OSHA CourseBiosafety Level 4 (BL-4) Construction TrainingCPR/First Aid Instructor 1996-1998American Concrete Institute - Grade I Field Technician 1995
Project Management Software e-builderPrologConstructwareOracle - Primavera Contract ManagerExpeditionVela Software on Tablets for PunchlistNumbers on iPad for PunchlistSmartbidnet.com
Accounting Software TimberlineJD Edwards AccountingQuickbooks
Scheduling Software Oracle - Primavera P6 Project ManagementPrimavera Project Planner (P3)SureTrakMicrosoft Project
Administrative Software Microsoft Office Suite - Outlook, Word, Excel, Powerpoint
Top Related